Bsnl Wtp Pm Um 005 Create Testing Equipments v1.1x

Preview:

DESCRIPTION

Bsnl Wtp Pm Um 005 Create Testing Equipments v1.1x

Citation preview

Page | 1

BSNL

User Manual

Plant Maintenance (PM)

Master Data Create-Testing Equipments

Version:1.1

Page | 2

Version Control

Date Version Author Change Description

09.04.2011 1.1 Pankaj Initial

The document has been prepared to be used by the following stake-holders:

• End Users Performing day to day transactions as per their Roles and Authorizations in SAP

System.

• Core Team – Directly involved.

• Business Process Owners – Respective Business Leaders, involved in validating the process

design.

Important Note:

The information in this document is only meant to be a reference for ERP Process configured as per the Business

Process approved by BSNL Management for Finance & Controlling Module and is not a complete description of the

SAP product and its functionalities. Its main purpose is to serve as a reference Document for User Training and

Support.

Page | 3

Course Overview

SAP Plant Maintenance module manages all the transactions related to maintenance of

machines or buildings. This training material covers the business process for creation of Testing

Equipments.

Target Audience

This course is intended for the following audiences:

• End Users (Executive, Planner & Manager)

Course Prerequisites

• Knowledge of navigating SAP systems

• Basic knowledge of Plant Maintenance

Course Goals

This course will prepare you to:

• Create Equipments: Testing Equipments

Course Objectives

After completing this course, you will be able to:

Page | 4

• Create Equipments: Testing Equipments

Important information to be noted:-

• All documents are to be created in reference to the preceding document.

• All SAP Transactions can be executed either by navigating to the required Transaction through the Menu Path or by simply entering the Transaction Code for

the respective Transaction in the Command Field.

Page | 5

Table of Contents

1 Create Equipment ............................................................................................................................ 6

1.1 Create Testing Equipment ........................................................................................................ 6

1.1.1 Maintain General Data details .......................................................................................... 8

1.1.2 Maintain Location details ................................................................................................. 8

1.1.3 Maintain Organization Data details ................................................................................... 9

1.1.4 Maintain Structure details ................................................................................................ 9

1.1.5 Maintain Class and Characteristics details....................................................................... 10

1.1.6 Maintain PRT Data .......................................................................................................... 12

1.1.7 Maintain warranty and AMC details ............................................................................... 13

2 Structure Display: Structure of Functional Location and Equipment ............................................... 15

Page | 6

1 Create Equipment

1.1 Create Testing Equipment

T-Code: IE01

Page | 7

Select the equipment category “Q” and press enter.

Page | 8

Maintain the following details:

1.1.1 Maintain General Data details

1.1.2 Maintain Location details

Page | 9

1.1.3 Maintain Organization Data details

1.1.4 Maintain Structure details

Page | 10

1.1.5 Maintain Class and Characteristics details

Click on

Page | 11

Maintain the required details

Page | 12

1.1.6 Maintain PRT Data

Page | 13

1.1.7 Maintain warranty and AMC details

Click on save .

Maintain

AMC dates

here

Maintain

Warranty

dates here

Page | 14

Page | 15

2 Structure Display: Structure of Functional Location and Equipment

T-Code: IH01

Page | 16