cbr excel

Preview:

DESCRIPTION

Perhitunagan CBR

Citation preview

Sheet1penurunan( inci)beban (kg)Pembacaan ArlojiKalibrasi0.000.0000.045810.019.1620.045810.0318.3240.045810.0527.4960.045810.0836.6580.045810.1045.81100.045810.1568.72150.045810.2091.62200.045810.30146.59320.045810.40206.15450.045810.50247.37540.045810,1"3.4599697885%0,2"4.5901803607%CBR Rata-rata =4.0250750746%

Sheet2FORMULIR PEMERIKSAAN CBR LAPANGAN YANG TIDAK DIRENDAMLOKASI:LABORATORIUM SIPILDIKERJAKAN : BERTHA HIDAYATI SEMBIRINGNO. CONTOH:1TANGAL : 03-06-2013KEDALAMAN:80 CMJENIS TANAH : LEMPUNGTABEL 1. PEMERIKSAAN KADAR AIR TANAHDATA TANAHHASILBERAT TANAH BASAH + CAWANBERAT TANAH BASAHBERAT CAWANBERAT TANAH KERING + CAWANBERAT TANAH KERING KADAR AIRTABEL 2. DATA PENETRASIWAKTUPENURUNANPEMBACAAN ARLOJIANGKABESAR BEBAN(MENIT)(INCI)ATASKALIBRASI0000.0458101/40.012520.045810.091621/20.02540.045810.1832410.0560.045810.274861 1/20.07580.045810.3664820.1100.045810.458130.15150.045810.6871540.2200.045810.916260.3320.045811.4659280.4450.045812.06145100.5540.045812.47374

Sheet3