CONFIGURATION STATUS
ACCOUNTING
Mohd Sayuti Bin Md SaufMohamad Ridzuan Bin Abdullah
Nik Mulaikah Naimah Binti Nik Adnan
Noorsuziyante Binti Mat NapiShahidah Binti Avelino
7/24/2019 Configuration Status Accounting-Introduction
2/26
PURPOSE
Configuration status accounting (CSA) is the process of creating
and organizing the knowledge base necessary for the
performance of configuration management
In addition to acilitating M! the purpose o SA is
to provide a highly reliable source o confgurationinormation to support all program or pro"ectactivities including program management
systems engineering
manufacturing
software development and maintenance
logistic support
modification
maintenance.
7/24/2019 Configuration Status Accounting-Introduction
3/26
Activity Configuration Status Accounting
7/24/2019 Configuration Status Accounting-Introduction
4/26
Configuration Status Report Include
A list of the configuration items that comprise a baseline
The date when each version of each configuration item was
baselined
A list of the specifications that describe each configurationitem
The history of baseline changes including rationales for
change
A list of open change reuests by configuration item !eficiencies identified by configuration audits
The status of works associated with approved change
reuests by C".
7/24/2019 Configuration Status Accounting-Introduction
5/26
Four Principle
hange Re#uests A Change #euest (C#) is a general term for a reuest to
change an artifact or process. The general process associated
with C#s is described in Concepts$ Change #euest
%anagement. Categories Aging (Time &ased #eports)'ow long have Change #euests of the
various kinds been open *hat is the +lag time,, of when in the lifecycle
defects are found- versus when are they being fied
!istribution (Count &ased #eports)'ow many Change #euests are
there in the various categories by owner- priority or state of fi
Trend (Time and Count #elated #eports)'*hat is the cumulative number
of defects being found and fied over time *hat is the rate of defect
discovery and fi
7/24/2019 Configuration Status Accounting-Introduction
6/26
Build Reports &uild #eports list all the files- their location- and
incorporated changes that make up a build for a specific
version of the software. &uild #eports can be maintained both at the system and
subsystem level$
%ersion &escriptions Similar to #elease /otes- 0ersion !escriptions describe
the details of a software release.
Audits There two kinds of audits that are covered in the
contet of Configuration %anagement
1$2hysical Configuration Audits
3$4unctional Configuration Audits.
7/24/2019 Configuration Status Accounting-Introduction
7/26
TYPICAL CSA INFORMATION OVER THE
ACQUISITION PROGRAM LIFE CYCLE
Ne' and innovative methods o capturing theconfguration o installed and spare items and
sot'are versions are becoming commonplace$ (hese methods include bar coding and the
interrogation o embedded identifcation via on)e#uipment data buses and on)board support
e#uipment$ (he technology or this process is no'
commonplace in the commercial personalcomputer industry and the automotive industry$
7/24/2019 Configuration Status Accounting-Introduction
8/26
(he inormation that is loaded into SA is
considered *metadata!* that is! inormation aboutthe data$ It provides status and cross)reerencesactual (echnical &ata +ackage ,(&+- inormationthat is stored digitally in data repositories$
.ach design activity establishes a documentrepository or the Is developed! produced! ormaintained by an /0ce o +ro"ect Responsibility
,/+R- under their authority$ (he data repositoriesare normally maintained by the inventory controlpoint responsible or the provisioning1supplysupport o the I$
7/24/2019 Configuration Status Accounting-Introduction
9/26
SA records should be maintained in such range anddepth as to be responsive to the re#uirements o the
various support activities or access to confgurationinormation$
(he data repository is the central point or thecollection! storage! processing! and promulgation o thisdata$
onfguration inormation should be available on are#uest basis! either by hard copy or online computeraccess$
(he SA records are used as *best source* input dataor purchasing data packages! design studies! andmanagement analyses re#uested by thesupporting1design activities$ In particular! the SAmetadata records must accurately re2ect the status othe confguration documents ,specifcations! dra'ings!lists! test reports! etc$- maintained in the documentrepositories$
7/24/2019 Configuration Status Accounting-Introduction
10/26
Concept n! Tec"nolo#$ %e&elop'ent
(ypical inormation sources include3 Mission need statements
Baseline perormance! cost! and schedule
goals System re#uirements documents or
alternative confgurations
+reliminary system perormance
Specifcations or selected confguration .ngineering change proposals or contract
change proposals! as applicable
7/24/2019 Configuration Status Accounting-Introduction
11/26
(ypical outputs include3 urrent revision o each document
urrent &ocument hange Authority ,&A-
and approval status or each document
7/24/2019 Configuration Status Accounting-Introduction
12/26
S$(te' %e&elop'ent n!%e'on(trtion
System perormance specifcation
I perormance specifcations
I detailed specifcations
.ngineering dra'ings and associated lists
A& fles
(est plans and procedures! and results
Audit plan
(ypical inormation sources include3
7/24/2019 Configuration Status Accounting-Introduction
13/26
Audit report
Audit certifcation
.ngineering change proposals
Notice o Revision ,N/RS-
.ngineering orders! change notices!
Installation and as)built verifcation
Removal and reinstallation
7/24/2019 Configuration Status Accounting-Introduction
14/26
(ypical outputinclude3
&A release and approval status o each document
4unctional! allocated! and product baselines
As)designed confguration! current and as o any priordate
As)built confguration! current up to time o delivery!and any prior date
As)delivered confguration
7/24/2019 Configuration Status Accounting-Introduction
15/26
ont5Status o .+s and R4&s in process
.6ectivity ad incorporation status o approved
.+s and R4&s! including retroft e6ectivity
(est and certifcation re#uirements to be completed prior to
milestones! such as revie's! demonstrations! tests! trials anddelivery
%erifcation and audit status and action items
7/24/2019 Configuration Status Accounting-Introduction
16/26
Pro!uction n!%eplo$'ent
(ypical inormation sourcesinclude3 All development phase items System I location by serial number Support e#uipment and sot'are Spares
(rainers (raining material/peratig and
maintenance manuals
7/24/2019 Configuration Status Accounting-Introduction
17/26
ont$$
I delivery dates and 'arranty data Shel lie or operating limits on
components 'ith limited lie or limitedactivation
/perational history ,e$g3 or aircrat)takeo6s and landing
%erifcation1validation o retroft
instruction! retroft kits Incorporation o retroft kits Installation o spares! replacements by
maintenance action
7/24/2019 Configuration Status Accounting-Introduction
18/26
(ypical output include3
All development phase items urrent confguration o all systems1Is in
all locations ,as)modifed1 as)maintained-
Re#uired and on)board confguration o allsupport e#uipment! spares! traines!training! manuals! sot'are! acilitiesneeded to operate and maintain all
systems1is at all sites Status o all re#uested! in)process! and
approved changes and deviation re#uests
7/24/2019 Configuration Status Accounting-Introduction
19/26
ont$$
Authorization and ordering actionsre#uired to implement approved changes!including recurring retroft
7arranty status o all is
+redicted replacement date or criticalcomponent
Retroft actions necessary to bring anyserial)numbered I to the current or any
prior confguration
7/24/2019 Configuration Status Accounting-Introduction
20/26
Opertionl Support
(ypical inormation sources include3 All production and deployment phase items
(ypical outputs include3 All production and deployment phase items
7/24/2019 Configuration Status Accounting-Introduction
21/26
CONFIGURATION STATUS ACCOUNTINGPROCESS EVALUATION CHEC)LIST
&ocumented process
SA inormation
SA system
Metrics
(ypical inormation sources include3
7/24/2019 Configuration Status Accounting-Introduction
22/26
%ocu'ente! proce((
Is there a documented confgurationstatus accounting ,SA- process8
Is the documented process ollo'ed8
Are personnel rom all disciplinesinvolved in the process inormed andkno'ledgeable about the proceduresthey are supposed to ollo'8
7/24/2019 Configuration Status Accounting-Introduction
23/26
CSA in*or'tion
9as an accurate! timely inormation baseconcerning the product and its associatedproduct inormation! appropriate to the
applicable phase,s- o the cycle! beenestablish8
Is confguration inormation appropriateto the product systematically recorded
and disseminated8 Is applicable SA inormation captured as
M tasks are perormed and is it
available or display or retrieval in atimel ashion8
7/24/2019 Configuration Status Accounting-Introduction
24/26
CSA ($(te'
Is the data collection and inormationprocessing system based on and
consistent 'ith the confguration statusaccounting inormation needs o theorganization8
Are the data relationships in the systembased on a sound set o business rules8
7/24/2019 Configuration Status Accounting-Introduction
25/26
Metric(
&oes the status accounting data beingcollected and the inormation system
enable meaningul metrics to bedeveloped and used to maintain andimprove the M process