View
38
Download
0
Category
Tags:
Preview:
DESCRIPTION
Demo Script. CCEM: Cold Chain Equipment Manager Version 2.1.5.2 December 1, 2010. Reports. Country Capacity Bar Graph. Region Capacity Bar Graph. Equipment by Age. Electricity Type. Facility Type. Equipment Distribution. Forecasting. Baseline Forecast. Facility Detail. - PowerPoint PPT Presentation
Citation preview
CCEM 2.1.5.2 1
Demo Script
CCEM: Cold Chain Equipment ManagerVersion 2.1.5.2
December 1, 2010
11/28/2010
CCEM 2.1.5.2 2
Reports
11/28/2010
CCEM 2.1.5.2 3
Country Capacity Bar Graph
11/28/2010
CCEM 2.1.5.2 4
Region Capacity Bar Graph
11/28/2010
CCEM 2.1.5.2 5
Equipment by Age
11/28/2010
CCEM 2.1.5.2 6
Electricity Type
11/28/2010
CCEM 2.1.5.2 7
Facility Type
11/28/2010
CCEM 2.1.5.2 8
Equipment Distribution
11/28/2010
CCEM 2.1.5.2 9
Forecasting
11/28/2010
CCEM 2.1.5.2 10
Baseline Forecast
11/28/2010
CCEM 2.1.5.2 11
Facility Detail
11/28/2010
CCEM 2.1.5.2 12
Vaccine Introduction
11/28/2010
CCEM 2.1.5.2 13
Schedule with PCV7
11/28/2010
CCEM 2.1.5.2 14
Schedule with PCV7 and Rota
11/28/2010
CCEM 2.1.5.2 15
Equipment Removal
11/28/2010
CCEM 2.1.5.2 16
Remove TCW 1990 from Health Centers
11/28/2010
CCEM 2.1.5.2 17
Remove 58 TCWsHC Deficit at 12 (up from 9)
11/28/2010
CCEM 2.1.5.2 18
Equipment Allocation
11/28/2010
CCEM 2.1.5.2 19
Equipment Allocation to Health Post
11/28/2010
CCEM 2.1.5.2 20
Equipment Allocation
11/28/2010
CCEM 2.1.5.2 2111/28/2010
CCEM 2.1.5.2 22
Putting it all together
11/28/2010
CCEM 2.1.5.2 2311/28/2010
CCEM 2.1.5.2 24
Equipment Lists
11/28/2010
CCEM 2.1.5.2 25
Equipment Transactions
11/28/2010
CCEM 2.1.5.2 26
Multiyear costs
11/28/2010
CCEM 2.1.5.2 27
Comparing Forecasts
11/28/2010
CCEM 2.1.5.2 28
Equipment Costs
11/28/2010
CCEM 2.1.5.2 29
Energy Costs
11/28/2010
CCEM 2.1.5.2 30
Energy savings from removing TCW 1990s from Health Centers
11/28/2010
CCEM 2.1.5.2 31
Spanish available (French in progress)
11/28/2010
Recommended