View
21
Download
0
Category
Tags:
Preview:
DESCRIPTION
COMPANY PORTFOLIIO. MCLENDON ENTERPRISES FOOTPRINT IN GA . OFFICE LOCATIONS. Main Office 2365 Aimwell Road Vidalia, GA 30474 (912) 537-7887. Savannah Office 9 Chatham Pkwy. S. Dr. Suite B-2 Savannah, GA 31405 (912) 349-0677. MISSION STATEMENT. - PowerPoint PPT Presentation
Citation preview
C O M P A N Y P O R T F O L I I O
MCLENDON ENTERPRISES
FOOTPRINTIN GA.
OFFICE LOCATIONS
Main Office2365 Aimwell RoadVidalia, GA 30474(912) 537-7887
Savannah Office9 Chatham Pkwy. S. Dr. Suite B-2Savannah, GA 31405(912) 349-0677
MISSION STATEMENT
McLendon Enterprises Inc. and its employees share the same goals of integrity, quality, teamwork, safety and continuous improvement in each and every project.
MEET THE TEAM
President Benny D. Mclendon Email UsSecretary / Treasure Jennifer Hollis jennifer@mclendonenterprises.com
General Manager Tim Adams tim@mclendonenterprises.com
Office Manager Anne Roller anne@mclendonenterprises.com
Chief Engineer Sean Scott P.E. sean@mclendonenterprises.com
Lead Estimator Shane Holland shane@mclendonenterprises.com
Construction Manager Rusty Williams rusty@mclendonenterprises.com
Senior Project Manager Adam Lee adam@mclendonenterprises.com
Business Development Bill Boies bill@mclendonenterprises.com
Contract Revenue Earned2011: $ 33,457,474.00 2012: $ 46,660,631.00
*Number Of Permanent Employees*2010: 93 2011: 112 2012: 130 2013: 140
BACKGROUND
McLendon Enterprises was incorporated in 1979 at which time the leadership role was then taken over by current President / Owner, Benny McLendon
Transportation ProjectsGeorgia Department of Transportation
CDBG ProjectsCity Streets / Roadway
Utility InstallationsWaterStorm
Sewer / Force main / Pump stations
Other ProjectsSubdivisions
Treatment PlantsDesign Builds
ON THE HORIZON
CURRENT PROJECTS OVER $ 2,000,000.00
NAME ACREAGE CITY / STATE GENERAL CONTRACTOR GC REFERENCE COTRACT COST
Dean Forest Road Widening
4480 Savannah, GA. Chatham CountyRuss Abolt
(County Manager) $7,895,231.00
Fort Stewart Elementary
50Fort Stewart,
GA.Sauers Constr.
Darren Harrell (305) 306-0205
$2,546,200.00
GA DOT CSSTP-0007000(190)
1200 Savannah, GA. GA DOTWill Murphey (912) 427-5754
$2,001,921.00
Multi-Purpose Machine Gun Range
420Fort Stewart,
GA.Trend Constr.
Bill Cooke (910) 436-3426
$3,509,212.00
GA DOT EDS00-0545-00(014)
9600 Vidalia, GA. GA DOTWill Murphey (912) 427-5754
$24,040,300.00
GA DOT B145143-13-000-00
1500Bryan /
Effingham GA DOT
Will Murphey (912) 427-5754
$4,023,000.00
GA DOT Screven County
Bridge1200 Sylvania, GA. GA DOT
Edwin Thompson
(478) 552-4603$3,900,000.00
Hwy 80 & Pine Barren / Old
Louisville Road800 Pooler, GA. City of Pooler
Robert Bryd (912) 748-7261
$2,000,120.00
PROJECTS COMPLETED WITHIN PAST TWO YEARS OVER $ 1,000,000.00
NAME CITY / STATE GENERAL CONTRACTOR OR ENGINEER CONTRACT COST
North Aviation Expansion Savannah, GA. North Aviation $24,371,531.00MLP 00-0030-(081) Evans
CountyClaxton, GA. GA DOT $18,934,256.00
ESS00-0545-00(028) Appling County
Baxley, GA. GA DOT $31,000,789.00WWTP Improvements City of Uvalda Hofstadter & Assoc. $415,019.00South Hunter Housing Savannah, GA. Balfour Beaty $3,047,079.00
Hazlehurst Airport Hazlehurst, GA. Hofstadter & Assoc. $2,087,801.00Swift Creek Bridge Toombs County GA DOT $2,952,926.00
Vidalia Cancer Center Vidalia, GA. Little Jon Engineering $1,097,626.00CCA Correctional Facility Millen, GA. Flint Constr $588,628.00
JD Dickerson School Vidalia, GA. McDonald Construction $385,144.00Aspen Heights Statesboro, GA. The Aspen Group $2,569,941.00
Bleckley Middle School Cochran, GA. Pope Construction $1,819,523.00East Dublin WWTP East Dulin, GA. Hofstadter & Assoc. $2,776,066.00
Bundy Officer Housing Ft. Stewart, GA. Balfour Beaty $2,727,139.00New Meadows Hospital Vidalia, GA. Brasfield & Gorrie $4,183,202.00
Hardin Canal Bridge Culvert
Savannah, GA. Chatham County $4,248,657.00
3D-GPS, 3D-MILLIMETER GPS, LPS
BUILDING TODAY'S INFRASTRUCTURE WITH TOMORROWS TECHNOLOGY
-- INCREASE GRADING PRODUCTIVITY SIGNIFICANTLY-- REDUCE STAKING ON JOBSITE ALMOST ENTIRELY
-- CONTROLLING OF MATERIAL
- - UP TO 300% MORE ACCURATE THAN STANDARD GPS-- INCREASED PRODUCTIVITY – FEWER PASSES NEEDED TO REACH FINISH GRADE
- - GRADE TO TIGHTER TOLERANCES
- - HIGH ACCURACY FOR TIGHT TOLERANCES PROJECTS-- USED WHEN THE JOBSITE DOES NOT HAVE VISIBILITY TO OPEN SKY I.E. WORKING BETWEEN BUILDINGS OR IN HEAVY TREE COVERAGE
CURRENT PROJECTS AS OF AUGUST 1, 2013
MCLENDON ENTERPRISES INC. FOOTPRINT IN GA.
-- LENGTH OF TAXI WAY = 6,800 FEET-- LENGTH OF TUNNEL =1,200 FEET
-- PILES DRIVEN = 688-- CUBIC YARDS OF DIRT MOVED = 850, 000
-- COST OF PROJECT = $ 24,371,531.00
NORTH AVIATION EXPANSION
- 15,000 CYDS. OF DIRT REMOVED-- THREE RUNS OF 72” RCP 180’ LONG EACH REPLACED
-- 50 CYD. CONCRETE WEEP WALL INSTALLED-- 20,000 CYDS. OF DIRT REPLACED
-- 130,000 LBS. OF SAND AND CONCRETE BAGS-- REPLACED 300’ OF RAILROAD
PLANT VOGTLE “21” DAY EMERGENCY RAIL REPAIR
-- LENGTH OF PROJECT = 2.5 MILES-- TOTAL UNDERGROUND UTILITIES INSTALLED = 9,750 FEET
-- CUBIC YARDS OF DIRT MOVED = 60, 000-- COST OF PROJECT = $ 7,895,231.00
DEAN FOREST ROAD WIDENING
-- LENGTH OF PROJECT = 1.58 MILES-- CYDS. OF CONCRETE POURED FOR RETAINING WALL
-= THREE FOOTBALL FIELDS x THREE FT. DEEP-- TOTAL UNDERGROUND UTILITIES INSTALLED = 84,480 FEET
-- COST OF PROJECT = $ 18,934,256.00
GA DOT MLP OO-0030-(081) EVANS COUNTY
NEW MEADOWS HOPISTAL
ASPEN HEIGHTS APARTMENT COMPLEX
VIDALIA, GA
STATESBORO, GA
COST OF PROJECT = $ 4,183,202.00
COST OF PROJECT = $ 2,569,941.00
MCLENDON ENTERPRISES INC. WORKING HAND IN HAND
-- CREATING MAXIMUM VALUE FOR EVERYONE-- WAYS TO MAINTAIN PROJECT SCHEDULES
-- HIGH QUALITY PROJECT RESULTS
BUDGETING
-- PLANNING AND PREPARING-- PROJECTS PROGRESSION-- EXECUTION OF PLANNING-- PROJECT COST ANALYSING
ON SITE MEETINGS
-- -- DID WE MAINTAIN A GOOD QUALITY PRODUCT ?
-- DID WE FINISH UNDER BUDGET ?-- DID WE FINISH PROJECT EARLY ?
-- WHAT DID WE LEARN ?
COMPLETION OF PROJECTS
THE
WAY !
ITEMS TO DISCUSS:
- MCLENDON ENTERPRISES HISTORY: PAST, PRESENT, AND FUTURE
- BUILDING TODAY'S INFRASTRUCTURE WITH TOMORROWS TECHNOLOGY
- MCLENDON ENTERPRISES INC. WORKING HAND IN HAND
Recommended