GENEAL NOTES

Setting out dimensions and sizing of all RC elements and load bearing structure should be taken from Brand Consulting (BC) drawings, project number 11269.

Sizing and specification for all M&E equipment should be taken from Silcock Dawson & Partners (SDP) drawings, project number 170083.

For all soft and hard landscaping information refer to Landscape Design Architecture (LDA) drawings, project number L1056.

REFERENCEING NOTES

This drawing should be read in conjunction with all relevant consultants drawings and specifications.

Refer to the following drawing series for:• L(00) - GA plans, elevations and sections• L(10) - Accommodation plans and site strategies• L(10) - Fire strategy plans• L(16) - Substructure and slab edge setting out• L(23) - Brickwork elevations (to be read with main elevations)• L(24) - Staircore & communal plans and sections• L(35) - Bay studies• L(45) - Ceiling plans• L(60) - House or apartment type plans• L(90) - Site plans and associated external works

• A(00) - Wall, floor, roof, podium and terrace build-ups• A(16) - Substructure detailing• A(22) - Internal details (wall junctions, fire stopping)• A(24) - Core stair, lift and service riser detailing• A(32) - Internal door details• A(35) - Envelope detailing• A(74) - Bathroom and ensuite types

• S(31) - Ext. door and window types and schedules• S(32) - Internal door types and schedules• S(34) - Balcony metalwork, recon stone & brick specials

SETTING OUT NOTES

Refer to L(90)120 series drawings for setting out of all gridlines and main building corners._________________________________________________________________________________________

ENVELOPE DIMENSIONINGAll openings in envelope measured to structural openings, refer toA(31) series drawings for sizes and details._________________________________________________________________________________________

PARTY & SEPARATING WALL DIMENSIONINGAll internal setting out of partywalls & communal walls and openings as shown below. See notes below for all dimensions for core, L(24), and unit, L(60), setting out.

RC shear wall lining buildups tagged, refer to A(00) series. Setting out of the metal stud/blockwork in walls should be measured off the face of the RC structure as dimensioned in the A(00) buildups.

Dimension from outer face of block/stud to stud to nearest gridline

Dimension from structural openings in walls to nearest stud/wall return

Dimension from centre of MVHR terminal to nearest gridline

_________________________________________________________________________________________

INTERNAL UNIT & STAIR CORE DIMENSIONINGRefer to L(60) series drawings noted in layouts above for all apartment and house partition and door setting out information.

Refer to L(24) series drawings noted in layouts above for all door and partition wall setting out in stair and lift cores.

C4.02.17FED

eW1a

REFERENCING TAGS

EXT. DOOR & WINDOW TAGSFor quantities and types refer to External Door & Window Elevations and Schedules, A(31) & S(31) series.

A.L02.105WE-C3a

External Door & Window numbering starts at 01 for each floor from top left corner of each building.

Numbering ascends clockwise on each floor

Building letter prefix (i.e. A, B, B1, C, I/L, J/K, K/L)

Level prefix indicating floor (i.e. B1, L00, L01)

Component numbering, individual per floor

Ext. door & window type (i.e. WE-S1a, WG-C2, WB-D2)

INT. DOOR TAGSFor quantities and types refer to Internal Door Elevations and Schedules, S(32) series.

For fire performance requirements refer to door schedules and fire strategy plans, S(32) & L(10) series.

BUILD-UP TAGSRefer to A(00) series for all external wall, internal wall, floor, ceiling, roof and terrace build-up types with thermal, acoustic and fire requirements as relevant.

eW - envelope wallpW - party wallcW - core blockwork wallgW - external fin wallpC - core stud partition

pD - dwelling partitioncL - ceiling typegF - floor typepF - podium typerF - roof type

BALCONY / TERRACE TAGSRefer to S(34) series for balcony /terrace typical elevations, schedules and locations.

Balcony / terrace type

Core letter prefix (i.e. A2, B, I, L)

Floor level (i.e. BM, 00, 01, 02)

Door number based on area/room

Door type, see type sheet S(32)01Com

mun

al

Door type, (please note that all house and flat internal door tags are not shown on GA plans, refer to L(60)s specified)

Ap

artm

ent

SYMBOL LEGEND

Vertical rainwater pipe

Two-way parapet outlet with pipe and hopper connecting to RWP

Soil and vent pipe

Stub stack

Air admittance valve

Gully to showers / bin stores / plantrooms - spec varies

Dry riser outlet

Dry riser inlet

Automatic opening vent, refer to L(10) fire drawings

Vertical movement joint as per S.E. details, refer to L(23) elevations for setting out to grid

MVHR extract 2550mm FFL to underside of terminal, set out to nearest grid

MVHR intake 2550mm FFL to underside of terminal, set out to nearest grid

Ancon WP3 windposts - refer to S.E. drawings for spec and details

Brick specials - refer to S(34)20s for indicative sizes

RWP

RWO

SVP

SS

DRO

AOV

FG

ESTATE KEY PLAN

PLOT TAGSRefer to L(10) series for overall building accommodation information in floor plan keys and a schedule breakdown.

Plot number

Plot tenure (i.e. PRI, PRS),Plot size (i.e. 1B2P, 2B3P),Drawing reference number

Flat type (i.e. Type A, Type B),Flat handing (where relevant)Overall flat areaType 01 (h) - 80

PRI, 1B2P - L(60)100

101

S wis721 Lt BT

N

I-L

B-C

A

Quay Road

Highbr

idge R

oad

North C

ircular Road (A406)

Fleet Road

River Roding

FH1

BT-1a

DR1

AAV

WP

BS

FIRE STOPPING NOTES

All items noted below are to be installed in strict accordance with manufacturer's requirements, technical data sheets and specifications.

MVHR intake and extract terminals (refer to 'Symbol Legend' adjacent) to have fire stopping as duct penetrates inner leaf of wall construction.

ARC Party Wall (PW200) vertical, or similar approved, fire stopping between external walls. All should achieve the same fire rating as the compartment wall/floor adjacent (2hr achieved).

Where noted on the plans internal fire stopping is needed to close 25mm cavity of wall separating ancillary spaces. Refer to notes adjacent, Fire Strategy notes and A(22) series drawings.

2500

2500

2500

BC.20

BC.20

BC.T BC.T

BC.S BC.S

BC.R BC.R

BC.Q BC.Q

BC.K BC.K

BC.L BC.L

BC.M BC.M

BC.N BC.N

BC.P BC.P

BC.1

BC.1

BC.2

BC.2

BC.3

BC.3

BC.4

BC.4

BC.5

BC.5

BC.6

BC.6

BC.7

BC.7

BC.8

BC.8

BC.9

BC.9

BC.10

BC.10

BC.11

BC.11

BC.12

BC.12

BC.13

BC.13

BC.14

BC.14

BC.15

BC.15

BC.16

BC.16

BC.17

BC.17

BC.18

BC.18

BC.19

BC.19

BC.A BC.A

BC.B BC.B

BC.C BC.C

BC.D

BC.E BC.E

BC.F BC.F

BC.G BC.G

BC.H BC.H

BC.J BC.J

+ 6.000

+ 6.000

+ 6.300

+ 6.300

+ 6.300

+ 6.300

+ 6.300

+ 6.300

+ 6.300

+ 6.300+ 6.300+ 6.300+ 6.300+ 6.300

+ 6.300

+ 6.300

+ 6.300

+ 6.300

+ 6.300

+ 6.300 + 6.300

Type BC-08* - 77 m²PRI, 1B2P - L(60)208

262

Type BC-09* - 78 m²PRI, 2B4P - L(60)209

263

Type BC-A - 40 m²PRI, 3B6P - L(60)250

257Type BC-A - 40 m²

PRI, 3B6P - L(60)250

258Type BC-A - 40 m²

PRI, 3B6P - L(60)250

259Type BC-A - 40 m²

PRI, 3B6P - L(60)250

260Type BC-A - 40 m²

PRI, 3B6P - L(60)250

261

Cycle152 m²

Energy Centre293 m²

Retail Unit 698 m²

Refuse120 m²

Entrance12 m²

Type BC-01* - 62 m²PRI, 1B2P - L(60)201

144

Water Tank Rm52 m²

Cycle70 m²

Refuse21 m²

Cycle72 m²

Refuse74 m²

Alt. Switch Rm14 m²

Substation21 m²

Retail Refuse10 m²

Car Park

Elec Switch Rm14 m²

L(00

)245

1

L(00

)244

2

L(00)242

1

L(00)243

2

L(00

)243

3

1L(00)281

1L(00)282

1L(00)283

2L(00)283B.C00.19

CB1B.C00.18

CL1

B.C00.17CB1

B.C00.16CB1

B.C00.15PS1

B.C00.09PS1

B.C00.11CS1

B.C00.01CS2

B.C00.14PS1

C.C00.16PD1

C.C00.13CL1

C.C00.01CS2

B.C00.10CS1

DRO

DRO

DRI

DRI

DRI

Cleaner's Cpd5 m²

Energy Centre293 m²

Boat Welfare17 m²

2475371345003500397554103713281349005208389524753713450035003975541037132813

2813

2985

5288

4500

3090

3373

2988

2138

2813

2985

1164

028

1329

8552

8845

0030

9033

7329

8821

38

eW3a

cW2a

pW5c

pW5a

eW1a

eW1a

eW1a

eW3b

gW2a

gW2e

gW2e

eW3b

eW3b

eW3a

eW3b

eW4a

eW3b

eW3b

eW3b

gW2e

eW1a

eW1a

eW1a

eW3b

cW2a

cW2a

eW3b

cW3a

eW3b

eW3b

eW3b

cW2a

eW1a

eW2b

eW1b

eW2b

eW1b

eW1a

eW1a

eW1a

eW1b

eW2b

eW1a

cW3a

pW2a

pW2a

WC WCShower

Fountain Plant Rm12 m²

Cpd

Head restraint - see A(22)02 & S/Eng 11269-PH1-300

Head restraint - see A(22)02 & S/Eng 11269-PH1-300

Head restraint - see A(22)02 & S/Eng 11269-PH1-300

Head restraint - see A(22)02 & S/Eng 11269-PH1-300

Head restraint - see A(22)02 & S/Eng 11269-PH1-300

WP

WP

WP

WP WP WP

WP

WP WP

B.C00.20EL1

B.L00.001BW-1a

B.L00.002LS-1f

B.L00.003BW-2b

B.L00.004BW-2c

B.L00.005BW-2b

B.L00.006WD-2c

B.L00.007PE-1b

B.L00.008BE-4b

B1.L00.001WD-2d

B1.L00.002PE-1a

B1.L00.003WS-2a

B1.L00.004WD-2d

B1.L00.005PE-1a

B1.L00.006WS-2a

B1.L00.007WD-2d

B1.L00.008PE-1a

B1.L00.009WS-2a

B1.L00.010WD-2d

B1.L00.011PE-1a

B1.L00.012WS-2a

B1.L00.013WD-2d

B1.L00.014PE-1a

B1.L00.015WS-2a

B-C

.L00

.001

GR

-1a

C.L

00.0

01LG

-2f

C.L

00.0

02LS

-1e

C.L

00.0

03C

E-3

b

C.L

00.0

04P

E-2

aC

.L00

.005

WD

-2c

C.L

00.0

06C

E-3

bC

.L00

.007

CE

-3bC.L00.008

PE-1bC.L00.009

BE-4b

C.L00.010CE-2b

C.L00.011LS-1g

C.L00.012LS-1g

C.L00.013LS-1g

C.L00.014LS-1a

C.L

00.0

15LS

-1c

C.L

00.0

16LG

-2h

C.L

00.0

17LS

-1g

B-C.L00.002VR-1i

B-C.L00.003VR-1i

B-C.L00.004VR-1i

B-C.L00.005VR-1i

B-C.L00.006VR-1i

B-C.L00.007VR-1i

B-C.L00.008EC-2a

B-C.L00.009EC-1a

B-C.L00.011SS-1a

B.L00.009LG-2g

B.L00.010LG-2g

B.L00.011RB-3a

B.L00.012RB-2a

B.L

00.0

13R

B-2

b

B.L

00.0

14R

B-1

a

B.L

00.0

15R

B-3

aB

.L00

.016

RB

-3a

B.L

00.0

17R

B-3

aB

.L00

.018

RB

-3a

B.L

00.0

19R

B-3

aB

.L00

.020

CE

-2a

B.L

00.0

21LS

-1f

B.L

00.0

22LG

-1e

B.L

00.0

23LS

-1f

B.L

00.0

24B

W-2

bB

.L00

.025

BW

-2b

B.L

00.0

26B

W-2

a

1115 2035 890 1360 3140 1360 1678 2373 2015 1360 2015 1360 1678 113 1023 1115 2373 900 328

1115259811151023

8983

1395

2595

8

1146

522

555

2322

535

9020

3577

813

6030

2813

6020

1513

6011

1513

6020

1513

6044

9013

6055

3

1698 778

1115136050531131023122823731685330237310353959231360890136015651360665910778

103747352015

778

1023

1800

30377

812

4815

6520

3577

813

6067

5

553 910 1115 1360 1115 2035 113

395

100

395

113 2035 1340 2710 1228 4960 890 2035 1790 1135 1565 1585 1115 1585 1115 1585 1115 1585 1115 1585 1115 1585 1125

302

553

685

1115

1360

1115

1360

1115

1360

1115

1360

1790

1360

1115

1360

1340

2373

103

900

1360

1115

1360

1115

1360

1115

1360

1115

1360

1228

1585

103

430

695

1340

778 2035

303

9303

3150

150

922

380

3593

380

1306

5

2921 380 3073 250 4520 250 12087

1264

2

102421620225212559683806440

2770

490

1703

8

8093 225 11862

778

1360

1763

300

4623

2000

425

1545

142

2843

195

2780

1545

L(00)241

1

L(00

)244

1

L(00)242

2L(00)242

1

L(00

)243

4L(

00)2

45

2

0.4 perm. vent at high level to louvre

Refer to L(24)401for Main Entrance

Elevations

Ref

er to

L(2

4)40

1fo

r M

ain

Ent

ranc

eE

leva

tions

Entrance9 m²

Fire stop to close25mm cavity, refer toFire Strategy & A(22)

series details

Fire stop to close25mm cavity, refer toFire Strategy & A(22)

series details

Fire stop to close25mm cavity, refer toFire Strategy & A(22)

series details

Fire stop to close25mm cavity, refer toFire Strategy & A(22)

series details

Fire stop to close25mm cavity, refer toFire Strategy & A(22)

series details

Fire stop to close25mm cavity, refer toFire Strategy & A(22)

series details

Fire stop to close25mm cavity, refer toFire Strategy & A(22)

series details

Fire stop to close25mm cavity, refer toFire Strategy & A(22)

series details

Refer to L(24)205 for Boat Welfare

RWP

GULSS

GUL

SS

AAV

SS SSAAV

SS GUL

FDP

FGC

AAV

SSSS

SVP

GUL

SS

Water

RDP

SS

LV

Gas

GUL

GUL GUL

GUL

GUL

GUL

GULGUL

RDPLVLVLV

LV

LV

RDP

GUL

FDP

AAV

RDP

AAV

RWP

FDP

SS

GUL

GUL

FDP

RWP

SS

SS

SS

SS

SS

Refer to the following SDP drawings for setting out of all incoming services into entry pit and finish of pit within energy centre.• 170083-SDP-BC-GF-DR-BW-2000• 170083-SDP-ZZ-ZZ-DR-SS-5960

Refer to the following SDP drawing for setting out incoming gas into entry pit and finish of pit within retail bin store.• 170083-SDP-ZZ-ZZ-DR-SS-5965

RWP

RWP

RWP

RWP

SVPSVP

RWPRWP

SVP

RWP

SVP

SS

RWP

SVP

RWP

RWP

LVLVLVLVLV

B-C.L00.010EC-3a

Refer to L(24)250 for Retail Unit 6

Refer to drawings A(35)52-54 for podium stair plans, sections

and detials

GUL

GUL

GUL

SHS post

SHS post

112.5

For offset drainage enclosure detail refer to dwg A(22)32

WP

Ram

p

+ 6.300

+ 6.000

SS SS SS SS

SS SS SS SS SS

Refer to L(24)201 for feature wall & postbox elevations and ventilation system panel indicative position

Refer to L(24)203 for feature wall & postbox elevations and ventilation system panel indicative position

210

3260

220 2930

220 1494

pW3a

pW1b

pW3b

290

720

140

86

140 54

3260

220

pW2a

pW2a

pW3b

pW3b

5367 290

3190

290

pW5a

pW5a

1217 140 2403 140

1810

290

2598

215

720 140

998

200

998 200

1763 626

2598

215

2152813

998

100

998

100

1438

140

1425

215

1760 140

cW2a

cW2a

cW2a

2580

215

cW2a

215 3498

35752901217 290 2103

pW3b

pW3b

423 140

C.C00.15PD1

eW2b

pW5c

pW5c

262 140

cW2a380498 12

2338

0

38022

pW5c

1230

140

2688 140

2550

290

cW2a

pW3b

pW3b

290 1126

225

2620

413

2470

pW3a

eW1b

pW2a

1885 140

5711

55 B.C00.13CK1

155 998

pW5b

pW5b

140

870

3005290

2705

140

200922

1480 290

pW5a

pW5a

pW3b

4360

290

pW5a

pW5c

3248

290

150

998

pW5a

pW3b

pW3b

1423

290

169290

380 2162

380

4887

21621402781380

6436

140

140 1460

2330

8

2223 220 2202048 463 220 220525

pW1a

pW1a

pW1a

pW1a

pW4a

pW4a

pW4a

pW4apW

4a

pW4apW

4a

pW4a

cW2a

cW2a

3930

2339

4548

250

1236

0

3231

4165

3097

3895

3010

B.C00.04RD1

B.C00.03RS3

B.C00.02RS2

B.C00.06RD1

C.C00.05CT2

C.C

00.0

7C

S1

C.C

00.0

8C

K1

C.C00.09CS1

C.C00.10CS1

C.C00.11CS1

C.C00.12CS1

C.C00.02RS2

C.C00.03RS3

C.C00.04RD1

B.C00.05CT2

B.C00.08CS1

B.C

00.0

7C

S1

Ref

er to

L(2

4)20

3fo

r co

re d

etai

ls

Ref

er to

L(2

4)20

1fo

r co

re d

etai

ls

24753713450035003975541037132813

27890

303 213 303

303

30377

813

6011

1520

3511

1513

6013

40

2777

859

7311

465

303

303

8438

303

888 303

44100

38335

1790 1360 1003 1023 890 685 2578 1360 1003 1023 890 685 2578 1360 1003 1023 890 685 2578 1360 1003 1023 890 685 2578 1360 1003 1023 890 685 14355765

303

28228

302 660

303

1619

020

588

640

GUL

cW2a

cW2a

Sprinkler Pump Rm24 m²

1763600

C.C00.14PD1

cW2a

cW2a

8614

0

140

86

7081402583

140

cW3a

cW3a

GUL

GUL

0.4 perm. vent at high level to louvre

300x250 PCC col, A(35)13(dim =grid to centre)

710

1. DO NOT SCALE FROM THIS DRAWING2. ALL DIMENSIONS TO BE CHECKED ON SITE3. ANY DISCREPANCIES SHOULD BE REPORTED TO THE

ARCHITECT / CONTRACT ADMINISTRATOR

GENERAL NOTES

C

Clerkenwell, London EC1V 0DS T: +44 (0)20 7812 8454

A0

STATUS

PROJECT

CLIENT

DRAWING NAME

DATE

SIZEDRAWN BY CHECK BY SCALE

JOB NO. DRAWING NO. REVISION1 : 100

J

CONSTRUCTION NOV 2017

1161

AC SJ

L(00)201

Fresh WharfBarking IG11 7BG

Building B-C - Level 00

Countryside Properties

Rev Date Description

- 2018-07-04 First issue.A 2018-08-14 Issued for Construction.B 2018-08-28 Fire stops & vents shown and noted.C 2018-11-02 Drainage points & notes added.D 2019-01-31 Gate structure upadated.E 2019-04-09 Door type references amended.F 2019-04-25 PDF drawing update on DocElite.G 2019-07-03 Main entrance reference note added.H 2019-08-20 Layouts/door amended following comments.

J 2020-03-13 PCC columns added as noted for verticalcavity barriers. MAOV louvres updated androof fan and enclosures amended.