U.S. Customs and Border Protection Infrastructure Update Transportation Border Working Group October 27, 2010. CBP Land Port of Entry Program Conditions at ARRA Ports. Boundary, WA (CBP). Los Ebanos, TX (CBP). Whitetail, MT (CBP). Van Buren, ME (GSA – flooded). Pinnacle Road, VT. - PowerPoint PPT Presentation

Citation preview

U.S. Customs and Border ProtectionInfrastructure Update

Transportation Border Working GroupOctober 27, 2010

U.S. Customs and Border ProtectionInfrastructure Update

Transportation Border Working GroupOctober 27, 2010

CBP Land Port of Entry ProgramConditions at ARRA Ports

Boundary, WA (CBP) Los Ebanos, TX (CBP)

Van Buren, ME (GSA – flooded)Whitetail, MT (CBP)

3

Existing LPOE

End State Rendering

PINNACLE ROAD, VT

Above: Foundation work is 98% complete

4

CHURUBUSCO, NY

Above: Bollard concrete pour

Below: Utility installation at the Government Garage

Above: Sand backfill and stockpile

Below: Installation of floor drain

5

PITTSBURG, NH

Existing LPOE

End State Rendering

Above: Erecting steel frame of building

FOREST CITY, ME

6

CBP archaeological specialists excavate the site of the proposed Forest City, ME LPOE.

7

WALHALLA, ND

Existing LPOE

End State Rendering

Above: Stem walls in place

8

WESTHOPE, ND

Existing LPOE

End State View from South

Above: View of electrical and plumbing work

Right: Curbs in place for lanes

9

SHERWOOD, ND

Existing LPOE

End State Rendering

Above: Curbs installed prior to asphalt paving

10

ANTLER, ND

Right: View of LPOE looking North

Left: Excavating for electrical in drive islands

11

MORGAN, MT

Above: Drive lane looking south at booth

Below: Housing module moving into final position

Above: Installation of roof sheathing on east side of LPOE

Below: Truss installation at south residential unit

12

WILD HORSE, MT

Right: Asphalt edge clean up and site grading

Left: Fire Suppression distribution lines being installed

13

CARBURY, ND

Existing LPOE

End State RenderingRight: View of newly set roof trusses and exterior of LPOE

Left: View from inside the LPOE

14

HANSBORO, ND

Existing LPOE

End State Rendering from South

Above: Foundation work at the port

15

NECHE, ND

Existing LPOE

End State Rendering

Left: Foundation work continues

Right: Installation of main building underslab plumbing and electrical

16

FRONTIER, WA

Above: Vapor Barrier installed at LPOE depressed slab

Below: Finishing concrete for slab-on-grade at Main Port Building

Above: Spreading crushed base rock for asphalt paving

17

WILLOW CREEK, MT

Control closet, camera, and monitor installed at the Willow Creek, MT LPOE, one of seven LPOEs receiving BSDP equipment.

NOONAN, ND

Above: Bypass lane with RPM bollards in the background

Below: Culvert under Highway 40

Above: View of the LPOE looking North

1919

Slide Title