View
2
Download
0
Category
Preview:
Citation preview
Norwood upgrades to Asta Powerproject and uncovers a better way to manage project performance
The Norwood Company is one of the
top contracting firms in the United
State’s Mid Atlantic region. Started
in 1975, the company grew to reach
the ENR Top 400 contractor list in
the early 2000s.
It offers construction management,
general contracting, pre-construction
planning, design/build, fast-track
construction, LEED coordination and
BIM integration on mid-sized to large
building projects in commercial,
industrial, healthcare, retail, and
other sectors.
With Suretrak no longer supported and growing more obsolete by the day, Werkeiser and his team knew they needed to make a switch. But, they also had hundreds of project schedules built in the old system that had to be accessible. And, with most of their project mangers only scheduling occasionally, they needed a system that would be easy to learn and use, scalable, and customizable to their processes.
A year-long search and vigorous testing proved Asta Powerproject to be the right fit for Norwood’s next chapter. The company began rollout in late 2015, with full implementation expected in 2016.
Feature rich and easy-to-use
Norwood’s new construction project
scheduling system needed to adhere
to best practices and principles of
Construction Project Management (CPM)
functionality.
The search committee’s list of critical
features for the new tool included the
ability to build a logical schedule with a
good audit trail, and the capability to
import from Suretrak so they wouldn’t
loose their old schedule data. The
company also wanted to be able to
customize the system and an easy way to
produce graphic-rich reports.
Case study: Norwood Company
Old software obsolescence uncovers new opportunities Norwood has been an early adopter of technology to continually improve their processes and better deliver projects. The company adopted Suretrak more than a dozen years ago to help project managers plan and schedule jobs.
Technology advances have been rapid
since that time and Jason Werkeiser,
project manager for the Norwood Group,
said the company was growing frustrated
with the legacy software as it “had more
and more problems with other system
updates we were making.”
astapowerproject.com
Asta Powerproject: The power behind successful projects
Equally important was the ease of actually
building a schedule and the speed with
which one could be built. Norwood
found that Asta Powerproject works the
way their team does – with time-saving
shortcuts like cut and paste from Excel,
mouse drag-and-drop functionality, and
quick task creation allowing up to 450
tasks to be made in 15 minutes.
“Asta Powerproject was the right price
and the right mix of tools we need now,”
said Werkeiser.
Sharable, concurrent licenses also
allow Norwood to affordably scale as
the company grows. And, it makes it
cost effective to allow part-time and
occasional schedulers to have access to
Asta Powerproject.
The Norwood Group worked with
Asta Powerproject's regional reseller,
for in-person training as well as on-line
support throughout Norwood’s
implementation process. Training was
tailored to ensure Norwood’s field staff
knew how to migrate files from Suretrak,
build schedules in Asta Powerproject,
and get the most out of the system’s
robust functionality.
About half of the 20 senior project
managers that build schedules have been
trained so far on Asta Powerproject with
the rest being trained in early 2016.
According to Werkeiser, “Everyone who
has spent a day in Asta Powerproject has
picked it up pretty quickly.”
The reseller team helped Norwood set
up the system and create templates
that will allow the project schedulers to
work even more quickly while more
easily following the company’s
preferred processes. Menus and
views were customized for standard,
owner, and print reporting needs.
Prepared for the next chapter of growthIn addition to the time savings and better reporting functionality the company
enjoys with Asta Powerproject, Norwood is also rethinking the various other ways project scheduling can improve their business.
Cost and resource loading as well as subcontractor performance management are planned areas of focus.
Norwood is also experimenting with Asta Powerproject’s BIM module to be able to visually show clients where they will be in a build at key benchmarks. That, says Werkeiser, is a great marketing opportunity and another chance to impress their clients.
“I’m a huge fan,” said Werkeiser. “I think it is a great product – the multiple ways to convey data. We know how a project should go. Asta Powerproject helps us communicate it.”
Asta Powerproject is helping Norwood prepare for their next chapter of growth as the company continues to use technology to build its competitive advantage.
Norwood’s Must-Haves
✓ Robust functionality
✓ Easy to learn and intuitive to use
✓ Produces a logical schedule withgood audit trail
✓ Able to import from Suretrak
✓ Customizable views andcommonly-used templates
✓ Produce graphic-rich reports in afew mouse clicks
✓ Cost-effective to allow moreusers and future scalability
Asta Powerproject checks all the boxes for Norwood:
Case study: Norwood Company
astapowerproject.com
Asta Powerproject: The power behind successful projects
Recommended