Case Study: Boiler Monitoring - Home - Novosound

Preview:

Citation preview

Case Study Boiler Monitoring

Continuous Monitoring inside boiler up to 400°C (752°F)

Sub-mm wall thickness loss measurement over 6 months

Bespoke solution developed to meet client needs

Compact Belenus size (50 x 32 x 20 mm) easily fitted to complex pipework

Simple sensor install avoided impact on other shutdown works

Client has access to thickness measurements at all times

Belenus permanently installed in aBoiler in a Gas Power Station

Belenus installed in 400°C boiler at a Gas Power Station

Belenus wall thickness measurement

Inspecting data at installation site

Sales@novosound.net

BiocityBoNess RoadNewhouse, Scotland, UKML1 5UH

Contact

www.novosound.net

+44 (0) 1698 678419

Recommended