• !ar"et is dominated by
Fendolite and !andolite manufactured by
Cafco# now Promat.
8/9/2019 Cementitious PFP (1).pptx
6/32
8/9/2019 Cementitious PFP (1).pptx
7/32
$torage
• %agged material &e't dry stored o(the ground.
• )ater basedcoatings 'rotect f rom frost and tem'
eratures *+,-
C
8/9/2019 Cementitious PFP (1).pptx
8/32
8/9/2019 Cementitious PFP (1).pptx
9/32
8/9/2019 Cementitious PFP (1).pptx
10/32
8/9/2019 Cementitious PFP (1).pptx
11/32
''lication conditions
• Do not a''ly if air tem'erature is /+-C and falling.
• $urface should be dry and at least0-C above dew'oint tem'erature.
• $hield from strong winds and strongradiant sunlight.
• !aximum surface tem'erature +,-C
8/9/2019 Cementitious PFP (1).pptx
12/32
8/9/2019 Cementitious PFP (1).pptx
13/32
1uality Control
)eather Conditions.
• Do not a''ly if air tem'erature is /+-Cand falling.
• $urface should be dry and at least 0-Cabove dew'oint tem'erature.
• $hield from strong winds and strongradiant sunlight.
• !aximum surface tem'erature +,-C
8/9/2019 Cementitious PFP (1).pptx
14/32
$lum'2Density
• ''aratus
Flat board2'late
$traight edge
3a'e measure $lum' tube
456+mm D x 506mm long7
)eighing scales Plastic sheet2bag
8/9/2019 Cementitious PFP (1).pptx
15/32
$lum'2Density
• Fill tube and levelo( the to'.
• Do not agitate or
com'ress the mixture.
• !easure distance
from to' of tube toto' of concave of the slum'.
8/9/2019 Cementitious PFP (1).pptx
16/32
$lum'2Density
• Place slum'material in bag
• )eigh sam'le
• Calculate density
8/9/2019 Cementitious PFP (1).pptx
17/32
$urface nish and watershedding.
• trowel nish recommended.
• )here there is a ris" of water 'ooling
chec" the material has been slo'edto shed water.
8/9/2019 Cementitious PFP (1).pptx
18/32
Dried Film 3hic"ness
• !easurements to be ta"en at leastevery 8m on each face of steel section
• Coating should not ta'er o( towards9ange edge
•
3olerance on thic"nesses :6 : ;8mm
8/9/2019 Cementitious PFP (1).pptx
19/32
1C !esh ty'e and tting
• Chec" one of the following ty'es arebeing used<
Plastic coated hexagonal mesh
=alvanised hexagonal mesh
• Chec" mesh will lie in the middlethird.
• Overla''ed correctly and no morethan 8 layers thic" in any situation
8/9/2019 Cementitious PFP (1).pptx
20/32
8/9/2019 Cementitious PFP (1).pptx
21/32
1uality Control
)eather Conditions.
• Do not a''ly if air tem'erature is / +-Cand falling.
• $urface should be dry and at least 0-Cabove dew'oint tem'erature.
• $hield from strong winds and strong
radiant sunlight.
• !aximun surface tem'erature +,-C
8/9/2019 Cementitious PFP (1).pptx
22/32
8/9/2019 Cementitious PFP (1).pptx
23/32
$lum'2Density
• ''aratus Flat board2'late
$traight edge
3a'e measure $lum' tube
456+mm D x 506mm long7
)eighing scales Plastic sheet2bag
8/9/2019 Cementitious PFP (1).pptx
24/32
8/9/2019 Cementitious PFP (1).pptx
25/32
$lum'2Density
• Fill tube and levelo( the to'.
• Do not agitate or
com'ress the mixture.
• !easure distance
from to' of tube toto' of concave of the slum'.
8/9/2019 Cementitious PFP (1).pptx
26/32
8/9/2019 Cementitious PFP (1).pptx
27/32
$lum'2Density
• Place slum'material in bag
• )eigh sam'le
• Calculate density
8/9/2019 Cementitious PFP (1).pptx
28/32
8/9/2019 Cementitious PFP (1).pptx
29/32
8/9/2019 Cementitious PFP (1).pptx
30/32
8/9/2019 Cementitious PFP (1).pptx
31/32
Dried Film 3hic"ness
• !easurements to be ta"en at leastevery 8m on each face of steel section
• Coating should not ta'er o( towards9ange edge
•
3olerance on thic"nesses :6 : ;8mm
8/9/2019 Cementitious PFP (1).pptx
32/32
Recommended