Inspection Date: June 14, 2019
New York State Department of TransportationGeneral Bridge Inspection Report
Structure Information
Postings
Number of Flags Issued New York State Inspection Overview
NBI Superstructure Condition:
NBI Deck Condition:
Federal NBI Ratings
NBI Substructure Condition:
NBI Channel Condition:
NBI Culvert Condition: N
8
8
8
N
Action Items
Inspector & Reviewer Signature Information
Political Unit:
QUEENS
Number of Spans:
Date:
109TH AVENUE
Thomas Matzerath, P.E. 084493-1
City of NEW YORK
This Bridge is not a Ramp
Approximate Year Built:
Review Signature:
11 - NEW YORK CITY
Feature Carried:
General Type Main Span:
County:
2 - NORTHEAST
Region:
2
Stelios Bertos, P.E. 066628-1
Not Posted
Not Posted
July 16, 2019
Posted Vertical Clearances Match Inventory:
678I678IX5M11018
YesPosted Load Matches Inventory:
Inspection Signature:
General Recommendation:
Date:
4 - Steel (Continuous), 02 - Stringer/Multi-Beam or Girder
Feature Crossed:
1948
6
July 16, 2019
Orientation:
Primary Maintenance Responsibility:
Primary Owner:
Red PIA:
Red:
Yellow:
Safety PIA:
0
0
0
0
Vulnerability Reviews Recommended: Collision, Steel
Further Investigation Requested: NO
Diving Inspection Requested: NO
New York State Department of Transportation
12 - State - Subcontracted to another Party
Non-Structural Condition Observations noted: YES
BIN: 1055660
Report Printed: July 25, 2019 12:03:22 PM
Posted Load in field: Not Posted Inventory On:
Inventory Under:
Processed by :
Yes
Page 1 of 25 Format Version 20190124
BIN: 1055660 Bridge Inspection ReportInspection Date: June 14, 2019
Overloads ObservedNo overload vehicles observed during this inspection.
Notes to Next InspectorNone
None
Improvements Observed
Additional Information
Snow FenceNone
Pedestrian Fence Height5'
Bin Plate ConditionOK
Scour Critical RatingN - Bridge not over waterway.
Page 2 of 25 Format Version 20190124
BIN: 1055660 Bridge Inspection ReportInspection Date: June 14, 2019
Field Notes
Staff Present During Inspection
Name Title Organization
Miguel Suriel ATL ATL
Thomas Matzerath TL TL
General Equipment Required for Inspection*
Access Type
13 - Walking
19 - Up to 30 Foot Lift
29 - Lane Closure With Shadow Vehicle
* For span specific equipment requirements refer to the Active Inventory's "Access Needs" tab in BDIS.
Detailed Time & Weather Conditions
Field Date Arrival Departure Temp (F) Weather Conditions
06/12/2019 09:00 AM 03:00 PM 70 Sunny
06/14/2019 09:00 AM 03:00 PM 70 Sunny
Inspection Times (hours)
1810No
Time required for travel, inspection and report preparationLane closure usageRailroad flagging time
Page 3 of 25 Format Version 20190124
BIN: 1055660 Bridge Inspection ReportInspection Date: June 14, 2019
Element Assessment by Span
Element** Total Quantity Unit CS-1 CS-2 CS-3 CS-4 CS-5Span Number : 1
BA215 - Reinforced Concrete Abutment 85 ft 72 5 8 0
BA220 - Reinforced Concrete Pile Cap/Footing 90 ft 90
BA302 - Compression Joint Seal 85 ft 85 0
BA310 - Elastomeric Bearing 11 each 11 0
515 - Steel Protective Coating 22 ft2 22 0
BA321 - Reinforced Concrete Approach Slab 988 ft2 988 0
BA800 - Erosion or Scour 85 ft 85 0
BA831 - Steel Beam End 11 each 11 0
BA850 - Backwall 85 ft 85 0
Element Assessment Summary Table
Element Total Quantity Unit CS-1 CS-2 CS-3 CS-4 CS-512 - Reinforced Concrete Deck 11422 ft2 10762 330 330 0
107 - Steel Open Girder/Beam 1430 ft 1070 360 0
210 - Reinforced Concrete Pier Wall 85 ft 85 0
215 - Reinforced Concrete Abutment 170 ft 147 10 13 0
220 - Reinforced Concrete Pile Cap/Footing 350 ft 350
302 - Compression Joint Seal 170 ft 170 0
310 - Elastomeric Bearing 33 each 33 0
321 - Reinforced Concrete Approach Slab 1976 ft2 1976 0
331 - Reinforced Concrete Bridge Railing 270 ft 270 0
510 - Wearing Surfaces 6778 ft2 6778 0
515 - Steel Protective Coating 13408 ft2 12442 622 344 0
800 - Erosion or Scour 420 ft 420 0
810 - Sidewalk 4428 ft2 4018 330 80 0
811 - Curb 270 ft 270 0
830 - Secondary Members 2 each 2 0
831 - Steel Beam End 22 each 22 0
850 - Backwall 170 ft 170 0
851 - Abutment Pedestal 22 each 22 0
852 - Pier Pedestal 11 each 11 0
853 - Wingwall 80 ft 80 0
Element Quantities
Page 4 of 25 Format Version 20190124
BIN: 1055660 Bridge Inspection ReportInspection Date: June 14, 2019
Element** Total Quantity Unit CS-1 CS-2 CS-3 CS-4 CS-5BA851 - Abutment Pedestal 11 each 11 0
BW220 - Reinforced Concrete Pile Cap/Footing 40 ft 40
BW800 - Erosion or Scour 40 ft 40 0
BW853 - Wingwall 40 ft 40 0
PR210 - Reinforced Concrete Pier Wall 85 ft 85 0
PR220 - Reinforced Concrete Pile Cap/Footing 90 ft 90
PR310 - Elastomeric Bearing 11 each 11 0
515 - Steel Protective Coating 22 ft2 22 0
PR800 - Erosion or Scour 170 ft 170 0
PR852 - Pier Pedestal 11 each 11 0
12 - Reinforced Concrete Deck 5711 ft2 5381 165 165 0
510 - Wearing Surfaces 3389 ft2 3389 0
107 - Steel Open Girder/Beam 715 ft 535 180 0
515 - Steel Protective Coating 6671 ft2 6221 300 150 0
331 - Reinforced Concrete Bridge Railing 135 ft 135 0
810 - Sidewalk 2214 ft2 2014 160 40 0
811 - Curb 135 ft 135 0
830 - Secondary Members 1 each 1 0
Span Number : 2
EA215 - Reinforced Concrete Abutment 85 ft 75 5 5 0
EA220 - Reinforced Concrete Pile Cap/Footing 90 ft 90
EA302 - Compression Joint Seal 85 ft 85 0
EA310 - Elastomeric Bearing 11 each 11 0
515 - Steel Protective Coating 22 ft2 22 0
EA321 - Reinforced Concrete Approach Slab 988 ft2 988 0
EA800 - Erosion or Scour 85 ft 85 0
EA831 - Steel Beam End 11 each 11 0
EA850 - Backwall 85 ft 85 0
EA851 - Abutment Pedestal 11 each 11 0
EW220 - Reinforced Concrete Pile Cap/Footing 40 ft 40
EW800 - Erosion or Scour 40 ft 40 0
EW853 - Wingwall 40 ft 40 0
12 - Reinforced Concrete Deck 5711 ft2 5381 165 165 0
510 - Wearing Surfaces 3389 ft2 3389 0
107 - Steel Open Girder/Beam 715 ft 535 180 0
515 - Steel Protective Coating 6671 ft2 6221 300 150 0
Page 5 of 25 Format Version 20190124
BIN: 1055660 Bridge Inspection ReportInspection Date: June 14, 2019
General Comments
Element** Total Quantity Unit CS-1 CS-2 CS-3 CS-4 CS-5331 - Reinforced Concrete Bridge Railing 135 ft 135 0
810 - Sidewalk 2214 ft2 2004 170 40 0
811 - Curb 135 ft 135 0
830 - Secondary Members 1 each 1 0
Inspection Notes
1. The BIN plae is located on the begin abutment stem under girder G6. It is in OK condition.
2. There are no changes to the Access, Debris or Electrical forms. The debris form is attached.
3. All stone veneer was inspected and no loose stones were noted.
4. All bays, except Bay #6 are covered with stay-in-place (SIP) forms. No loose concrete was noted on the underside of theexposed deck and overhangs.
5. Vertical clearances were verified.
See vertical clearance sketches for details.
6. Non-structural condition observations have been issued during this inspection.
7. There is a Joint Maintenance Report attached to report.
8. Steel and Collision Vulnerability Assess Reviews are requested in this inspection.
** Elements with a prefix designate the locations of BA-Begin Abutment, BW-Begin Wingwall, EA-End Abutment, EW-EndWingwall, CO-Culvert Outlet, and PR-Pier. No prefix generally indicates the element is part of the superstructure.
Element Condition Notes
TQ CS-1 CS-2 CS-3 CS-4 CS-5Span 1: 12 - Reinforced Concrete Deck 5711 5381 165 165 0 0Span 2: 12 - Reinforced Concrete Deck 5711 5381 165 165 0 0
Referenced Photo(s): 5Condition State 3 Note
Referenced Sketch(es): None
In both spans, < 5% of the underdeck SIP forms exhibit corrosion in scattered locations.TQ CS-1 CS-2 CS-3 CS-4 CS-5
Span 1: 107 - Steel Open Girder/Beam-515 - Steel ProtectiveCoating 6671 6221 300 150 0 0Span 2: 107 - Steel Open Girder/Beam-515 - Steel ProtectiveCoating 6671 6221 300 150 0 0
Referenced Photo(s): 5Condition State 3 Note
Page 6 of 25 Format Version 20190124
BIN: 1055660 Bridge Inspection ReportInspection Date: June 14, 2019
Referenced Photo(s): 5Condition State 3 Note
Referenced Sketch(es): None
The girders in both spans exhibit scattered areas of paint that is starting to become ineffective.TQ CS-1 CS-2 CS-3 CS-4 CS-5
Span 1: BA215 - Reinforced Concrete Abutment 85 72 5 8 0 0Span 2: EA215 - Reinforced Concrete Abutment 85 75 5 5 0 0
Referenced Photo(s): 6Condition State 3 Note
Referenced Sketch(es): None
Both the begin and end abutment stems exhibit full height vertical cracks > 0.05" wide.
Begin abutment: Under Girders G2 to G9.
End abutment: Under Girders G2, G4, G5, Bay #7 & Girder G9.TQ CS-1 CS-2 CS-3 CS-4 CS-5
Span 1: BA302 - Compression Joint Seal 85 0 85 0 0 0Span 2: EA302 - Compression Joint Seal 85 0 85 0 0 0
Referenced Photo(s): 7, 8Condition State 2 Note
Referenced Sketch(es): None
Below deck, there is evidence of previous joint leakage on most of the backwall and stem. See photo #7.
Above deck, the joint appears to be in satisfactory condition with minor dirt accumulation in the compression joint seal. Seephoto #8.
TQ CS-1 CS-2 CS-3 CS-4 CS-5Span 1: BA310 - Elastomeric Bearing-515 - Steel ProtectiveCoating 22 0 0 22 0 0Span 1: PR310 - Elastomeric Bearing-515 - Steel ProtectiveCoating 22 0 0 22 0 0
Referenced Photo(s): 3, 9Condition State 3 Note
Referenced Sketch(es): None
The bearings exhibit areas of 100% paint loss with minor surface rust and areas of paint that is starting to becomeineffective. See photos #3 & #9.
TQ CS-1 CS-2 CS-3 CS-4 CS-5Span 1: 810 - Sidewalk 2214 2014 160 40 0 0Span 2: 810 - Sidewalk 2214 2004 170 40 0 0
Referenced Photo(s): 10Condition State 3 Note
Referenced Sketch(es): None
The right sidewalk near Pier #1, in both spans, exhibits full width transverse cracks,up to 1/8" (W).
Page 7 of 25 Format Version 20190124
BIN: 1055660 Bridge Inspection ReportInspection Date: June 14, 2019
Category: APPROACH - Other -Light Standards Quantity: 2 Unit: ea
Referenced Element(s): NONE
Referenced Photo(s): 1Referenced Sketch(es): NONEThe lighting standards, designation numbers unknown, located on the left and right sidewalks at the begin approach exhibitsaccess covers not properly secured.
An NSCO has been re-issued for this condition.Category: ATTACHMENTS - Utilities Quantity: 2 Unit: ea
Referenced Element(s): NONE
Referenced Photo(s): 2Referenced Sketch(es): NONEThe water main utility pipe, located in Bay #1, is not centered and is bent to the right at the support opening utility hole indiaphragms D3 & D4 adjacent to Pier #1. See photo #2. The pipe appeared stable at the time of inspection and no leakagewas observed.
An NSCO has been re-issued for this condition.Category: CLEANING - Bridge Seat Quantity: 2 Unit: ea
Referenced Element(s): NONE
Referenced Photo(s): 3Referenced Sketch(es): 2At both the begin and end (new condition) abutments, there is an accumulation of debris on the bridge seat. The debris doesnot hinder inspection of the bridge elements.
See attached debris form.
An NSCO has been re-issued for this condition except as noted.
Category: OTHER -vegetative growth Quantity: 1 Unit: ea
Referenced Element(s): NONE
Referenced Photo(s): 4Referenced Sketch(es): NONEThere is vegetative growth along the end abutment right wingwall which is also covering a horizontal clearance sign.
This is a new NSCO.
Non-Structural Condition Observations
Page 8 of 25 Format Version 20190124
BIN: 1055660 Bridge Inspection ReportInspection Date: June 14, 2019
19.IMG_6047.JPGPhoto Number: 1 Photo Filename:
Attachment Description:Location: Begin Approach,Right Side, LightingStandard with UnsecuredCover, Looking Back. Ref.NSCO.
19.IMG_6054.JPGPhoto Number: 2 Photo Filename:
Attachment Description:Location: Span 1, Over Pier#1, Bay #1, Utility Shifted tothe Right, Looking Ahead.Ref. NSCO.
Inspection Photographs
Page 9 of 25 Format Version 20190124
BIN: 1055660 Bridge Inspection ReportInspection Date: June 14, 2019
19.IMG_6034.JPGPhoto Number: 3 Photo Filename:
Attachment Description:Location: Begin Abutment,Bay #5, Debris on BridgeSeat and Bearing Condition,Looking Back & Left. Ref.NSCO.
19.IMG_6064.JPGPhoto Number: 4 Photo Filename:
Attachment Description:Location: End Abutment,Right Wingwall, VegetativeGrowth, Looking Left. Ref.NSCO.
Page 10 of 25 Format Version 20190124
BIN: 1055660 Bridge Inspection ReportInspection Date: June 14, 2019
19.IMG_6040.JPGPhoto Number: 5 Photo Filename:
Attachment Description:Location: Span 1, Bays #9& #10, SIP Form Corrosion& Girder Paint Condition,Looking Up & Ahead.(Typical Photo).
19.IMG_6027.JPGPhoto Number: 6 Photo Filename:
Attachment Description:Location: Begin AbutmentStem, Under Girder G9, FullHeight Vertical Cracks,Looking Ahead. (TypicalPhoto).
Page 11 of 25 Format Version 20190124
BIN: 1055660 Bridge Inspection ReportInspection Date: June 14, 2019
19.IMG_6037.JPGPhoto Number: 7 Photo Filename:
Attachment Description:Location: Begin AbutmentStem, Evidence of PreviousJoint Leakage, LookingBack & Left. (TypicalPhoto).
19.IMG_6042.JPGPhoto Number: 8 Photo Filename:
Attachment Description:Location: End Abutment,Joint with Deck, MinorDebris, Looking Right.(Typical Photo).
Page 12 of 25 Format Version 20190124
BIN: 1055660 Bridge Inspection ReportInspection Date: June 14, 2019
19.IMG_6057.JPGPhoto Number: 9 Photo Filename:
Attachment Description:Location: Pier #1, Bearingunder Girder G4, PaintCondition, Looking Ahead &Left.
19.IMG_6050.JPGPhoto Number: 10 Photo Filename:
Attachment Description:Location: Span 2, Near Pier#1, Right Sidewalk,Transverse Cracks, LookingBack.
Page 13 of 25 Format Version 20190124
BIN: 1055660 Bridge Inspection ReportInspection Date: June 14, 2019
19_Photo_Location_Plan.jpgSketch Filename:1Sketch Number:
Sketch Description: Photo Location Plan
Inspection Sketches
Page 14 of 25 Format Version 20190124
BIN: 1055660 Bridge Inspection ReportInspection Date: June 14, 2019
19.BD240.jpgSketch Filename:2Sketch Number:
Sketch Description: BD240
Page 15 of 25 Format Version 20190124
BIN: 1055660 Bridge Inspection ReportInspection Date: June 14, 2019
19_Vertical_Clearance.jpgSketch Filename:3Sketch Number:
Sketch Description: Vertical Clearance
Page 16 of 25 Format Version 20190124
BIN: 1055660 Bridge Inspection ReportInspection Date: June 14, 2019
2019 JMRR for Bin 1055660_Page_1.jpgSketch Filename:4Sketch Number:
Sketch Description: JMRR Page 1
Page 17 of 25 Format Version 20190124
BIN: 1055660 Bridge Inspection ReportInspection Date: June 14, 2019
2019 JMRR for Bin 1055660_Page_2.jpgSketch Filename:5Sketch Number:
Sketch Description: JMRR Page 2
Page 18 of 25 Format Version 20190124
BIN: 1055660 Bridge Inspection ReportInspection Date: June 14, 2019
1055660_LOCATION_MAP.JPG
1055660_QUAD_MAP.JPG
Standard Photographs
Page 19 of 25 Format Version 20190124
BIN: 1055660 Bridge Inspection ReportInspection Date: June 14, 2019
AbutmentBegin.jpg
AbutmentEnd.jpg
Page 20 of 25 Format Version 20190124
BIN: 1055660 Bridge Inspection ReportInspection Date: June 14, 2019
ApproachBegin.jpg
ApproachEnd.jpg
Page 21 of 25 Format Version 20190124
BIN: 1055660 Bridge Inspection ReportInspection Date: June 14, 2019
ElevationLeft.jpg
ElevationRight.jpg
Page 22 of 25 Format Version 20190124
BIN: 1055660 Bridge Inspection ReportInspection Date: June 14, 2019
F2_F4CrossedSpan2Left.JPG
F2_F4CrossedSpan2Right.JPG
Page 23 of 25 Format Version 20190124
BIN: 1055660 Bridge Inspection ReportInspection Date: June 14, 2019
F3_F4CrossedSpan1Left.JPG
F3_F4CrossedSpan1Right.JPG
Page 24 of 25 Format Version 20190124
Recommended