Demo Script

Preview:

DESCRIPTION

Demo Script. CCEM: Cold Chain Equipment Manager Version 2.1.5.2 December 1, 2010. Reports. Country Capacity Bar Graph. Region Capacity Bar Graph. Equipment by Age. Electricity Type. Facility Type. Equipment Distribution. Forecasting. Baseline Forecast. Facility Detail. - PowerPoint PPT Presentation

Citation preview

CCEM 2.1.5.2 1

Demo Script

CCEM: Cold Chain Equipment ManagerVersion 2.1.5.2

December 1, 2010

11/28/2010

CCEM 2.1.5.2 2

Reports

11/28/2010

CCEM 2.1.5.2 3

Country Capacity Bar Graph

11/28/2010

CCEM 2.1.5.2 4

Region Capacity Bar Graph

11/28/2010

CCEM 2.1.5.2 5

Equipment by Age

11/28/2010

CCEM 2.1.5.2 6

Electricity Type

11/28/2010

CCEM 2.1.5.2 7

Facility Type

11/28/2010

CCEM 2.1.5.2 8

Equipment Distribution

11/28/2010

CCEM 2.1.5.2 9

Forecasting

11/28/2010

CCEM 2.1.5.2 10

Baseline Forecast

11/28/2010

CCEM 2.1.5.2 11

Facility Detail

11/28/2010

CCEM 2.1.5.2 12

Vaccine Introduction

11/28/2010

CCEM 2.1.5.2 13

Schedule with PCV7

11/28/2010

CCEM 2.1.5.2 14

Schedule with PCV7 and Rota

11/28/2010

CCEM 2.1.5.2 15

Equipment Removal

11/28/2010

CCEM 2.1.5.2 16

Remove TCW 1990 from Health Centers

11/28/2010

CCEM 2.1.5.2 17

Remove 58 TCWsHC Deficit at 12 (up from 9)

11/28/2010

CCEM 2.1.5.2 18

Equipment Allocation

11/28/2010

CCEM 2.1.5.2 19

Equipment Allocation to Health Post

11/28/2010

CCEM 2.1.5.2 20

Equipment Allocation

11/28/2010

CCEM 2.1.5.2 2111/28/2010

CCEM 2.1.5.2 22

Putting it all together

11/28/2010

CCEM 2.1.5.2 2311/28/2010

CCEM 2.1.5.2 24

Equipment Lists

11/28/2010

CCEM 2.1.5.2 25

Equipment Transactions

11/28/2010

CCEM 2.1.5.2 26

Multiyear costs

11/28/2010

CCEM 2.1.5.2 27

Comparing Forecasts

11/28/2010

CCEM 2.1.5.2 28

Equipment Costs

11/28/2010

CCEM 2.1.5.2 29

Energy Costs

11/28/2010

CCEM 2.1.5.2 30

Energy savings from removing TCW 1990s from Health Centers

11/28/2010

CCEM 2.1.5.2 31

Spanish available (French in progress)

11/28/2010

Recommended