View
5
Download
0
Category
Preview:
Citation preview
DRAFT REPORT | FALL 2019
FRAMEWORKS CHAPTER HEADING6 7
CAMPUS MASTER PLAN GUIDING FRAMEWORKS & GOALS
Enrich the academic and research environment through targeted building renovations and expansions, combined with strategic investment in new facilities.
� Transform the academic environment for today’s student
� Maximize existing academic space
� Increase facilities to improve the academic and research environment
Elevate the student experience by increasing the number of students living on campus and ensure all students have access to robust dining, recreation, and support options.
� Dedicate the campus core to the student experience
� Enhance opportunities for campus activity beyond classroom hours
� Create equitable student housing close to the campus core
� Improve and expand facilities for recreation, athletics, and learning
Make campus a more welcoming place for visitors through improved wayfinding. Explore mixed-use partnership opportunities and investment in strategic community assets.
� Enhance regional assets such as the University Farm
� Seek partnership opportunities with the City of Chico
� Create a visible and accessible arts and culture district
Invest in sustainable strategies such as on-site renewable energy production to achieve net zero. Enhance existing natural amenities such as Big Chico Creek.
� Implement carbon reduction strategies to achieve carbon neutrality by 2030
� Phase off natural gas and increase on-site renewable production
� Decentralize campus energy systems into efficient district level systems
� Improve landscape and stormwater function and aesthetic
Promote an inclusive environment by fostering a welcoming campus, access to robust support services, and facilities reflective of a diverse population.
� Improve services and facilities for counseling, health and wellness
� Increase resources to address food and basic needs insecurities
� Provide new and renovated facilities and open space to reflect today’s student
A LEARNING CHICO STATEAN EXPERIENTIAL CHICO STATE A CONNECTED CHICO STATE A SUSTAINABLE CHICO STATEAN INCLUSIVE CHICO STATEProvide safe and accessible pedestrian routes across all of campus. In key areas, expand bicycle access and support facilities to encourage sustainable modes of transit.
� Consolidate existing parking opportunities
� Improve safety and campus character of the Ivy/Warner corridor
� Extend and clarify the pedestrian network
� Re-introduce non-motorized vehicles into campus
A MOBILE CHICO STATE
DRAFT REPORT | FALL 2019
10 11PROPOSED MASTER PLANCAMPUS PLAN
KEYImproved 10B Practice Field North Multi-Purpose Fields New Softball Facility Stormwater Detention Area Parking Structure Arena Pool Facility West Campus Gateway Plaza Acker Gymnasium Renovation University Stadium Seating Hammer Throw Venue Field 6&7 Improvements Existing Ropes Course Location Enhanced Pedestrian Gateway New Golf Practice Area Location South Field Improvements 1-4 Warner Street West Academic Building Creekside Residence Halls Rio Chico Creekside Houses Renovations Rio Chico Redevelopment Langdon Engineering Center Renovation 1st Street Extension & Plaza Warehouse FMS Office Building Forensic Anthropology/Admin/Office Bldg WREC Expansion + Health Center Student Services Center Renovation Meriam Library Renovation Bell Memorial Union Renovation Mixed Use Building
SUMMARY MAP AND
LABELS
LEGEND Deen House Renovation Sapp Hall Renovation Trinity Hall Renovation Glenn II Academic Building RCE Renovation/Sovereignty Center Kendall Hall Renovation Selvester's Cafe Demolition Laxson Auditorium Renovation Ayres Hall Renovation Physical Science Building Renovation Pedestrian Path Underpass Hotel & Convention Center Retail + Parking Structure Mixed Use Office Building Museum Academic/Admin/Office Buildings Expanded Surface Parking Modoc II Academic Building Holt Hall Renovation & Entry Addition Holt Hall Entry Plaza North Residence Halls Lassen Hall Renovation Shasta Hall Renovation Butte Hall Renovation & Addition Non-Motorized Vehicle Path Stormwater Daylighting North Campus Plaza Warner Street Laboratory/Research Building Whitney Hall Renovation Ivy/Warner Street Improvements 12kV Upgrades
03
01
02
03
04
31
05
32
06
33
08
35
07
34
09
36
10
37
11
38
12
39
13
40
14
41
15
42
16
43
17
22
44
49
18
23
45
50
19
24
46
51
20
25
47
52
21
26
27
48
53
54
55
56
57
58
59
60
61
01
28
29
30
02
05
06
07
08
60
14
04
56
10
15
1211
61
1316
1618
17
09
59
53
5251
51
3754
58
34
2127
20 22
19
28
5557
30
29
33
3635
49
50
40
41
39
38
31
32
4243
44
48
45
46
46
47
26
25
23
24
Recommended