CURRICULUM VITAE
Name: GREGOR Pavel, Ing.
Nationality: Czech
Date of birth: July 21st, 1983
Mobil: +420731154205
Email: gregor.pavel@centrum.cz
Skype: gregor.pavel5312
Domicile: Czech Republic, Moravicany
Practice of foreign languages: English (written, spoken)
German (written and spoken basic)
Czech (written, spoken)
Slovak (written, spoken)
Education: Technical Secondary School of General Machinery – 1998 to 2002/
Leaving Examination, Bc.
Technical University of Ostrava
Faculty of Mechanical Engineering – 2002 to 2007 / Ing.
Qualification: International welding inspector – IWI-C / CZ 08001
Certified European welding engineer – CEWE/CZ 09002
International welding engineer – IWE / CZ 07044
International welding technologist – IWT / CZ 05031
Direct visual test – EN 473-VT2-Multifunction Sector
Direct visual test – EN 473-VT2-according to PED 97/23/EC
Competent person for welding revision of ČD
Certificate welding supervisor for nuclear energetics (ČEZ)
PT2(multifunction sector) course according to EN ISO 9712
MT2(multifunction sector) course according to EN ISO 9712
UT2 course according to EN ISO 9712
RT2 course according to EN ISO 9712
Saudi Aramco inspector - SAP no.:70015331
QM03-Mechanical-Gen
QM04-Non-Destructive Examination
QM05-Line Pipe
QM06-Fabricated piping
QM07-Valves
QM08-Fittings
QM09-Gaskets
QM15-Structural steels
QM26-Rotating Equip-Pumps
QM27- Rotating Equip-Compressors
QM28- Rotating Equip-Turbines
QM30-Pressure Vessels
QM31-Heat Exangers
QM32-Boilers
QM33-Heaters
QM34-Tanks
QM37-Relief Valve, Control Valve
VT2,PT2,MT2,RT2,UT2 according to SNT-TC-1A
NACE Coating inspector level 1 – Certified
NACE Coating inspector level 2 – Course
Frosio inspecor level III certified according to NS 476, cert.no.9202
The National Board of Boiler&Pressure vessel inspector certificate-ASME-
Fabrication: General and Welded
The National Board of Boiler&Pressure vessel inspector certificate – 2015
National Board Inspection Code, Part 1, Instalation
The National Board of Boiler&Pressure vessel inspector certificate – 2015
National Board Inspection Code, Part 2, Inspection
Codes and standards: ASME V,VIII,IX, AWS D1.1, DIN, EN, CSN, PED 97/23/ES,API6A,API6D,
API598,API14A,API other, ASTM, TEMA, NORSOK, NACE/SSPC, DNV, LR
Main specialities: Heavy machinery, welded pipes, tubes, fittings, castings etc.
Structures – main frame, cranes, pressure vessels, ball valves, gate valves, plug
valves, tanks, boilers, offshore platforms, transition pieces, monopole, pipe line,
Painting– water based and solvent based
Experience in welding(base material): Welding of hard surfaces –Hardox or other
Welding of high strengh material - Weldox S1100QL, S960QL, S690QL
Welding of stainless steel – 316LSi, 308LSi
Welding of carbon steel – S355J2+N, NVE36, S355NL
Duplex, Aluminium
Experience in welding(welding meth.): 111 – Manual metal arc welding
131 – MIG welding with solid wire electrode
135 – MAG welding with solid wire electrode
136 – MAG welding with flux cored electrode
138 – MAG welding with metal cored electrode
141 – TIG welding with solid filler material
121 – Submerged arc welding
783 – Drawn arc stud welding with ceramic
151 – Plasma MIG welding
Summary of career: since December 2012
Inspekt-Servis, Edif NDE, ERAM, SQS, QTS etc
External Freelance Inspector - for heavy machinery and steel structures (oil&gas bussines,
petrochemical&chemical bussines, offshore bussines etc.), ball valves, gate
valves, plug valves, choke valves, desuperheaters, heat exchangers, pumps,
compresors, turbines, seamless pipes, welded pipes, containers, pressure
vessels, boilers, tanks, cryogenic heat exchangers etc.; pre-inspection
meeting, in-process inspection, marking, painting, packing, shipment,
welding, assembling, manufacturing, machining, expediting, final inspection,
factory acceptance tests, witness of hydrostatic tests, verifying of all
documentation etc.
since January 2012
ISI Inspection Servis Geneva s.a.
External Inspector - for heavy machinery and steel structures, ball valves, gate valves; pre-
inspection meeting, marking, coating, painting, packing, shipment, welding,
assembling, manufacturing, machining, expediting, final inspection, witness
hydrostatic test, verifying of all documentation - see below
since January 2011
Intertek
External Inspector
- hydrostatic tests of pressure vessels, performance tests of air compressors,
final inspection of steel structures, NDT – check of qualification personnel
and check of procedure, expediting of venture, expediting of ball valves –
see below
since November 2010
ATG, RINA
External Inspector
- for inspection of dynamical and statical balancing tests of rotors,
hydrostatic tests of suction and discharge body, performance
test of pump, welding supervisor, expediting
August 2008 – March 2012
UNEX a.s.
Development department manager
- coordination and team leading in the field of machining, materials, shanking,
surface treatment and welding; project team leading; cooperation
with desing and technological preparation of fabrication; leading employees
executing welding operations on steel structures in the process of fabrication
June 2008 – March 2012
UNEX a.s.
Welding inspector
- assessment of steel welding conformity construction; verification and
observance of the welding procedure and NDT testing, complete inspection
of documentation (basic material certification, NDT reports, WPS, WPQR)
November 2007-March 2012
UNEX a.s.
Welding engineer
- assessment of drawing documentation, proposing of suitable technologies,
welding procedures, preparation and equipments, processing of welding
documentation according to EN, DIN, ASME, AWS; welding supervision
and quality assessment
July 2005 – March 2012
UNEX a.s.
Welding technologist
- assessment of drawing documentation, proposing of suitable technologies,
welding procedures, preparation and equipments, processing of welding
documentation according to EN, DIN, ASME, AWS
Major assignments:
Name of product Project User/Cleint Contractor Vendor Manufacturer Inspection location Activities o.b.o. Type of inspection Activities
Number of inspection
dates Year
Main Heat Exchanger, Exchanger + Vessel
EPC13 UTILITY PACKAGE
JAZAN REFINERY PROJECT
Saudi Arabian Oil Company (Saudi Aramco) Hitachi Air Liquide Fives Group Fives, Golbey, France Hitachi Japan
In-Process, Final inspection, Packing, Documentation review, Shipment Inspection 4 2016
Plug Valves
REDUCE SALES GAS WATER CONTENT@ SGP and UGP
Saudi Arabian Oil Company (Saudi Aramco)
TARGET Construction Saudi Arabia
BRDR. Christensen ApS
BRDR, Skuderlose, 4690 Haslev, Denmark TARGET
PIM, in-process, Coating,Final inspection, Packing, Documentation review, Shipment Inspection 1 2016
11 sets of Medium Duty Centrifugal Pump
Jubail Interface Supply Facility Project
Saudi Aramco Total Refininf and Petrochemical Company (SATORP)
SINOPEC ENG´G Group Saudi CO.LTD
RUHRPUMPEN GmbH
RUHRPUMPEN GmbH, Stockumerstrasse 28 D58453 Witten, Germany SINOPEC
In-process, FAT, Coating, Final inspection, Packing,Documentation review, Shipment Inspection 4 2016
Split Tee, Pipe Spool, Hot Tap Adapter
56’’ EWG-2 SECTION III SALES GAS PIPELINE (MGS PH-1) AND 30’’ EWECG-1 SALES GAS PIPELINE
Aramco Oversea Comapny
DODSAL & Company
RMA Kehl, Oststasse 17, 77964 Kehl, Germany
RMA Kehl, Oststasse 17, 77964 Kehl, Germany
Dodsal& Company
PIM, in-process, Coating,Final inspection, Packing, Documentation review, Shipment Inspection 2 2016
Desalter Package / Static Mixer
JAZAN Refinery and Terminal Project (EPC 9)
Saudi Arabian Oil Company (Saudi Aramco)
SK engineering& construction
Fjords Processing
Axinox, Soissons, France Axinox, Soissons, France SKE&C
Final inspection, Packing, Documentation review, Shipment Inspection 1 2016
Plug Valves
Construction of PP12 Gas Fuel Delivery System
Saudi Arabian Oil Company (Saudi Aramco)
MUSTANG-HDP
IMCO/ KANOO
BRDR. Christensen ApS
BRDR, Skuderlose, 4690 Haslev, Denmark MUSTAND-HDP
PIM, in-process, Coating,Final inspection, Packing, Documentation review, Shipment Inspection 1 2016
Loading Arms
Yamal LNG Project
Yamal LNG / Technip
JGC Corporation SVR GmbH Flashsteel
Flashsteel, Martinov, Czech Republic JGC Corporation
PIM, In-process, check of welding of PQR, testing of welded samples, Final inspection, Documentation review Inspection 6 2016
Loading Arms
Yamal LNG Project
Yamal LNG / Technip
JGC Corporation SVR GmbH Flashsteel
Flashsteel, Martinov, Czech Republic JGC Corporation Expediting 1 2016
Pipe Metalic, SAW Straight, Non Sour
56´´ EWG-2 Loop-2 and 56´´ KAEC Pipeline Project
Saudi Arabian Oil Company (Saudi Aramco)
Dodsal & Company
Global Pipe Company
Erndtebrucker Eisenwerk GmbH & Co.KG
EEW, Im Grunewald 2, 57339 Erndtebruck, Germany
Dodsal&Company
PIM, In-process, Final inspection, Documentation review, Packing, Shipment Inspection 1 2016
ZVS Plug Valves
Expand LPG Production Facilities at Yanbu Refinery
Saudi Arabian Oil Company (Saudi Aramco)
TARGET Construction S.A WLL
Saudi FAL Co.LTD
BRDR. Christensen ApS
BRDR, Skuderlose, 4690 Haslev, Denmark TARGET
PIM, in-process, Coating,Final inspection, Packing, Documentation review, Shipment Inspection 1 2016
Oil Modular Skid / Scraper Valves
KHURAIS WELLS MANIFOLDS AND PIPELINE
Aramco Oversea Comapny
Gulf Steel Works
Hartmann Valves GmbH
Hartmann Valves GmbH, Bussardweg 15, 31303 Burdorf-Ehlershausen, Germany
Gulf Steel Works
PIM, in-process, Coating,Final inspection, Packing, Documentation review, Shipment Inspection 1 2016
Pressure Safety Relief Valves
JAZAN Refinery and Terminal Project (EPC 9)
Aramco Oversea Comapny
SK engineering& construction
LESER GmbH & Co KG Factory
LESER GmbH & Co KG Factory Itzehoer Strasse 63 – 65 24594 Hohenwestedt, Germany SKE&C
PIM, in-process, Coating,Final inspection, Packing, Documentation review, Shipment Inspection 2 2016
Stainless Steel Welded Pipes
JAZAN Refinery and Terminal Project (EPC 9)
Aramco Oversea Comapny
SK engineering& construction
BSL Pipes & Fittings
BSL Pipes & Fittings, Billy Sur Aisne- France SKE&C
In-Process, Final inspection, Packing, Documentation review, Shipment Inspection 14 2016
Secondary steel - Boat landings, External ladders, Intermediate platforms, Upper ladders, External platforms
Veja Mate Wind Farm Veja Mate
Offshore Wind Force company
Bladt Industry, Poland
JWSC, Stetin Poland, Gotech, Nove Czernowo, Poalnd
JWSC, Stetin Poland, Gotech, Nove Czernowo, Poalnd
Offshore Wind Force company
In-Process (assembling, welding, flame straightening etc), Final inspection (dimensional check, NDT check,surface preparation), Marking, Packing, Documentation review, Shipment Inspection 128
2015 / 2016
Lube Oil Units
Shaybah Combined Cycle Power Generation Project
Aramco Oversea Comapny SEPCO Siemens
AEL Apparatebau GmbH
AEL Apparatebau GmbH , Dobelner Str.9, 04703 Leisnig, Germany SEPCO
In-Process, Coating, Final inspection, Packing, Documentation review, Shipment Inspection 12
2015 / 2016
Gantry Cranes
Yamal LNG Project
Yamal LNG / Technip
JGC Corporation PROTEA SP. Z O.O.
PROTEA SP. Z O.O., Gorzowska 18 str.Ligota Gorna, 46-203 Kluczbork,Poland JGC Corporation
PIM, In-process, Visual inspection of welding activities, check of assembling, check of location before closing, painting activities check, NDT check, Factory acceptance test, Final inspection, Documentation check, Packing, Shipment Inspection 48
2015 / 2016
Gantry Cranes
Yamal LNG Project
Yamal LNG / Technip
JGC Corporation PROTEA SP. Z O.O.
PROTEA SP. Z O.O., Gorzowska 18 str.Ligota Gorna, 46-203 Kluczbork,Poland JGC Corporation Expediting 6
2015 / 2016
Sunp Pumps
Construction of new lift station IW-10A MARAFIQ-YANBU
BR C.A.T. International Co.LTD
Abunayyan Trading Corp.
Xylem Water Solutions
Xylem Water Solutions, SE-361 80 Emmaboda, Sweden
BR C.A.T. International Co.LTD
FAT, Documentation review, Final inspection Inspection 1 2015
Mud Gas Separators, Liquid Gas Seal Tank, Bulk Storage Tank, Surge Tanks, Dust Cyclones Collectors, Rock Catchers, Air Receivers
P6056 MARINER Topside EPC Project BP, DSME
RDS A KCA Deutag Company MH Wirth
Astra, Machinery Plan Astra AB
Astra, Machinery Plan Astra AB.Ulonu str. 33 , LT-62161 Alytus, Lithuania RDS
In-Process (assembling, welding, hydrostatic test etc), Final inspection, Documentation Review, Packing, Shipment Inspection 112
2014 / 2015
Desuperheaters
Jazan Refinery&Terminal Projects EPC #2
Aramco Oversea Comapny
Hyundai Arabia Company LLC
CCI Valve Tehcnology GmbH
CCI Czech Republic s.r.o.
CCI Czech Republic s.r.o., Brno, Czech Republic AOC-H
PIM, in-process, final inspection, Documentation review
Monitoring Inspection 1
2015 / 2016
Plug Valves
JAZAN Refinery and Terminal Project
Aramco Oversea Comapny
SK engineering& construction
BRDR. Christensen ApS
BRDR, Skuderlose, 4690 Haslev, Denmark SKE&C
PIM, in-process, Coating,Final inspection, Packing, Documentation review, Shipment Inspection 1
2015 / 2016
Carbon Steel Seamless Tubes
MASTER GAS SYSTEM-PHASE 1
Saudi Arabian Oil Company (Saudi Aramco) SEPCO
S&T Corporation
Zeleziarne Podbrezova
Zeleziarne Podbrezova, Podbrezova, Slovakia SEPCO
PIM, In-Process (Eddy current tests, Mechanical testing etc.), Final inspection, Packing, Documentation review, Shipment Inspection 3 2015
Ball Valves
Expand Shabab Pipeline Capacity to 1000MBPD
Aramco Oversea Comapny
BR C.A.T. International Co.LTD MSA a.s.
MSA, Dolni Benesov, Czech Republic
BR C.A.T. International Co.LTD
PIM, in-process, Coating,Final inspection, Packing, Documentation review, Shipment Inspection 30 2015
Nitrogen Generation Package, Heater Inserts
Midyan Gas Processing Facility (MGPF)
Aramco Oversea Comapny
LARSEN & TOUBRO ARABIA LLC.
Hadetec, The Netherlands ExHeat Ltd
ExHeat Ltd, Threxton Road Industrial Estate, Watton, Thetford Norfolk, IP25 6NG, United Kindom
LARSEN & TOUBRO ARABIA LLC.
Check of Heater Panel -Wiring diagram, Functional test of Thyristor control panel, Eletrical test final, Functiona test-Final Panel Inspection 1 2015
Ball Valves AOC Source inspection
Aramco Oversea Comapny MSA a.s.
MSA, Dolni Benesov, Czech Republic AOC-H
In-Process (visual inspection and base material identification, hydrostatic shell test before internal coating,hydrostatic tests after internal coating, coating, final inspection, documentation review, packing, shipment Inspection 10 2015
Oil Cooler, Closed-Circuit Cooling water cooler, Air Cooled Heat Exchanger - Oil Cooler, Air cioled Heat Exchanger - CCE Unit 1
Shaybah Combined Cycle Power Generation Project
Aramco Oversea Comapny SEPCO Siemens
GEA-BTT BATIGNOLLES TECHNOLOGIES THERMIQUES
GEA-BTT, 25 RUE DU RANZAI, NANTES, 44025, France SEPCO
PIM, In-porcess (PIM, assembling, dimnesional check etc.), Final inspection, Documentation review, Packing, Shipment Inspection 12 2015
AXL 2nd Stage Shipper Pump with Lube Oil Systém - Main Rotor, Spare rotor
Shaybah crude stabilization project – ABQAIQ Plants
Saudi Arabian Oil Company (Saudi Aramco)
ESSAR Projects Saudi Company
Flowserve Testing Centre Vossendaal
Flowserve Testing Centre Vossendaal, Paralelweg 6, 4878 AH, Etten-Leur, Netherlands ESSAR
Performance Tests including NPSHR and mechnical run, Final inspection including name plate verification, closing of mechanical punch list, documentation review, packing, shipment Inspection 8 2015
Ball Valves
South Tank Farm Facilities, Jazan
Saudi Arabian Oil Company (Saudi Aramco) Petrofac MSA a.s.
MSA, Dolni Benesov, Czech Republic Petrofac
Hydrostatic tests and pneumatic tests Inspection 5 2015
CS Header Boxes for LP Condensate Vent Condenser 1pc of Inlet/Outlet Header, Return Header, CS Header Boxes Excess Steam Condenser 8pcs of Inlet Header, Return Header, outlet header
JAZAN Refinery and Terminal Project (EPC13 Utility Package)
Saudi Arabian Oil Company (Saudi Aramco) Hitachi LTD Hamon D’Hondt
Hamon D’Hondt, 1524 rue de la Paix 59970 Fresnes Sur Escaut France Hitachi LTD
Final weld heat treatment, visual inspection, random dimensional check, Final inspection after PWHT including U-Stamp marking, Documentation review Inspection 3 2015
Plug Valves(MOV, GOV and ZV)
Midyan Gas Processing Facility (MGPF)
Saudi Arabian Oil Company (Saudi Aramco)
LARSEN & TOUBRO ARABIA LLC.
BRDR. Christensen ApS
BRDR, Skuderlose, 4690 Haslev, Denmark
LARSEN & TOUBRO ARABIA LLC.
PIM, in-process(PMI, material identificaiton, hydrostatic tests etc.), Coating,Final inspection, Packing, Documentation review, Shipment Inspection 16 2015
Globe, Angle valves
JIGCC Power Block Project (Package 4)
Aramco Oversea Comapny SEPCO NEM
Emerson Process Management
Emerson Process Management, Szekesfehervar, Holland fasor 6, Hungary SEPCO
Visual inspection, Pressure tests, coating, Markings, Documentation review, final inspection Inspection 2 2015
Stainless Steel Welded Pipe
JAZAN Refinery and Terminal Project (EPC 9)
Aramco Oversea Comapny
SK engineering& construction
BSL Pipes & Fittings
BSL Pipes & Fittings, Billy Sur Aisne- France SKE&C
In-Process (Heat Treatment, mechanical testing), Closing of NCR, Final inspection, Packing, Documentation review, Shipment Inspection 4 2015
Carbon Steel Seamless Tubes
Jazan Refinery Unit J23
Aramco Oversea Comapny
Tecnicas Reunidas
S&T Corporation
Zeleziarne Podbrezova
Zeleziarne Podbrezova, Podbrezova, Slovakia
Tecnicas Reunidas
In-Process (Eddy current tests, Mechanical testing etc.), Final inspection, Packing, Documentation review, Shipment Inspection 3 2015
Reciprocating Compressors for Propylene Service type 1TES40 + spare parts
Lake Charles Chemicals (LCCP) Project FLUOR
Neuman & Esser Germany
Neuman & Esser Germany, Wurzen-Germany FLUOR
PIM, in-process, Final inspection, Documentation review Inspection 4 2015
Special fittings for jackets piping RABIGH II CP2
Aramco Oversea Comapny DAELIM APB
APB, Gustav-Kramer-Strasse 5b, 8605 Kapfenberg, Austria DAELIM
In-process(PMI, PMI marking, hydrostatic test etc.), Final inspection, Packing, Documentation review 3 2015
Ball Valves
Cogen Interconnection Facilities for 3rd Party Cogen at Ratanura Refinery
Aramco Oversea Comapny
FUTAI ARABIA LLC
ELSTER NV/SA MSA a.s.
MSA, Dolni Benesov, Czech Republic AOC-H
PIM, In-Process, Final inspection, Documentation review
Monitoring Inspection 10 2015
Pipe Spoools
Brighouse Bay Compressor Station
Bord Gais Networks
Waga Warme Gastechnik GmbH Hilliger GmbH
Hilliger GmbH, Bahnhofstraße 10 04808 Thallwit
Bord Gais Networks
Review of welding procedure qualification, welders qualification, review of NDT, Material traceability, welders stamping, hydrostatic pressure test, tightness test, tightness test waterpipes, dimensional inspection pipe spools, final inspection. Inspection 2 2015
Ball Valves
OFFSHORE MAINTAIN POTENTIAL FACILITIES - 2012/ABSF PIPELINES, SS CABLES & JUMPERLINES (BI 10-03042-0012
Aramco Oversea Comapny
SAIPEM S.p.A. Sharjah MSA a.s.
MSA, Dolni Benesov, Czech Republic AOC-H
Painting, Marking, Final inspection(dimensional check, visual check), Documentation review
Monitoring Inspection 1 2015
Multiphase flowmeters
OFFSHORE MP FACILITIES 2014
Aramco Oversea Comapny
SNAMPROGETTI SAUDI ARABIA CO. LTD.
ONESUBSEA PROCESSING AS
ONESUBSEA PROCESSING AS, KLEPPESTO, HORSOY, Norway AOC-H
FAT, Final inspection, Documentation review
Monitoring Inspection 1 2015
Vertical Pumps
Shaybah CPFE Project
Aramco Oversea Comapny
Samsung Engineering Flowserve UK
Flowserve UK, Newark/United Kingdom
Samsung Engineering
Final inspection including visual, dimensional and name plate check, Packing, Documentation review Inspection 1 2015
Ball Valves AOC Source inspection
Aramco Oversea Comapny MSA a.s.
MSA, Dolni Benesov, Czech Republic AOC-H
PIM, In-Process (visual inspection and base material identification, hydrostatic shell test before internal coating,hydrostatic tests after internal coating, coating, final inspection, documentation review, packing, shipment Inspection 6 2015
SHP On-Off Safety Valves
RABIGH Phase II CP3/4 Project
Aramco Overseas Company B.V. & Sumitomo Chemical Co., Ltd.
GS Engineering&Construction BHDT GmbH
BHDT GmbH, 8605 Kapfenberg/ Austria
GS Engineering& Construction
PIM, in-process, Non Destructive testing, hydrostatic tests, painting, final inspection, packing, marking Inspection 3 2015
Plug valves (MOV/GOV)
Master Gas Expansion Phase 1 56´´ EWG-2 Section III (LOOP 2)
Aramco Oversea Comapny DODSAL
Serck Audco Valves
Serck Audco Valves, Burrell Road , Haywards Heath, United Kindom , RH16 1TL AOC-H PIM Inspection 1 2015
Pelletizer systém
IBN SINA Poly Oxy Methylene IBN SINA
Intecsa Ingenieria
Coperion GmbH ECON GmbH
ECON GmbH, Weisskirchen, Austria
Intecsa Ingenieria Closing of Punch list Inspection 2 2015
Gate Valves, Swing Check Valve
Worley Parsons
Trouvay& Cauvin Ltd MSA a.s.
MSA, Dolni Benesov, Czech Republic Worley Parsons
Nitrogen leak pressure test, Functional test, pressure test, Documentation review Inspection 3 2015
Carbon Steel Seamless Tubes
L9C0045] Jazan Refinery and Terminal
Aramco Oversea Comapny
Tecnicas Reunidas
Zeleziarne Podbrezova
Zeleziarne Podbrezova, Podbrezova, Slovakia
Tecnicas Reunidas
In-Process (Eddy current tests, Mechanical testing etc.), Final inspection, Packing, Documentation review, Shipment Inspection 2 2015
Liquid incinerator package (2x100%) 2 Trains / Plate heat exchanger
Rabigh II Common utilities&tank farm (UO2&UO3,RP1]
Aramco Oversea Comapny Petrofac
John Zink Hamworthy Combustion
Tranter International AB
Tranter International AB, 46228 Vanersborg, Sweden AOC-H
PIM, Pressure tests, final dimensional and visual check, check of code stamping, check of ASME U-stamp
Monitoring Inspection 2 2015
ER310-Essential Service Generator Package
Ivar Aasen Field Dev. Project
Det Norske Oljeselskap ASA SMOE
Frank Mohn Flatøy AS Metalistas LT
Metalistas LT,35113 PANEVEZYS - LITHUANIA SMOE
Visual inspection, dimensional check, documentation review Inspection 1 2015
Antisurge Valve
JSC Yamal LNG Plant EPSCC
Yamal LNG / Technip Technip
CCI Czech Republic s.r.o.
CCI Czech Republic s.r.o., Brno, Czech Republic Technip
Final inspection including visual check, dimensional check and name plate check Inspection 1 2015
Helifuel Transfer Supply Skids
Arabiyh & Hasbah
Aramco Oversea Comapny Saipem
Eeastern Petroleum Supplies
Eeastern Petroleum Supplies AOC-H
Dimensional and physical verification,welding check review and NDT, PMI test review, wiring check, equipmenty lay out check, wiring marking and tagging check, label check, component check, functional test Inspection 1 2015
SHP blow-off valve
RABIGH Phase II CP3/4 Project
Aramco Overseas Company B.V. & Sumitomo Chemical Co., Ltd.
GS Engineering&Construction BHDT GmbH
BHDT GmbH, 8605 Kapfenberg/ Austria
GS Engineering& Construction
PIM, in-process, Hydrostatic tests, functional tests, final inspection, packing, marking Inspection 3 2015
Carbon Steel Seamless Tubes
Jazan Refinery and Terminal Project
Aramco Oversea Comapny
Tecnicas Reunidas
Zeleziarne Podbrezova
Zeleziarne Podbrezova, Podbrezova, Slovakia
Tecnicas Reunidas
In-Process (Eddy current tests, Mechanical testing etc.), Final inspection, Packing, Documentation review, Shipment Inspection 1 2015
HP Pipe Fittings and Flanges Aquarius Shell FLUOR PFF Europe BV
PFF Europe BV, Wielewaalweg 4, 4791 PD Klundert, The Netherland FLUOR
Base material traceability, marking, documentation review Inspection 10 2015
Gate Globe Check Valves Aquarius Shell FLUOR MRC Global
MRC Global, 2665 Bleiswijk, The Netherland FLUOR
Visual check, name plate check, painting check, final inspection, documentation review Inspection 1 2015
Wet Chlorine Filter 21F001 Sulphurnet
Polytex Composite, s.r.o.
Polytex Composite, s.r.o., Karvina-Nove Mesto, Czech Republic Sulphurnet
Visual inpsection, dimensional check, hydrostatic test, documentation review Inspection 1 2015
Cold Drawn Precision Seamless Steel Tubes RAMT
Aramco Oversea Comapny
JGC Gulf Engineering Co.Ltd.
Zeleziarne Podbrezova
Zeleziarne Podbrezova, Podbrezova, Slovakia
JGC Gulf Engineering Co.Ltd.
Sampling and mechanical testing, NDT, chemical composition, final inspection, documentation review,packing inspection Inspection 2 2015
Ball Valves
Wasit Gas Plant Downstream Pipeline Project
Aramco Oversea Comapny
Gulf Consolidated Contractors Co. Ltd. GCC MSA a.s.
MSA, Dolni Benesov, Czech Republic
Gulf Consolidated Contractors Co. Ltd. GCC
Hydrostatic tests, functional tests, documentation review Inspection 3 2015
Shuttle Drives Complete
Shiploader Replacement Carrington Terminal Project
Port Waratach Coal Services JACOBS
Sandvik and Construction Australia
C.H. Schafer Getriebe GmbH
C.H. Schafer Getriebe GmbH, Hauptstr.42, D-1896 Ohorn/Germany JACOBS
Visual inspection, name plate check, painting check, documentation review Inspection 1 2015
Castings Orion Roucka Slevarna Roucka Slevarna, Lutin, Czech Republic Orion
Cut of samples/lugs from castings for testing, marking, visual check, documentation review Inspection 5 2015
Ball Valves
06-FCP-196B New Metering Skid SASOL/Shell
Worley Parsons
Krohne Oil and Gas B.V.-The Netherlands MSA a.s.
MSA, Dolni Benesov, Czech Republic Worley Parsons
Hydrostatic tests, functional tests, documentation review Inspection 2 2015
Vertical Suspended Closed Drain Pumps
A00/JP-7478/Closed Drain Systém
JIANNOU & PARASKEVAIDER (OVERSEAS) LTD LIBYA Flowserve, Austria
Flowserve, Austria, A 2345 Brunn/Gebirge, Austria
JIANNOU & PARASKEVAIDER (OVERSEAS) LTD LIBYA / TUV HELLAS
Factory acceptance tests(bearing temperature,performance test, vibration test, dismantling/strip down inspection, noise test Inspection 4 2015
Container for Evacuation Chute BP Technip
VIKING LIFE-SAVING EQUIPMENT AS
Ferram Strojirna, s.r.o.
Ferram Strojirna, s.r.o., Vávrovicka 275/89, 747 07, Opava , Czech Repubic Technip
cutting inspection, marking, assembling, welding, visual inspection, NDT before and after Load test check, Load test, painting activities, Final inspection, documentation review Inspection 16 2015
Boom, Lattice Boom Crane Kenz Figee Unex a.s.
Unex, Brnicko, Unicov, Czech Republic
Kenz Figee / ABS Consulting
Visual inspection after welding, material identification, final inspection, documentation review Inspection 4 2015
Castings - Non Slam Check Valves / Wedge
Satah Al-Razboot (SARB) Field Development Project – EPC PKG4 ADMA
Hyundai Engineering & Construction
ORION S.P.A Roucka Slevarna
Roucka Slevarna, Lutin, Czech Republic
Hyundai Engineering & Construction
Visual and dimensional inspection of raw material, castings, cutting of test blocks of discs (before mechanical test and chemical analysis), mechanical testing in laboratory, documentation review Inspection 6 2015
HI Turbine Assembly, HI Steam Turbine Unit 10
JAZAN IGCC Power Block Project
Saudi Arabian Oil Company (Saudi Aramco) SEPCO Siemens AG
Siemens AG, 45478 Mulheim, Germany
SEPCO / TUV Rheinland
Preservation, Packing, Transport and Storage of Steam Turbine and condeser components, documentation review Inspection 1 2015
Globe Valves, Check Valves, Gate Valves Donggi Project
REKIND-Donggi MSA a.s.
MSA, Dolni Benesov, Czech Republic REKIND-Donggi
Hydrostatic tests, functional tests, documentation review Inspection 4 2015
Castings-Corpo Pompa , Corperchio corpa pompa
FindeR Pompe S.p.A
Vitkovicke Slevarny s.r.o.
Vitkovicke Slevarny s.r.o., Vitkovice, Czech Republic
FindeR Pompe S.p.A / DNV-GL Expediting 1 2015
Coupling Technip
EPT Emerson Power Transmission
GE Oil & Gas KOP-FLEX
KOP-FLEX, Piestanska 1202/44, 915 28 Nove Město nad Vahom, Slovakia GE Oil & Gas
Components balance with assembly balance, load couplings documentation review Inspection 1 2015
Casting - Nozzle chamber upper half Casting - Nozzle chamber lower half
CB&I Netherland
GE Oil & Gas
Vitkovicke Slevarny s.r.o.
Vitkovicke Slevarny s.r.o., Vitkovice, Czech Republic GE Oil & Gas
Dimensional check, documentation review Inspection 4 2015
Coupling NPCC/Technip
EPT Emerson Power Transmission
GE Oil & Gas KOP-FLEX
KOP-FLEX, Piestanska 1202/44, 915 28 Nove Město nad Vahom, Slovakia GE Oil & Gas
Non destructive examinations, load couplings, all torque transmitting components, residual unbalance check, load couplings assembled, unbalance repeatability check, interface dimensional check Inspection 3 2015
Vacuum Jacket pipes & valves
LIN LOX Phase I & GOX Phase II Flow Meters SABIC Schwanner GmbH
Schwanner GmbH, Burgikirchen,Germany SABIC
Visual inspection, marking check, leak test, final inspection, documentation review Inspection 1 2015
Boiler Suspension
Singapore Jurong Cogen Project
ExxonMobil Asia Pacific Pte Ltd
Foster Wheeler Italiana Srl
NEM, Seiko Flowcontrol GmbH
Seiko, Czech Republic
Seiko , 69671 Blatnice pod Svatym Antoninkem 866 Czech Republic
Foster Wheeler Italiana Srl
Visual check, dimensional check, identification/marking check, documentation review Inspection 1 2015
Valves Aramco Oversea Comapny SEPCO NEM
Emerson Process Management
Emerson, 8000 Székesfehérvár, Holland fasor 6, Hungary SEPCO Audit 1 2015
Combustion Air Preheater
Sohar Refinery Improvement Project
Oman Refineries and Petrochemicals Company LLC.
CB&I Lummus B.V.
Moravia-Apex, spol. s.r.o.
Moravia-Apex, spol. s.r.o., Olomoucka 7/9, Brno, Czech Republic
CB&I Lummus B.V.
Leakage test, Block Assembly, Dimensional check, Visual inspection, name plate check, NDT, Final inspection, Packing, Documentation review Inspection 3 2015
330 330 - MN-1105 00 V-1100 Sampler Hydrocyclone 330 330 - MN-1740 00 2nd Centrate Hydrocyclone
16100 - IBN SINA POLYOXYMETHYLENE PROJECT
Saudi Arabia Basic Industries (Sabic)
Innoweld Metalverarbeitungs GmbH
Innoweld Metalverarbeitungs GmbH, Industriepark, 8682 Mürzzuschlag-Hönigsberg Austria
Saudi Arabia Basic Industries (Sabic)
Final visual and dimensional inspection, hydrostatic test Inspection 1 2015
Hub Size 400 GE Oil & Gas V-Nass, spol, s.r.o.
V-Nass, spol, s.r.o., Ostrava-Vitkovice, Halasova 1a 706 02, Czech Republic GE Oil & Gas
Final inspection, Documentation review Inspection 1 2015
Antisurge Valves
Yamal LNG Project
Yamal LNG / Technip GE Oil & Gas CCI Italy
CCI Czech Republic s.r.o.
CCI Czech Republic s.r.o., Brno, Czech Republic Technip
Visual and dimensional control, Verification Name plate identification, Functional test Inspection 1 2015
Bale Valve
Eastern Goldfields pipeline
APA Group/APT Management Services Pty Ltd MSA a.s.
MSA, Dolni Benesov, Czech Republic APA Group
Welding activites check, hydrostatic test, functional test, final inspection including dimensional check, check of marking, documentation review Inspection 8 2015
Gate Valves
ALAŞEHİR 45 MW GEOTHERMAL POWER PLANT
Zorlu Endustriyel Ve Enerji Tesisleri Insaat Tic. AS MSA a.s.
MSA, Dolni Benesov, Czech Republic
Zorlu Endustriyel Ve Enerji Tesisleri Insaat Tic. AS
Pressure test, Functional test Inspection 12 2015
Desuperheaters
KEMYA-SEP-HALOBUTYL (HB) PROJECT
Saudi Arabia Basic Industries (SABIC)
CCI Czech Republic s.r.o.
CCI Czech Republic s.r.o., Brno, Czech Republic
Saudi Arabia Basic Industries (SABIC) Hydrostatic tests Inspection 3 2015
Fuel Gas Filtration Skids
Cormorant Alpha Platfor. TAQA Bratani,Integrated Services Con.
SPX Dehydration Process Filtration KPS Metal a.s.
KPS Metal a.s., Urbankova 231 Moravske Budejovice, Czech Republic
SPX Dehydration Process Filtration
Verification of punch lists, visual inspection, dimensional verification, leak test of assembled ackage, instrument wiring check, documentation review Inspection 3 2015
Multibore HUB Size 580, Female MB Hub Body, Machining IDD Chevron GE Oil & Gas V-Nass, spol, s.r.o.
V-Nass, spol, s.r.o., Ostrava-Vitkovice, Halasova 1a 706 02, Czech Republic GE Oil & Gas
Hardness testing, Final inspection, Documentation review Inspection 1 2015
Rotometers KEMYA
Saudi Arabia Basic Industries (SABIC)
Brooks Instrument Ktf Sp. z.o.o.
Brooks Instrument Ktf, Berenyi str 72-100, H-8000 Szekesfehervar, Hungary
Saudi Arabia Basic Industries (SABIC)
Visual inspection-quantities, identification, appearance, dimensions, Pressure test, Liquid dye penetrant examination, functional test, PMI, Document review Inspection 1 2015
Casings - Turbine upper and lower part CHILCA PLUS
DURO FELGUERA
SIEMENS Energy Žďas a.s.
Žďas a.s., Strojírenská 6,Žďár n/Sázavou, Czech Republic
DURO FELGUERA
Magnet particle tets of casting check, Ultrasonic test of casting check, Dimensional and visual check, Magnet particle test of casting after machinig, Documentation review Inspection 1 2015
Motor operated valve, Soft-seated, NPS24
Hadeed New Natural Gas Supply Metering Station
Saudi Arabian Oil Company (Saudi Aramco)
Pall Corporation MSA a.s.
MSA, Dolni Benesov, Czech Republic Pall Corporation
PIM, in- process (visual inspection after machinig, hydrostatic test, functional test etc.), painting activites check, Final inspection, Packing, Documentation review, Shipment Inspection 8 2015
Check Valves
Expand Shybah-ABQAIQ Pipeline Capacity – 1000MBCD
Saudi Arabian Oil Company (Saudi Aramco)
Br.C.A.T. International Co.LTD. MSA a.s.
MSA, Dolni Benesov, Czech Republic
Br.C.A.T. International Co.LTD.
PIM, in- process(visual inspection after machinig, hydrostatic test, functional test etc.), painting activites check, Final inspection, Packing, Documentation review, Shipment Inspection 8 2015
Check, Gate, Globe valves
E.14.4942 ARAMCO Al-Muajjiz Terminal Rehabilitation
Saudi Arabian Oil Company (Saudi Aramco)
BELLELI Energy s.r.l. MSA a.s.
MSA, Dolni Benesov, Czech Republic
BELLELI Energy s.r.l.
PIM, in- process(visual inspection after machinig, hydrostatic test, functional test etc.), painting activites check, Final inspection, Packing, Documentation review, Shipment Inspection 16 2015
PEDESTAL CRANE- Base Frame, Boom, Winches, A-Frame Ivar Aasen
Det Norske Oljeselskap ASA SMOE Pte Ltd
National Oilwell Varco Stalkon
Stalkon, Police Poland H. Cegielsky, Poznan Poland SMOE Pte Ltd
Painting activities check, Dimensional check, general surveillance, documentation review Inspection 14 2014
Ball Valves AOC Source inspection
Aramco Oversea Comapny MSA a.s.
MSA, Dolni Benesov, Czech Republic AOC-H
PIM, Visual inspection after machinig, Hydrostatic tests, Functional tests, Final inspection, Documentation review, Packing, Shipment Inspection 4 2014
Ball Valves AOC Source inspection
Aramco Oversea Comapny MSA a.s.
MSA, Dolni Benesov, Czech Republic AOC-H
PIM, Visual inspection after machinig, Hydrostatic tests, Functional tests, Final inspection, Documentation review, Packing, Shipment Inspection 4 2014
Steam Air Preheaters
MEJORA EFICIENCIA HORNOS
Repsol Petroleo, S.A
Tecnicas Reunidas
Benelux-Apex B.V.
Moravia-Apex, spol. s.r.o.
Moravia-Apex, spol. s.r.o., Olomoucka 7/9, Brno, Czech Republic
Tecnicas Reunidas
Visual inspection, Dimensional check, Name plate check, Painting check, Final inspection, Documentation Review Inspection 3 2014
Ammonium Sulphate Crystallization Unit. IEFCL PROJECT
INDORAMA ELEME FERTILIZER AND CHEMICAL LIMITED Toyo
Gea Messo Gmbh. Gea Technika
Gea Technika, Opole, Poland Toyo PIM Inspection 2014
Ammonium Sulphate Crystallization Unit. IEFCL PROJECT
INDORAMA ELEME FERTILIZER AND CHEMICAL LIMITED Toyo
Gea Messo Gmbh. Gea Technika
Gea Technika, Opole, Poland Toyo Expediting 4 2014
Drivers cabin, Machinery Houses
Ivar Aasen Development Project
Det Norske Oljeselskap ASA SMOE Pte Ltd
National Oilwell Varco ND Service
ND Service, Kontenerowa 30, 81-155 Gdynia, Poland SMOE Pte Ltd
Inspection fo mechanical completation for drivers cabin, Inspection of machinery houses Inspection 2 2014
Basket Seadrill (SHI) SGS Korea
National Oilwell Varco Hydro Naval
Hydro Naval, 76-270 Slupsk, Poland SGS Korea
Factory acceptance test, Final inspection, Documentation review Inspection 1 2014
Motor operated Choke Valve
ARABIYAH-HASBAH PLATFORMS AND POWER(BI 10-00916)
Aramco Oversea Comapny
SAIPEM S.P.A. SHARJAH
CCI Valve Tehcnology GmbH
CCI Czech Republic s.r.o.
CCI Czech Republic s.r.o., Brno, Czech Republic AOC-H PIM
Monitoring Inspection 2014
Other Major assignments: (from 2005 till 2014)
TRANSFORMATOR
Client: TECHNIP, FRANCE
Vendor: SIEMENS, FEROKOTAO, CROATIA
Project: 61246X MARTIN LINGE TOPSIDES EPSCC
Check of start painting activities – painting according to Norsok M 501 + Technip
requirements, check of surface preparation before blasting, check of surface
preparation after blasting, bresel test, roughness test, dust test, check of blasted
surface according to comparator, check of environment before painting, check of
painting activities-first layer, second layer, final coat; check of final paint surface and
check of DFT; release transformator for shipment; issueing of IRN, check of final
documentation
PUMP
Client: POSEIDON RESOURRCES, USA
Vendor: FLOWSERVE, Madrid, Spain
Project: CARLSBAD
Performance test – check of vibration, noise, bearing temperature, flow, guaranteed
point, discharge pressure Pd, operation speed, electrical parameter, identification,
used base material, diameters according to drawing
RISER CLAMPS, CAP BEAMS
Client: SAIPEM SA
Vendor: MHF, STELLENDAM,ROTTERDAM, Netherlands
Project: ENI CG, Litchendjili WP4-OUT, CG, ENI CG, Litchendjili WP10,CG
Check of all materials for assembling of structure ase per appl WPS, verify roll
forming operation + (strain age) tests, assembling/fitting capped beams according to
drawings including dimensional control + fit up control, monitoring welders during
production to confirm welding is according to WPS, visual inspection of welds on
weld completion, requesting NDE of welds according to NDT client’s requirements,
confirmation all NDE are comlete and accepted, final check, check of dimensions
and geometry, check of cold vulcanisation of the clamps and tests, release structure
for protective coating, check of coating report with DFT measurements, check of
vulcanisation reports, final inspection and compiling of all documents and
manufacturing record book, issueing of release note, check of shipping documents
RUBBER COATING
Client: TENARIS
Vendor: TRELLEBORG OFFSHORE NORWAY, Norway
Project: OFON Phase 2 Project
Check of full traceabilty according to procedure, check of girt blasting, visual
inspection before and after blasting; check of air temperature, relative humidity, steel
temperature, check of salt test, check of roughness, surface cleanliness, UV inspection,
check of dust level, check of application of primer/rubber cement, check of
identification number-clearly legible, check of primer batch, check of rubber coating –
layer by layer, check of nylon tape wrapping, check rest of time before vulcanisation,
check of curing, cure according to pre-set program, visual inspection after
vulcanisation, testing and measuring – hardness test outer layer, coating thickness,
holiday test, adhesion test on test plate, hammer test, limited CD test, CD test, signing
of release note, packing and preparations for transport, check of final documentation
AIR PREHEATERS
Client: WORLEY PARSON, AUSTRALIA
Vendor: BENELUX-APEX GROUP, MORAVIA-APEX,BRNO
Project: CLEANESE PROJECT FAIRWAY
PIM, check of production – fit up, welding, NDT activities, painting, hydrostatic test
(leak test), final inspection (dimensional check, visual check, review documentation,
issueing of inspection release note, packing check); check of adhesion of painting and
thickness of painting
AIR ORE-HEATER
Client: KBR, USA
Vendor: BENELUX-APEX GROUP, MORAVIA-APEX,BRNO
Project: DYNO F441 NOBEL LOUISIANA AMMONIA PROJECT
PIM, check of production – fit up, welding, NDT activities, painting, hydrostatic test
(leak test), final inspection (dimensional check, visual check, review documentation,
issued inspection release note, packing check); check of dry film thickness of painting
AIR ORE-HEATER
Client: KBR, USA
Vendor: BENELUX-APEX GROUP, MORAVIA-APEX,BRNO
Project: DYNO F441 NOBEL LOUISIANA AMMONIA PROJECT
PIM, check of production – fit up, welding, NDT activities, painting, hydrostatic test
(leak test), final inspection (dimensional check, visual check, review documentation,
issued inspection release note, packing check); check of adhesion of painting and
thickness of painting
CHOKE CONTROL VALVES
Client: ABU DHABI DEVELOPMENT CO.Ltd
Vendor: CCI, Czech Republic
Project: Shah Gas Development (SGD) Program
Final inspection, check of welding procedure (WPS,WPQR), qualification welder
(WQR), NDE procedures, NDT qualification,Check of basic/secondary materials,
material certificates, check of NDT protocols (PT,RT), check (witness) of Factory
acceptance test – Hydrostatic pressure test, seat leakage test, functional test, fugitive
emission production test; check of painting of valve and check of conservation,
crating, marking before shipment; check of holiday test of painting, adhesion of
painting
OIL SEPARATOR
Client: FLUOR
Vendor: EM Polar, Czech Republic
Project: BASF TDI Refrigeration Units
Final inspection, check of welding procedure (WPS,WPQR), qualification welder
(WQR), NDE procedures, NDT qualification,Check of basic/secondary materials,
material certificates, check of NDT protocols (PT,RT); check(witness) of hydrostatic
pressure test and check of leakage test; check of painting of vessel, check of adhesion
of painting
XT CAS CASTING UPPER & LOWER
Client: TECHNIP
Vendor: ŽĎAS, Czech Republic
Project: 2408 ETILENO XXI
Final inspection, check of mechanical testing result, check of MT, UT, RT
examinations, documentation review, visual and dimensional check
MECHANICAL SEAL
Client: TECHNIP
Vendor: JOHN CRANE, Czech Republic
Project: ETILENO XXI
Final inspection, visual and dimensional check, check of quality control
manufacturing dossier
PIPE, 8 IN NPS x LONGITUAL WELDED
Client: ARAMCO OVERSEAS COMPANY BV
Vendor: SOSTA, Germany
Project: SOURCE
PIM-verification of manufacturer possibility for manufacture pipe according SA
procedures
PRESSURE VESSELS – STILL COLUMN,REFLUX CONDENSER
Client: TALISMAN ENERGY
Vendor: STREICHER, Slovakia
Project: MONTROSE BLP
Final inspection,Check of welding procedure (WPS,WPQR), qualification welder
(WQR), NDE procedures, NDT qualification, check of basic/secondary materials,
material certificates, check of NDT protocols (PT,RT); check(witness) of hydrostatic
pressure test and check of pad leakage test
DRIVEC SKID LEFT/RIGHT HAND, TORQUE TUBE SKID
Client: TALISMAN ENERGY
Vendor: UNEX, Czech Republic
Project: MONTROSE BLP
Check during manufacture – assembling, welding,painting(after blasting); final
inspection, check of welding procedure (WPS,WPQR), qualification welder (WQR),
NDE procedures, NDT qualification, check of basic/secondary materials, material
certificates, check of NDT protocols (PT,RT); check of holiday test of painting,
adhesion of painting and thickness of painting and salt on surface
BALL VALVES
Client: PT REKAYASA INDUSTRI
Vendor: MSA, Czech Republic
Project: EPCIC OF THE PIPELINE SYSTEM FOR PAMPUNG LNG
FLOATING STORAGE AND REGASIFICATION FACILITIES
Inspection – verification of raw material, issued certificate 3.2. for base material,
check of mechanical testing in laboratory, pressure test and functional test, final
dimensional check, check of final visual and marking, cleaning, painting, protection,
packing, review of the documents generated, usued release note for shipment; check of
adhesion of painting and thickness of painting
AIR INTAKE FILTER
Client: ROLLS-ROYCE ENERGY SYSTEM
Vendor: AXIS, Czech Republic
Project: M.A677-Kinabalu
Final inspection,Check of welding procedure (WPS,WPQR), qualification welder
(WQR), NDE procedures, NDT qualification,Check of basic/secondary materials,
material certificates, check of NDT protocols (PT,RT); visual check surface after
passivation/pickling of welds, dimensional check of basic dimensions
STEM EXTENSION
Client: GE OIL & GAS
Vendor: V-NASS, Czech Republic
Project: KIZOMBA Satellites Phase 2 Project
Final inspection, witness of PMI tests, documentation review; check of adhesion of
painting and thickness of painting
FORGINGS
Client: GE OIL & GAS
Vendor: ŽĎAS, Czech Republic
Project: KIZOMBA Satellites Phase 2 Project
Final inspection, hardness test, ultrasonic test, documentation review
PUMP CASING - DRY COOLING WATER SYSTEM Client: SK Engineering & Construction Co., Ltd
Vendor: ASG Hydro Ltd, Hungary Project:TUFANBEYLI Thermal Power Plant Hydrostatic test
OIL SUPPLY UNIT, OVERHEAD TANK GN 600 Client: JACOBS ENGINEERING S.A.
Vendor: HYDAC, Poland
Project: ODI Project
RUN TEST, visual check, dimensional check, documentation check, check of paint
WET GAS VENTURI METER
Client:EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA
Vendor: SEIKO FLOW CONTROL,Czech republic
Project: DAMAR-A Project
Check the documentation status related to QA/QC document ,ITP, test procedure and
welding procedure; check and verify material availability, obtain suborders, check of
arrival date for the outstanding materials, check of start date of fabrication, date for
completion, check of adhesion of painting and thickness of painting
FEED FILLTER, RESIN TRAPS,PUMPS FILTER / PRESSURE VESSEL Client: FAUDI
Vendor: CKD CHLAZENÍ, Czech Republic
Project: MOZYR OIL REFINERY Review of drawing, review of weld procedure(WPS,WPQR), material control
including material test certificate, visual check of weld joints on tack welded
conditions, welding process, check of completeness on finished components, visual
examination of the weld joints, dimensional check and check material stamping, post
welded heat treatment report, hydro test, dryling, air-leaktest; check of adhesion of
painting and thickness of painting
FAIRLEAD
Client: DAEWOO SHIPBUILDING & MARINE ENGINEERING
Vendor: ELFE, s.r.o., Czech Republic
Project: SONGA Project
Final inspection - dimensional check, check of final visual and marking, cleaning,
painting according Norsok, protection, packing, review of the documents generated,
usued release note for shipment
HUB´s
Client: GE OIL & GAS
Vendor: V-NASS, Czech Republic
Project: KIZOMBA SATELLITES PHASE 2 Project
Weld cladding
CATALYST FILTER/PRESSURE VESSELS
Client: DAELIM
Vendor: SAM, Slovakia Republic
Project: SADARA ISOCYANATES PLANT Project
Pre-inspection meeting, PMI, verification of raw material, product traceability,
dimensional check, check of assembly, check of welding, visual check, check of
hydrostatic pressure test, check of NDT(VT,PT,RT), review of the document; check of
adhesion of painting and thickness of painting
GATE VALVES
Client: CONOCOPHILLIPS INC. LTD
Vendor: MSA, Czech Republic
Project: DEGC, DC-1 & CGPX Project
Inspection – PMI, verification of raw material, pressure test and functional test, final
dimensional check, check of final visual and marking, cleaning, painting, protection,
packing, review of the documents, issueing of release note for shipment; check of
adhesion of painting and thickness of painting
SUPPLY OF DRY VACUUM PUMP
Client: TOYO
Vendor: EDWARDS, Czech Republic
Project: EEP2 Project
Expediting – check of manufacturing equipment, manufacturing premises, state of
equipment, possibilities of manufacturing, approving of drawing documentation,
availability and traceability of base material, manufacturing plan-in process; check of
adhesion of painting and thickness of painting
SEAMLESS UMBILICAL COILED TUBING
Client: TECHNIP/CHEVRON AUSTRALIA PTY LTD.
Vendor: SANDVIK, CHOMUTOV
Project: WHEATSTONE SUBSEA INSTALATION
Verification (witness, monitoring, review) of ladle analysis, product traceability,
incoming inspection of hollows into pilgering line, pilgering, ID & OD degreasing and
cleaning, cleanliness check before final heat treatment, heat treatment qualification,
heat treatment, straightening, belt polishing, NDE and visual inspection of straight
tubes, eddy current testing, ultrasonic testing for surface and subsurface defects,
measurement of the main dimensions by UT, marking and traceability, final inspection
of tubes, positive material identification (PMI), burst test, product analysis, tensile
test, hardness test, flattening test, flaring test, pitting corrosion test, ferrite content,
microstructure test, release to the next processing, WPQR /WPAR, approval of WPS/
WPAR, production test welds, liquid penetrant testing of the welds, radioscopy of the
weld, visual inspection of the welds, coiling of the tubes, packing of coil; packing of
straight tubes, final documentation/ QA releasing
STEAM AIR PRE HEATER
Client: LHT (CB&I)
Vendor: BENELUX-APEX GROUP, MORAVIA-APEX,BRNO
Project: KOMSOMOLSKY REF.HYDROCRACKING COMPLEX
Hydrostatic test (leak test), final inspection (dimensional check, visual check, review
documentation, issued inspection release note, packing check); used standards ASME
IX, ASME VIII,division 1, NDT according to AWS D1.1, ITP of client, internal
specification of client or supplier´s specification approved by client; check of adhesion
of painting and thickness of painting
COMBUSTION AIR PREHEATER
Client: CB&I (LHT)
Vendor: BENELUX-APEX GROUP, MORAVIA-APEX,BRNO
Project: KNPC(Kuwait national petroleum co. ) HYDROGEN PLANT
Hydrostatic test (leak test), final inspection (dimensional check, visual check, review
documentation, issueing of inspection release note, packing check); used standards
ASME IX, ASME VIII, division 1, NDT according to AWS D1.1, ITP of client,
internal specification of client or supplier´s specification approved by client; check of
adhesion of painting and thickness of painting
BALL MILL SYSTEM(CLASSIFIER FEED TANK), 2 OFF CLASSIFIE
FEED PUMPS
Client: ALSTOM S&E AFRICA (PTY) LTD
Vendor: CHRISTIAN PFEIFFER MASCHINEFABRIK, AUSTRIA
Packing inspection (packing and marking); review of QC documentation book
GATE VALVES, BALL VALVES
Client: ELECNOR MEXICO, GS KICO ENGINEERING
Vendor: MSA
Inspection – pressure test and functional test, final dimensional check, check of final
visual and marking, cleaning, painting, protection, packing, review of the documents,
issueing og release note for shipment; check of adhesion of painting and thickness of
painting
HEAT EXCHANGER
Client: ALSTOM POWER
Final inspection, PT examination, visual examination, dimensional examination,
leaking test; check of adhesion of painting and thickness of painting
MAIN PIPE LINE, LINE VALVE STATIONS – project Gazella
Client: NET4GAS
Vendor: Denys and Alpine
Mechanical supervisor for stations – preheating check, including temperature
measurement during the welding, check of WPQR, WPS, check of welding
electrodes, wire, documentation inspection, check of welders, check of repairs,
inspection of NDT procedures and personnel-certificates, check of equipment
calibration, check of pressure test, expediting of all parts (base material, assembling,
manufacturing, preparation for shipment), check of holiday test of painting, adhesion
of painting and thickness of painting
HEAT EXCHANGER
Client: VITKOVICE POWER ENGINEERING
Final inspection, PT examination, visual examination, dimensional examination,
leaking test; check of adhesion of painting and thickness of painting
HAB SIZE, CAP SIZE, WPQ RING, FLANGE API
Client: BP Exploration (Caspian Sea) Limited
Vendor: ŽĎAS Metallurgy
Final inspection – mechanical completion check/approval, manufacturing record book
approval, heat treatment – quenching, austenising, tempering, mechanical testing,
dimensional control
WET GAS VENTURI METER
Client: ExxonMobil Exploration And Production Malaysia Inc.
Vendor: Seiko Flowcontrol
Expediting – check of manufacturing equipment, manufacturing premises, state of
equipment, possibilities of manufacturing, approving of drawing documentation,
availability and traceability of base material, manufacturing plan-in process, WPS,
PQR/WPQR, NDT procedures, qualification of NDT workers and welders, list of
subsupliers; check of adhesion of painting and thickness of painting
HEAT EXCHANGER
Client: STROJON
Final inspection, PT examination, visual examination, dimensional examination,
leaking test; check of adhesion of painting and thickness of painting
STEAM AIR PREHEATOR
Client: SK engineering&construction, Korea republic
Vendor: Moravia – Apex, Czech republic
Final inspection before packing, leak test of blocks, PT examination, visual
examination, dimensional examination; check of adhesion of painting and thickness
of painting
COMBUSTION AIR PREHEATER
Client: Kuwait national petroleum company, Kuwait
Vendor: Moravia - Apex, Czech republic
Final inspection, PT examination, visual examination, dimensional examination;
check of adhesion of painting and thickness of painting
HEAT EXCHANGER
Client: KRALOVOPOLSKA
Final inspection, PT examination, visual examination, dimensional examination,
leaking test; check of adhesion of painting and thickness of painting
AIR PREHEATER
Client: SBM offshore, Netherland
Vendor: Ingersoll-rand, Czech republic
Compresor performance test
PRESSURE VESSEL
Client: NET4GAS, CZECH REPUBLIC
Vendor: GAZGEP, HUNGARY
Pressure test
PUMPS for MOCHOVCE NUCLEAR POWER PLANT UNIT 3,4
Client: Slovenske Eleketrarne a.s.
Vendor: Sigma Engineering s.r.o.
Inspection of dynamical and statical balancing test of rotors
PUMPS for MOCHOVCE NUCLEAR POWER PLANT UNIT 3,4
Client: Slovenske Eleketrarne a.s.
Vendor: Sigma Engineering s.r.o.
Inspection of hydrostatic tests of suction body and discharge body, performance tests,
final inspection – check of dimension, visual, packing, documentation; check of
adhesion of painting and thickness of painting
STERN ROLLER BOX, STINGER ROLLER BOX
Client: Suebsea 7, United Kingdom
Vendor: Huisman Konstrukce, Czech republic
Factory acceptance test
GATE VALVES
Client: Saipem, Italy
Vendor: Šmeral Brno, Czech republic
Visual examination of casting, certificate material check, magnetic examination
CHIMNEY
Client: La Gaz Integral, France
Vendor: Steelcon, Slovakia
Pre-inspection meeting, certificate base material check, WPS-WPQR check, check
of preparation for painting; check of adhesion of painting and thickness of painting
A-FRAME, BASE FRAME, PEDESTAL, BOOM
Client: Sparrows, Scotland
Vendor: Zamtet Industry, Poland
Inspection of manufacturing, supervising of welding procedure, check of adhesion
of painting and thickness of painting
GUIDE CONE OB VCS 12´´
GUIDE CONE IB VCS 12´´
Client: Total E & P Angola
Vendor: Zamtet Industry, Poland
Final inspection, MCCR, full traceabilty chceck, review QC records, visual
examination; check of adhesion of painting and thickness of painting
GUIDE CONE IB VCS 12´´
Client: Total E & P Angola
Vendor: In-Bul, Poland
Dimensional examination
BEARING FRAME, FRAME FOR DRIVE
Client: Inco engineering
Vendor: Unex a.s.
Processing of drawing and welding documentation according to EN; supervising of
welding procedures
HEAT EXCHANGER
Client: UNEX
Final inspection, PT examination, visual examination, dimensional examination,
leaking test; check of adhesion of painting and thickness of painting
PINION, RING
Client: Power-station Opatovice, a.s.
Vendor: Unex a.s.
Processing of drawing and welding documentation according to CSN; supervising
of welding procedures
DISCHARGE ROD FOR COKING BATTERY
Client: Power-station Opatovice, a.s.
Vendor: Unex a.s.
Processing of drawing and welding documentation according to CSN; supervising
of welding procedures
SPARE PARTS FOR CRANE-40t
Client: ČEZ a.s.
Vendor: Unex a.s.
Processing of drawing and welding documentation according to EN; supervising of
welding procedures
OVERHAUL OF STEEL CONSTRUCTION FOR TRANSFORMER
VESSEL 300MV
Client: ETD Transformer, a.s.
Vendor: Unex a.s.
Processing of drawing and welding documentation according to EN; supervising of
welding procedures
TRANSFORMER KETTLE 600KV
Client: Siemens Power Transmission and Distribution
Vendor: Unex a.s.
Processing of drawing and welding documentation according to EN; supervising of
welding procedures.
9E BASE FRAME, OFFSHORE PLATFORM
Client: GE EPE, France
Vendor: Unex a.s.
Processing of drawing and welding documentation according to ASME; supervising
of welding procedures
TRANSFORMER KETTLE Storebelt
Client: Siemens AG, Energy Sector
Vendor: Unex a.s.
Processing of drawing and welding documentation according to EN; supervising of
welding procedures
MAIN GIRDES
Client: Kalmar Industries BV
Vendor: Unex a.s.
Inspecting of quality and supervising of welding procedures
LONG TRAVEL ARRANGEMENT
Client: Sandvik Mining Construction
Vendor: Unex a.s.
Inspecting of quality and supervising of welding procedures
BOOM , OFFSHORE PLATFORMS
Client: National Oilwell Norway AS
Vendor: Unex a.s.
Processing of drawing and welding documentation according to NORSOK M101;
Supervising of welding procedures
PARTS OF EOT CRANE 150t x 37,4m
Client: Konecranes Schwerlastkrane GmbH
Vendor: Unex a.s.
Inspecting of quality and supervising of welding procedures
LOWER BEAM, LOWER CROSSBAR, FRAME SUPPORT
Client: Disa Industries A/S
Vendor: Unex Slovakia – factory Snina
Inspecting of quality and supervising of welding procedures
COLUMN
Client: Viastore system GmbH
Vendor: Unex a.s.
Inspecting of quality and supervising of welding procedures
BASE FRAME
Client: Keenz Figee
Vendor: Unex a.s.
Processing of drawing and welding documentation according to AWS D1.1.;
supervising of welding procedures
BASE FRAME + ACCESSORIES
Client: MacGregor Hydramarine
Vendor: Unex a.s.
Inspecting of quality and supervising of welding procedures
Date: 11/4/2016
Dipl. Ing. Pavel Gregor