Conceptual Design TC comments (III)

Preview:

DESCRIPTION

Conceptual Design TC comments (III). Concept Stage. Development Stage. Production Stage. Retirement stage. Support Stage. Utilization stage. HL-LHC Life cycle. Dismantling. Requirements definition. Functional specification. Engineering specification. - PowerPoint PPT Presentation

Citation preview

The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement 284404.

Conceptual Design

TC comments (III)

2

HL-LHC Life cycleMoving from the concept to the development stage implies an assessment and a validation of the requirements.

Acquisition Process

Organizational Project-Enabling Processes

Project Processes: Planning, Measurements, Assessment, Control, Risk, Configurarion, Information, Decision Management

Requirements definition

Functional specification

Engineering specification

Fabrication, Assembly and

Verification

Installation - Comissioning

Operation & Maintenance

Concept Stage Development Stage Production Stage

Utilization stage

Support Stage

Dismantling

Retirement stage

3

Moving from Concept to DevelopmentThis validation shall at least include a common agreement on the following requirements:

• Performance parameters

• Technical parameters

• Configuration and installation constrains

• Interface parameters

• Cost and Schedule constrains

4

WPs included

5

Time line

WP April May May June June July July August August Sept Sept Oct

Defining architecture

Drafting

Presentation TC

Implement comments

Final Approval

6

Work to be done after• Implement comments received during this sessions

(July – Sep 2014)

• Consolidate de conceptual specifications and find missing tasks and incompatibilities (July – Sep 2014)

• Prepare be first Schedule (July - Oct 2014)

• Prepare de bottom up budget (July - Dec 2014)

• Start the conceptual specifications for the “software wps” and for the technical infrastructures and services (Sept - Dec 2014)

7

Work to be done after• Contents shall be coherent with PDR

• Launching of Technical specifications linked to the conceptual specifications

WP4

8

WP4

Crab cavities (ACF)

LHC

Cryomodule(ACFGA)

RF services(ACFSV)

SPS prototype

Other function

Harmonic system

200 MHz

800 MHz

Other function

Wide-band feedback

9

WP12

WP12

Vacuum (V)

Beam screenNon-shielded

(VSC)

P2(VSCG)

P8(VSCG)

Shielded Beam Screen(VSM)

P1(VSMA)

P5(VSMA)

Vacuum chambers (VCj)

Vacuum layout (LV)

LSS 1 LSS 5 LSS 4Insulation vacuum

(LVI)

By pass vacuum layout (LV)

Vacuum layout experiments (LVXj)

ATLAS

CMS

LHCb

ALICE

WP 3 Magnets for Insertion Regions

10

WP3(Magnets)

MQXFA(Q1, Q3)

MQXFB(Q2)

Orbit correctors

MCBXFA(Q1, Q3)

MCBY (Q5)

MCBC (Q6)

MCBXFB (Q2)

MCBRD (D2)

MCBYY (Q4)

High-order correctors

MQSXF

MCSSXF

MCSXF

MCOXF

MCOSXF

MCDXF

MCDSXF

MCTXF

MCTSXF

MBXF (D1) MBRD (D2) MQYY (Q4) MQY (Q5) MQML (Q6)

11

WP11

WP1111 T dipole magnet

2 m Model

Double-aperture Magnet (MBHDP)

Single-aperture Magnet(MBHSP)

11-T Dipole (DS)

Cryo-assembly (LBH)

Cold mass (LMBH)

Magnet (MBH)

Other(tbc)

Cryo-assembly prototype (LBH_P)

Cold mass (LMBHP)

Magnet (MBH_P)

Other (tbc)

Connection cryostat (LE?xxx)

12

WP6Cold powering

P7

Arc

P5

Matching Section

Inner Triplet

Arc

P1

Matching Section

Inner Triplet

Arc

The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement 284404.