Click to edit Master title style Recoil Separator for ReA12 Workshop Program and Goals Wolfgang...

Preview:

Citation preview

Click to edit Master title style

Recoil Separator for ReA12Workshop Program and Goals

Wolfgang Mittig

MSU-NSCL NSCL 12th July 2014

For the organizing committee

Click to edit Master title styleFacts

•FRIB is under construction•Low energy (~10MeV/n) re-accelerated beams are an important part of the program

Click to edit Master title styleReaccelerated Beams ProgramDo we need a spectrometer?

•why, for what physics? W. Nazarewicz, draft of whitepaper

•what physics cannot be done without a spectrometer?•how we can improve the draft of the whitepaper?•what type of spectrometerdo we agree with the recommendation of the preparatory writing workshop?

Click to edit Master title styleRecent work

http://meetings.nscl.msu.edu/CommunityMeeting2013/recoil.htm

Questionnaire:

Writing workshop June 12-13 2014 • excel file of proposals• draft of the whitepaper• recommendation These documents were attached to the mail to the today’s workshop registered participants

Click to edit Master title styleContext and Goal •FRIB with re-acceleration will be completed in 2022•construct a spectrometer needs 5 years 2022-5=2017•2017-2014 = 3 years for the project approved/funded•http://www.lecmeeting.org/ Texas A&M, Aug. 21-23•Long Range Plan (LRP) for nuclear physics

•Goal: present at the LECM a well documented scientific and technical project that can be endorsed by the community: white paper + recommendation

Recommended