Denver International Airport

South Terminal Project and Taxi Operation Update

South Terminal Redevelopment Project

Current Phase of Project

Excavation of South Grounds

Removal of Terminal Roadway Bridges

Taxi Driver Dwell Time Project

Goals:• Upgrade the AVI System Software• Allow Cab Operators to Load / Manage Their

Daily Dispatch Lists• Monitor and Report About Drivers’ Dwell /

Duty Time

Entrance to the Holding Lot

Installation of Proximity Card Readers

Taxi Dispatch Queue

Revenue Collection Gate

Dispatcher’s Window

Dwell Time and AVI Tag Read Functions

Project challenges

• Airport IT / Software vendor interface• Timeline control• Hardware and installation• Communication with taxi operators / PUC• Training for staff and operators

Thank You!Questions?