COMMUNITY UPDATE

August 22, 2018

COMMUNITY UPDATEAndrew Neiditz | SOUTH SOUND 911

Steve Dwoskin | CallisonRTKLDavid Chamness| CallisonRTKL

• OUR PROGRESS

• Employee charrettes- May 15 & 16, July 11 & 12

• Initial coordination meetings with City of Tacoma and utilities

• Building systems selection process

• Development of interior layout

• Building form and envelope studies

• Construction estimate updates

SITE LAYOUT

Does not represent final or proposed design. For illustrative purposes only

SOUTH D STREET

PACIFIC AVENUE

SO

UTH

36TH

STR

EE

T

SECURE STAFF PARKING

SOUTH SOUND 911PUBLIC SAFETY

COMMUNICATIONS CENTER72,500 S.F.

LANDSCAPE SECURITY SETBACK

LANDSCAPE SECURITY SETBACK

PUBLIC ENTRANCE

STAFF ENTRANCE

SITE SECTION | WEST – EAST (FROM SOUTH 36TH STREET)

THIRD FLOOR

SECOND FLOOR

GROUND FLOOREMPLOYEE ENTRANCE

PACIFICAVENUE

EMPLOYEE PARKING

82 FEETSTAND-OFF

ZONE50

’ –0”

H

110’ – 0” W

32’ –

0” H

SITE SECTION | SOUTH – NORTH (FROM PACIFIC AVE)

THIRD FLOOR

SECOND FLOOR

GROUND FLOORPUBLIC ENTRANCE COMMUNICATION SYSTEMS

911 COMMUNICATIONS CENTER

305’ – 0” W

50’ –

0” H

GROUND LEVEL

RECORDS

COMMUNICATIONSSYSTEMS

FACILITYSUPPORT

FACILITYSERVICES

EMERGENCYOPERATIONS

CENTER

PUBLICENTRY

TRAININGROOM

SERVICEAREA

LEVEL 2

INFORMATIONSERVICES

911COMMUNICATIONS

SUPPORT

911COMMUNICATIONS

CENTER

LEVEL 3

ADMINISTRATION EXECUTIVE AREA911

COMMUNICATIONSCENTER

(BELOW)

BUILDING FORM

ARCHITECTURAL INSPIRATION

Office Precedents

Material Reference Communications Center Precedent

MASSING VIEW

Puget Sound Hospital (View from South Division Lane and South D Street)

MASSING VIEW

Proposed Building (View from South Division Lane and South D Street)

PACIFIC AVENUE (LOOKING SOUTHWEST)

PACIFIC AVENUE (LOOKING NORTHWEST)

SOUTH D STREET (LOOKING NORTHWEST)

BUILDING COLORS & MATERIALS

Insulated Metal Panels

Precast Concrete IPE Wood Metal Canopy

Metal Railing Vertical Seam Metal Panels

LANDSCAPE PLAN

LANDSCAPE TYPOLOGIES

Forest

Meadow Stormwater Green Roof

Rock Gardnen

DESIGN KICKOFF

DESIGN

CONSTRUCTION

2ND QUARTER2018

3RD QUARTER2018

2ND QUARTER2019

3RDQUARTER2020

BUILDINGCOMMISSIONING

• User Group Charrettes• Equipment Demos• Conceptual Design• Functional Layouts • Site Due Diligence- Survey, Geotech

• Schematic Design• Design Development• Building Agency Coordination• Construction Documentation & Permits• Construction Cost Reviews• End of Phase Presentations to SS911 • Technology Integration

• Set-up• Move-In (soft openings)• Initiate backup improvements

• Schematic Design complete September 2018

• Additional employee charrettes completed

• Construction cost review August 2018

• Policy Board meeting – August 22, 2018

• Community meeting – August 22, 2018

• Bidding and Award- 2ND Quarter 2019• Permitting• Construction

SCHEDULE OVERVIEW

• Contact | info@southsound911.org

• Project Web Page: www.southsound911.org/pscc

QUESTIONS?

THANK YOU.