United States Department of the InteriorNational Park Service
Class A Construction Cost EstimateBASIS OF ESTIMATE
document.xls Basis of Estimate Page 1 of 85 Print Date: 05/07/2023
PROJECT INFORMATION
Project: Project Name
Park NamePark Alpha Code
PMIS: TBD or PMIS number if knownEstimate Date: Estimate Date
Park: Park Apha:
Prepared By: Estimator NameCompany: CompanyAddress: AddressCity, State Zip: CityPhone: Phone
BACKGROUND SUPPORTING MATERIAL (Scope of Work):
SOURCE OF COST DATA:
ESTIMATE ASSUMPTIONS:Describe any assumptions made to prepare estimate and highlight areas needing clarification for future estimates.
MAJOR CHANGES FROM PREVIOUS ESTIMATE:Describe any major changes in scope of work, materials, systems, assumptions, etc. from the previous estimate version.
Briefly describe scope of work included in the estimate, plan dates, exclusions, etc. List any Government Furnished Property (GFP)
Document all sources of cost information used in the estimate. (Attach additional information if necessary)
United States Department of the InteriorNational Park Service
Class A Construction Cost EstimateBASIS OF ESTIMATE
document.xls Basis of Estimate Page 2 of 85 Print Date: 05/07/2023
PROJECT INFORMATION
Project: Project Name
Park NamePark Alpha Code
PMIS: TBD or PMIS number if knownEstimate Date: Estimate Date
Park: Park Apha:
DESCRIPTION OF MARK-UP & ADD-ONS:
Design Contingency: 0.00% Explain & Justify
0.00% Explain & Justify
Government General Conditions: 0.00% Explain & Justify
Contractor Overhead: 0.00% Explain & Justify
Contractor Profit: 0.00% Explain & Justify
Contracting Method Adjustment: 0.00% Describe anticipated contract method and justify value used.
Annual Inflation Escalation Factor: 0.00% Projected annual inflation rate.
0
OTHER COMMENTS:
Provide any additional information, qualifications, etc.
Standard. General Conditions:
Time Until Project Midpoint (Months) Number of months from estimate (or data) date until the projects midpoint of construction.
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
PROJECT COST SUMMARY
document.xlsProject Cost Summary Page 3 of 85 Print Date: 05/07/2023, 07:02:32
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS Number: TBD or PMIS number if known Date:
Bid Item No. Bid Item DescriptionAPR
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0
Total Material Cost
Total Labor Cost
Total Equipment
Cost
Total Direct Construction
Costs
Design Contingency
General Conditions
General Contractor Overhead
General Contractor
Profit
Contracting Method
Adjustment
Inflation Escalation
Months
Bid Item: 1 Asset / Project Element 1 TOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY (if any): WBS L2 WBS Description $ - $ - $ - $ - WBS L2 WBS Description $ - $ - $ - $ - WBS L2 WBS Description $ - $ - $ - $ - WBS L2 WBS Description $ - $ - $ - $ - WBS L2 WBS Description $ - $ - $ - $ -
Total - Bid Item 1 Asset / Project Element 1 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Bid Item: 2 Asset / Project Element 2 TOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY (if any):
WBS L2 WBS Description $ - $ - $ - $ - WBS L2 WBS Description $ - $ - $ - $ - WBS L2 WBS Description $ - $ - $ - $ - WBS L2 WBS Description $ - $ - $ - $ - WBS L2 WBS Description $ - $ - $ - $ -
Total - Bid Item 2 Asset / Project Element 2 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Bid Item: 3 Asset / Project Element 3 TOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY (if any):
WBS L2 WBS Description $ - $ - $ - $ - WBS L2 WBS Description $ - $ - $ - $ - WBS L2 WBS Description $ - $ - $ - $ - WBS L2 WBS Description $ - $ - $ - $ - WBS L2 WBS Description $ - $ - $ - $ -
Total - Bid Item 3 Asset / Project Element 3 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Bid Item: 4 Asset / Project Element 4 TOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY (if any):
WBS L2 WBS Description $ - $ - $ - $ - WBS L2 WBS Description $ - $ - $ - $ - WBS L2 WBS Description $ - $ - $ - $ - WBS L2 WBS Description $ - $ - $ - $ - WBS L2 WBS Description $ - $ - $ - $ -
Total - Bid Item 4 Asset / Project Element 4 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Bid Item: 5 Asset / Project Element 5 TOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY (if any):
WBS L2 WBS Description $ - $ - $ - $ - WBS L2 WBS Description $ - $ - $ - $ - WBS L2 WBS Description $ - $ - $ - $ - WBS L2 WBS Description $ - $ - $ - $ - WBS L2 WBS Description $ - $ - $ - $ -
Total - Bid Item 5 Asset / Project Element 5 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
PROJECT COST SUMMARY
document.xlsProject Cost Summary Page 4 of 85 Print Date: 05/07/2023, 07:02:32
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS Number: TBD or PMIS number if known Date:
Bid Item No. Bid Item DescriptionAPR
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0
Total Material Cost
Total Labor Cost
Total Equipment
Cost
Total Direct Construction
Costs
Design Contingency
General Conditions
General Contractor Overhead
General Contractor
Profit
Contracting Method
Adjustment
Inflation Escalation
Months
Bid Item: 6 Asset / Project Element 6 TOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY (if any): WBS L2 WBS Description $ - $ - $ - $ - WBS L2 WBS Description $ - $ - $ - $ - WBS L2 WBS Description $ - $ - $ - $ - WBS L2 WBS Description $ - $ - $ - $ - WBS L2 WBS Description $ - $ - $ - $ -
Total - Bid Item 6 Asset / Project Element 6 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Bid Item: 7 Asset / Project Element 7 TOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY (if any):
WBS L2 WBS Description $ - $ - $ - $ - WBS L2 WBS Description $ - $ - $ - $ - WBS L2 WBS Description $ - $ - $ - $ - WBS L2 WBS Description $ - $ - $ - $ - WBS L2 WBS Description $ - $ - $ - $ -
Total - Bid Item 7 Asset / Project Element 7 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Bid Item: 8 Asset / Project Element 8 TOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY (if any):
WBS L2 WBS Description $ - $ - $ - $ - WBS L2 WBS Description $ - $ - $ - $ - WBS L2 WBS Description $ - $ - $ - $ - WBS L2 WBS Description $ - $ - $ - $ - WBS L2 WBS Description $ - $ - $ - $ -
Total - Bid Item 8 Asset / Project Element 8 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Bid Item: 9 Asset / Project Element 9 TOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY (if any):
WBS L2 WBS Description $ - $ - $ - $ - WBS L2 WBS Description $ - $ - $ - $ - WBS L2 WBS Description $ - $ - $ - $ - WBS L2 WBS Description $ - $ - $ - $ - WBS L2 WBS Description $ - $ - $ - $ -
Total - Bid Item 9 Asset / Project Element 9 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Bid Item: 10 Asset / Project Element 10 TOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY (if any):
WBS L2 WBS Description $ - $ - $ - $ - WBS L2 WBS Description $ - $ - $ - $ - WBS L2 WBS Description $ - $ - $ - $ - WBS L2 WBS Description $ - $ - $ - $ - WBS L2 WBS Description $ - $ - $ - $ -
Total - Bid Item 10 Asset / Project Element 10 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
Total Bid Items 1-10 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
PROJECT COST SUMMARY
document.xlsProject Cost Summary Page 5 of 85 Print Date: 05/07/2023, 07:02:32
Estimator NameEstimate Date
Bid Item Total
$ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ -
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
PROJECT COST SUMMARY
document.xlsProject Cost Summary Page 6 of 85 Print Date: 05/07/2023, 07:02:33
Estimator NameEstimate Date
Bid Item Total
$ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ -
$ -
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
BID ITEM COST SUMMARY
document.xlsBid Item 1 Summary Page 7 of 85 Print Date: 05/07/2023, 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS Number: TBD or PMIS number if known Date:
Bid Item Number Asset / Project Element / Description Size/Count UnitsBID ITEM 1 Asset / Project Element / Description 0 Unit
WBS Description Labor Cost/Unit Total Labor Cost NET Cost/Unit Total NET Costs
1 A10 Foundations #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!2 A20 Basement Construction #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!3 B10 Superstructure #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!4 B20 Exterior Enclosure #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!5 B30 Roofing #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!6 C10 Interior Construction #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!7 C20 Stairs #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!8 C30 Interior Finishes #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!9 D10 Conveying Systems #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!10 D20 Plumbing Systems #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!11 D30 HVAC #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!12 D40 Fire Protection #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!13 D50 Electrical #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!14 E10 Equipment #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!15 E20 Furnishings #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!16 F10 Special Construction #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!17 F20 Selective Building Demolition #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!18 G10 Site Preparation #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!19 G20 Site Improvements #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!20 G30 Site Mechanical Utilities #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!21 G40 Site Electrical Utilities #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!22 G50 Other Site Construction #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!23 XX Special Use - 1 #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!24 XX Special Use - 2 #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!25 XX Special Use - 3 #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
Subtotal Direct Construction Costs #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $0 #DIV/0! #DIV/0!$0.00 $ - $ - $ - $0
$ - $ - $ - $0Design Contingency 0.00% $0
Total Direct Construction Costs $0Standard General Conditions 0.00% Applied to Total Direct Construction Cost less GFP $0
0.00% Applied to Total Direct Construction Cost less GFP $0Subtotal NET Construction Cost $0
Overhead 0.00% $0Profit 0.00% $0
Estimated NET Construction Cost $00.00% $0
0 Months Annual Rate = 0.00% Inc. Bonds & CMA $0 Total Estimated NET Cost of Construction $0
Item No.
Material Cost/Unit
Total Material Cost
Equipment Cost/Unit
Total Equipment Cost
Direct Cost/Unit
Total Direct Costs
Total Value of Government Furnished Property (GFP) Inc. in Direct Cost . In most cases GFP is normally zero - see footnote- Direct Cost Subtotal without GFP .
Government General Conditions
Contracting Method Adjustment Inflation Escalation
GFP costs only apply when the Government pre-purchases items, or provides other materials out of Government inventory, to be installed by contractor. Adjustments and Markup on GFP only include Inflation Escalation; No other adjustment factors or O&P markup have been applied.
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1 - A10 - Foundations 8 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: A10 Foundations Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
A1010 STANDARD FOUNDATIONSMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL STANDARD FOUNDATIONS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
A1020 SPECIAL FOUNDATIONSMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL SPECIAL FOUNDATIONS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1 - A10 - Foundations 9 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: A10 Foundations Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
A1030 SLAB ON GRADEMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL SLAB ON GRADE 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1 - A10 - Foundations 10 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: A10 Foundations Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Summary Item: A10 Foundations
Description Quantity Unit
MATERIAL LABOR EQUIPMENT TOTALS
Total Cost
A10 Foundations 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-A20 Basement 11 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: A20 Basement Construction Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
A2010 BASEMENT EXCAVATIONMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASEMENT EXCAVATION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
A2020 BASEMENT WALLSMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASEMENT WALLS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-A20 Basement 12 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: A20 Basement Construction Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-A20 Basement 13 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: A20 Basement Construction Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Summary Item: A20 Basement Construction
Description Quantity Unit
MATERIAL LABOR EQUIPMENT TOTALS
Total Cost
A20 Basement Construction 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-B10 Superstructure 14 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: B10 Superstructure Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
B1010 FLOOR CONSTRUCTIONMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL FLOOR CONSTRUCTION 1000 Unit $ - $0 $ - $0 $ - $0 $ - $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
B1020 ROOF CONSTRUCTIONMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL ROOF CONSTRUCTION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-B10 Superstructure 15 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: B10 Superstructure Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-B10 Superstructure 16 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: B10 Superstructure Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Summary Item: B10 Superstructure
Description Quantity Unit
MATERIAL LABOR EQUIPMENT TOTALS
Total Cost
B10 Superstructure 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-B20 Exterior Enclosure 17 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
OPSummary Item: B20 Exterior Enclosure Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
B2010 EXTERIOR WALLSMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL EXTERIOR WALLS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
B2020 EXTERIOR WINDOWSMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL EXTERIOR WINDOWS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-B20 Exterior Enclosure 18 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
OPSummary Item: B20 Exterior Enclosure Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
B2030 EXTERIOR DOORSMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL EXTERIOR DOORS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-B20 Exterior Enclosure 19 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
OPSummary Item: B20 Exterior Enclosure Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Summary Item: B20 Exterior Enclosure
Description Quantity Unit
MATERIAL LABOR EQUIPMENT TOTALS
Total Cost
B20 Exterior Enclosure 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-B30 Roofing 20 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: B30 Roofing Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
B3010 ROOF COVERINGSMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL ROOF COVERINGS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
B3020 ROOF OPENINGSMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL ROOF OPENINGS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-B30 Roofing 21 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: B30 Roofing Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-B30 Roofing 22 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: B30 Roofing Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Summary Item: B30 Roofing
Description Quantity Unit
MATERIAL LABOR EQUIPMENT TOTALS
Total Cost
B30 Roofing 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-C10 Interior Construct. 23 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: C10 Interior Construction Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
C1010 INTERIOR PARTITIONSMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL INTERIOR PARTITIONS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
C1020 INTERIOR DOORSMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL INTERIOR DOORS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-C10 Interior Construct. 24 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: C10 Interior Construction Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
C1030 FITTINGSMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL FITTINGS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-C10 Interior Construct. 25 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: C10 Interior Construction Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Summary Item: C10 Interior Construction
Description Quantity Unit
MATERIAL LABOR EQUIPMENT TOTALS
Total Cost
C10 Interior Construction 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-C20 Stairs 26 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: C20 Stairs Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
C2010 STAIR CONSTRUCTIONMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL STAIR CONSTRUCTION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
C2020 STAIR FINISHESMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL STAIR FINISHES 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-C20 Stairs 27 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: C20 Stairs Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-C20 Stairs 28 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: C20 Stairs Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Summary Item: C20 Stairs
Description Quantity Unit
MATERIAL LABOR EQUIPMENT TOTALS
Total Cost
C20 Stairs 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-C30 Interior Finishes 29 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: C30 Interior Finishes Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
C3010 WALL FINISHESMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL WALL FINISHES 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
C3020 FLOOR FINISHESMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL FLOOR FINISHES 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-C30 Interior Finishes 30 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: C30 Interior Finishes Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
C3030 CEILING FINISHESMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL CEILING FINISHES 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-C30 Interior Finishes 31 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: C30 Interior Finishes Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Summary Item: C30 Interior Finishes
Description Quantity Unit
MATERIAL LABOR EQUIPMENT TOTALS
Total Cost
C30 Interior Finishes 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-D10 Conveying Systems 32 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: D10 Conveying Systems Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
D1010 ELEVATORSMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL ELEVATORS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
D1020 ESCALATORS & MOVING WALKSMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL ESCALATORS & MOVING WALKS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-D10 Conveying Systems 33 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: D10 Conveying Systems Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
D1030 MATERIAL HANDLING SYSTEMSMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL MATERIAL HANDLING SYSTEMS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
D1090 OTHER CONVEYING SYSTEMSMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL OTHER CONVEYING SYSTEMS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-D10 Conveying Systems 34 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: D10 Conveying Systems Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Summary Item: D10 Conveying Systems
Description Quantity Unit
MATERIAL LABOR EQUIPMENT TOTALS
Total Cost
D10 Conveying Systems 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-D20 Plumbing 35 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: D20 Plumbing Systems Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
D2010 PLUMBING FIXTURESMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL PLUMBING FIXTURES 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
D2020 DOMESTIC WATER DISTRIBUTIONMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL DOMESTIC WATER DISTRIBUTION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-D20 Plumbing 36 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: D20 Plumbing Systems Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
D2030 SANITARY WASTEMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL SANITARY WASTE 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
D2040 RAIN WATER DRAINAGEMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL RAIN WATER DRAINAGE 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-D20 Plumbing 37 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: D20 Plumbing Systems Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
D2050 SPECIAL PLUMBING SYSTEMSMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL SPECIAL PLUMBING SYSTEMS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
D2090 OTHER PLUMBING SYSTEMSMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL OTHER PLUMBING SYSTEMS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Summary Item: D20 Plumbing Systems
Description Quantity Unit
MATERIAL LABOR EQUIPMENT TOTALS
Total Cost
D20 Plumbing Systems 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-D30 HVAC 38 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: D30 HVAC Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
D3010 ENERGY SUPPLYMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL ENERGY SUPPLY 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
D3020 HEAT GENERATING SYSTEMSMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL HEAT GENERATING SYSTEMS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-D30 HVAC 39 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: D30 HVAC Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
D3030 COOLING GENERATING SYSTEMSMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL COOLING GENERATING SYSTEMS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
D3040 DISTRIBUTION SYSTEMS (HVAC)MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL DISTRIBUTION SYSTEMS (HVAC) 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-D30 HVAC 40 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: D30 HVAC Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
D3050 TERMINAL & PACKAGE UNITSMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL TERMINAL & PACKAGE UNITS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
G3060 CONTROLS & INSTRUMENTATIONMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL CONTROLS & INSTRUMENTATION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-D30 HVAC 41 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: D30 HVAC Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
G3070 SPECIAL HVAC SYSTEMS & EQUIPMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
G3080 SYSTEM TESTING & BALANCINGMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL SYSTEM TESTING & BALANCING 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
SPECIAL HVAC SYSTEMS & EQUIPMENT
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-D30 HVAC 42 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: D30 HVAC Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
G3090 OTHER HVAC SYSTEMS & EQUIPMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL OTHER HVAC SYSTEMS & EQUIPMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Summary Item: D30 HVAC
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
D30 HVAC 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-D40 Fire Protection 43 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: D40 Fire Protection Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
D4010 FIRE PROTECTION SPRINKLERS SYSTEMSMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
D4020 STANDPIPE & HOSE SYSTEMSMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL STANDPIPE & HOSE SYSTEMS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
FIRE PROTECTION SPRINKLERS SYSTEMS
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-D40 Fire Protection 44 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: D40 Fire Protection Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
D4030 FIRE PROTECTION SPECIALTIESMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL FIRE PROTECTION SPECIALTIES 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
D4090 OTHER FIRE PROTECTION SYSTEMSMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL OTHER FIRE PROTECTION SYSTEMS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-D40 Fire Protection 45 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: D40 Fire Protection Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Summary Item: D40 Fire Protection
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
D40 Fire Protection 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-D50 Electrical 46 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: D50 Electrical Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
D5010 ELECTRICAL SERVICE & DISTRIBUTIONMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL ELECTRICAL SERVICE & DISTRIBUTION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
D5020 LIGHTING & BRANCH WIRINGMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL LIGHTING & BRANCH WIRING 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-D50 Electrical 47 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: D50 Electrical Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
D5030 COMMUNICATIONS & SECURITYMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL COMMUNICATIONS & SECURITY 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
D5040 SPECIAL ELECTRICAL SYSTEMSMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL SPECIAL ELECTRICAL SYSTEMS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-D50 Electrical 48 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: D50 Electrical Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
D5090 OTHER ELECTRICAL SYSTEMSMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL OTHER ELECTRICAL SYSTEMS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Summary Item: D50 Electrical
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
D50 Electrical 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-E10 Equipment 49 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: E10 Equipment Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
E1010 COMMERCIAL EQUIPMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL COMMERCIAL EQUIPMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
E1020 INSTITUTIONAL EQUIPMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL INSTITUTIONAL EQUIPMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-E10 Equipment 50 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: E10 Equipment Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
E1030 VEHICULAR EQUIPMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL VEHICULAR EQUIPMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
E1090 OTHER EQUIPMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL OTHER EQUIPMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-E10 Equipment 51 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: E10 Equipment Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Summary Item: E10 Equipment
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
E10 Equipment 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-E20 Furnishings 52 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: E20 Furnishings Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
E2010 FIXED FURNISHINGSMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL FIXED FURNISHINGS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
E2020 MOVABLE FURNISHINGSMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL MOVABLE FURNISHINGS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-E20 Furnishings 53 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: E20 Furnishings Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
E2090 OTHER FURNISHINGSMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL OTHER FURNISHINGS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-E20 Furnishings 54 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: E20 Furnishings Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Summary Item: E20 Furnishings
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
E20 Furnishings 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-F10 Special Construction 55 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: F10 Special Construction Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
F1010 SPECIAL STRUCTURESMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL SPECIAL STRUCTURES 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
F1020 INTEGRATED CONSTRUCTIONMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL INTEGRATED CONSTRUCTION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-F10 Special Construction 56 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: F10 Special Construction Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
F1030 SPECIAL CONSTRUCTION SYSTEMSMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL SPECIAL CONSTRUCTION SYSTEMS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
F1040 SPECIAL FACILITIESMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL SPECIAL FACILITIES 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-F10 Special Construction 57 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: F10 Special Construction Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
F1050 SPECIAL CONTROLS & INSTRUMENTATIONMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Summary Item: F10 Special Construction
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
F10 Special Construction 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
SPECIAL CONTROLS & INSTRUMENTATION
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-F20 Selective Demo. 58 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: F20 Selective Building Demolition Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
F2010 BUILDING ELEMENTS DEMOLITIONMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BUILDING ELEMENTS DEMOLITION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
F2020 HAZARDOUS COMPONENTS ABATEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
HAZARDOUS COMPONENTS ABATEMENT
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-F20 Selective Demo. 59 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: F20 Selective Building Demolition Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-F20 Selective Demo. 60 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: F20 Selective Building Demolition Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Summary Item: F20 Selective Building Demolition
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
F20 Selective Building Demolition 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-G10 Site Preparation 61 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: G10 Site Preparation Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
G1010 SITE CLEARINGMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL SITE CLEARING 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
G1020 SITE DEMOLITION & RELOCATIONSMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL SITE DEMOLITION & RELOCATIONS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-G10 Site Preparation 62 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: G10 Site Preparation Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
G1030 SITE EARTHWORKMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL SITE EARTHWORK 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
G1040 HAZARDOUS WASTE REMEDIATIONMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL HAZARDOUS WASTE REMEDIATION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-G10 Site Preparation 63 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: G10 Site Preparation Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
G1090 OTHER SITE PREPARATIONMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL OTHER SITE PREPARATION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Summary Item: G10 Site Preparation
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
G10 Site Preparation 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-G20 Site Improvements 64 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: G20 Site Improvements Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
G2010 ROADWAYSMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL ROADWAYS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
G2020 PARKING LOTSMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL PARKING LOTS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-G20 Site Improvements 65 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: G20 Site Improvements Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
G2030 PEDESTRIAN PAVINGMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL PEDESTRIAN PAVING 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
G2040 SITE DEVELOPMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL SITE DEVELOPMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-G20 Site Improvements 66 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: G20 Site Improvements Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
G2050 LANDSCAPINGMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL LANDSCAPING 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
G2060 SITE FURNISHINGSMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL SITE FURNISHINGS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Summary Item: G20 Site Improvements
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
G20 Site Improvements 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-G30 Site Mechanical 67 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: G30 Site Mechanical Utilities Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
G3010 WATER SUPPLYMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL WATER SUPPLY 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
G3020 SANITARY SEWERMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL SANITARY SEWER 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-G30 Site Mechanical 68 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: G30 Site Mechanical Utilities Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
G3030 STORM SEWERMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL STORM SEWER 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
G3040 HEATING DISTRIBUTIONMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL HEATING DISTRIBUTION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-G30 Site Mechanical 69 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: G30 Site Mechanical Utilities Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
G3050 COOLING DISTRIBUTIONMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL COOLING DISTRIBUTION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
G3060 FUEL DISTRIBUTIONMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL FUEL DISTRIBUTION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-G30 Site Mechanical 70 of 85 05/07/2023 07:02:33
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: G30 Site Mechanical Utilities Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
G3090 OTHER SITE MECHANICAL UTILITIESMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL OTHER SITE MECHANICAL UTILITIES 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Summary Item: G30 Site Mechanical Utilities
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
G30 Site Mechanical Utilities 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-G40 Site Electrical 71 of 85 05/07/2023 07:02:34
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: G40 Site Electrical Utilities Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
G4010 ELECTRICAL DISTRIBUTIONMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL ELECTRICAL DISTRIBUTION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
G4020 SITE LIGHTINGMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL SITE LIGHTING 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-G40 Site Electrical 72 of 85 05/07/2023 07:02:34
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: G40 Site Electrical Utilities Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
G4030 SITE COMMUNICATIONS & SECURITYMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL SITE COMMUNICATIONS & SECURITY 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
G4090 OTHER SITE ELECTRICAL UTILITIESMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL OTHER SITE ELECTRICAL UTILITIES 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-G40 Site Electrical 73 of 85 05/07/2023 07:02:34
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: G40 Site Electrical Utilities Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Summary Item: G40 Site Electrical Utilities
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
G40 Site Electrical Utilities 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-G50 Other Site Const. 74 of 85 05/07/2023 07:02:34
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: G50 Other Site Construction Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
G5010 SERVICE & PEDESTRIAN TUNNELSMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL SERVICE & PEDESTRIAN TUNNELS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
G5090 OTHER SITE SYSTEMS & EQUIPMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL OTHER SITE SYSTEMS & EQUIPMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-G50 Other Site Const. 75 of 85 05/07/2023 07:02:34
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: G50 Other Site Construction Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-G50 Other Site Const. 76 of 85 05/07/2023 07:02:34
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: G50 Other Site Construction Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Summary Item: G50 Other Site Construction
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
G50 Other Site Construction 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-Special Use 1 77 of 85 05/07/2023 07:02:34
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: XX Special Use - 1 Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-Special Use 1 78 of 85 05/07/2023 07:02:34
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: XX Special Use - 1 Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-Special Use 1 79 of 85 05/07/2023 07:02:34
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: XX Special Use - 1 Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Summary Item: XX Special Use - 1
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
XX Special Use - 1 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-Special Use 2 80 of 85 05/07/2023 07:02:34
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: XX Special Use - 2 Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-Special Use 2 81 of 85 05/07/2023 07:02:34
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: XX Special Use - 2 Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1-Special Use 2 82 of 85 05/07/2023 07:02:34
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: XX Special Use - 2 Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Summary Item: XX Special Use - 2
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
XX Special Use - 2 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1 -Special Use 3 83 of 85 05/07/2023 07:02:34
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: XX Special Use - 3 Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1 -Special Use 3 84 of 85 05/07/2023 07:02:34
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: XX Special Use - 3 Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
United States Department of the InteriorNational Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
document.xls, Item 1 -Special Use 3 85 of 85 05/07/2023 07:02:34
Project: Project Name Estimate By: Estimator NamePark: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By: PMIS: TBD or PMIS number if known Date:
Summary Item: XX Special Use - 3 Total Cost: $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
BASE CODE BASE ELEMENTMF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Summary Item: XX Special Use - 3
Description Quantity UnitMATERIAL LABOR EQUIPMENT TOTALS
Total Cost
XX Special Use - 3 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Uniformat II WBS Code Material
Cost/Unit Total Material
Cost Labor
Cost/Unit Total Labor
CostEquipment Cost/Unit
Total Equipment
Cost Total
Cost/Unit
Recommended