Civil ConstructionCivil Construction

May 2008May 2008

Civil Construction Civil Construction Civil Construction Civil Construction

What means civil construction on site.What means civil construction on site.

The following slides will show pictures taken from various The following slides will show pictures taken from various construction sites including some comments.construction sites including some comments.

Our main activities are soil improvement works, site Our main activities are soil improvement works, site infrastructure installation, power plant buildings like infrastructure installation, power plant buildings like machine hall, control room building, water treatment machine hall, control room building, water treatment plant, store- and workshop buildings, cooling towers, plant, store- and workshop buildings, cooling towers, cooling water intake and outfall structures, roads, cooling water intake and outfall structures, roads, outdoor facilities and landscaping.outdoor facilities and landscaping.

Civil ConstructionCivil ConstructionCivil ConstructionCivil Construction

What means civil construction on What means civil construction on sitesite

• The Civil Site fabrication areaThe Civil Site fabrication area• Infrastructure preparationsInfrastructure preparations• Earthworks and foundationsEarthworks and foundations• Steel reinforced concrete worksSteel reinforced concrete works• Structural steelwork and claddingStructural steelwork and cladding• Other works related to civilOther works related to civil• Finishing worksFinishing works

Civil Construction Civil Construction Civil Construction Civil Construction

The Civil Site Fabrication AreaThe Civil Site Fabrication Area

The pictures are showing various foundation works The pictures are showing various foundation works and steel work performed during the early stage and steel work performed during the early stage of a combined cycle power station project of a combined cycle power station project (CCPP).(CCPP).

The Civil job is not an installation it is a fabrication job on siteThe Civil job is not an installation it is a fabrication job on site

Campo di Gibraltar, Spain, UHA Boiler Foundation

The Civil job is not an installation it is a fabrication job on siteThe Civil job is not an installation it is a fabrication job on site

Campo, UHA Boiler Foundation

The Civil job is not an installation it is a fabrication job on siteThe Civil job is not an installation it is a fabrication job on site

Campo, UHA

The Civil job is not an installation it is a fabrication job on siteThe Civil job is not an installation it is a fabrication job on site

UHA Boiler Stack Embedments

The Civil job is not an installation it is a fabrication job siteThe Civil job is not an installation it is a fabrication job site

Campo, UMC Main Maschine Building

Civil Construction Civil Construction Civil Construction Civil Construction

Infrastructure PreparationsInfrastructure Preparations

One of the first activities at site is the preparation of One of the first activities at site is the preparation of all necessary infrastructure. Such as site all necessary infrastructure. Such as site management office buildings, access roads lay management office buildings, access roads lay down areas, service lines (water, sewage, down areas, service lines (water, sewage, phone, power, etc.).phone, power, etc.).

Infrastructure PreparationsInfrastructure Preparations

Kogan Creek, Australia, Site Management Offices

Infrastructure PreparationsInfrastructure Preparations

Kemerton, Australia, Wheel wash facility

Infrastructure PreparationsInfrastructure Preparations

Kemerton, site access road

Infrastructure PreparationsInfrastructure Preparations

Kogan Creek, Banana Bridge Imrovement

Civil Construction Civil Construction Civil Construction Civil Construction

Earthworks and foundationsEarthworks and foundations

The major activities during the early stage of a The major activities during the early stage of a project are the earthworks and the construction project are the earthworks and the construction of all building foundations and equipment of all building foundations and equipment foundations for turbines, generators, foundations for turbines, generators, transformers and others.transformers and others.

Earthworks and foundationsEarthworks and foundations

Kogan Creek, Surface Water Retaining Basin

Earthworks and foundationsEarthworks and foundations

Kogan Creek, UHA Boiler Area Excavation

Earthworks and foundationsEarthworks and foundations

Ras Laffan,

Earthworks and foundationsEarthworks and foundations

Ras Laffan, Fa. Keller

Earthworks and foundationsEarthworks and foundations

Ras Laffan, 12UMB

Earthworks and foundationsEarthworks and foundations

Olkiluoto 3, Finland, main machine building

Turbine Table OLK3 Concrete Pour in May 2007

Earthworks and foundationsEarthworks and foundations

OLK3, Foundation Works

Earthworks and foundationsEarthworks and foundations

OLK3, Foundation works

Civil Construction Civil Construction Civil Construction Civil Construction

Steel reinforced concrete worksSteel reinforced concrete works

The concrete works are the most time consuming The concrete works are the most time consuming works of the entire civil activities on site.works of the entire civil activities on site.

One of the focus are the numerous embedded parts One of the focus are the numerous embedded parts that have to be placed in foundations. Those are that have to be placed in foundations. Those are steel ancor plates, steel pockets, bolts, steel ancor plates, steel pockets, bolts, conduits, earthing rods, and others.conduits, earthing rods, and others.

Steel reinforced concrete worksSteel reinforced concrete works

Arubal, Spain UGJ Cooling Tower Water Treatment Plant

Steel reinforced concrete worksSteel reinforced concrete works

Arubal, UST Workshop and Store Building

Steel reinforced concrete worksSteel reinforced concrete works

Arubal, UCA Control Room Building

Steel reinforced concrete worksSteel reinforced concrete works

Ras Laffan 2005, Transformer Bay

Steel reinforced concrete worksSteel reinforced concrete works

Duct for High Voltage Cables, Ras Laffan 2005

Steel reinforced concrete worksSteel reinforced concrete works

Kemerton, Gas Turbine Base Foundation

Steel reinforced concrete worksSteel reinforced concrete works

Gas Turbine and Generator Foundation

Steel reinforced concrete works (Sugen, India)Steel reinforced concrete works (Sugen, India)

Civil Construction Civil Construction Civil Construction Civil Construction

Structural steelwork and claddingStructural steelwork and cladding

Most of the building‘s carcasses are made of Most of the building‘s carcasses are made of steelstructure, double skin cladding and thermal steelstructure, double skin cladding and thermal insulation. insulation.

The building carcass has to fulfill noise protection The building carcass has to fulfill noise protection requirements as well as protection against dust, wind requirements as well as protection against dust, wind and water, freezing temperatures and/or heat.and water, freezing temperatures and/or heat.

The steel structure has to carry the load of the overhead The steel structure has to carry the load of the overhead cranes as well as load of equipment like piping, cranes as well as load of equipment like piping, mechanical modules, cable trays and others.mechanical modules, cable trays and others.

Structural steelwork and claddingStructural steelwork and cladding

Arubal, UMC Main Machine Building

Structural steelwork and claddingStructural steelwork and cladding

Arubal,10UMC and HRSG Boiler

Structural steelwork and claddingStructural steelwork and cladding

Kogan Creek, Australia

Structural steelwork and claddingStructural steelwork and cladding

Shuweihat

Civil Construction Civil Construction Civil Construction Civil Construction

Other works related to civilOther works related to civil

Those works can be soil improvement works (piling, Those works can be soil improvement works (piling, soil exchange) or conveyor belts for coal fired soil exchange) or conveyor belts for coal fired power plants, silos, bridges, rain water retaining power plants, silos, bridges, rain water retaining basins and so on.basins and so on.

Even the installation of a fully functioning concrete Even the installation of a fully functioning concrete mix plant on site can be part of our civil works.mix plant on site can be part of our civil works.

Other carcass worksOther carcass works

Kogan Creek, Conctere Mix Plant

Other carcass worksOther carcass works

Kogan Creek, Storm water dam – spill way

Other carcass worksOther carcass works

Iskenderun, Turkey, Coal Stockyard

Other carcass worksOther carcass works

Iskenderun, Coal Stockyard

Other carcass worksOther carcass works

Iskenderun, UET Storage Silos

Civil ConstructionCivil Construction

Finishing worksFinishing works

The Control Room Building is the center of the The Control Room Building is the center of the power plant control and consitst of control power plant control and consitst of control rooms, office space, sanitary installations, social rooms, office space, sanitary installations, social areas, meeting rooms and so on.areas, meeting rooms and so on.

Other buildings that require finishing works are for Other buildings that require finishing works are for instance the Water Treatment Building, Store- instance the Water Treatment Building, Store- and Workshop Building and Laboratory Building.and Workshop Building and Laboratory Building.

Finishing Works (UCA Sugen, India, Control Room)Finishing Works (UCA Sugen, India, Control Room)

Finishing Works (UCA Building, Sugen India)Finishing Works (UCA Building, Sugen India)

Finishing Works (USV and UGD, Sugen India)Finishing Works (USV and UGD, Sugen India)

Finishing Works UMC, 3 x Single Shaft, Sugen India)Finishing Works UMC, 3 x Single Shaft, Sugen India)

Recommended