CH-2000 m R.O.W - 45.00 FOOTPATH OUTER RING...

Preview:

Citation preview

RAMP LENGHT 224.00m

NEHRU PLACE

INTERSECTION

S T O P

S T

O

P

S T O P

EXISTING FLYOVER

EXISTING FLYOVEREXISTING FLYOVER

EXISTING FLYOVER

T

O

G

.K

.- II è

R10.5

4

5

.

5

0

EXISTING FLYOVER

SLOPE 1 IN 30

7.50

PROPOSED FLYOVER

S T O P

S T

O

P

R

1

0

.

5

0

R

1

5

.

2

7

9.00

9.0

0

S T

O

P

8.00

5

.

5

0

R

-1

.2

m

3.00

R

-

1

.2

m

2.7

7

9.0

0

Service Road

Service Road

9.00

7

.

5

0

FOOTPATH

9.00

R

-4

0

.0

0

9.00

9.00

R

-3

5

.0

0

Service Road

FOOTPATH

Service Road

Service Road

FOOTPATH

FOOTPATH

FOOTPATH

FOOTPATH

Service Road

Service Road

FOOTPATH

Service Road

Service Road

FOOTPATH

FOOTPATH

FOOTPATH

FOOTPATH

Service Road

Ped

estrian

su

bw

ay

Ped

estrian

su

bw

ay

Service Road

Service Road

FOOTPATH

Service Road

Serv

ice R

oad

7

.

5

0

2.50

11.00

9.00

9.00

11.00

2.50

6.50

11.00

R

1

4

.

0

0

R

2

4

.

0

0

R

1

7

.

0

0

3.00

7.50

R

-3

2

.0

0

FOOTPATH

20.50

11.00

2.50

14.50

2.50

7

.

5

0

7

.

5

0

11.50

14.00

9.00

9.00

9.00

11.00

2.50

3.09

FOOTPATH

8.00

13.77

9.00

B

'

B

PROPOSED FLYOVER

GREATER KAILASH METRO STATION

EXISTING FLYOVER

ROW 45.00M

(AS PER ZONAL

DEVELOPMENT PLAN ZONE-F)

FLAT PORTION 40.00m

R

-1

3

.0

0

ROW 45.00M

(AS PER ZONAL

DEVELOPMENT PLAN ZONE-F)

LA

LA

L

AJP

AT

R

AI M

AR

G

HA

NS

RA

J S

ET

HI M

AR

G

TABLE TOP PEDESTRIAN CROSSING (150 MM ABOVE ROAD LEVEL

CONNECTED TO ROAD WITH RAMP OF SLOPE 1:50)

CH

-3000 m

CH

-2000 m

<<UP

DN >>

<<DN

UP>>

NEHRU PLACE

INTERSECTION

S T O P

S T

O

P

S T O P

EXISTING FLYOVER

EXISTING FLYOVEREXISTING FLYOVER

EXISTING FLYOVER

SA

VIT

RI C

INE

MA

INT

ER

SE

CT

ION ( T

O B

E S

IGN

AL

IZE

D A

T L

OW

ER

LE

VE

L)

T

O

G

.K

.- II è

OUTER RING ROAD

R10.5

5

9.00

5

.

5

0

R.O

.W - 45.00

7.50

S T O P

S T

O

P

R

1

0

.

3

2

R

1

5

.

2

7

9.0

0

S T

O

P

9.00

5

.

5

0

R

-1

.2

m

3.00

R

-

1

.2

m

2.77

9.0

0

Service Road

Service Road

9.00

7

.

5

0

9.00

R

-4

0

.0

0

9.00

9.00

R

-3

5

.0

0

Service Road

FOOTPATH

Service Road

Service Road

FOOTPATH

FOOTPATH

FOOTPATH

FOOTPATH

Service Road

Service Road

FOOTPATH

Service Road

Service Road

FOOTPATH

FOOTPATH

FOOTPATH

FOOTPATH

Service Road

Ped

estrian

su

bw

ay

Ped

estrian

su

bw

ay

Service Road

Service Road

Service Road

FOOTPATH

Service Road

Serv

ice R

oad

7

.

5

0

2.50

11.00

9.00

9.00

11.00

2.50

6.50

11.00

R

1

4

.

0

0

R

2

4

.

0

0

R

1

7

.

0

0

3.00

7.50

R

-3

2

.0

0

FOOTPATH

20.50

11.00

2.50

14.50

2.50

7

.

5

0

7

.

5

0

11.50

14.00

9.00

9.00

9.00

11.00

2.50

FOOTPATH

13.77

EXISTING FLYOVER

EXISTING FLYOVER

GREATER KAILASH STATION

PROPOSED FLYOVER

SLOPE 1 IN 30

PROPOSED FLYOVER

10.50

RAMP LENGHT 224.00m

RAMP LENGHT 171.00m

FLAT PORTION 41.00m

ROW 45.00M (AS PER ZONAL

DEVELOPMENT PLAN ZONE-F)

CH

-3000 m

CH

-2000 m

ROW 45.00M

(AS PER ZONAL

DEVELOPMENT PLAN ZONE-F)

FOOTPATH

<<DN

DN>>

<<UP

CHIRAG DELHI

INTERSECTION

GR

AM

IN/IP

T

AU

TO

TABLE TOP TABLE TOP

3.3 M WIDE FOOTPATH3.3 M WIDE FOOTPATH

FOOTPATH

FIREMEN ACCESSSTAIRCASE - 4

04 05 06 07 08 09 10

U48

U43

U18.1

U40

ROOF OVER ENTRYSTRUCTURE

ENTRYSTRUCTURE

PLINTH

RAMPSLOPE - 1:12

FOOTPATH

U51

S1 S4d

2.60

15.30

6.00

22.14

17.98

22.55

8.00

9.78

5.60

5.60

2.50 0.751.20

2.50

1.90

7.20

5.55

24.44

18.38

7.400 9.450 9.450 12.500 12.000 10.500

F.F.L.

L.P.0.50 m

H.P.0.65 m

X1201

X1201

Y1201 Y1201

31201

41201 21201

11201

UP FROM CONC

UP

LIFT 413 PASSENGERS

D3

GR2

D2a

F.F.L. (+222.75 M)

L4

5.00 BOUNDARY WALLAS PER DMRCSTANDARDS

LVL.+0.15M

5.6X5.6 MCUTOUT INFLOOR

R-01

SLOPE1:100

(+222.75 M)

(+222.15 M)

LIFTCANOPY

OPEN TO SKY

RS1

NOMINAL GRADINGTOWARDS DRAIN

NOMINAL GRADINGTOWARDS DRAIN

PLUMBING CUTOUT ATCEILING 1.0X0.7 M

ELECTRICAL

SHAFT FROMUNDERCROFT

LEVEL TO COVERLEVEL

ES10

CABLE GALLERY 1.5 M(HEIGHT)X4.0 M (WIDTH)

R3

WALL TO BE SHIFTED

Z1201

Z1201

C2

C1

5.950

1.00

2.00

4.00

7.00

6.00

0.45

2.50

U45

F.F.L. (+222.75 M)

F.F.L. (+223.05 M)

F.F.L. (+222.75 M)

1.80

4.0

00

22.681

1.247

UP

DN

3.32

7.07

D1

1.50

3.00

D2a

990 LTR.DAY TANK

U76

ES9

11.12

SLOPE

1:8

3.00

0.60

1.00

NOMINAL GRADINGTOWARDS DRAIN

UP

D2a D2a

S4a

R3

R3

R3

R3

R3

MANHOLE

PL03

S4e

SERVICESGALLERY

CUTOUT ATCOVER LEVEL INTECHNICAL GALLERY

S6a

D4b

FHC1.2MX0.75M

5.90

1.00

R6

2.00 D2a

1.50

1.20

0.75

1.00

1.00

ES11

600MM HIGH WALL PLINTH F.F.L. (+222.75 M)

D4b

D4b D4b

0.50

1.20 CUTOUT FOR AIR COOLEDCHILLER AND COOLING TOWERCABLES 0.5 X 1.2M

R7

C12150Ø RWP TOGROUND LEVEL

CENTER OFINTERMEDIATESUPPORT FOR ESC-1

E

2.80

SLOPE 1:8 SLOPE 1:84.80

1.20

6.20 6.22

GR2

FIRE BRIGADESUCTIONYARD HYDRANTVALVE4 WAY FIRE BRIGADEINLET FOR HYDRANTSYSTEM

RS1

RS1 LVL.+0..15M (+222.15 M) LVL. ± 0.0 M (+222.00 M)

F.F.L. (+222.75 M)

SUNSHADE

2.40

5.86

6.15 5.55

UP FROM CONC

DNST 01

ESC 01

20.25

12.82

YARD HYDRANTVALVE

C4

C5 3.653.95

3.00

3.003.30 6.00

2.50

1.50 2.50 2.00

DG

5.779

B.E. B.E.

N.E.N.E.

WAY TOD.G. SET

H

A

U

Z

K

H

A

S

A

S

IA

D

C

E

N

T

R

E

B

H

E

L

PANCHSHILA

PARK N

ORTH

S

H

E

IK

H

S

A

R

A

I P

H

-I

S

A

V

IT

R

I N

A

G

A

R

C

H

IR

A

G

H

D

E

L

H

I

PANCHSHIL

ENCLAVE

M

I

L

K

H

A

S

I

N

G

H

M

G

.

A

S

IA

D

T

O

W

E

R

COMBODIA

PANCHSHIL

ENCLAVE

J

O

S

I

P

B

R

O

Z

T

I

T

O

M

A

R

G

MASJID MOTH

G

E

E

T

A

N

J

A

L

I

M

G

.

K

H

IR

K

I M

A

IN

R

D

.

B

H

A

V

IS

H

Y

A

N

ID

H

I

E

N

C

L

A

V

E

K

H

E

L

G

A

O

N

M

G

.

SADHANA E

NCLAVE

B

E

G

U

M

P

U

R

B

E

G

U

M

P

U

R

I

M

A

S

J

ID

AMAR

JAYANTI

K

IM

L

IN

G

V

A

R

D

A

A

N

çT

O

M

U

N

IR

K

A

D

R

A

IN

DR

AIN

T

O

S

O

U

T

H

E

X

T

E

N

S

I

O

N

è

çT

O M

AD

AN

GIR

T

O

M

O

O

L

C

H

A

N

D

è

K

A

L

U

S

A

R

A

I

V

IJ

A

Y

M

A

N

D

A

L

E

N

C

L

A

V

E

P

O

L

IC

E

C

O

L

O

N

Y

H

A

U

Z

K

H

A

S

P

A

D

M

IN

I

E

N

C

L

A

V

E

B

H

IM

N

A

G

R

I

D

L

F

H

A

U

Z

K

H

A

S

E

X

T

N

S

A

F

D

A

R

J

A

N

G

D

E

V

E

L

O

P

M

E

N

T

A

R

E

A

A

U

R

O

B

I

N

D

O

M

A

R

G

A

U

R

O

B

IN

D

O

M

A

R

G

T

O

A

I

I

M

S

è

G

R

E

A

T

E

R

K

A

IL

A

S

H

1

K

A

IL

A

S

H

C

O

L

O

N

Y

S

A

N

T

N

A

G

A

R

K

A

L

K

A

J

I

K

A

IL

A

S

H

H

IL

L

DDA FLATS

MASJID MOTH PH 1

M

A

I

N

R

O

A

D

K

A

L

K

A

J

I

H

A

N

S

R

A

J

G

U

P

T

A

M

A

R

G

R

A

J

A

D

H

I

R

S

A

N

M

A

R

A

G

N

E

H

R

U

P

L

A

C

E

I

N

T

E

R

S

E

C

T

I

O

N

MALVIYA NAGAR

INTERSECTION

çT

O R

ING

RO

AD

T

O

M

A

L

V

IY

A

N

A

G

A

I.I.T.

INTERSECTION

PANCHSHEEL

INTERSECTION

E

X

I

S

T

I

N

G

E

L

E

V

A

T

E

D

D

M

R

C

T

R

A

C

K

C

CH

-4000 m

SERVICE ROAD

FOOTPATH

FOOTPATH

FOOTPATH

FOOTPATH

FOOTPATHFOOTPATHFOOTPATHFOOTPATH

FOOTPATHFOOTPATH

IS

H

W

A

R

N

A

G

A

R

G

IR

I N

A

G

A

R

G

U

R

U

R

A

V

I D

A

S

M

A

R

G

C

A

P

T

A

N

G

A

U

R

M

A

R

G

N

H

-

2

çT

O

A

S

H

R

A

M

T

O

O

K

H

L

A

I

N

D

U

S

T

R

I

A

L

E

S

T

A

T

E

P

H

A

S

E

-

I

I

è

M

A

A

N

A

N

D

M

A

I

M

A

R

G

I

N

T

E

R

S

E

C

T

I

O

N

U

D

A

Y

S

H

A

N

K

A

R

M

A

R

G

GREATER KAILASH

ENCLAVE II

G

R

E

A

T

E

R

K

A

IL

A

S

H

II

C

H

IT

T

A

R

A

N

J

A

N

P

A

R

K

T

O

G

.K

.-

II

è

T

O

IIT

G

A

T

E

è

EP

EP

EP

B

O

U

N

D

A

R

Y

W

A

LL

B

O

U

N

D

A

R

Y

W

A

LL

B

O

U

N

D

A

R

Y

W

A

LL

BO

U

N

D

AR

Y W

ALL

B

O

U

N

D

A

R

Y

W

A

L

L

BO

U

N

D

AR

Y W

ALL

B

O

U

N

D

A

R

Y

W

A

LL

BO

U

N

D

AR

Y W

ALL

F

O

O

T

P

A

T

H

FOOTPATH

RAILWAY LINE

RAILWAY LINE

RAILWAY LINE

RAILWAY LINE

RAILWAY LINE

RAILWAY LINE

RAILWAY LINE

RAILWAY LINE

RAILWAY LINE

RAILWAY LINE

RAILWAY LINE

RAILWAY LINE

H

U

T

H

U

T

HUT

HIGH MAST

EP

EP

EP

EP

EP EP

EP

FOOTPATH

FOOTPATH

FOOTPATH

FOOTPATH HIGH MAST

SHED

BOUNDARY WALL

BOUNDARY W

ALL

BOUNDARY WALL

FOOTPATH

SHED

FO

O

T O

VER

B

R

ID

G

E

F

O

O

T

O

V

E

R

B

R

ID

G

E

P

W

D

O

F

F

IC

E

S

/S

O

P

E

N

P

L

O

T

M

IC

R

O

S

M

A

L

L

A

N

D

M

E

D

IU

M

E

N

T

E

R

P

R

IS

E

S

D

E

V

E

L

O

P

M

E

N

T

I

N

S

T

IT

U

T

E

M

O

D

I

F

L

O

U

R

M

I

L

L

S

P

A

R

K

D

R

. JH

A

M

A

R

G

MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

U

N

D

E

R

C

O

N

S

T

.

BOUNDARY WALL

MH

LB

MH

MH

MH

MH

MH

MH

MH

B

U

IL

D

IN

G

B

U

IL

D

IN

G

DEVELOPMENT INSTITUTE

MICRO SMALL AND MEDIUM ENTERPROSES

DEVELOPMENT INSTITUTE

MICRO SMALL AND MEDIUM ENTERPROSES

TEMPAL

ROOM

RO

OM

SHED

SHED

SHED

ROOM

ROOM

SHED

PLINTH

RA

MP

WE

LLFO

U

N

TA

IN

SHED

BU

ILD

IN

G

BASM

EN

T +2

OFFICE + ROOM

SHED

ELECTRIC

BOX

PLINTH

PLIN

TH

SHIV

PLINT

HS/S

S/S

TEMPAL

S/S

ROOM SHED

DRA

IN

HUT

STAIRCASE AREA

BOUNDARY WALL

BOUNDARY WALL

BOUNDARY WALL

BOUNDARY WALL

BOUNDARY WALL

BOUNDARY WALL

GUARDROOM

ROOM

TANK

WATER

JUNCTIONBOX

MH

WELL

SHED

MH

MH

MH

HIGHMAST

MH

JUNCTION BOX

JUNCTION BOX

JUNCTION BOX

FO

O

TPATH

FO

O

TPATH

F

O

O

T

P

A

T

H

SHUTTER

GATE

G+1ROOM

GATE

G +1

ROOM

ONE

LENTER +

ONE

SHED

SHAD

RO0M STAIR

TOILETS

ROM S/S

RO0MS/S

S/S

ROM S/S

ROOM S G

+ 1

GROUND FLOOR + SHED

GREEN

ARE A

OPEN

AREA

ROAD

TOILETS

ROM S/S

TOILETS

ROM S/S

ROOM S G

+ 1

GROUND FL

OOR + S

HED

S H E D

GUARDSHAD

HINDUSTAN COCA COLA

BAVERAGES LIM

ITED

GUARDSHADAREA OPEN

BASMENT + 2 FLOOR

SHOPAREA

SHUTTER

GATE

G+1ROOM

GATE

G +1

ROOM

ONE

LENTER +

ONE

SHED

SHAD

RO0M STAIR

TOILETS

ROM S/S

RO0MS/S

S/S

ROM S/S

ROOM S G

+ 1

GROUND FLOOR + SHED

GREEN

ARE A

OPEN

AREA

ROAD

TOILETS

ROM S/S

TOILETS

ROM S/S

ROOM S G

+ 1

GROUND FL

OOR + S

HED

S H E D

GUARDSHAD

HINDUSTAN COCA COLA

BAVERAGES LIM

ITED

GUARDSHADAREA OPEN

BASMENT + 2 FLOOR

SHOPAREA

SHUTTER

GATE

G+1ROOM

GATE

G +1

ROOM

ONE

LENTER +

ONE

SHED

SHAD

RO0M STAIR

TOILETS

ROM S/S

RO0MS/S

S/S

ROM S/S

ROOM S G

+ 1

GROUND FLOOR + SHED

GREEN

ARE A

OPEN

AREA

ROAD

TOILETS

ROM S/S

TOILETS

ROM S/S

ROOM S G

+ 1

GROUND FL

OOR + S

HED

S H E D

GUARDSHAD

HINDUSTAN COCA COLA

BAVERAGES LIM

ITED

GUARDSHADAREA OPEN

BASMENT + 2 FLOOR

SHOPAREA

SHUTTER

GATE

G+1ROOM

GATE

G +1

ROOM

ONE

LENTER +

ONE

SHED

SHAD

RO0M STAIR

TOILETS

ROM S/S

RO0MS/S

S/S

ROM S/S

ROOM S G

+ 1

GROUND FLOOR + SHED

GREEN

ARE A

OPEN

AREA

ROAD

TOILETS

ROM S/S

TOILETS

ROM S/S

ROOM S G

+ 1

GROUND FL

OOR + S

HED

S H E D

GUARDSHAD

HINDUSTAN COCA COLA

BAVERAGES LIM

ITED

GUARDSHADAREA OPEN

BASMENT + 2 FLOOR

SHOPAREA

SHED

SHED

STORE

STORE

STORE & WORK SHOP

STORE & WORK SHOP

OFFICE BUILDING

MOTER ROOM

OPEN AREA

BASMENT + 2

ST

O

R

E &

W

O

R

K SH

O

P

OPEN AREA

FOOTPATH

RO

OM

SHED

OFFICE

SHED

PLINTH

RA

MP

BUILDING

WE

LL

FOOTPATH

GATE

SHUTTER

G +1

ROOM

G+1ROOM

GATE

ONE

LENTER +

ONE

SHED

SHAD

RO0M STAIR

TOILETS

ROM S/S

RO0M

S/S

S/S

ROM S/S

ROOM S G

+ 1

GROUND FLOOR + SHED

GREEN

ARE A

OPEN

AREA

TOILETS

ROM S/S

ROAD

TOILETS

ROM S/S

ROOM S G

+ 1

GROUND FL

OOR + S

HED

S H E D

GUARDSHAD

HINDUSTAN COCA COLA

BAVERAGES LIM

ITED

GUARDSHADAREA OPEN

PA

R

K

MOTER ROOM

GENARTER

OPEN AREA

ROOM

BASMENT + 2 FLOOR

ROOM

ROOM

ROOMROOM

S/S

STORE

S/S

S/S

OPEN AREA

OPEN AREA

STORE

BASMENT + 2

STORE

TOILET

STORE & W

ORK SHOPST

O

R

E &

W

O

R

K SH

O

PST

OR

E &

W

OR

K SH

OP

W

AL

L

&

SH

ED

S

/S

W

AL

L &

SH

ED

S

/S

STORE & WORK SHOP

OPEN AREA

OPEN AREA STORE & WORK SHOP

WALL & SHED G/ 1

OPEN AREA

STORE & PAINTING WORK SHOP

WALL & SHED G/ 1

STORE & W

ORK SHOP

G

+

3

OFFICE AREA G+1

OFFICE AREA G+1

SHOPAREA

G

+

1

S/S

BUILDING

U/G CHAMBER

ROOM

S

H

O

P

ADD. BOARD

SHO

P

HUT

TOP LVL= 8.877

TOP LVL= 9.614

WOLKING LVL= 9.614

TOP LVL= 9.704

WOLKING LVL= 6.473

WALK WAY ROOF ELV.225.547

WALK WAY ELV.223.361

WALK WAY ROOF ELV.225.886

WALK WAY ELV.223.026

B

O

U

N

D

A

R

Y

W

A

LL

BOUN

DARY

WAL

L

EP

EP

EP

EP EP

FOOTPATH

FOOTPATH HIGH MAST

BOUNDARY WALL

BOUNDARY WALL

BOUNDARY W

ALL

FOOTPATH

SHED

NS

IC

C

OM

PLE

X

MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

BOUNDARY WALL

LB

FOOTPATH

BOUNDARY W

ALL

O

K

H

L

A

P

H

-

I

I

I

C

h

:

2

5

4

6

2

.

2

0

5

4

.1

0

0

P

-1

5

P

-0

3

P

-0

4

P

-1

4

P

-1

7

P

-1

6

P

-0

2

P

-1

0

P

-1

1

P

-1

2

P

-1

3

P

-0

8

BOTANICAL GARDEN

JANAKPURI

2

5

9

0

0

PVC25722.500

C

P

-0

7

C

P

-0

6

D

M

R

C

E

L

E

V

A

T

E

D

L

I

N

E

R

6

.0

0

R

6

.0

0

6.60

6.60

0.50

0.50

9.90 9.90

R

6

.0

0

R

6

.0

0

9.90

0.60

9.90

MUZ 3.15MNMV 2.8M FOOTPATH 3.6M

DEAD ZONE 1.0M

MOTORIZED LANE 20.2M

MEDIAN

ROW

ROW ROW ROW ROW ROW ROW

ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW

ROW ROW

ROW ROW ROW ROW

ROW

ROW

ROW ROW

ROW

ROW

ROW

ROW

ROW

ROW ROW ROW ROW

ROW ROW

ROW ROW ROW ROW ROW ROW

ROW ROW ROW ROW

ROW ROW

ROW ROW ROW ROW ROW

ROW ROW ROW

ROW

ROW

ROW

ROW

ROW

ROW

ROW

ROW

ROW

R15.0

0

R

1

5

.0

0

R

15.0

0

R

1

5

.0

0

R

1

5

.0

0

R

6.0

0

R

6

.0

0

R

6

.0

0

R

6

.0

0

6.60

6.60

L

A

N

D

S

C

A

P

E

B

U

F

F

E

R

BU

S STO

P

BU

S STO

P

R

2

2

.5

6

m

R 20.00

N

A

T

I

O

N

A

L

S

M

A

L

L

I

N

D

U

S

T

R

I

E

S

C

O

R

P

O

R

A

T

I

O

N

E

N

D

O

F

U

N

D

E

R

G

R

O

U

N

D

R

A

M

P

/

C

O

N

T

R

A

C

T

E

N

D

B

O

U

N

D

A

R

Y

C

H

:

2

5

2

4

1

.

6

6

(

C

E

N

T

R

E

L

I

N

E

)

X

=

1

8

7

0

0

.

3

0

4

Y

=

-

1

7

1

4

.

5

9

7

R

.O

.W

4

5

.0

0

F

O

O

T

O

V

E

R

B

R

ID

G

E

R.O.W 45.00

U

P

>

>

<

<

U

P

D

N

>

>

<

<

D

N

PETROL PUMP

BHARAT

FILLING POINT

FILLING POINT

FILLING POINT FILLING POINT

FILLING POINT

PETROL PUMP

FILLING POINT

FOOTPATH

CH

-5000 m

CH

-6000 m

C

H

-

3

0

0

0

m

C

H

-

2

0

0

0

m

C

H

-

1

0

0

0

m

JBJB

JBJBJB

JB

JB

JB

JB

JB

JB

JB

JB JB

JB

JBJBJB

JBJBJB

JB

JB JB

JB

JB

JB

JB

JBJB

JBJBJB

JB

JB

JB

JB

JB

JB

JB

JB JB

JB

JBJBJB

JBJBJB

JB

JB JB

JB

JB

JB

JB

G+3

S-9

G+1

S-11

G+2

S-13

G+2

S-15

G+3

S-17

G+3

S-19

G+1

S-21

G+1

S-23

G+3

S-25

B+4

S-27

G+3

S-29

G+1

S-31

G+3

S-33

G+3

S-35

G+1

S-37

G+3

S-39

G+3

S-39 A

B+4

S-41

B+4

S-214

G+1

N-84

G+3

N-86

G+3

N-88

G+3

N-90

G+2

N-92

G+3

N-94

G+1

N-96

G+1

N-98

G+1

N-100

G+1

N-102

G+3

N-104

G+1

N-106

G+3

N-108

B+3

S-212

B+3

S-210

TO

CO

LO

NY

RO

AD

ROAD

SE

RV

ICE

RO

AD

FOOTPATH FOOTPATH

FOOTPATH

FOOTPATH

FOOTPATHFOOTPATH

FOOTPATH

FOOTPATH

HUTHUT

HUT

GOVT. BOY & GIRLS SECONDARY SCHOOL

MEDIAN

MEDIAN

MEDIAN

MEDIAN

MEDIAN

MEDIAN

MOTHER DAIRY

BUS STOP

LANE LANE

TO

MA

LV

IYA

NA

GA

R

B-30 BLD E3

G+3

H

U

T

GE

NE

RA

L STO

RE

SA

FAL S

TOR

E

SH

OP

MO

THE

R D

AIR

Y

TO

PA

NC

HS

HE

EL C

OL

ON

Y S

HO

PP

ING

CE

NT

RE

S-217

G+3

S-215

G+1 S-221

G+3 S-227

G+2 S-229

G+2

S-231

G+3

S-233

G+3

S-219

G+1

S-287

G+2

S-292

G+1

G+4G+4

S-287

G+2

S-288

G+1

TO C

OLO

NY

RO

AD

S-343

G+1

S-345

S/S

S-349

S

/S

U/C

G+3

G+3

HDFC BANK

RESIDENCE ASMAL LUXURY

HOTEL G+4

S-339

G+1

S-341

G+3

S-343

G+1

MA

X E

YE

CA

RE

G+2 S

-349

S

/S

LAN

E

G+3

S-361G+3

S-369A

G+4

S-351,UNDER

TO C

OLO

NY

RO

AD

CONS.

TOILET

SHOP

TO

DA

YA

LB

AG

H S

WA

MI N

AG

AR

DUSTBIN

SHED

MCD

FL

AT

G+3

MC

D

FL

AT

G+

3

S/S

S/

S

HUT

S/

S

S/S

SHED

FO

OT

PA

TH

FOOTPATH

FOOTPATH

SOCIETY

FLATS

G+2

TE

XI S

TA

ND

G+3

D.P BANSAL

BU

ILT-

UP

AR

EA

RESIDENCE

G+1

B-60

G+1

B-59

G+3

B-58

B-4

B-57

S/S

B-56

G+2

B-55

OP

EN

LA

ND

B-5

4G+2

B-53

S/S

B-52

B+4

B-51

B+4

B-50

S/S

B-49

B+4

B-48

B+1

B-47

B+3

B-46

G+2

B-45

G+2

B-44

B+3

B-43

THE HAVEN

G+3

G+1

B-39

G+1

B-38

G+3

B-37G+3

B-36

B-40 B-42

B+4

B-41

BUILDING

G+3

BUILDING

P

A

R

K

GATE

SERVICE ROAD

GA

TE

GA

TE

GATEGATEGATE

PANCHSHILA FLYOVER

SERVICE ROAD

SERVICE ROAD

SERVICE ROAD

FOO

TPA

TH

FOO

TPA

TH

FO

OTP

AT

H

FO

OTP

ATH

SERVICE ROAD

GATE

GATE GATE

GATE GATE GATEGATE GATE GATE GATE

GATE

GATE

GATE GATE GATE GATE

GA

TE

GATE

GATEGATE GATE GATE GATE GATE GATE

GATE

GATE GATE GATE GATE GATEGATE GATE

GA

TE

GA

TE

GATE GATE GATE GATE GATE GATE GATE

GATE

GATE

GATE

GA

TE

GA

TE

GATE GATE GATE GATE GATE

GA

TE

GA

TE GATE GATE

GA

TE

GA

TE

GATE GATE GATE GATE GATE GATE

GA

TE

GA

TE

GA

TE

GA

TE

GATE

G

A

T

E

GATE

GATE

GATE GATE GATE GATEGATE GATE GATE GATE GATE GATE GATE GATE GATEGATE

SUB-WAY

J-BOX

J-BOX

J-BOX J-BOX

J-BOX

J

-B

O

X

FO

OT

PA

TH

B

O

R

E

J

-B

O

X

F

O

O

T

P

A

T

H

SERVICE ROAD SERVICE ROAD SERVICE ROAD

SERVICE ROAD

SERVICE ROAD

SERVICE ROAD

SERVICE ROAD

SERVICE ROAD

J-BOX

IGL GAS LINE

TO NEHRU PLACE

OUTER RING ROAD

OUTER RING ROAD

GA

TE

GATE

TO

S

IW

ALIK

E

NC

LA

VE

G

A

T

E

DUSTBIN

J-B

HU

T

J-B

OX

GA

TE

ELECTRIC LINE

S O A M I N A G A R

S A D H N A E N C L A V E

JBJB

JBJBJB

JB

JB

JB

JB

JB

JB

JB

JB JB

JB

JBJBJB

JBJBJB

JB

JB JB

JB

JB

JB

JB

G+3

S-9

G+1

S-11

G+2

S-13

G+2

S-15

G+3

S-17

G+3

S-19

G+1

S-21

G+1

S-23

G+3

S-25

B+4

S-27

G+3

S-29

G+1

S-31

G+3

S-33

G+3

S-35

G+1

S-37

G+3

S-39

G+3

S-39 A

B+4

S-41

B+4

S-214

G+1

N-84

G+3

N-86

G+3

N-88

G+3

N-90

G+2

N-92

G+3

N-94

G+1

N-96

G+1

N-98

G+1

N-100

G+1

N-102

G+3

N-104

G+1

N-106

G+3

N-108

B+3

S-212

B+3

S-210

TO

CO

LO

NY

RO

AD

ROAD

SE

RV

ICE

RO

AD

FOOTPATH FOOTPATH

FOOTPATH

FOOTPATH

FOOTPATHFOOTPATH

FOOTPATH

FOOTPATH

IGL

IGL IGL

IGL

IGLIGL

IGL

IGL

BH

DB

HUTHUT

HUT

GOVT. BOY & GIRLS SECONDARY SCHOOL

EP

EP

EP

ELECTRIC LINE

MEDIAN

MEDIAN

MEDIAN

MEDIAN MEDIAN

MEDIAN

MOTHER DAIRY

LANE LANE

TO

MA

LV

IYA

NA

GA

R

EP EP EPEP

B-30 BLD E3

G+3

H

U

T

GE

NE

RA

L STO

RE

SA

FAL S

TOR

E

SH

OP

MO

THE

R D

AIR

Y

TO

PA

NC

HS

HE

EL C

OL

ON

Y S

HO

PP

ING

CE

NT

RE

S-217

G+3

S-215

G+1 S-221

G+3 S-227

G+2 S-229

G+2

S-231

G+3

S-233

G+3

S-219

G+1

S-287

G+2

S-292

G+1

G+4G+4

S-287

G+2

S-288

G+1

TO C

OLO

NY

RO

AD

S-343

G+1

S-345

S/S

S-349

S

/S

U/C

G+3

G+3

HDFC BANK

RESIDENCE ASMAL LUXURY

HOTEL G+4

S-339

G+1

S-341

G+3

S-343

G+1

MA

X E

YE

CA

RE

G+2 S

-349

S

/S

LAN

E

G+3

S-361G+3

S-369A

G+4

S-351,UNDER

TO C

OLO

NY

RO

AD

CONS.

TOILET

BU

ILD

ING

SHOP

TO

DA

YA

LB

AG

H S

WA

MI N

AG

AR

DUSTBIN

SHED

MCD

FL

AT

G+3

MC

D

FL

AT

G+

3

S/S

S/

S

HUT

S/

S

S/S

SHED

FO

OT

PA

TH

FOOTPATH

SOCIETY

FLATS

G+2

TE

XI S

TA

ND

G+3

D.P BANSAL

BU

ILT-

UP

AR

EA

RESIDENCE

G+1

B-60

G+1

B-59

G+3

B-58

B-4

B-57

S/S

B-56

G+2

B-55

OP

EN

LA

ND

B-5

4G+2

B-53

S/S

B-52

B+4

B-51

B+4

B-50

S/S

B-49

B+4

B-48

B+1

B-47

B+3

B-46

G+2

B-45

G+2

B-44

B+3

B-43

THE HAVEN

G+3

G+1

B-39

G+1

B-38

G+3

B-37G+3

B-36

B-40 B-42

B+4

B-41

BUILDING

G+3

BUILDING

P

A

R

K

EP EP EP EP EP EP EP EP EP EP

EP

EP EP

EP

EP EP

GATE

EP

EPEPEPEPEPEPEPEP

SERVICE ROAD

GA

TE

GA

TE

GATEGATEGATE

PANCHSHILA FLYOVER

EP

SERVICE ROAD

SERVICE ROAD

SERVICE ROAD

EP

EP

EP EP EP EPEP

EP

EP

EP

EP

EP

EP EP EP EP EP

EP

EP

EP

EP

EP

EP EP EP EP EP

EP

EP

EP

EP

EP

FOO

TPA

TH

FOO

TPA

TH

FO

OTP

AT

H

FO

OTP

ATH

SERVICE ROAD

GATE

GATE GATE

GATE GATE GATEGATE GATE GATE GATE

GATE

GATE

GATE GATE GATE GATE

GA

TE

GATE

GATEGATE GATE GATE GATE GATE GATE GATE

GATE

GATE GATE GATE GATE GATEGATE GATE

GA

TE

GA

TE

GATE GATE GATE GATE GATE GATE GATE

GATE

GATE

GATE

GA

TE

GA

TE

GA

TE

GATE GATE GATE GATE GATE

GA

TE

GA

TE GATE GATE

GA

TE

GA

TE

GATE GATE GATE GATE GATE GATE

GATE

GA

TE

GA

TE

GA

TE

GA

TE

GATE

G

A

T

E

GATE

GATE

GATE GATE GATE GATEGATE GATE GATE GATE GATE GATE GATE GATE GATEGATE

SUB-WAY

J-BOX

J-BOX

J-BOX J-BOX

J-BOX

J

-B

O

X

FO

OT

PA

TH

B

O

R

E

J

-B

O

X

F

O

O

T

P

A

T

H

SERVICE ROAD SERVICE ROAD SERVICE ROAD

SERVICE ROAD

SERVICE ROAD

SERVICE ROAD

SERVICE ROAD

J-BOX

SP

SP

SP

IGL

IGL IGL

IGL

IGL

IGL

IGL

IGL

IGL

IGL

IGL

IGL GAS GAS GAS GAS GAS GAS GAS GAS

IGL GAS LINE

TO NEHRU PLACE

OUTER RING ROAD

GA

TE

GATE

TO

S

IW

ALIK

E

NC

LA

VE

EP

G

A

T

E

DUSTBIN

J-B

HU

T

GA

TE

J-B

OX

S O A M I N A G A R

ELECTRIC LINE

S A D H N A E N C L A V E

GATE

11.1

2

E

X

IS

T

IN

G

F

L

Y

O

V

E

R

E

X

IS

T

IN

G

F

L

Y

O

V

E

R

O

U

T

E

R

R

IN

G

R

O

A

D

1

.2

9

ELECTRIC

-L

IN

E

ELECTRIC

-L

IN

E

ELECTRIC

-L

IN

E

ELECTRIC

-L

IN

E

ELECTRIC

-L

IN

E

ELECTRIC

-LIN

E

ELE

CT

RIC

LIN

E

ELECTRIC

-L

IN

E

ELECTRIC

-LIN

E

ELECTRIC

-LIN

E

ELECTRIC

-L

IN

E

ELECTRIC

-L

IN

E

ELECTRIC

-L

IN

E

ELECTRIC

-LIN

E

ELECTRIC

-LIN

E

ELECTRIC

-LIN

E

ELECTRIC

-LIN

E

ELECTRIC-LINE

ELECTRIC

-LIN

E

ELECTRIC

-LIN

E

ELECTRIC

-LIN

E

ELECTRIC

-L

IN

E

ELECTRIC

-LIN

E

ELECTRIC

-LIN

E

ELECTRIC

-L

IN

E

E

L

E

C

T

R

IC

-L

IN

E

ELECTRIC LINE ELECTRIC LINEELECTRIC LINEELECTRIC LINEELECTRIC LINE

IGL

IGL

GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS

GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS

ELECTRIC LINE ELECTRIC LINE

ELE

CT

RIC

LIN

E

E

L

E

C

T

R

IC

L

IN

E

ELECTRIC

-L

IN

E

ELECTRIC

-L

IN

E

ELECTRIC

-L

IN

E

E

L

E

C

T

R

IC

-L

IN

E

DRAIN

DRAIN

ELECTRIC LINE

ELECTRIC LINE

E

P

EP

EPEP

E

P

E

P

E

P

E

P

E

P

E

P

E

P

E

P

EP

EP

EP

EP EP

EP

DRAIN

DRAIN

DRAIN

DRAIN

DRAIN

DRAIN

D

R

A

IN

DR

AIN

DR

AIN

D

R

A

IN

DR

AIN

D

R

A

IN

D

R

A

IN

ELECTRIC-LINE

ELECTRIC-LINE

ELECTRIC-LINE

ELECTRIC

-LIN

E

ELECTRIC-LINE

E

LE

C

T

R

IC

LIN

E

ELECTRIC LINE

EP

34.68 EP EP EP EP EP EP EP EP EP EP EPEP EP EPEP EPEP

EP EP EP EP

EP EP EP EP EP EP EP EP

EP EP EP EP

EP EP EP

EP

EP

EP EP EP EP EP

EP EP EP EP EP EP EP EP EP EP EP EP EP

EP EP

EP EP EP EP EP EP EP EP

EP EP EP EP EP

EP

EP

EP

EP

EP

EP

EP

EP EP

EP

E

P

E

P

E

P

E

P

E

P

EP

E

P

E

P

E

P

E

P

E

P

E

P

E

P

E

P

E

P

E

P

E

P

E

P

E

P

E

P

E

P

E

P

E

P

EP

EP

EP

EP

EP

EP EP EP EP EP

EP EP EP EP EP

EP

EP

E

P

E

P

E

P

E

P

E

P

E

P

E

P

E

P

E

P

E

P

EP

E

P

E

P

E

P

E

P

E

P

E

P

E

P

E

P

E

P

E

P

E

P

E

P

E

P

E

P

E

P

E

P

E

P

EP

E

P

E

P

EP

EP

EP

EP

EP

E

P

E

P

E

P

E

P

E

P

E

P

E

P

E

P

EP

E

P

E

P

E

P

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

DRAIN

DRAIN

DRAIN

DRAIN

DRAIN

DRAIN

DRAIN

DRAIN

L-3

c

r

e

a

t

e

r

k

a

i

l

a

s

h

r

o

a

d

c

h

i

t

t

e

r

a

n

j

a

n

p

a

r

k

r

o

a

d

m

a

a

n

a

n

d

m

a

y

e

e

m

a

r

g

l

o

t

u

s

t

e

m

p

l

e

r

o

a

d

n

e

h

ru

p

la

c

e

m

a

rk

e

t ro

a

d

l

a

l

a

l

a

j

p

a

t

r

a

i

r

o

a

d

h

a

n

s

r

a

j

s

e

t

h

m

a

r

g

c

r

p

a

r

k

m

a

i

n

r

o

a

d

c

r

e

a

t

e

r

k

a

i

l

a

s

h

r

a

o

d

e

p

d

p

r

o

a

d

lal bahadur shastri m

arg

lal bahadur shastri m

arg

ma

ha

ris

hi d

aya

na

nd

m

arg

s

h

iv

a

lik

ro

a

d

Au

gust k

arn

ti marg

SR

I KR

ISH

NA

CH

AIT

AN

YA

MA

HA

PR

AB

HU

MA

RG

n

e

h

ru

p

la

c

e

ro

a

d

s

h

y

a

m

s

u

n

d

e

r m

a

lh

o

tra

m

a

rg

h

d

fc

b

a

n

k

trito

n

h

o

s

p

ite

l

h

d

fc

b

a

n

k

fa

b

h

o

te

l b

ro

a

d

w

a

y

p

ia

g

g

io

v

e

h

ic

le

s

p

v

t

g

o

v

e

rn

m

e

n

t g

irl s

c

h

o

o

;

g

o

v

e

rn

m

e

n

t g

irl s

c

h

o

o

;

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

GAS GAS GAS GAS GASGAS

GA

S

GASGAS

GAS GAS GAS GAS GAS GAS

SEW

ER LIN

E

SEW

ER LIN

E

SEW

ER LIN

E

SEW

ER LIN

E

SEW

ER LIN

E

SEW

ER LIN

E

SEW

ER LIN

E

SEWER LIN

E

S

E

W

E

R

L

IN

E

S

E

W

E

R

L

IN

E

S

E

W

E

R

L

IN

E

S

E

W

E

R

L

IN

E

S

E

W

E

R

L

IN

E

S

E

W

E

R

L

IN

E

S

E

W

E

R

L

IN

E

SEWER LIN

E

SE

WE

R L

INE

SE

WE

R L

INE

S

E

W

E

R

L

IN

E

S

E

W

E

R

L

IN

E

SEWER LINE

SEWER LINE

SEWER LINE

W

A

T

E

R

L

IN

E

W

A

T

E

R

L

IN

E

W

A

T

E

R

L

IN

E

W

ATER L

IN

E

W

ATER LIN

E

W

ATER LIN

E

W

ATER LIN

E

W

ATER L

IN

E

W

ATER LIN

E

W

ATER LIN

E

W

ATER LIN

E

W

ATER LIN

E

W

ATER L

IN

E

W

ATER L

IN

E

W

ATER LIN

E

WATER LINE

WATER LINE

W

A

T

E

R

L

IN

E

W

ATER L

IN

E

W

A

TE

R

L

IN

E

WATER LINEWATER LINE

W

ATER LIN

E

W

ATER L

IN

E

W

ATER L

IN

E

W

ATER LIN

E

W

ATER L

IN

E

W

ATER LIN

E

W

ATER LIN

E

W

ATER LIN

E

W

ATER LIN

E

W

ATER LIN

E

W

ATER LIN

E

W

ATER LIN

E

W

ATER LIN

E

W

ATER LIN

E

W

ATER LIN

E

W

ATER LIN

E

W

A

T

E

R

L

IN

E

W

A

T

E

R

L

IN

E

W

A

T

E

R

L

IN

E

W

A

T

E

R

L

IN

E

W

AT

ER

LIN

E

WATER LINE

WATER LINE

WATER LINE

WATER LINE

WATER LINE

W

A

T

E

R

LIN

E

W

A

T

E

R

L

IN

E

W

A

T

E

R

L

IN

E

W

ATER LIN

E

W

A

T

E

R

L

IN

E

W

A

T

E

R

L

IN

E

W

A

T

E

R

L

IN

E

W

A

T

E

R

L

IN

E

W

A

T

E

R

L

IN

E

W

A

T

E

R

L

IN

E

W

A

T

E

R

L

IN

E

WATER LIN

E

W

ATER LIN

E

W

ATER LIN

E

W

ATER LIN

E

WATER LINE

WATER LINE

W

A

T

E

R

L

IN

E

W

A

T

E

R

L

IN

E

W

A

T

E

R

L

IN

E

W

A

T

E

R

L

IN

E

W

A

T

E

R

LIN

E

W

A

T

E

R

LIN

E

W

A

T

E

R

LIN

E

W

A

T

E

R

LIN

E

W

A

T

E

R

L

IN

E

W

A

T

E

R

LIN

E

W

A

T

E

R

L

IN

E

W

A

T

E

R

L

IN

E

W

A

T

E

R

L

IN

EW

A

T

E

R

L

IN

E

W

A

T

E

R

L

IN

E

W

A

T

E

R

LIN

E

W

A

T

E

R

LIN

E

W

A

T

E

R

LIN

E

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

W

A

T

E

R

L

IN

E

W

A

T

E

R

L

IN

E

W

ATER L

IN

E

W

ATER LIN

E

W

ATER LIN

E

W

A

T

E

R

L

IN

E

WATER LINE

W

ATER LIN

E

W

ATER L

IN

E

W

ATER LIN

E

W

ATER LIN

E

W

ATER LIN

E

W

ATER L

IN

E

M

TNL

M

TNL

M

TNL

M

TNL

M

TNL

M

TNL

M

TNL

MTNL

M

TNL

M

TNL

MTNL

M

TNL

MTNL

M

TNL

M

TNL

M

TNL

M

TNL

M

TNL

M

TNL

M

T

N

L

M

T

N

L

M

T

N

L

SEW

ER LIN

E

S

E

W

E

R

L

IN

E

S

E

W

E

R

L

IN

E

S

E

W

E

R

L

IN

E

M.T.N.L

M.T.N.L

M.T

.M.L

M.T

.M.L

M.T.N.LM.T.N.LM.T.N.LM.T.N.LM.T.N.LM.T.N.LM.T.N.LM.T.N.LM.T.N.L M.T.N.L

M.T.N.L

M.T.N.L M.T.N.L M.T.N.L

M.T.N.L

M.T

.N.L

M.T

.N.L

2

0

0

M

M

W

A

T

E

R

L

I

N

E

1

0

0

M

M

W

A

T

E

R

L

I

N

E

1

0

0

M

M

W

A

T

E

R

L

I

N

E

1

0

0

M

M

W

A

T

E

R

L

IN

E

2

0

0

M

M

W

A

T

E

R

L

IN

E

9

0

0

M

M

W

A

T

E

R

L

IN

E

1

5

0

M

M

W

A

T

E

R

L

IN

E

2

5

0

M

M

S

E

W

E

R

L

IN

E

2

5

0

M

M

S

E

W

E

R

L

IN

E

4

5

0

M

M

W

A

T

E

R

L

IN

E

4

5

0

M

M

W

A

T

E

R

L

IN

E

4

5

0

M

M

W

A

T

E

R

L

IN

E

4

5

0

M

M

W

A

T

E

R

L

IN

E

S

E

W

E

R

L

I

N

E

1

5

0

M

MM

A

N

4

5

0

M

M

W

A

T

E

R

L

I

N

E

4

5

0

M

M

W

A

T

E

R

L

I

N

E

1

5

0

M

M

W

A

T

E

R

L

I

N

E

600 M

M

W

ATER LINE

4

5

0

M

M

W

A

T

E

R

L

IN

E

3

0

0

M

M

S

E

W

E

R

L

IN

E

1

5

0

M

M

W

A

T

E

R

L

I

N

E

M

A

IN

3

0

0

W

A

T

E

R

L

IN

E

4

5

0

M

M

W

A

T

E

R

L

IN

E

5

0

0

M

M

S

E

W

E

R

L

IN

E

3

0

0

M

M

S

E

W

E

R

L

IN

E

4

5

0

M

M

S

E

W

E

R

L

IN

E

3

0

0

M

M

S

E

W

E

R

L

IN

E

C

A

P

T

A

I

N

G

A

U

R

M

A

R

G

I

N

T

E

R

S

E

C

T

I

O

N

S

A

V

I

T

R

I

C

I

N

E

M

A

I

N

T

E

R

S

E

C

T

I

O

N

TO- MODI MILLè

TO I.I.T

è

TO- MODI MILLè

TO I.I.T

è

DM

RC

UN

DE

RG

RO

UN

D L

INE

DM

RC

UN

DE

RG

RO

UN

D L

INE

C.P.M. F-2, PWDE.E. F-31, PWD

GR

EA

TE

R K

AIL

AS

H R

OA

D

GR

EA

TE

R K

AIL

AS

H R

OA

D

UPPER LEVEL PLAN

LOWER LEVEL PLAN

Craphts Consultant

(I) Pvt. Ltd.1. ALL DIMENSIONS ARE IN METERS UNLESS MENTIONED OTHERWISE.

A P P R O V A L O F U T T I P E C

The 64th meeting of the UTTIPEC working group ll-B was held under the chairmanship of pr.Secretary, PDW on20.06.2017

OBSERVATIONS :

The above objection / suggestion were presented by PWD, GNCTD, in the Working Group-II-B meeting and theobservations are as follows:

i). The flyover at Malviya Nagar intersection has been proposed to provide signal free movement for the traffic movingstraight on Outer Ring Road.Once the proposed flyover is in place the intersection will be signalized to allow the rightturns for the traffic coming from Malviya Nagar side and moving towards Chirag Delhi as well as the traffic turning rightfrom IIT side to Malvya Nagar side alongwith signalized pedestrian crossing. It is also understood that there will besignificant increase in traffic volume (especially the local traffic comprising of feeder services) around this intersectiononc Panchsheel Park Metro station becomes operational. The provision of flyover at this intersection will significantlyreduce the congestion at lower level as the majority of straight moving traffic will be catered by the proposed flyover.

ii). The distance between the Chirag Delhi intersection and Malviya Nagar Intersection is 1186m while the distancebetween Khel Gaon Marg Intersection and Malviya Nagar Intersection is 1085 m meaning thereby that Malviya NagarIntersection is placed almost centrally between these two. It is to be noted that the distance between the toe of existingChirag Delhi flyover and the toe of the proposed flyover would be 540 m whereas the distance between the toe of existingPanchsheel Flyover and proposed flyover at Malviya Nagar would be 485 m meaning thereby the weaving lengths oneither end of proposed flyover will be adequate as per the codal provision.

iii). The assumption of reduction in width of carriageway from existing 12 m to 9 m on Outer Ring Road as stated inobjection/suggestion is not correct. In fact 9 + 9 m carriageway on flyover would take care of the traffic moving straightacross the intersection on Outer Road as uninterrupted movement. At surface level, 9 m and 10.5 m widths ofcarriageways have been proposed towards southern and northern side of proposed flyover respectively which will takecare of the turning traffic at the intersection.

iv). The entry to / exit from the petrol pumps existing on either side of Oute Ring Road near Malviya Nagar intersectionhas been proposed through the surface level road proposed on either side of flyover and therefore, access to the petrolpumps are not affected with the provision of the flyover.

v). Closure of median at Malviya Nagar intersection after completion of DMRC work around this place would warrantdetour of approximately 2 km (both ways) for both the right turning traffic at Malviya Nagar intersection. This would alsocontinue to load both the carriageways of Outer Ring Road between Panchsheel and Chirag Delhi flyovers, which is notdesirable from the point of view of level of service and high economic cost. Present closure of median is only temporaryfeature to regulate the traffic in view of ongoing DMRC work.

RECOMMENDATION :

Based on the above observation Working Group recommended the proposal for consideration of the Governing Body.

Presented in the 54th UTTIPEC Governing Body meeting, held on 22.06 2017 at underthe chairmanship of the hon'ble Lt. Governor of Delhi.

DECISION OF THE GOVERNING BODY:

The proposal was approved.

NOTE:

MINUTES OF 64th WORKING GROUP II-B MEETING : MINUTES OF 54th GOVERNING BODY MEETING :MINUTES OF 62nd WORKING GROUP II-B MEETING :Minutes of the 62nd meeting of the UTTIPEC Working Group II-B (Retrofitting ofExisting Corridor), held under the Chairmanship of Secretary, PWD, on Wednesday,03.05.2017 at 11.00 AM. in the Conference Room of Secretary, PWD, 5th level, 'B'Wing, Delhi Secretariat, New Delhi.

i). It was observed that between the existing Chirag Delhi and Savitri Cinema flyover(Northern side) near LPG gas godown, there is a reduction of carriageway lanes,which is creating bottleneck leading to severe traffic congestion. It was decidedthat PWD, GNCTD will take up widening in consultation with other Stakeholdersfor smooth flow of traffic.

OBSERVATIONS :

ii). The approved multi modal integration of Greater Kailash and Panchsheel Park metrostations needs may be integrated with this project.

iii). The doubling of Sarai Kale Khan grade separator will be integrated with NHAI'sproposal of NH-24- Ring road 'T'-junction.

iv). PWD, GNCTD in consultation with Delhi Traffic Police will make suitable provisionof traffic signal phasing and signages to ensure optimum utilization of grade separatorsfor smooth flow of traffic which should be submitted to UTTIPEC.

v). PWD, GNCTD to take necessary clearances from the land owning agencies andstakeholders for the proposed widening, wherever required.

vi). Representatives of Delhi Traffic Police (SR) and DMRC agreed with the proposals.

RECOMMENDATION :

Based on the above observations, Working Group recommended the proposal of aboveall four intersection for uploading on UTTIPEC website for community feedback andaccordingly for consideration and approval of Governing Body.

Dy. Director (Plg.)

UTTIPEC

Asstt. Director (Plg.)

UTTIPEC

Sr. Consultant (T)

UTTIPEC

1. Approval of Governing Body is for Transportation and Circulation plan only.

2. This is the conceptual drawing and detailed engineering design, is to be evaluated byRoad Owning Agency.

3. Structural engineering safety/ road geometric features are strictly to be followed bythe implementing agency as per the Bureau of Standards (BIS)/ Indian Road Congress(IRC) and any other statutory codes.

4. UTTIPEC's Street Design Guidelines approved by the Hon'ble L.G. on 25.11.2010 tobe followed by the Executing/ Implementing agencies.

5. Acquisition of land for Implementation of project shall be the, responsibility ofExecuting/ Implementing agencies.

6. The necessary permission for cutting of trees and rainwater harvesting etc. shall beobtained by the executing/ Implementing agencies from concerned deptt. as per theprevailing policy.

7. All required statutory clearances are to be obtained by the executing/ implementingagencies.

8. Drawings for the construction are to be prepared by the Road Owning Agency.

9. Signages and road marking should be as per IRC Code .

10. Road safety audit to be prepared by road owning agency as per the standard guidlines.

KEY PLANSTUDY STRETCH

PROPOSED CONCEPTUAL TRAFFIC CIRCULATION PLAN( NEHRU PLACE INTERSECTION TO SAVITRI CINEMA INTERSECTION )

Prepared On :

30 / 10 /2017

Managing Director

REMARKAS PERDATESL NO

CLIENT:

PROJECT:

THIS DRAWING IS A PROPERTY OF THECRAPHTS CONSULTANTS ( I ) PVT. LTD. ANDMUST NOT BE COPIED OR REPRODUCED IN ANY FORM

Checked By : P. ALAMDRAWN BY

M. Arafat

CRAPHTS

TITLE:

CONSULTANTS:

DRG NO -

CRTS / PWD / ORR / LP / 200-C

SCALE -

1:1000

P . W . D . GOVT. OF DELHI

CRAPHTS CONSULTANTS (I) PVT. LTD.14/3, Mathura Road, Faridabad.

Ph - 91-2278813, 2275948.

INTEGRATED TRANSIT CORRIDOR DEVELOPMENT AND STREET

NETWORK/CONNECTIVITY PLAN FOR THE CORRIDOR (A) ON OUTER RING

ROAD FROM MODI MILL FLYOVER TO IIT GATE AND (B) ON RING ROAD FROM

BHAIRON MARG T JUNCTION TO DND INTERSECTION.

REVISIONS

LEGENDS

Existing Road

Tree

ROW

SYMBOL

DISCRIPTION

DMRC Line (Underground)

Drain

Proposed Road

Foot Path

Green Belt

Builtup Area

Property to be demolished

Existing Median

Existing Flyover

Proposed Flyover

Building Line

Affacted Area

Traffic Circulation

DMRC Line (Elevated)

DMRC Stations

Proposed Ramp

Existing Ramp

Lane Marking

12/05/2017 Recommendation/suggestion of Working group UTTIPEC, DDAR1

R2 Discussion with Dy.Director,UTTIPEC, DDA28/09/2017R2

11/10/2017R3 Discussion with Dy.Director,UTTIPEC, DDA

24/10/2017R4 Discussion with Sr. Consultant,UTTIPEC, DDA

AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
E
AutoCAD SHX Text
North

Recommended