Comp Studio Work

Preview:

DESCRIPTION

Syracuse University School of Architecture Comprehensive Studio (2012)

Citation preview

Auburn Performing Arts Center

Façade Rendering From State Street | N – S | 1/4” = 1’1/4” = 1’

Structural Components and HVAC Zones | 1/32” = 1’

Structural Progression and HVAC Zones | 1/32” = 1’

3/8” = 1’

Longitudinal Sectional Rendered Perspective Threw Theater House | W - E | 3/8” = 1’

Longitudinal Section of Sight and Light Angles | W – S | 1/4” = 1’1/4” = 1’