D E S I G N R E Q U I R E M E N T S A N D G U I D E L I N E S
Design Requirements and Guidelines – December 2010
MERIDIAN PARK, THE NEW LANDMARK INDUSTRIAL ESTATE AT NEERABUP, WILL SET A NEW BENCHMARK FOR THE SUSTAINABLE DEVELOPMENT OF INDUSTRIAL ESTATES IN WESTERN AUSTRALIA. SHOWCASING INNOVATIVE URBAN DESIGN PRINCIPLES, MERIDIAN PARK WILL BE A THRIVING COMMUNITY FOR INDUSTRY.
PART ONE: GUIDING PRINCIPLES GSummary document which provides an introduction to Meridian Park, an overview of the estate objectives, the key development requirements and an explanation of the approvals process.G1 Vision and Introduction 1G2 Key Principles 2G3 Purpose and Sustainability 3G4 Process 4G5 Requirements and Deliverables 5
PART TWO: MANDATORY REQUIREMENTS MThese are the minimum mandatory development requirements and should be read in conjunction with Part Three, Best Practice and Support Information, the Building Code of Australia (BCA), relevant Australian Standards and the requirements of the City of Wanneroo.M1 Urban Design and Architectural Form 6M2 Passive Design 7M3 Parking and Access 8M4 Landscaping 9-10M5 Service, Storage and Display Areas 11M6 Fencing and Signage 12M7 Energy Management 13M8 Water Management 14M9 Management 15
PART THREE: SUPPORT INFORMATION SThis section outlines additional detail behind the intent of the Design Guidelines and provides support information whilst not specifically being mandatory.S1 Land Use and Business Types 16S2 Requirements for General Industrial 17S3 General Industrial Design Principles 18S4 Requirements for Service Industrial 19S5 Landmark and DAP Sites 20S6 Architectural Guiding Principles 21-22S7 Parking and Access 23S8 Landscaping and Paving 24S9 Service, Storage and Display Areas 25S10 Fencing 26S11 Signage 27S12 Passive Solar Design 28S13 Energy and Lighting 29S14 Water Management 30S15 Material Selection 31-32S16 Management 33S17 Cost Benefit Analysis 34-36
PART FOUR: APPENDICES AA1 General Industrial Lots iA2 Service Industrial Lots iiA3 Site Layout Guide iiiA4 Site Layout - Detailed vA5 Site Layout Examples viA6 Stage 1-5 Overall Layout Plan xiA7 Plant Species List xiiA8 Precedents xivA9 Materials Guide and Precedents xviiiA10 City of Wanneroo Car Parking Standards xxA11 Design Guideline Checklists xxiiiA12 Credits xxviii
TABLE OF CONTENTS
1
GUIDING PRINCIPLES
This section of Guiding Principles is a summary of the Design Requirements at Meridian Park.
JOONDALUP 4 km
PEDERICK ROAD
MA
TH
ER
DR
IVE
FLYNN DRIVE
PIN
JAR
RO
AD
WANNEROOGOLFCLUB
WA
NN
ER
OO
RO
AD
Neerabup
Me
rid
ian
Pa
rk
Design Requirements and Guidelines – December 2010
VISION AND INTRODUCTION
G1.1 Introduction
Meridian Park, Neerabup is the next generation in industrial estate
design, setting standards in sustainability, social amenity and
building quality.
Driven by LandCorp’s forward-looking sustainability plan, the
development aims to lead the way in water and energy efficiency.
Meridian Park will also provide an employment base for the rapidly
expanding North West Corridor, which includes developments
such as LandCorp’s future sustainable residential development at
Alkimos.
G1.2 Unique Vision
The designers of Meridian Park have challenged the traditional
concept of the industrial precinct, aiming to create an intelligent
commercial development with a strong sense of place with a sound
economic and environmental future.
Working together, these Town Planners, Architects, Engineers
and Developers have crafted an exciting vision for a commercial
community that blends the features of; intelligent design, abundant
amenities, a desirable location and ecological sensitivity.
G1.3 Development Area
The Meridian Park development area comprises approximately 400
hectares of industrial land to be jointly developed by LandCorp and
the City of Wanneroo. Meridian Park is situated off Flynn Drive within
the 1000 hectare Neerabup Industrial Area, north of Wanneroo. The
Meridian Park development is expected to meet the industrial land
needs of Perth’s rapidly growing North West Corridor for the next
20 years.
G1.4 Web Address
landcorp.com.au/meridianpark
G1
2
GUIDING PRINCIPLES
STAGES 1-5
Design Requirements and Guidelines – December 2010
KEY PRINCIPLES
G2 Key Principles of Meridian Park
LandCorp and the City of Wanneroo’s vision is to create a landmark
industrial estate with a strong sense of place which demonstrates
efficient use of land, water, energy and resources
1. QualityShowcasing innovative urban design principles, Meridian Park will
be a thriving community for industry.
2. SustainabilityMeridian Park will set new benchmarks for sustainable industrial
development and design in Western Australia.
3. Design
Meridian Park has a strong architectural character which is
contemporary, distinctive and original. There will be a strong sense
of place for users and visitors.
4. Economic Development Attract businesses that will provide employment self-sufficiency
for the region.
Support and encourage the growth of businesses following
establishment in Meridian Park.
Generate job diversity and choice in the North West Corridor.
Attract smart businesses and ‘knowledge workers’ to the region.
Attract investment and business uses that will present the best
land-use opportunities for the region.
G2
3
GUIDING PRINCIPLES
Design Requirements and Guidelines – December 2010
PURPOSE AND SUSTAINABILITY
G3.1 Purpose of this document
The Meridian Park Design Requirements and Guidelines have the
following key functions:
To outline the LandCorp and City of Wanneroo approvals process.
Provide guidance on the permitted type of businesses and
developments.
Establish the site planning and built form requirements.
Provide guidance on landscaping and paving requirements.
Provide guidance on fittings and fixtures to meet the
sustainability objectives.
G3.2 How to use this document
These Design Requirements are divided into sections with a varying
level of detail to suit the readers requirements. The first section
prefixed with G, provides a high-level summary guide. The second
section prefixed with M, sets out the mandatory requirements. The
third section prefixed with S, provides in-depth support technical
information and best practice guidance. The final section is an
appendix prefixed with A, and contains reference diagrams and
information.
G3.3 Sustainability Initiatives
International and national initiatives acknowledge the issue of
CO2 emmissions and the impacts of climate change and a drying
climate. These initiatives set targets and actions to achieve overall
reductions in energy and water consumption and transport costs
through a variety of mechanisms, which align overall with the
objective of Sustainability. Achievement will not only ensure the
long-term viability of Western Australia, but also save money for
your business.
In support of these initiatives LandCorp and the City of Wanneroo
are promoting leading practice in Industrial Park design through
comprehensive design criteria, which will positively influence
water, energy and resource efficiency, maintain and enhance the
environment, and promote quality urban spaces within Meridian Park.
Passive solar or climate responsive design, improved efficiency and
reduced consumption are incorporated into the principles of these
guidelines to enable more efficient use of energy and water.
G3
Energy Efficiency
Land Use
Amenity Waste
Communication
Architecture and Built Form
Environmental Quality
Water Management
4 Design Requirements and Guidelines – December 2010
PROCESS
G4.1 Process
When you choose to develop at Meridian Park you will be
required to follow the planning approvals process which includes
understanding and using the Design Guidelines and provisions
of City of Wanneroo District Planning Scheme No 2. The Design
Guidelines explain the process and methods available for
developers to achieve all of the key principles.
Divided into two stages the planning and documentation of your
development would proceed as follows:
Enter Into Agreement to Develop Land [Purchase or Lease]
at Meridian Park, by negotiating with LandCorp or their
representatives.
Stage One: Pre-Development Approval
Step 1 Design Workshop [1 hour] with the Estate Architect to
discuss planning and design prior to lodgement. If there are
parts of the Design Guidelines that you do not understand this is
an excellent time to ask those questions.
Step 2 Lodge Development Application with Estate Architect for
endorsement. See also column titled ‘Submission requirements.’
Step 3 Endorsement of Development Application by Estate
Architect. This is required prior to your lodgement with the City of
Wanneroo.
Step 4 Lodge your Development Application with City of
Wanneroo Planning Department.
Step 5 Receive Development Application approval from the City of
Wanneroo.
Stage Two: Detailed Design Approval
Step 6 Submit Detailed Design to Estate Architect
Step 7 Endorsement of Detailed Design by Estate Architect.
Step 8 Lodge Building Licence application with City of Wanneroo
Building Department.
Step 9 Approval of Building Licence by City of Wanneroo.
Step 10 Proceed with development.
GUIDING PRINCIPLESG4
Stage Two: Detailed Design Approval
STEP 6Submit Detailed Design to Estate Architect
STEP 7Endorsement of Detailed Design by Estate Architect
STEP 8Apply for Building Licence with City of Wanneroo
Stage One: Pre-Development Approval
STEP 1Attend Planning / Design Workshop with Estate
Architect. Estate Architect is available to discuss applications prior to lodgement.
STEP 2Lodge Development Application with Estate Architect
STEP 3Endorsement of Development Application by Estate
Architect
STEP 4Lodge Development Application with City of Wanneroo
STEP 5Receive Development Approvals
5
GUIDING PRINCIPLES
Design Requirements and Guidelines – December 2010
G5REQUIREMENTS AND DELIVERABLES
G5.1 Design Guideline Requirements
1. Architectural Form
Consolidated building uses and conditional lean-to additions
Clearly expressed entries
Active and glazed streetscape facades
Visual amenity
Buildings to engage the street with minimal set backs and
Micro Climate Zones, (break-out spaces) to side boundary to
allow access, natural light, ventilation and landscaping
2. Parking and Access
Accessible car parks, preferably shared to create efficiencies and
maximise developable land.
3. Landscape
Sense of place, visual amenity, assisting sustainability. Low water
reliance. Micro-climate areas for staff break-out areas and activation
of street frontages.
4. Service, Storage and Display Areas
Secondary areas are screened with appropriately placed quality
visual screening.
5. Fencing and Signage
Minimise fencing, integration and aligned with building façade and
compatible with building design.
6. Energy Efficiency
To maximise use of passive technologies such as solar shading and
cross-ventilation to reduce the energy use of the buildings. All fixed
appliances have minimum energy efficiency requirements.
7. Water Management
Minimise the use of water with optional collection and reuse. All
storm water to be retained on site.
8. Materials Selection
Use of high quality and interesting materials to contribute to a
positive streetscape and building elevations.
9. Management
Requirement to ensure Meridian Park maintains key principles.
Building use and operation remains compliant and upholds required
standards.
G5.2 Submission Requirements
Developers are required at each stage to submit the following
documents:
Stage One
Completed Stage 1 Check List
Completed Design Guidelines Certification
Site Plan
Floor Plans of all levels including breeze path
Roof Plan
Elevations of all building walls
Shadow Diagram
Stage Two
Completed Stage 2 Check List
Site Plan showing fencing and landscaping
Extent and nature of the landscape including soil improvement
and mulch
Plant species, numbers and locations
Reticulation type and location
Outdoor furniture and amenity details
Location and details of external lighting
Details of boundary walls, fencing and gates
Extent and type of paving treatment.
Floor Plans of all buildings
Shadow Diagram
Elevations and Sections though all buildings
Breeze Path Diagram
Lighting Plan Specification and Locations
Electrical Specification and Locations
Construction Waste Management Plan
Star rating of sanitary fittings
6
MANDATORY REQUIREMENTS
This Mandatory Section of the Design Requirements establishes the minimum acceptable development criteria for key aspects applicable to all development within Meridian Park.
URBAN DESIGN AND ARCHITECTURAL FORM
M1.1
Consolidate all customer service areas and employee amenities
within the front building zone, and the operational area within the
rear building zone.
M1.2
Design to setback requirements are listed below, see also Section
S2, S6 and A3.
6m fixed front setback
3m side setback (for a minimum length of 21m from the front
boundary) to create a Micro-Climate Zone (see Landscape
section M4.11 and Fencing and Signage section M6). Not
applicable to secondary street corner Lots.
M1.3
Building designs are to provide visual interest to the street by
creating active building façades (predominantly glazed and
preferably with visible access points or opennings) and/ or other
creative solutions that engage and respect the streetscape. Refer to
precedent studies in section A8 for examples.
Glazing should bring day lighting to customer service areas and
provide surveilance of the street.
Building entries should be clearly visible from the street and provide
intuitive way-finding for visitors and present a positive corporate
image. Refer to the Estate Architect for additional explanation.
Additional shading devices may be required on east and west
elevations.
M1.4
Canopies, awnings and solar shading devices play an important role
in the character of a facade and are to be utilised and thoughtfully
integrated into the facade as required on elevations visible from the
street.
Developments that apply feature materials and colours to elements
of the built form to provide visual amenity are encouraged. Refer to
Section A8 and A9 – Precedents and Materials Guide.
M1.5
Developments of more than one building must be complimentary to
each other in terms of scale.
M1.6
Secondary street facing facades on corner Lots are to be of similar
architectural quality as the prime street facade.
M1.7
‘Lean-to’ structures added to the predominant building mass must
be a minimum height equivalent to two storey (7m).
M1.8
Building designs and landscape treatments are to address Crime
Prevention through Environmental Design principles. Refer to
Section M4 and S7 for more details.
M1.9
Submission Requirements:
Site plans, floor plans, section plans and building elevations are
to be submitted to the Estate Architect as part of Stage 1 Pre-
Development Approval and Stage 2 Detailed Design Approval. Refer
to Part G4 on Process and A11 for a Checklist for more details.
Design Requirements and Guidelines – December 2010
M1
7Design Requirements and Guidelines – December 2010
MANDATORY REQUIREMENTSM2 PASSIVE DESIGN
M2.1
All developments are to optimise the application of passive solar
design principles (described in Section S12) and as required in the
Building Code of Australia, including; building orientation, shading,
natural lighting and cross-flow ventilation etc. Street facing
facades, which are to be prominently glazed to satisfy the urban
design principles, must be appropriately shaded from solar heat
gain.
M2.2
External shading devices (overhangs, directional louvers, shutters
and awnings) are to be provided for all north, west and east facing
openings exposed to solar heat gain.
M2.3
Provide a suitable level of natural lighting to the floor level of all
buildings by incorporating strategically placed windows, light
shelves, light wells, awning reflectors etc into the overall design.
If this can not be demonstrated by the developer and determined
by the Estate Architect by casual review of the drawings and
good design practice, then a computer model may be requested
to confirm that at least 30% of the total floor area of all buildings
achieve a Daylight Factor (DF) of 2.0% as measured at 1.0m above
floor level measured under a uniform design sky.
M2.4
Hi level (clerestory) operable windows and vent openings are to be
provided within the building to ensure cross ventilation and heat
purging.
M2.5
Pale coloured roof and wall materials are to be used to reduce heat
gain in summer and reduce cooling energy levels and costs.
The maximum roof solar absorptance (SA) permitted is 0.5, refer
to BCA for colour classification and BASIX (NSW). Colorbond have
a number of Very Light (SA <0.35) and Light (SA <0.55) colorbond
steel roof solutions.
M2.6
Ceiling voids are to be ventilated to remove excess heat in summer.
8
MANDATORY REQUIREMENTS
PARKING AND ACCESS
M3.1
For safety and way-finding reasons public parking is to be located
within the public parking zone near the front (prime street) adjacent
the cross-over, as indicated in the plan on this page. See also
Support Information section S7 and Appendix sections A4 and A10.
4 5 6 7 8 9
4 5 6 7 8 9
12
3
10 11 12 13 14 15
Ø 21
Service vehicle zone depth from rear of primary building zone
6 m 15 mpriority building zone3 m 3 m
primary setback
PRIORITY BUILDING ZONE
Micro Climate Zone
GENERAL INDUSTRIAL USE AREA
optional dual accessparking bays
two way crossover
optional direct access to parking bays kerbs would need to be re-aligned
landscaped setbackzone
VEHICLE SERVICE AND ACCESS AREA
alig
nmen
t of
scr
een
if re
ar is
use
d fo
r ext
erna
l sto
rage
location of adjoining lot's dual access road which could be by private agreement between neighbours, a shared accessway for both lots (max 11m wide, shown dotted)
the adjoining lot's service area is generally located here and could by private agreement between adjoining neighbours be a shared zone to allow for greater turning circle and access facilities
additional car parkingbays as required
GENERAL INDUSTRIAL EXTENSION ZONE
NEIGHBOURING PROPERTY
5.5
m1.
5 m
dual
use
pat
hway
3 m
11
Zone A Zone B Zone C
Zone D
40 m
Property Boundary
EXTENSION AREA OR STORAGE/DISPLAY AREA IF SCREENED
PUBLIC PARKING ZONE
Design Requirements and Guidelines – December 2010
M3
9Design Requirements and Guidelines – December 2010
LANDSCAPING
M4.1
Total landscaping (hard and soft) to be a minimum of 8% and a
maximum of 10% of the total site area. Landscaping can exceed 10%
of the site area on the condition that all irrigation to plants is from
harvested water or none of the plants are irrigated.
M4.2
Maximum irrigated soft landscape, i.e. planting, permitted per
development, shall not exceed 60% (80% for corner Lots) of the
specified total landscaping requirement.
M4.3
Shade trees must be provided 1 per 10 linear metres along the
street boundary of any site.
M4.4
A minimum of 1 shade tree per 4 car-parking bays is to be provided
in accordance with District Planning Scheme Number 2.
M4.5
Planting density for all landscape areas must be a minimum of 2
plants per square metre.
M4.6
Turf can be used only for specifically designated passive recreation
purposes, including protected lunchtime breakout spaces but is
limited to 10% of the total landscaping requirement. Turf is not
permitted for any other purpose including aesthetic reasons.
M4.7
Plant species (trees and shrubs) must be selected from those
listed in Appendix A7.
M4.8
Soil Conditioner (humus) is to be used in all planted areas to
help retain soil moisture and nutrients and mulch used in all soft
landscape areas to maximise water retention.
M4.9
Watering of soft landscaped areas to be provided by automatic,
electronic controlled drip irrigation system. Application rates should
be in accordance with the Water Corporation Waterwise guidelines
(www.watercorporation.com.au/W/waterwise_index.cfm).
M4.10
Provide centralised controller and integrated moisture sensors for
all reticulation systems. Moisture sensors must be properly set
up, tested for the soil conditions and maintained. Sensors should
be designed to turn off irrigation when soil moisture levels do not
require watering and therefore minimise water use.
M4.11
The micro-climate zone is a side setback open to the street
which enourages increased landscaping, natural light and cross-
ventilation into the building and potentially a break-out space for
staff or simply a visual amenity seen from inside the building.
It is a 3 metre side [landlocked] set back with a minimum depth of
21 metres from the front [prime street] boundary. It is encouraged
to continue for the length of the development to enhance the
amenity for users but is mandatory for 21 metres. It can serve as
a service corridor for storage and the like whilst also providing high
level openable windows and natural light. Refer to sections S6 and
S8.
MANDATORY REQUIREMENTSM4
10
PROPERTY BOUNDARY
VERGE PLANTING AND IRRIGATION TO BE DESIGNED AND
INSTALLED BY LANDCORP AND MAINTAINED BY ADJACENT
PRIVATE LAND OWNER
VERGE PLANTING TO BE INCLUDED IN ADJACENT PRIVATE
LAND OWNER’S LANDSCAPE THEME AND WORKS
(PLANTING AND IRRIGATION TO BE DESIGNED, INSTALLED
AND MAINTAINED BY ADJACENT PRIVATE LOT OWNER)
FOOTPATH
PARALLEL PARKING
NOTE: STREET TREES TO BE AS PER ESTATE STREET TREE
MASTER PLAN TO BE INSTALLED BY LANDCORP AND
MAINTAINED BY ADJACENT PRIVATE LOT OWNER. PRIVATE
TREES TO BE SELECTED AND MAINTAINED BY ADJACENT
PRIVATE LOT OWNER.
Design Requirements and Guidelines – December 2010
M4.12
Minimise impervious paving (as far as practicable) by using
pervious paving and direct stormwater from impervious areas to
landscape areas.
M4.13
All stormwater shall be harvested or infiltrated onsite.
M4.14
Swales are to be provided within car parking areas where possible
to direct stormwater runoff into landscape areas and promote
recharge of groundwater.
M4.15
Where car parking and hardstand areas are large, soak-wells are
required to be provided.
Refer to Department of Water’s stormwater manual. www.water.
wa.gov.au
M4.16
Submission Requirements:
Proponents are required to develop a landscape plan (at 1:100 or
1:200 scale) which provides details of the landscaping proposed
within the lot and addresses the above mandatory design
requirements. The landscape plan will be assessed by the Estate
Architect and will need to identify:
Extent and nature of the landscape treatments including soil
improvement and mulch finishes;
Plant species, numbers and locations;
Reticulation type and location;
Location and nature of outdoor furniture and amenities;
Location and details of external lighting;
Extent and type of boundary walls, fencing and gates; and
Extent and type of paving treatment.
MANDATORY REQUIREMENTSM4
Picture courtesy of LandCorp
11Design Requirements and Guidelines – December 2010
SERVICE, STORAGE AND DISPLAY AREAS
M5.1
Service and storage areas must be screened behind the front
building line and from the street. Landscaping and fencing can be
utilised to screen these areas.
M5.2
Screens must be of high quality and complimentary to the building
facades.
M5.3
Screening method must include some visually permeable
components to maintain a sense of site openness. Screening of
unsightly elements is required but not at the price of creating large
expanses of solid screen walls. Material selection of the screen
walls requires carefully consideration.
M5.4
Front setback of display areas must be in line with the building line.
MANDATORY REQUIREMENTSM5
12 Design Requirements and Guidelines – December 2010
FENCING AND SIGNAGE
M6.1
Security fencing is permitted along the side (non-street) and rear
boundaries but fencing to any street frontage (including corner
developments) is to be kept to a minimum and not to be forward of
the building line.
M6.2
The landscaped micro-climate zone is encouraged to be un-fenced
and open to the street. If a fence is required it must equal or better
the detail in section S10 as determined by the Estate Architect.
M6.3
The minimum standard for fencing is black powder-coated square
metal vertical posts and top and bottom horizontal support rails.
M6.4
One free standing or composite pylon sign per lot will be permitted
and shall:
Be symmetrical to the facade or aligned with key features such
as a blade wall or other architectural element in the building
facade
Not exceed 12 m in height
Not exceed 20 m2 face area
M6.5
No flood lighting is to be utilised to illuminate signage. Electron-
luminescent strips and fluorescent side-lit panels are preferred.
Halo lighting and/or indirect illuminations or internally illuminated
signs are preferred to direct lighting.
M6.6
Signage material and lighting is to be consistent with the
architectural treatment.
M6.7
Submission Requirements:
Proponents are required to submit the following to the Estate
Architect as part of the Stage 2 Detailed Design Approval (refer to
Section G4 for more details).
Fencing plan including materials, finishes and colours.
Specifications of external signage.
MANDATORY REQUIREMENTSM6
13Design Requirements and Guidelines – December 2010
MANDATORY REQUIREMENTSM7ENERGY MANAGEMENT
M7.1
Predicted annual base building energy consumption allowances
need to comply with the Building Code of Australia (BCA) JV3 (or
lastest version) protocols and assessed by the City of Wanneroo.
M7.2
Minimum 80% of the selected lamps for internal use are to have
an efficacy of at least 90 lumens/Watt output and manufacturers
quoted life of 20,000 hours.
M7.3
Minimum 80% of the selected lamps for external use are to have
an efficacy of at least 65 lumens/Watt output and manufacturers
quoted life of 20,000 hours.
No external up-lighting to be used.
All external luminaries are to have an upward light component of
less than 4%.
No stray lighting such as floodlighting to be used to illuminate
signage.
Glare or light spill should not adversely impact adjoining
properties or passing motorists. Preferred corporate signage
lighting is internal, halo, or well-focussed indirect lighting.
M7.4
Provision of solar hot water systems (minimum 4 star rating), or
5 star gas or heat pumps system for all buildings that require hot
water facilities.
M7.5
Submission Requirements:
Proponents are required to submit the following plans to the Estate
Architect as part of the Stage 2 Detailed Design Approval. Refer to
Section G4 for more details.
Breeze path diagram
Shadow diagram
Detailed lighting plan and specifications of electrical fixtures and
fittings.
14 Design Requirements and Guidelines – December 2010
MANDATORY REQUIREMENTSM8 WATER MANAGEMENT
M8.1
Install 4 star rated dual flush toilets, 6 star urinals or waterless
urinals (where installed) and 3 star rated fittings and appliances.
M8.2
Shower and personal storage facilities are to be provided on-site for
all developments that exceed 2000m2 GLA.
M8.3
Submission Requirements:
Proponents are required to submit specifications and
manufacturers star rating for the proposed sanitary fittings to the
Estate Architect as part of the Stage 2 Detailed Design Approval
(refer to Section G4 for more details).
15Design Requirements and Guidelines – December 2010
MANDATORY REQUIREMENTSM9 MANAGEMENT
M9.1
Verge areas shall be maintained (including reticulation) and not
modified (unless otherwise approved by LandCorp) by property
owners.
M9.2
Businesses should be aware of their environmental obligations
regarding the transport, storage, use and disposal of materials
and substances used on site including the need for regulatory
approvals from the Water Corporation, Department of Environment
and Conservation, Department of Minerals and Petroleum and Local
Government.
M9.3
All developments to minimise the use of toxic materials.
M9.4
All developments to comply with AS 1668 minimum fresh air rates.
M9.5
Submission Requirements:
Proponents are required to prepare and submit to the Estate
Architect a Waste Construction Management Plan for the proposed
development as part of the Stage 2 Detailed Design Approval (refer
to Section G4 for more details).
Construction Waste Management Plan (CWMP). Template to be
provided by LandCorp.
16
SUPPORT INFORMATION
This section provides background information in support of the Mandatory Requirements and outlines examples of acceptable best practice.
Design Requirements and Guidelines – December 2010
LAND USE AND BUSINESS TYPES
S1.1 Permitted Land Uses
The permitted uses listed below still require planning approval in
accordance with the City of Wanneroo District Planning Scheme
No.2.
General Industrial Zone:
Car Park
Car Wash
Dry Cleaning Premises
Fuel Depot
General Industry
Light Industry
Storage Yard
Landscape Supplies
Laundry
Milk Depot
Motor Vehicle Repairs
Salvage Yard
Transport Depot
Vehicle Sales/Hire Premises
Warehouse
Wood yard
Service Industrial Zone:
Industry (light)
Laundry
Auction Room
Warehouse
Car Park
Car Wash
Dry Cleaning Premises
Showroom
Transport Depot
Vehicle Sales/Hire Premises
Veterinary Consulting Rooms
Veterinary Hospital
Permitted Uses must comply with the Mandatory Requirements
contained in Part Two (M1-M9) of this document and will require
Estate Architect approval prior to applying for Council approval.
S1.2 Discretionary Land Uses
Land uses not specified as ‘Permitted’ may be approved as a
‘Discretionary Use’ under the City of Wanneroo District Planning
Scheme No.2. Clarification regarding discretionary uses should be
sought from both LandCorp and the City of Wanneroo prior to the
lodgement of any application.
S1
17Design Requirements and Guidelines – December 2010
SUPPORT INFORMATIONS2 REQUIREMENTS FOR GENERAL INDUSTRIAL
S2.1 Application
General Industrial lots are highlighted in the overall
plan on this page.
S2.2 Building Setbacks and Layout
The required building setbacks have been
established giving consideration to the following:
Good streetscape outcomes
Adjoining properties and buildings
Solar aspect and breeze paths
Development form
Crime Prevention Through Environmental
Design (CPTED) principles
General Indu strialScale: 1:5 00
General Indu strialScale: 1:4 00
General Indu strialScale: 1:4 00
Nom
.9.5
Service vehicle zone 6 m 15 m 40 m
primary setback
Priority building zone
glazed elevation with solarshading
general industrial use areablade walls
Nom
.12
8 1 4
0.6 m6 m5.5 m6 m1.5Nom. building width 22 m3 m
glazed elevation with solar shading
solar shading
micro climatelandscaped zone
internal carpark access road width
access road
12
3
micro climate zone
General industrial use areaPriority building zone
two way crossover
parking
vehicle service and access area
General industrial extension zone
Extension Area or Storage/Display area if screened
Typical PlanStreet Elevation
Longitudinal Section
Stage 1-5 Overall Plan
18 Design Requirements and Guidelines – December 2010
SUPPORT INFORMATIONS3GENERAL INDUSTRIAL DESIGN PRINCIPLES
S3.1 Guiding Principles – General Industrial Development
There is scope to create a number of built form designs that
comply with the mandatory requirements. Listed below are some
explanatory notes on the main design principles. Please also refer
to Appendix A8and A9 for a number of inspirational precedents.
1. The desired built form outcome is for simple singular building
masses of consistent height (equivalent to two storeys) to
incorporate administration, showroom and industrial uses.
Traditional lean-to offices are discouraged.
2. Buildings are placed to create a pairing effect with adjoining
developments. This promotes a unified streetscape, rhythmic
urban design, centralised cross-over locations and opportunities
for shared access and serviceability. The front setbacks are
reduced to 6m to bring the buildings close to the street and
create a boulevard feel.
3. Side walls can be expressed as feature (blade) walls which are
allowed to extend 3m into the primary setback zone.
4. Front elevations would ideally be predominantly glazed or
contribute positively to the streetscape in another way (refer to
M1.3 and precedents in section A8).
5. General orientation is to be perpendicular to the street and to
have side access servicing from the open hardstand/ parking
area.
6. Openings (windows, clerestory windows, doors, roller shutters)
in the side walls promote cross ventilation.
7. 3m side setbacks create a linear micro-climate zone between
neighbouring buildings. This landscaped zone provides a
breakout space for staff and promotes greater natural light and
cross-ventilation. This is mandatory within 21m of the prime lot
boundary and encouraged for the depth of the whole site. Non-
landscaped areas greater than 21m from the street boundary
should be screened from view.
8. Skylights to promote natural light through the roof.
9. Parking between the building facade and the street should be
avoided (other than roadside embayment parking bays). Off
street parking and hardstand areas are located to the sides of
buildings to create openness to maximise land use efficiencies
whilst maintaining good urban design principles.
S3.2 Corner Lots
Primary Street frontage will be determined by LandCorp
Secondary Street setbacks: minimum 3 metres, except as varied
by a Detailed Area Plan
S3.3 Internal Zones (refer to plan diagram in M3)
Zone A: Office/ Administration Use, fixed setback 6 metres from
front boundary and 3 metre side setback for microclimate zone
Zone B: Main Building Mass, maximum 21 metres setback from
front boundary and permitted but discouraged zero side setback
Zone C: Zero setback permitted to rear and side
19Design Requirements and Guidelines – December 2010
SUPPORT INFORMATIONS4REQUIREMENTS FOR SERVICE INDUSTRIAL
S4.1 Application
Service Industrial lots within Stages 1 to 5 are highlighted on the
plan in Appendix A2.
S4.2 Building Setbacks and Layout
The general requirements of the two service industrial development
scenarios are outlined below. Guidance from the Estate Architect
will be required in determining setbacks for individual lots in each
scenario. (Read in context with the diagrams on this page)
Main Building Mass should be built to the side boundary
(secondary street boundary for corner lots) to maintain built
edge.
Secondary Building Mass (smaller scaled building proportionate
to Main Building Mass) should front the primary street (this will
assist with screening of service yard).
Corner lots can locate rainwater tanks on the secondary street
behind the front setback line. All other lots can locate rainwater
tanks within the setback zone.
Service areas should be screened by the Secondary Building
Mass.
Car parking and shared crossovers are encouraged to be located
on the primary street.
Secondary Building Mass should front the primary street and
screen service areas behind.
6m wide access-way is to be maintained through to rear and
any adjoining lots.
1064
Service Yard area
Shade structure shown dashed
Main Building Mass
water tanks
6m connection service road
Main Building Mass
Secondary Building Mass
8 1 4
water tanks
solar shadingdevice
architecturalblade walls
glazed shopfronts
Service yard area behind
Crossoversglazed shopfronts
solar shadingdevice
architectural blade walls
service yardarea
side entrance offparking area
secondary building mass in section
Typical Plan
Street Elevation Cross Section
20 Design Requirements and Guidelines – December 2010
SUPPORT INFORMATIONS5 LANDMARK AND DAP SITES
S5.1
Sites in key prominent locations have been nominated as landmark
sites and the development on these sites are guided by Detailed
Area Plans (DAPs).
The key objectives of landmark sites are:
To promote prominent architectural form on corner elements to
provide a reference point in the built form and landscape.
Encourage additional height elements where appropriate to
keynote a point of difference with the balance of the estate and
demark estate points of entry.
Ensure articulated facades which provide aesthetic appeal and
overlook to feature open spaces.
Provide for variations to setback requirements where necessary
to create prominent feature elements.
Provide some guidance to preferred land uses.
21Design Requirements and Guidelines – December 2010
SUPPORT INFORMATIONS6ARCHITECTURAL GUIDING PRINCIPLES - URBAN AND
ARCHITECTURAL FORM
S6.1 Objective
To create a high quality, best practice, industrial estate with a strong
sense of place for users and visitors, by the use of distinctive, flexible
and environmentally responsible architecture and urban design.
This section expands on the architectural design intent and
reasoning behind the mandatory and best practice initiatives.
S6.2 Guiding Principles - Architectural Design
1. Blade Walls
The side perimeter walls can be extended into the setback zone if
required. This would be encouraged to provide strong street facing
facade definition, with the added benefits of providing support
for solar shading devices to shade street facades . They can also
provide good integrated signage opportunities.
2. Singular Building Mass
A uniform building volume and scale, equivalent to at least two
storeys, to contain all building functions would provide a strong
streetscape for the estate. It would articulate the ‘hit and miss’
pattern derived by the location of crossovers which effectively
determines the building locations on smaller Lots. It is a more
efficient use if land and would enhance the effectiveness of the
required micro-climate space which is placed between buildings,
thus creating a ‘micro-climate’ for staff, landscaping, openings, etc.
3. Microclimate Landscape Strip
A mandatory 3m wide landscape zone is to be created along the
side boundary for a minimum length of 21 metres from the front
boundary. Typically, adjoining lots mirror each other thus creating
a micro-climate zone 6m wide on the side boundary which is
preferably unfenced (see conditions, S10) and visually connected
to the streetscape. It is encouraged that this feature is carried
through to the whole length of the buildings thus creating a linear
courtyard with opportunities for cross-ventilation, natural light, etc.
A screen can be placed 21m from the front boundary to screen non-
landscape uses if this micro-climate zone does not extend to the
full length of the building. At 3m wide is allows openings in the side
building walls and greater flexibility for passive solar design and
improved amenity for occupants. See NPV benefits in S17.
4. Shared Access
The placement of buildings in a side by side ‘paired’ clustering,
creates opportunities for neighbouring buildings to share turning
circle and vehicle circulation zones to maximise efficiency.
Crossover locations are strategically placed to facilitate shared
access arrangements.
Standard legal pro-forma agreements for the sharing of access-
ways and microclimate zones with an adjoining land owner are
available from LandCorp.
5. Vehicle Parking
Parking areas for General Industrial lots are not permitted between
the building and the street (other than embayment parking bays).
22 Design Requirements and Guidelines – December 2010
SUPPORT INFORMATIONS6 This creates positive, interactive streetscapes. Vehicle servicing
and parking is to be placed to the sides of the building, or to the rear.
Service Industrial lots have partial street edge parking, but not in
front of the primary building zone.
6. Flexible Design
The built form principles of the design guidelines are based on
simple, best practice architecture, which can be applied to any of
the permitted uses and be adaptable for future use. The desired
built form is for a simple, efficient, well executed and functional
building solution that is conceived with care and attention to detail,
materiality, scale and context.
7. Crime Prevention Through Environmental Design
Reduced building setbacks, side service areas open to the street
and predominantly glazed street facades all provide good visual
connectivity to the public zones and hence crime prevention
qualities.
CPTED Principles:
Maximise passive surveillance of street and public areas
Parking areas should be visible from adjacent properties.
Ensure building design limits the ability for unauthorized entries.
Design to ensure clear demarcation between the public and
private realm.
Ensure the design does not provide areas with minimal or no
surveillance.
8. Visual Amenity
This requirements permits individuality within the design
provisions. The underlining design principles are robust enough
to transcend interpretation by proponents. This estate aims to set
a new cultural standard in industrial building design and create a
shared aesthetic and strong sense of place. The design ideas are
simple enough to have longevity and create quality spaces for all to
appreciate.
S6.3 Best Practice Recommendations
Adaptable Buildings
Provide simple adaptable buildings that can easily be converted
or divided and therefore remain flexible for future use, without
diluting the simple expressive nature of the shared estate
aesthetic.
Paired developments facilitate sharing of car parking, turning
areas and cross-overs.
Provide minimum two-storey front façades and ideally a
singular built form mass to create a strong streetscape and a
good urban design.
23Design Requirements and Guidelines – December 2010
SUPPORT INFORMATIONS7PARKING AND ACCESS
S7.1 Objective
To provide a high level of accessibility for businesses, employees
and visitors to the estate whilst maximising developable
land through the use of on-street parking and shared access
arrangements.
S7.2 Requirements
Provision of the required number of bays is based on the intended
use of the site, as specified by the City of Wanneroo District
Planning Scheme No.2 outlined in Appendix A9 (also refer to City of
Wanneroo direct).
S7.3 Efficient Parking and Access Arrangements
PARKING PLACEMENT
Public car parking for each site is to be located within the public
parking zone at the front of the property, refer M3 and M4.
On-street parking, where provided by LandCorp, can be
offset against City of Wanneroo parking requirements (i.e.
if a development requires 10 bays and 2 on-street carpark
embayment’s are provided, only 8 bays are required to be provided
within the property).
Where there are multiple tenancies, the offset shall apply across the
entire site and not for individual tenancies.
Staff parking may be located within the public parking zone or can
be located within the roadway, circulation and screened parking
zone as indicated in section M3.
Specific parking requirements contained in the City of Wanneroo
District Planning Scheme No.2 is outlined in Appendix A10.
SHARED ACCESS ARRANGEMENTS
The lot configuration within Meridian Park has been designed to
promote sharing of vehicle access and turning/movement areas to
minimise unnecessary hardstand area. This will have a desirable
effect on streetscape amenity through limiting the occurrences of
crossovers and increased road safety through minimising access
locations.
Crossover locations will be provided by LandCorp, refer to
Appendix A4, A5 and A6.
S7.4 Best Practice Recommendations
In order to create more efficient use of land, site layout should
facilitate the sharing of vehicle access and turning/movement
radiuses. Applicants are advised to liaise with the Estate Architect in
this regard (specifically relating to the placement of trees within car
parking and truck turning movements).
Adjoining lot owners are encouraged to liaise with each other to
facilitate shared parking and access arrangements that maximise
vehicle access-ways and turning radiuses.
A template for a Deed of Agreement for Reciprocal Access can
be provided on request from LandCorp. See also examples in
Appendix A5.
24 Design Requirements and Guidelines – December 2010
SUPPORT INFORMATIONS8 LANDSCAPING AND PAVING
S8.1 Objective
Landscape plays an important role in creating a strong sense of
place, providing a high level of amenity and assisting in thermal and
solar efficiency.
These benefits must also be balanced against the need to minimise
potable water consumption. Through appropriate design, detailing
and species selection these objectives can be mutually achieved.
S8.2 Landscape and Paving
LandCorp will be provided street verge landscaping to establish a
uniformly high standard and sustainability measures within the
streetscape.
With the exception of street trees, the landscaping of verges will
occur after construction on each individual lot to avoid damage
during the construction phase.
Street trees will be provided at the time of road construction to
ensure uniform growth throughout each stage of the development.
It is the owner’s responsibility to ensure that street trees
adjacent to their lot are protected during the construction phase.
S8.3 Best Practice Recommendations
1. Water Sensitive Landscape Design
Use dry planting and low water usage plants where possible and
group plants with similar water requirements (hydrozoning) for
most efficient water usage for all species.
Mulch all planted areas with 75mm thick mulch to help the water
retention properties of the soil.
Slope paved areas and driveways away from buildings and
towards planting areas minimising concentration of water flow.
Incorporate opportunities for the recycling of grey and black
water from the development to be used for irrigation purposes.
Where available, property owners should use topsoil and mulch
from stockpiles from the estate.
2. Micro-Climate Zone Design
Provide a shady break-out space for staff amenity.
Tree planting is encouraged to provide shade and direct and filter
winds towards openings in buildings to reduce heat loads during
summer and create a controlled environment.
Water tanks and bicycle racks may also be located in this space,
but not at the expense of the provision of amenity for staff.
Provide and reinforce natural surveillance and clear sightlines
through the design of the hard and soft landscape.
3. Solar Screen Planting
Planting of shade trees within the green zones, shown in section
M2 will help reduce heat loads to the building during summer whilst
allowing heat and light to penetrate the building during winter.
4. Hardstand and Paving Areas
The treatment of hardstand and paving areas will have significant
implications for the quality and quantity of stormwater generated by
a site, as well as having implications for microclimate and amenity.
Permeable surfaces should be maximised in order to reduce
stormwater runoff. Examples of permeable paving include
gravel, compacted graded gravel, TERRABOND porous paving and
segmental paving.
Refer to Department of Water’s, Stormwater Management Manual:
www.water.wa.gov.au
25Design Requirements and Guidelines – December 2010
SUPPORT INFORMATIONS9SERVICE, STORAGE AND DISPLAY AREAS
S9.1 Objective
All aspects of a development that are visible from the street
or adjoining public areas, need to contribute positively to the
streetscape, urban design principles and estate aesthetics.
S9.2 Best Practice Recommendations
Screening should be used to conceal unsightly items and areas that
do not contribute to the streetscape.
Screens should be strategically placed to achieve this objective,
be of a similar quality to the building facades and integrated with
the buildings where possible.
26 Design Requirements and Guidelines – December 2010
SUPPORT INFORMATIONS10 FENCING
S10.1 Objective
All aspects of a development that make up the visible elements
viewable from the street or adjoining public areas need to be given
the same level of design sensitivity and integration as the building
facades.
They must also contribute positively to the quality of the
streetscape and the shared aesthetic of the estate.
S10.2 Micro Climate Zone
It is preferred that the mandatory minimum area of micro climate
zone (3m x 21m) is unfenced and seen as a wrapping of the verge
around the street facade. If a fence is required, then it must be
constructed as per the diagrams on this page.
S10.3 Best Practice Recommendations
Fencing transparency should be sensitive to the needs of screening
from public view unsightly storage or service areas and at the same
time maintaining the objective of an open and active façade.
All fencing should be in keeping with the theme of the estate and
complement the proposed built form.
Minimal fencing is preferred to promote the urban design
principles of openness and intuitive way-finding.
Materials used for fencing should be of similar quality as the
building facades and be strategically placed to be integrated to
the buildings.
Building street facades should not be screened or fenced to
ensure a connection between the streetscape and public realm
is retained.
3
Limited fencing permitted on front boundary of micro-climate zone.Preference is for no fencing, but if it is required by the developer, then it must meet the quality and detailing standards of the design guidelines. Chain or link mesh is not permited.
Screen or fence permitted at the end of the mandatory climate zone depth (21m from boundary)
BUILDING
6000
Set
back
Fencing permitted on side boundary of micro-climate zone, but not encouraged. Ideally should match front section (street facing) or similar post fence by Gryffin or equivalent. Chain mesh not permitted.
Blad
e w
all
Front street boundary line
3000
1500
0Si
de L
ot b
ound
ary
line
0615_SK27
Building
60 80
1600
Max
. hei
ght
Fence configuration with square mild steelsquare (shs) or tubular (chs) posts, paint finished.Minimum overall openness is 50% and maximum 1600mmabove finished ground level.
Horizontal support rails (dotted) are not preferred but are permittedon the condition they are fixed to the inside, no more than two and the top rail must be set out min. 400mm lower than the top of vertical posts.
Side
bou
ndar
y
3000
SK27_CD
400
Min
.
Part Plan
Elevation Detail
27Design Requirements and Guidelines – December 2010
SUPPORT INFORMATIONS11SIGNAGE
S11.1 Signage
Signage should be sensitively located so as not to detract from
the facade or streetscape and not be excessive in scale or
quantity. Materials and lighting of the sign should compliment the
architecture.
Often it is found that the graphic effectiveness of a sign is in the
‘space around’ text and its placement.
A discrete sign on the edge of a substrate can be more effective
than a huge sign that dominates the backing material, be it a wall
or building facade.
Signage to the blade walls should be treated with care and not
distract from the facade expression.
Creative solutions are encouraged, for instance the use of ‘super-
graphics’ as suggestive signs (refer to reference project images)
used as effective background textures or images.
Materials within the buildings can be effective signage, for
example by facade material selections or corporate colours.
Signs could offer solar shading, or be part of the glazed facade
treatment.
Utilise durable and environmentally conscious materials and
technologies
28 Design Requirements and Guidelines – December 2010
SUPPORT INFORMATIONS12 PASSIVE SOLAR DESIGN
S12.1 Objective
To optimise passive solar gain and improve overall building
performance through energy efficient design and fitout.
S12.2 Guiding Principles
The orientation of buildings on the site should be planned to
promote natural lighting, ventilation and heating and cooling.
Passive Solar Design decreases the reliance upon mechanical
heating or cooling thereby reducing energy loads and operational
costs. These simple and logical design factors can significantly
reduce everyday running costs of buildings with little or no
additional building cost. Refer to Section M2
1. Natural Daylight
Natural daylight provides less heat gain than most types of artificial
light for equivalent lighting levels.
Skylights and Clerestory windows enable natural daylight to
permeate the building without loss of privacy or usable floorspace.
Skylights provide some of the best ways to admit daylight and
distribute it evenly thereby saving energy and improving visual
comfort levels.
2. Passive Solar Shading
Exposed west and east facing surfaces, openings and windows
should be minimised or adequately shaded. Shade structures
are highly visible items and must be of suitable quality and be
integrated into the facade and architecture. Awnings can be
oversailing roof canopies, light shelves, vertical and/or horizontal
louvres or screens.
Unshaded west and east facing high mass walls (e.g: concrete pre-
cast or tilt-up panels) should be externally clad to minimise heat
gain and insulated to isolate thermal mass internally and minimise
heat radiation to the interior.
Provision of well considered landscaping is necessary for valuable
shade throughout summer and to allow for the permeation of winter
sun (refer to Section M2 and M4 for more details on landscaping).
3. Cross Ventilation
Orientation and openings should maximise natural cross flow
ventilation. Some of the fundamental built form and urban design
principles of Meridian Park is to provide and encourage side
setbacks that allow good cross ventilation through external wall
openings appropriately placed on the building facades, in addition to
roller shutters.
4. Energy Efficient Lighting
The use of high efficacy lamps will have little impact on installation
costs in real terms yet can achieve a typical +10% energy saving on
installation when compared with lower efficacy light sources such
as metal halide and T8 fittings.
The largest energy savings can be made by the installation of
daylight/occupancy control systems which provide an average five
year payback through energy savings.
NorthSouth
diffuse southern daylight
UV filtered sunlight
Skylights 0615 New Master File for DG ImagesDnA Architects 12-02-2008
29Design Requirements and Guidelines – December 2010
SUPPORT INFORMATIONS13ENERGY AND LIGHTING
S13.1 Best Practice Recommendations
Where installed heating and cooling systems to achieve a minimum
4 star energy rating.
INTERNAL LIGHTING
All internal lighting to be integrated with a lighting management
system
The size of individually switched zones does not exceed 500m2
for rear building zone
Switching is clearly labelled and easily accessible by building
occupants
All areas with sufficient natural daylight (DF of 2.0% for 30% of
GFA) shall incorporate daylight linked lighting controls to switch-
off lights (eg. Photo-cell sensors.)
An automated time clock control system is provided to all areas
All internal lighting to incorporate Power Factor improvement
measures within the fitting.
Light levels to be in accordance with AS 1680 Interior Lighting
Part 2
All lamp fittings shall have a minimum Light Output Ratio of 0.75
EXTERNAL LIGHTING
External lighting can be linked to photo-cell sensors and/or time
clock control
Signage can be illuminated by electron-luminescent strips and
fluorescent side-lit panels.
RENEWABLE ENERGY
Photovoltaic (PV) panels and small scale wind turbines can be
installed on developments to offset energy demand.
Smart meters can be installed on all developments wishing to
use PV to provide surplus power to grid.
30 Design Requirements and Guidelines – December 2010
SUPPORT INFORMATIONS14 WATER MANAGEMENT
S14.1 Objective
To minimise the impact of Meridian Park on scarce water resources
through the implementation of a total water management approach
and water sensitive urban design principles.
S14.2 Rainwater Harvesting
The storage/tanks should ideally achieve a 65% target reduction in
potable water use if 90 kilolitres per gross hectare is plumbed into
toilets and landscape irrigation systems.
Capacity of the rainwater tanks is based on a ratio of 90 kL/Ha to be
adjusted for individual developments based on lot sizes. For a 2000
m2 lot, the tank size to achieve a 65% potable water reduction is
approximately 18 kilolitres. Smaller lots or strata lots could provide a
pro-rata amount of storage.
The capacity of the on-site rainwater tanks may need to be adjusted
to accommodate specific end user requirements and projected
employee numbers.
S14.3 Storage Tanks
Rainwater tanks can be located within the designated landscape
areas, or side setback micro-climate zone, integrated into the overall
building design, installed below ground or screened as required.
It is not necessary to screen the tanks from prime street views if
there has been adequate consideration into the design, placement
and finish of storage tanks.
Rainwater tank overflow is to be directed into designated landscape
areas.
S14.4 Best Practice Recommendations
All developments should aim to provide a minimum roof area
equivalent to 50% of the total lot area to harvest the required
rainwater for toilet flushing, cold water laundry (if required)
and irrigation purposes. Where there is insufficient roof area,
equivalent volumes of rain water will need to be harvested from
other surfaces with appropriate filtration and redirected to the
rainwater tank.
Rainwater tanks can be located in the micro-climate zone. There
are a number of storage solutions available that suit the linear
nature of the micro-climate zone whilst also allowing general
access. Water storage solutions can also have excellent thermal
sink properties that benefit the thermal performance of the
buildings through careful placement and selection of storage
types.
31Design Requirements and Guidelines – December 2010
SUPPORT INFORMATIONS15MATERIAL SELECTION
S15.1 Objective
Buildings are to utilise appropriate materials to reflect the quality
and values of the Meridian Park development and contribute
positively to the architectural aesthetic of the estate.
S15.2 Best Practice Recommendations
Building materials and finishes should be selected taking into
consideration the recommendations and guidelines below. The
best practice recommendations and materials selection examples
in Appendix A9 contain some of the more creative materials that
would be considered suitable. At the Estate Architect review stage,
proposals will be assessed for specific suitability and quality of
materials.
EXTERNAL BUILDING MATERIALS
Material properties to consider:
Suitability to the location and exposure to view from the street
and adjacent open areas.
Thermal properties including insulation and thermal sink.
Reflectivity in general.
Maintenance, durability and life cycle expectation.
Use of recycled materials.
Embodied energies of fabrication, assembly, transport, and re-
use.
Textural aesthetic quality and visual interest.
Extent, scale and proportion in context of the overall building
and its application.
FLANKING WALLS
Flanking walls (side external walls) are key visual cues to the
estate aesthetic and should be designed with suitable quality and
materials and convey visual solidity. Materials and finishes to
consider:
Pre-cast concrete finished with coloured pigments, relief details,
exposed aggregate, sand blasted finish, broom finish, artists
moulds or attached artwork.
Textured paint and/or render.
Framed panel cladding, (Alucobond, CFC, Vitrepanel, or similar)
Rain screens to protect heavy mass walls from absorbing
unwanted solar heat.
Rammed earth with limestone additive obtained from onsite.
Corrugated metal sheeting with appropriate finishing.
Insulated panels or composite panels with metal outer facing
(Kingspan or similar)
32 Design Requirements and Guidelines – December 2010
STREET FACADES
Should generally be transparent and could consist of:
Glass; clear with film, screen-printed, sandblasted or cast glass
panels, colour backed glass with vinyl adhesive sheeting or high
performance low-e glass.
Integrated solar shading devices into the façade, louvres,
vertical mesh screens, awnings (galvanised, anodised or
powder coated), timber screens.
FINISHES
Finishes for external walls should provide visual interest. Some
options include:
Bold colours in limited areas as architectural highlights
Textured paint
Galvanised metal
Smooth finished concrete
Exposed aggregate precast concrete
Corrugated metal sheeting
Cor – Ten steel
Metal faced composite panels
Metal rain screens
Metal mesh
Perforated metal screens
Timber
Terracotta rain screens,
Polycarbonate multi cell panels
Stack bonded concrete block
Appendix A9 contains more examples of materials selection options.
SUPPORT INFORMATIONS15
33Design Requirements and Guidelines – December 2010
SUPPORT INFORMATIONS16MANAGEMENT
S16.1 Objective
To ensure that high quality built form, visual amenity, water
sensitive landscaping and other longer term sustainability
objectives are achieved and maintained.
S16.2 Best Practice Recommendations
High standards are required to achieve best practice principles and
corporate responsibility to environmental issues on all levels.
CONSTRUCTION
Site construction should be undertaken with minimal resource
waste to landfill by engaging a waste management company with
proven recycling strategies.
BUILDING MANAGEMENT
Incorporate appropriate environmental management and
pollution prevetion practices.
Encourage water use efficiency and reuse opportunities in the
ongoing management.
Businesses should provide on-site recycling bins and transfer
waste to the Mindarie Regional Council Facility.
Maximise energy efficiency and use of renewable energy.
Promote appropriate waste management practices including
waste avoidance, recovery and recycling.
34 Design Requirements and Guidelines – December 2010
SUPPORT INFORMATIONS17 COST BENEFIT ANALYSISCOST BENEFIT ANALYSISCOST BENEFIT ANALYSISCOST BENEFIT ANALYSIS
In developing the Meridian Park Industrial Estate (‘the Estate”),
LandCorp has demonstrated its commitment to quality sustainable
industrial land development through the application of the Meridian
Park Design Guidelines (“the Guidelines). The design and planning
of the Estate focuses on maximising the efficient use of land,
water, energy and resources. The Estate is a leading example of an
industrial precinct that maximises benefits to developers, tenants
and the community alike through high quality sustainable design.
Planning for the estate follows both national and international
trends in efficient and sustainable industrial building design and
land development. In developing these Guidelines, LandCorp
has continued to review and assess the cost effectiveness,
sustainability and implementation implications of the Guideline
provisions, to ensure both direct capital and operating savings and
benefits, as well as productivity and social amenity benefits within
the Estate.
LandCorp invited Worley Parsons, with input from other design
professionals, to undertake an evaluation of the key provisions
and requirements of the Guidelines in order to ascertain and detail
the cost effectiveness and benefits. The first phase of this was a
desktop review which found that the majority of the provisions
could be implemented at little or no additional cost when compared
with a standard industrial development. A second phase, based
on Worley Parsons’ EcoNomics™ Assessment, looked at the costs
and benefits of the various Guideline provisions in more detail.
Economics™ is a sophisticated way of assessing the financial,
social and environmental implications of the Guidelines across the
full life-cycle. The EcoNomics™ assessment has enabled LandCorp
to quantify the key provisions in the Guidelines in monetary terms,
and strike a practical balance between energy, water, and resource
efficiency, against the investment required by purchasers required
to achieve these outcomes.
The assessment evaluated the Guidelines in three key components
including Energy Efficiency, Water Efficiency or Aesthetic and
Amenity value. The assessment included monetised values for
greenhouse gas emissions, tenant/occupant health, tenant/
occupant productivity, and aesthetic amenity.
The Meridian Park Guidelines were assessed against a “Business
as Usual” (BAU) or standard Industrial development. This entailed
the modelling of a Meridian Park building design and comparing
it against a typical BAU design. All results are presented as a
comparison to the BAU.
Based on the results of the Economics ™ assessment, LandCorp has
made significant changes to the original Meridian Park Guidelines,
and many of the previous Mandatory requirements are now Best
Practice. As the costs of water and energy increase in the coming
years, as many expect, many of the Best Practice provisions will
become more cost effective and move towards mandatory practice.
LandCorp will review the Guidelines on a periodic basis in response
to market conditions. A summary of the results of the Worley
Parsons study is contained in the following sections. A full copy
of the Worley Parsons report can be made available on request to
LandCorp.
35Design Requirements and Guidelines – December 2010
SUPPORT INFORMATIONS17COST BENEFIT ANALYSIS - RESULTS
The Energy Efficiency analysis demonstrated that the following
provisions are financially, environmentally and socially economic,
compared with the BAU design within the first 5 years:
Shade trees
Hi level clerestory operable windows and vents
Ceiling void ventilation
High efficacy lamps
Solar Hot Water or heat pumps and
Smart Meters
This reflects research globally that indicates highly energy efficient
buildings can generate a 7 to 12 percent increase in net operating
income by reducing operating costs (Fox 2008). The relatively low
current cost of energy in Western Australia, however, resulted in
some requirements only becoming economic after 5 to 10 years.
Lighting management systems and PV/Wind turbine systems are
Best Practice recommendations that require 10 years for the energy
savings to overcome the capital costs.
As capital costs for renewable energy systems and carbon pollution
becomes costed the economics and payback for alternative energy
systems will improve.
The Water Efficiency analysis highlighted the relatively low capital
cost of the selected design requirements, coupled with a relatively
low benefit value due to the cost of water in Western Australia
currently $1.17/kL. The majority of the requirements assessed were
only economic, in comparison to the BAU, after a period of time..
All provisions are NPV negative for the first 5 years, with the
following provisions economic within 10 years.
Maximum irrigated soft landscaping shall not exceed 60%,
Watering of soft landscaped areas to be provided by automatic,
electronic controlled drip irrigation system and
Plant species to be selected from the selected list
Economics assessment of Energy Efficiency Provisions under base case
conditions compared with BAU
Economics assessment of Water Efficiency Provisions under base case
conditions compared with BAU
0K
18K
35K
53K
70K
Trees Meters Ceilings Vents Solar HW Lamps Lighting PV
6.901.30
29.10
7.50
61.00
1.30
17.80
26.00
Net Present Value ($) for 2030
Energy Efficient Provisions
0K
1K
2K
3K
Irrigation Plants Landscaping Plant Density
0
2.30
0.80
2.50
Net Present Value ($) for 2030
Water Efficiency Provisions
36 Design Requirements and Guidelines – December 2010
SUPPORT INFORMATION
COST BENEFIT ANALYSIS - RESULTS
The Aesthetic and Amenity Value analysis highlighted the benefit of
climate responsive orientation design and landscaping for building
occupants.
The combined requirement of (Design to setback 6m front
and 3m side and Microclimate zone to be created in 3m space
between buildings) was the most economic of the requirements.
The benefits associated with visual connection and access of
building staff to external landscapes, in particular the micro-climatic
zone, resulted in significant health and wellbeing benefits.
The following Best Practice requirements are also NPV positive and
economic:
Site layout to enable shared parking and access arrangements
and
Provide blade walls and minimum two storey front façade
References
Fox, R (2008) ‘Getting the true assessment of a LEED-certified
building’s value is worth the inconvenience’ The Sustainable
Enterprise Report: Turning Awareness into Action, Deloitte & Kyoto
Publishing, 2008
0K
30K
60K
90K
Setback Shared Parking Blade Walls
21.40
29.50
80.80
Net Present Value ($) for 2030
Aesthetic and Amenity Provisions
Economics assessment of Aesthetic and Amenity Provisions under base case conditions
compared with BAU
S17
iDesign Requirements and Guidelines – December 2010
DnA Architects 14-02-2007, 0615_SP30.1_CD1
RING STREET
GLOBAL ROAD
AVERY STREET
WARMAN STREET
STAGE 4
PEA
K W
AY
HEMISHERE STREET
HEMISHERE STREET
PIN
NA
CLE D
RIV
EPIN
NA
CLE D
RIV
EPIN
NA
CLE D
RIV
E
FLYNN DRIVE
8002
1060
1061
1062
10661068
1069
1055 1056
1057 1058
1064
8001
1071
10721073
1074
1075
1076
1077
10781079
1080
1059
GREEN
WIC
H P
ARA
DE
1063
10651065
General Industrial 1
General Industrial 2
Service Industrial - C 1
Service Industrial - C 2
Service Industrial - A 1
Service Industrial - A 2
Service Industrial - B 1
Service Industrial - B 2
DAP Site 1
DAP Site 2
Primary Building Envelopes
Site
Landscape
Secondary Building Zone
Lot Boundary
AXIS PARADE
HO
RIZ
ON
TERRA
CE
ORBIT
STREET
STAGE 1 AXIS PARADE
PEA
K W
AY
GREEN
WIC
H P
ARA
DE
GREEN
WIC
H P
ARA
DE
AVERY STREET
LO
NG
ITU
DE A
VEN
UESTAGE 3
STAGE 2
STAGE 5B
STAGE 5A
1001 1021 1059
1002
1003
1004
1005
1006
10081009
1010 1011
1012 1013
1014
1016
1017
1018
1019
1020 1022
1023
1024
1025
1026
1027 1028 1029
103010311032
1034
1035
1036
1039104010411042
1048
1049
1050 1051
10441043
1038 1037
1007 1015
1033
P R E L I M I N A R Y
GENERAL INDUSTRIAL LOTS
A1APPENDICES
General Industrial Lots
The lot and built form layout is indicative only. It is subject to
change and detailed design. Layout plan depicts proposed ultimate
configuration.
ii Design Requirements and Guidelines – December 2010
DnA Architects 14-02-2008, 0615_SP30.2_CD1
RING STREET
GLOBAL ROAD
WARMAN STREET
STAGE 4
PEA
K W
AY
HEMISHERE STREET
PIN
NA
CLE D
RIV
EPIN
NA
CLE D
RIV
E
FLYNN DRIVE
8002
1060
1061
1062
10661068
1069
1021
1055 1056
1057 1058
1064
8001
1071
10721073
1074
1075
1076
1077
10781079
1080
1001 1059
GREEN
WIC
H P
ARA
DE
1063
AVERY STREET
PIN
NA
CLE D
RIV
E
General Industrial 1
General Industrial 2
Service Industrial - C 1
Service Industrial - C 2
Service Industrial - A 1
Service Industrial - A 2
Service Industrial - B 1
Service Industrial - B 2
DAP Site 1
DAP Site 2
Primary Building Envelopes
Site
Landscape
Secondary Building Zone
Lot Boundary
STAGE 1
STAGE 3
STAGE 2
STAGE 5B
STAGE 5A
HEMISHERE STREET
AXIS PARADE
HO
RIZ
ON
TERRA
CE
ORBIT
STREET
AXIS PARADE
PEA
K W
AY
GREEN
WIC
H P
ARA
DE
GREEN
WIC
H P
ARA
DE
AVERY STREET
LO
NG
ITU
DE A
VEN
UE
1002
1003
1004
1005
1006
10081009
1010 1011
1012 1013
1014
1016
1017
1018
1019
1020 1022
1023
1024
1025
1026
1027 1028 1029
103010311032
1034
1035
1036
1039104010411042
1048
1049
1050 1051
1044
1065
1043
1038 1037
1007 1015
1033
SERVICE INDUSTRIAL LOTS
P R E L I M I N A R Y
A2APPENDICES
Service Industrial Lots
The lot and built form layout is indicative only. It is subject to
change and detailed design. Layout plan depicts proposed ultimate
configuration.
iiiDesign Requirements and Guidelines – December 2010
Access
Two independant 6m wide two waycrossovers can be constructed witha medium strip of 0.5m on each Lot, to create a 'pairing effect' of traffic nodes.This effectively locates the buildings onthe opposite side of the site, to thevehicle/ parking zone which is accessed directly from the crossover.
Shared crossover access is encouragedand arranged by agreement between neighbouring owners.
If a shared crossover is used, it is moreefficient land use even if the two way crossover is 11m wide for very large vehicles, shown dotted.
Blade Walls
External side walls expressed as blade walls set back 3m from street boundary.Side walls enclose office, showroom with industrial use to the rear into singular building mass, with minimum two storey street elevation. Width of building will be afactor of use function and external vehicleand servicing requirements including parking.
The external wall nearest the side boundary needs to be set back 3m for the first 21m fromthe prime (street) boundary. Beyond 21m it isencouraged but not mandatory. It is hoped that proponents will see the benefits and adopt themicro-climate zone for the length of the building.
Extended parapet walls at least 1.5m above roof level to create a common architecturalexpression of main walls as 'blade elements'.
Width of building influenced by on site parking, service area and internal building area requirements.
Possible building widths shown dotted highlightvariation, which would be a product of building use and vehicle requirements. Examples shownare based on: 13.7m for single aspect parking off access road19.6m for single aspect parking off internal road25.2m for double aspect parking off internal road
Building Envelope
Priority zone, for location of office, reception, showroom, public interface, staff areas, etc. Area can be shared with industrial uses from zone B.Mandatory side set back of 3m tocreate micro-climate zone. Width couldbe independant to zone B, but intentis to create a singular building mass.Street elevation must be glazed and as transparent as possible (with solar shading)to present an active edge to the street.
General industrial building use zone.Encouraged to have 3m side setback to continue micro-climate zone. Service access from the side or rear.
Rear area could be building area if required or service zone. If it is used for storage or hardstand it should be screened from the street.
Landscape
6m setback zone for landscaping. Note blade walls will project 3m into this area.
Mandatory 3m wide micro-climate landscape strip 15m deep and visible from the street. Could accommodate water tanks.
Continuation of 3m wide breakout area micro-climate zone, landscape strip. Can be used to locate stormwater holding tanks. If used for storage or isnot landscaped sufficiently, it needs to be appropriately screened from view.
Landscape strip could extend to rear.
Vehicles
Car parking, circulation, service yard and turning circle zone is predominantly to the side of the building for a numberof reasons; one being that there is an opportunity for neighbouring Lots to share the service yard area and therefore accommodate vehicles of larger turning circles. Parking should be closer to the street and service vehicles towards the rear.
Demonstration of how the area for vehicles can be varied to suit the building width and parking arrangement. Examples shownare based on: 13.7m for single aspect parking off access road19.6m for single aspect parking off internal road25.2m for double aspect parking off internal road
Flexible
The rear area and full width behind the vehicleservice area and parking zone could be an extention of the building envelope or ascreened hardstand or storage area.
Demonstration of how the building width canvary to provide more space but needs to betraded off with in site vehicle requirements.Minimum distance from side boundary 13.7m.
Single LotGeneral Industrial Use
3
6
1540
3
6
11
B
B:
21A:
A
13.7
19.6
25.2
A
A:
B
B:
C:
C
C:
C C
A
B
C
3
A:
B:
C:
A
B
A:
B:
A
BA
B
A:
B:
556
A:
B:
DnA Architects 3-12-2007, 0615_DD1_CD4
D:
D
Ø 19.5
61
Access
Two independant 6m wide two waycrossovers can be constructed witha medium strip of 0.5m on each Lot, to create a 'pairing effect' of traffic nodes.This effectively locates the buildings onthe opposite side of the site, to thevehicle/ parking zone which is accessed directly from the crossover.
Shared crossover access is encouragedand arranged by agreement between neighbouring owners.
If a shared crossover is used, it is moreefficient land use even if the two way crossover is 11m wide for very large vehicles, shown dotted.
Blade Walls
External side walls expressed as blade walls set back 3m from street boundary.Side walls enclose office, showroom with industrial use to the rear into singular building mass, with minimum two storey street elevation. Width of building will be afactor of use function and external vehicleand servicing requirements including parking.
The external wall nearest the side boundary needs to be set back 3m for the first 21m fromthe prime (street) boundary. Beyond 21m it isencouraged but not mandatory. It is hoped that proponents will see the benefits and adopt themicro-climate zone for the length of the building.
Extended parapet walls at least 1.5m above roof level to create a common architecturalexpression of main walls as 'blade elements'.
Width of building influenced by on site parking, service area and internal building area requirements.
Possible building widths shown dotted highlightvariation, which would be a product of building use and vehicle requirements. Examples shownare based on: 13.7m for single aspect parking off access road19.6m for single aspect parking off internal road25.2m for double aspect parking off internal road
Building Envelope
Priority zone, for location of office, reception, showroom, public interface, staff areas, etc. Area can be shared with industrial uses from zone B.Mandatory side set back of 3m tocreate micro-climate zone. Width couldbe independant to zone B, but intentis to create a singular building mass.Street elevation must be glazed and as transparent as possible (with solar shading)to present an active edge to the street.
General industrial building use zone.Encouraged to have 3m side setback to continue micro-climate zone. Service access from the side or rear.
Rear area could be building area if required or service zone. If it is used for storage or hardstand it should be screened from the street.
Landscape
6m setback zone for landscaping. Note blade walls will project 3m into this area.
Mandatory 3m wide micro-climate landscape strip 15m deep and visible from the street. Could accommodate water tanks.
Continuation of 3m wide breakout area micro-climate zone, landscape strip. Can be used to locate stormwater holding tanks. If used for storage or isnot landscaped sufficiently, it needs to be appropriately screened from view.
Landscape strip could extend to rear.
Vehicles
Car parking, circulation, service yard and turning circle zone is predominantly to the side of the building for a numberof reasons; one being that there is an opportunity for neighbouring Lots to share the service yard area and therefore accommodate vehicles of larger turning circles. Parking should be closer to the street and service vehicles towards the rear.
Demonstration of how the area for vehicles can be varied to suit the building width and parking arrangement. Examples shownare based on: 13.7m for single aspect parking off access road19.6m for single aspect parking off internal road25.2m for double aspect parking off internal road
Flexible
The rear area and full width behind the vehicleservice area and parking zone could be an extention of the building envelope or ascreened hardstand or storage area.
Demonstration of how the building width canvary to provide more space but needs to betraded off with in site vehicle requirements.Minimum distance from side boundary 13.7m.
Single LotGeneral Industrial Use
3
6
1540
3
6
11
B
B:
21
A:
A
13.7
19.6
25.2
A
A:
B
B:
C:
C
C:
C C
A
B
C
3
A:
B:
C:
A
B
A:
B:
A
BA
B
A:
B:
556
A:
B:
DnA Architects 3-12-2007, 0615_DD1_CD4
D:
D
Ø 19.5
61
A3APPENDICES
Site Layout Guide 1-3
iv Design Requirements and Guidelines – December 2010
Access
Two independant 6m wide two waycrossovers can be constructed witha medium strip of 0.5m on each Lot, to create a 'pairing effect' of traffic nodes.This effectively locates the buildings onthe opposite side of the site, to thevehicle/ parking zone which is accessed directly from the crossover.
Shared crossover access is encouragedand arranged by agreement between neighbouring owners.
If a shared crossover is used, it is moreefficient land use even if the two way crossover is 11m wide for very large vehicles, shown dotted.
Blade Walls
External side walls expressed as blade walls set back 3m from street boundary.Side walls enclose office, showroom with industrial use to the rear into singular building mass, with minimum two storey street elevation. Width of building will be afactor of use function and external vehicleand servicing requirements including parking.
The external wall nearest the side boundary needs to be set back 3m for the first 21m fromthe prime (street) boundary. Beyond 21m it isencouraged but not mandatory. It is hoped that proponents will see the benefits and adopt themicro-climate zone for the length of the building.
Extended parapet walls at least 1.5m above roof level to create a common architecturalexpression of main walls as 'blade elements'.
Width of building influenced by on site parking, service area and internal building area requirements.
Possible building widths shown dotted highlightvariation, which would be a product of building use and vehicle requirements. Examples shownare based on: 13.7m for single aspect parking off access road19.6m for single aspect parking off internal road25.2m for double aspect parking off internal road
Building Envelope
Priority zone, for location of office, reception, showroom, public interface, staff areas, etc. Area can be shared with industrial uses from zone B.Mandatory side set back of 3m tocreate micro-climate zone. Width couldbe independant to zone B, but intentis to create a singular building mass.Street elevation must be glazed and as transparent as possible (with solar shading)to present an active edge to the street.
General industrial building use zone.Encouraged to have 3m side setback to continue micro-climate zone. Service access from the side or rear.
Rear area could be building area if required or service zone. If it is used for storage or hardstand it should be screened from the street.
Landscape
6m setback zone for landscaping. Note blade walls will project 3m into this area.
Mandatory 3m wide micro-climate landscape strip 15m deep and visible from the street. Could accommodate water tanks.
Continuation of 3m wide breakout area micro-climate zone, landscape strip. Can be used to locate stormwater holding tanks. If used for storage or isnot landscaped sufficiently, it needs to be appropriately screened from view.
Landscape strip could extend to rear.
Vehicles
Car parking, circulation, service yard and turning circle zone is predominantly to the side of the building for a numberof reasons; one being that there is an opportunity for neighbouring Lots to share the service yard area and therefore accommodate vehicles of larger turning circles. Parking should be closer to the street and service vehicles towards the rear.
Demonstration of how the area for vehicles can be varied to suit the building width and parking arrangement. Examples shownare based on: 13.7m for single aspect parking off access road19.6m for single aspect parking off internal road25.2m for double aspect parking off internal road
Flexible
The rear area and full width behind the vehicleservice area and parking zone could be an extention of the building envelope or ascreened hardstand or storage area.
Demonstration of how the building width canvary to provide more space but needs to betraded off with in site vehicle requirements.Minimum distance from side boundary 13.7m.
Single LotGeneral Industrial Use
3
6
1540
3
6
11
B
B:
21
A:
A
13.7
19.6
25.2
A
A:
B
B:
C:
C
C:
C C
A
B
C
3
A:
B:
C:
A
B
A:
B:
A
BA
B
A:
B:
556
A:
B:
DnA Architects 3-12-2007, 0615_DD1_CD4
D:
D
Ø 19.5
61
Access
Two independant 6m wide two waycrossovers can be constructed witha medium strip of 0.5m on each Lot, to create a 'pairing effect' of traffic nodes.This effectively locates the buildings onthe opposite side of the site, to thevehicle/ parking zone which is accessed directly from the crossover.
Shared crossover access is encouragedand arranged by agreement between neighbouring owners.
If a shared crossover is used, it is moreefficient land use even if the two way crossover is 11m wide for very large vehicles, shown dotted.
Blade Walls
External side walls expressed as blade walls set back 3m from street boundary.Side walls enclose office, showroom with industrial use to the rear into singular building mass, with minimum two storey street elevation. Width of building will be afactor of use function and external vehicleand servicing requirements including parking.
The external wall nearest the side boundary needs to be set back 3m for the first 21m fromthe prime (street) boundary. Beyond 21m it isencouraged but not mandatory. It is hoped that proponents will see the benefits and adopt themicro-climate zone for the length of the building.
Extended parapet walls at least 1.5m above roof level to create a common architecturalexpression of main walls as 'blade elements'.
Width of building influenced by on site parking, service area and internal building area requirements.
Possible building widths shown dotted highlightvariation, which would be a product of building use and vehicle requirements. Examples shownare based on: 13.7m for single aspect parking off access road19.6m for single aspect parking off internal road25.2m for double aspect parking off internal road
Building Envelope
Priority zone, for location of office, reception, showroom, public interface, staff areas, etc. Area can be shared with industrial uses from zone B.Mandatory side set back of 3m tocreate micro-climate zone. Width couldbe independant to zone B, but intentis to create a singular building mass.Street elevation must be glazed and as transparent as possible (with solar shading)to present an active edge to the street.
General industrial building use zone.Encouraged to have 3m side setback to continue micro-climate zone. Service access from the side or rear.
Rear area could be building area if required or service zone. If it is used for storage or hardstand it should be screened from the street.
Landscape
6m setback zone for landscaping. Note blade walls will project 3m into this area.
Mandatory 3m wide micro-climate landscape strip 15m deep and visible from the street. Could accommodate water tanks.
Continuation of 3m wide breakout area micro-climate zone, landscape strip. Can be used to locate stormwater holding tanks. If used for storage or isnot landscaped sufficiently, it needs to be appropriately screened from view.
Landscape strip could extend to rear.
Vehicles
Car parking, circulation, service yard and turning circle zone is predominantly to the side of the building for a numberof reasons; one being that there is an opportunity for neighbouring Lots to share the service yard area and therefore accommodate vehicles of larger turning circles. Parking should be closer to the street and service vehicles towards the rear.
Demonstration of how the area for vehicles can be varied to suit the building width and parking arrangement. Examples shownare based on: 13.7m for single aspect parking off access road19.6m for single aspect parking off internal road25.2m for double aspect parking off internal road
Flexible
The rear area and full width behind the vehicleservice area and parking zone could be an extention of the building envelope or ascreened hardstand or storage area.
Demonstration of how the building width canvary to provide more space but needs to betraded off with in site vehicle requirements.Minimum distance from side boundary 13.7m.
Single LotGeneral Industrial Use
3
6
1540
3
6
11
B
B:
21
A:
A
13.7
19.6
25.2
A
A:
B
B:
C:
C
C:
C C
A
B
C
3
A:
B:
C:
A
B
A:
B:
A
BA
B
A:
B:
556
A:
B:
DnA Architects 3-12-2007, 0615_DD1_CD4
D:
D
Ø 19.5
61
A3APPENDICES
Site Layout Guide 4-6
vDesign Requirements and Guidelines – December 2010
A4APPENDICES
Site Layout - Detailed
1370
0
1960
0
2520
0
4 5 6 7 8 9
12
3
10 11 12 13 14 15
Ø 21000
500
Nom
inal
bui
ldin
g w
idth
22
343
Minimum service vehicle zone depth from rear of primary building zone
6000 15000 40000 nominal 19019
bladewalls
priority building zone
set back for blade walls
3000 3000
primary setback
Priority building zone location of administration, reception, customer and staff areas
predominantly glazedtwo storey streetelevation with solarshading (see details)
mandatory priority section of micro climate zone for landscaping
encourage windows looking onto landscaped area
alternative entry and location of windows
preferred non staffentry via street facade
preferred micro climate zone for landscaping and break out spaces, with picture windows and access doors. If this area is used for any other use it needs to be suitably screened from the street. The 3m distance from the boundary also facilitates wall openings to encourage daylight and natural ventilation and could bean ideal location for stormwater storage tanks.
encourage access doors and windows in this blade wall looking onto landscaped (micro climate) area
general industrial use area
should dual access parking bays be provided (dotted) off the internal access road, this would be the effective location of the central external wall (dotted) which maintains a 1.5m side path
internal access road
optional dual accessparking bays
two way crossover
optional direct access to parking bayskerbs would need to be re-aligned
landscaped setbackzone
median strip, f lush or kerbed to suit adjoining lots
parking
1500max.
vehicle service and access area
preferred location for roller shutter and service access openings
alig
nmen
t of
scr
een
if re
ar is
use
d fo
r ext
erna
l sto
rage
boundary external wall
preferred alignment of central external wall
Alternative A alignment of central external wall
Alternative B alignment of central external wall
location of adjoining lot's dual access road which could be by private agreement between neighbours, a shared accessway for both lots (max 11m wide, shown dotted) for greater eff iciency, access for heavier vehicles and increased building streetscape frontage
the adjoining lot's service area is generally located here and could by private agreement between adjoining neighbours be a shared zone to allow for greater turning circle and access facilities
additional car parkingbays as required
general industrial use can beextended to rear boundary
general industrial use can be extendedinto this area or if properly screen beused for external storage or display, and-the-like
scre
en
5500
1500
1500
land
scap
ed
part
of
the
road
res
erve
no s
tree
tpa
rkin
g in
fron
tof
mic
ro c
limat
e
dual
use
path
way
side
pa
thin
tern
al c
arpa
rk
acce
ss ro
ad w
idth
6000
1500
park
ing
bays
alignment
3000
5000verge
6000
5500
1100
0
tanks tanks
Zone A Zone B Zone C
Zone D
DnA Architects 05-12-2007, 0615_PD1.3_CD3
vi Design Requirements and Guidelines – December 2010
A5APPENDICES
Site Layout Examples
Showroom / Recreation / Bulky Goods / Veterinary
25m ROAD RESERVEROAD H
Sho
wro
om /
Rec
reat
ion
/ Bul
ky
Goo
ds /
Vet
erin
ary
GB
A 90
0sqm
Inte
rnal
Dis
play
: 285
sqm
Offi
ce A
rea:
140
sqm
Sto
re: 4
75sq
m
Offi
ce
shar
ed a
cces
sro
ad, s
uita
ble
for
serv
ice
vehi
cles
Sto
re
Sho
wro
om /
Dis
play
15m
Offi
ce /
Sho
wro
om6m
Type
Exa
mpl
e
20
Nov
embe
r 200
7
TE.0
1
land
scap
ed a
rea
for s
taff
/m
icro
clim
ate
viiDesign Requirements and Guidelines – December 2010
A5APPENDICES
Site Layout Examples
Logistics / Salvage / Transport Depot
25m ROAD RESERVEROAD H
12
34
5
Logi
stic
s / S
alva
ge /
Tran
spor
t Dep
otG
BA
600s
qmW
areh
ouse
: 385
sqm
Offi
ce A
rea:
215
sqm
Ext
erna
l Sto
rage
Yar
d: 6
20
Offi
ce
land
scap
ed a
rea
for s
taff
/ mic
ro c
limat
e
shar
ed a
cces
sro
ad, s
uita
ble
for
serv
ice
vehi
cles
Scr
eene
d S
tora
ge Y
ard
67
89
10
War
ehou
seS
cree
ned
Sto
rage
Yar
d
rain
wat
er ta
nks
and
serv
ice
yard
.
Type
Exa
mpl
e
20
Nov
embe
r 200
7
TE.0
2
viii Design Requirements and Guidelines – December 2010
A5APPENDICES
Site Layout Examples
Light Industry / Vehicle Repair
25m ROAD RESERVEROAD H
Ligh
t Ind
ustry
/ V
ehic
le R
epai
rG
BA
550s
qmW
areh
ouse
/ W
orks
hop:
400
sqm
Not
iona
l Offi
ce A
rea:
150
sqm
Offi
ceW
areh
ouse
shar
ed a
cces
sro
ad, s
uita
ble
for
serv
ice
vehi
cles
Wor
ksho
p
Ext
erna
l Wor
k Y
ard
land
scap
ed a
rea
for s
taff
/ mic
ro c
limat
e
Type
Exa
mpl
e
20
Nov
embe
r 200
7
TE.0
4
ixDesign Requirements and Guidelines – December 2010
A5APPENDICES
Site Layout Examples
Manufacturing / Warehousing
25m ROAD RESERVEROAD H
12
34
56
78
910
11
Man
ufac
turin
g / W
areh
ouse
GB
A 95
8sqm
War
ehou
se: 4
75sq
mW
orks
hop:
120
sqm
Wor
k Y
ard:
185
sqm
Offi
ce A
rea:
120
sqm
1213
1415
16
1819
20
Offi
ce
War
ehou
se
shar
ed a
cces
sro
ad, s
uita
ble
for
serv
ice
vehi
cles
Wor
ksho
p
Ext
erna
l Wor
k Y
ard
land
scap
ed a
rea
for s
taff
/ mic
ro c
limat
e
Type
Exa
mpl
e
20
Nov
embe
r 200
7
TE.0
5
x Design Requirements and Guidelines – December 2010
A5APPENDICES
Site Layout Examples
Trade Boat, Caravan or Vehicle Display / Sales / Hire
25m ROAD RESERVEROAD H
Trad
e, B
oat,
Car
avan
or V
ehic
le
Dis
play
/ S
ales
/ H
ireG
BA
560s
qmIn
tern
al D
ispl
ay: 2
85sq
mO
ffice
Are
a: 1
40sq
mW
orks
hop:
135
sqm
Ext
erna
l Dis
play
Yar
d: 6
20sq
m
Offi
ce
land
scap
ed a
rea
for s
taff
/ mic
ro c
limat
e
shar
ed a
cces
sro
ad, s
uita
ble
for
serv
ice
vehi
cles
Scr
eene
d S
tora
ge Y
ard
Wor
ksho
pE
xter
nal D
ispl
ay Y
ard
Sho
wro
om /
Dis
play
Ext
erna
l Dis
play
15m
Offi
ce /
Sho
wro
om6m
Type
Exa
mpl
e
20
Nov
embe
r 200
7
TE.0
3
xiDesign Requirements and Guidelines – December 2010
A6APPENDICES
Stage 1-5 Overall Plan
The lot and built form layout is indicative only. It is subject to
change and detailed design. Layout plan depicts proposed ultimate
configuration.
DnA Architects 27-11-2007, 0615_SP30_CD11
General Industrial 1
General Industrial 2
Service Industrial - C 1
Service Industrial - C 2
Service Industrial - A 1
Service Industrial - A 2
Service Industrial - B 1
Service Industrial - B 2
DAP Site 1
DAP Site 2
Primary Building Envelopes
Site
Landscape
Secondary Building Zone
Lot Boundary
1002
1003
1004
1005
1006
1007
10081009
1010 1011
1012 1013
1014
1015
1016
1017
1018
1019
1020 1022
1023
1024
1025
1026
1027 1028 1029
103010311032
1033
1034
1035
8002
1036
1039104010411042
1048
1049
1050 1051
1044
1060
1061
1062
1065
10661068
1069
1021
1055 1056
1057 1058
1063
1064
8001
1071
10721073
1074
1075
1076
1077
10781079
1080
1001 1059
1043
1038 1037
RING STREET
GLOBAL ROAD
AXIS PARADE
HO
RIZ
ON
TERRA
CE
ORBIT
STREET
AVERY STREET
WARMAN STREET
STAGE 1
STAGE 2
STAGE 4
STAGE 5A
STAGE 5B
AXIS PARADE
PEA
K W
AY
PEA
K W
AY
HEMISHERE STREET
HEMISHERE STREET
GREEN
WIC
H P
ARA
DE
GREEN
WIC
H P
ARA
DE
GREEN
WIC
H P
ARA
DE
AVERY STREET
PIN
NA
CLE D
RIV
EPIN
NA
CLE D
RIV
EPIN
NA
CLE D
RIV
E
LO
NG
ITU
DE A
VEN
UE
FLYNN DRIVE
STAGE 3
OVERALL LAYOUT PLAN
P R E L I M I N A R Y
xii Design Requirements and Guidelines – December 2010
A7APPENDICES
Plant Species ListSpecies N
ame
Com
mon N
ame
PrivateLand
Carpark
Verge/Median
Screening
Feature
Public Open Space
Potentially invasive
Com
ments
Agonis flexuosa*
Pepperm
int•
••
Allocasuarina cunningham
ianaR
iver Sheoak
••
•
Angophora costata*
Sm
ooth barked apple-m
yrtle•
•
Banksia littoralis
Sw
amp B
anksia•
Use in w
et / dam
pland areasB
anksia menziesii*
Fire-Wood B
anksia•
••
Banksia prionotes*
Acorn B
anksia•
••
Brachychiton discolor x
populneus•
Brachychiton gregorii
Desert K
urrajong•
Brachychiton populneo-
acerifoliusP
ink Kurrajong
•
Casuarina obesa
Sw
amp S
heoak•
••
•D
elonix regiaP
oinciana•
•
Eucalyptus botryoides
Bangalay
••
•U
se in high water
table areasE
ucalyptus caesia*G
ungurru•
•P
lant en masse
Eucalyptus calophylla 'R
osea'P
ink Marri
••
Eucalyptus calophylla**
Marri
••
Eucalyptus erythrocorys*
Illyarrie•
Plant en m
asseE
ucalyptus ficifolia*R
ed Flowering G
um•
••
••
Eucalyptus gom
phocephalaTuart
•E
ucalyptus grandisR
ose Gum
••
Eucalyptus leucoxylon**
••
••
Eucalyptus m
aculata**S
potted Gum
••
••
Eucalyptus nicholii**
Willow
Leaved P
eppermint
••
Eucalyptus platypus
Coastal M
oort•
Eucalyptus sideroxylon
Pink M
ugga Mugga
••
•E
ucalyptus spathulata**S
wam
p Mallet
•E
ucalyptus stoateiS
carlet Pear G
umE
ucalyptus todtianaP
rickly Bark
••
••
Ficus macrophylla
Moreton B
ay Fig•
Ficus rubiginosaP
ort Jackon Fig•
•U
se only when
there is a lot of space
Hym
enosporum flavum
Queensland
•M
agnolia grandiflora•
Melaleuca lanceolata**
Rottnest Tea Tree
••
•M
elaleuca linariifolia**S
now in S
umm
er•
•
Melaleuca preissiana
•U
se in high water
table areasM
elaleuca quinquenerviaC
ajeput•
••
••
Melaleuca rhaphiophylla
••
Metrosideros excelsa
Christm
as bush•
••
Nuytsia floribunda*
WA
Christm
as Tree•
••
Podocarpus elatus
Plum
Pine
•Tipuana tipu
Tipuana•
••
Tree Species
Blackw
ell Associates P
ty Ltd Phone: (08) 9383 0888 Fax: (08) 9383 3888 W
eb: ww
w.blackw
ell.net.au 1
xiiiDesign Requirements and Guidelines – December 2010
A7APPENDICES
Plant Species List
Species Nam
eC
omm
on Nam
e
Private Land
Carpark
Verge/ Median
Screening
Feature
Public Open Space
Potentially invasive
Com
ments
Acacia saligna**
••
••
Adenanthos cygnorum
Woolybush
••
•A
denanthos cuneatusC
oastal Jug Flower
••
••
Adenanthos m
eisneri•
Adenanthos sericeus
Coastal W
oolybush•
Anigozanthos flavidus x
pulcherrimus
Kangaroo P
aw•
•S
uitable for m
icroclimate area
Anigozanthos flavidus x rufus
Kangaroo P
aw•
•B
anksia ashbyii*•
•B
anksia baxteri*•
•B
anksia burdettii•
•B
anksia hookeriana*•
•B
anksia speciosa*R
ic-Rac B
anksia•
•B
anksia victoriae*•
•B
eaufortia sparsa*S
wam
p Bottlebrush
••
Beaufortia squarrosa*
Sand B
ottlebrush•
•C
allistemon 'K
ings Park
••
Callistem
on citrinusC
rimson B
ottlebrush•
•C
allistemon phoeniceus
•C
alothamnus quadrifidus*
One-S
ided Bottlebrush
••
Cham
elaucium uncinatum
*G
eraldton Wax
••
Darw
inia citriodora**•
••
•D
ianella revoluta•
••
Dianella tasm
anica•
•D
ianella utopia•
••
Dianella variegata
Varigated D
ianella•
••
•E
ucalyptus macrocarpa*
Rose of the W
est•
••
•E
ucalyptus rodantha•
••
•E
ucalyptus tetragona•
•G
revillea 'Ellendale P
ool'•
•G
revillea 'Honeygem
'•
•G
revillea 'Joe Mason'
••
Grevillea bipinnatifida*
••
Grevillea biternata
••
•G
revillea crithmifolia
••
•G
revillea obtusifolia•
•
Hakea laurina
••
•S
uitable for m
icroclimate area
Hakea francisiana
Sea U
rchin Hakea
•H
akea petiolaris•
•
Hypocalym
ma angustifolium
Sw
an River M
yrtle•
••
•S
uitable for m
icroclimate area
Kunzea baxteri
••
Kunzea pulchella
•Leucophyta brow
niiC
ushion Bush
••
••
Macrozam
ia reidlei*•
Suitable for
microclim
ate areaM
elaleuca coccinea*•
Melaleuca elliptica
•M
elaleuca hypericifolia**•
•M
elaleuca nesophila**•
•
Murraya exotica
Orange Jessam
ine•
•S
uitable for m
icroclimate area
Philodendron xanadu
•S
uitable for m
icroclimate area
Protea 'D
uchess of Perth'
••
••
•P
rotea eximia
Broadleaf S
ugarbush•
••
Protea m
agnificaQ
ueen Sugarbush
••
••
Protea scolym
ocephalaThistle S
ugarbush•
••
••
Verticordia grandis
Scarlet Feather Flow
er•
Verticordia nitens
Christm
as Morrison
•X
anthorrhoea preissii*G
rass Tree•
••
•
Shrubs
Blackw
ell Associates P
ty Ltd Phone: (08) 9383 0888 Fax: (08) 9383 3888 W
eb: ww
w.blackw
ell.net.au 1
xiv Design Requirements and Guidelines – December 2010
A7APPENDICES
Plant Species ListSpecies N
ame
Com
mon N
ame
Private Land
Carpark
Verge/Median
Screening
Feature
Public Open Space
Potentially invasive
Com
ments
Adenanthos cuneatus 'C
oral C
arpet'•
••
•
Convolvulus m
auritanicus•
Erem
ophila glabraE
mu bush
••
•
Gazania rigens
••
•
Not to be used
within 500m
of bush forever or 200m
of dam
pland/remnant
bushland
Grevillea crithm
ifolia 'Prostrata'
••
••
Grevillea obtusifolia 'P
rostrata'•
••
•G
revillea 'Sea S
pray'•
••
Grevillea thelem
anniana*•
••
Hem
iandra pungens*•
Hibbertia scandens
••
Suitable for
microclim
ate areaM
yoporum parvifolium
•P
atersonia occidentalis*N
ative Iris•
••
•
Species Nam
eC
omm
on Nam
e
Private Land
Carpark
Verge/Median
Screening
Feature
Public Open Space
Potentially invasive
Com
ments
Cissus rhom
bifolia "Ellen
Danica'
•S
uitable for m
icroclimate areas-
shade planting only
Hardenbergia com
ptonianaN
ative Wisteria
••
••
Suitable for
microclim
ate areaK
ennedia prostrataR
unning Postm
an•
••
•
Trachelospermum
jasminoides
Chinese S
tar-Jasmine
••
Suitable for
microclim
ate area
Clim
bers
Groundcovers
Blackw
ell Associates P
ty Ltd Phone: (08) 9383 0888 Fax: (08) 9383 3888 W
eb: ww
w.blackw
ell.net.au 1
xvDesign Requirements and Guidelines – December 2010
A8 APPENDICES
Precedents
xvi Design Requirements and Guidelines – December 2010
A8APPENDICES
Precedents
xviiDesign Requirements and Guidelines – December 2010
A8 APPENDICES
Precedents
xviii Design Requirements and Guidelines – December 2010
A8APPENDICES
Precedents
xixDesign Requirements and Guidelines – December 2010
A9 APPENDICES
Materials Guide and Precedents
Wall - concrete Wall - concrete Glass facade Glass facade Metal facade
Precast concrete Smooth finishconcrete
Painted concrete Textured paint and relief artwork in concrete Metal mesh screens
Feature stonework Rendered wall Corrugated sheeting
Timber cladding
Polycarbonate facade High quality metal post fencing
Concrete pavers with rebates Riverbed stones Granite and marble off cuts for flooring Stone flooring
DnA Architects 14-11-2007, 0615_R10_CD3Note: formerly Drawing Number R5
xx Design Requirements and Guidelines – December 2010
A9APPENDICES
Materials Guide and Precedents
xxiDesign Requirements and Guidelines – December 2010
A10 APPENDICES
City of Wanneroo Car Parking Standards
xxii Design Requirements and Guidelines – December 2010
A10APPENDICES
City of Wanneroo Car Parking Standards
xxiiixxiiDesign Requirements and Guidelines – December 2010
A10 APPENDICES
City of Wanneroo Car Parking Standards
xxivxxiii Design Requirements and Guidelines – December 2010
A11APPENDICES
Design Guidelines Checklist - Stage 1
MER
IDIA
N PA
RK
Design G
uideline Stage 1 Checklist - Pre-developm
entS
elf
Assessm
ent
LandCorp A
ssessment
LandCorp A
ssessment
MER
IDIA
N PA
RK
Design G
uideline Stage 1 Checklist - Pre-developm
entS
elf
Assessm
entC
om
pliant
No
n Co
mp
liant
Docum
ents
Com
pleted Stage 1 C
heck List (this document)
Com
pleted Design G
uidelines Certification A
pplication
Site P
lan
Floor Plans of all buildings including breeze path inform
ation
Shadow
Diagram
Elevations
Design R
equirements
Urb
an and A
rchitectural Form
M1
Consolidated custom
er service and employee am
enities within front building
zoneO
perational area within rear building zone
6m front set back for building
3m side set back for m
inimum
21m from
front boundary
Service Industrial lots have 6m
access way to rear
Active building edges to street and adjacent open parking areas
Secondary street facades of sim
ilar quantity to primary facade
Ancillary use areas contained w
ithin the same built form
envelope.
Parking
and A
ccess M3
Required car parking bays provided
Public parking w
ithin parking zone
Landscap
ing M
4
Micro-clim
ate zone provided
Landscaping (hard and soft) between 8%
and 10% of S
ite Area
Shade trees provided to east and w
est building walls and 1 per 10m
on front
boundary. One shade tree per four car bays.
Imperm
eable hardstand limited as far as practicable
Service, S
torag
e and D
isplay A
reas M5
Service areas screened behind front building line
Display areas in line or behind building line
0615 Meridian P
ark Design G
uidelines Checklist - 5 O
ct 2010 Revision 2
/Volumes/P
rojects-2/0615 Meridian P
K D
esign Guidelines/0615 P
roject Filing/2 Client/2.3 R
eport/Design G
uidelines/Feb - Aug 2010 D
G
Revised Layout/R
evised DG
Checklist Feb &
Oct 2010/101005 D
G S
tage 1 Checklist R
ev 2
xxvDesign Requirements and Guidelines – December 2010
A11 APPENDICES
Design Guidelines Checklist - Stage 1M
ERID
IAN
PAR
KD
esign Guideline Stage 1 C
hecklist - Pre-development
Self
Assessm
ent
LandCorp A
ssessment
LandCorp A
ssessment
MER
IDIA
N PA
RK
Design G
uideline Stage 1 Checklist - Pre-developm
entS
elf
Assessm
entC
om
pliant
No
n Co
mp
liant
Fencing and
Sig
nage M
6
Fencing to front and secondary streets kept to minim
um
Front fence behind building line (building line does not include blade walls)
Conditional fence in front of m
icro-climate zone
Fence complies w
ith minim
um standard
Pylon sign sym
metrical or aligned w
ith facade
Sign is less than 12m
height and 20m2 surface area
Passive D
esign M
7
Developm
ent optimises use of passive solar design
External shading to all north, east and w
est facade openings
Minim
ize east and west glazing not facing street
High level openable w
indows and vents provided for heat purging
All roofing has solar absorbance of 0.5 or less
Ceiling voids ventilated
101005 DG
Stage 1 C
hecklist Rev 2
101005 DG
Stage 1 C
hecklist Rev 2
xxvi Design Requirements and Guidelines – December 2010
A11APPENDICES
Design Guidelines Checklist - Stage 2M
ER
IDIA
N P
AR
KD
es
ign
Gu
ide
line
Sta
ge
2 C
he
ck
list - P
re-d
ev
elo
pm
en
tS
elf
Asse
ssm
en
t
La
nd
Co
rp A
ss
es
sm
en
tL
an
dC
orp
As
se
ss
me
nt
ME
RID
IAN
PA
RK
De
sig
n G
uid
elin
e S
tag
e 2
Ch
ec
klis
t - Pre
-de
ve
lop
me
nt
Se
lf
Asse
ssm
en
tC
om
plia
nt
No
n C
om
plia
nt
Do
cu
me
nts
Co
mp
lete
d S
tag
e 2
Check L
ist (th
is d
ocum
ent)
Site
Pla
n
Fencin
g P
lan
Land
scap
e P
lans
•E
xte
nt a
nd
natu
re o
f the la
nd
scap
e tre
atm
ents
inclu
din
g s
oil im
pro
vem
ent
and
mulc
h fin
ishes;
•P
lant s
pecie
s, n
um
bers
and
locatio
ns;
•R
etic
ula
tion typ
e a
nd
locatio
n;
•Lo
catio
n a
nd
natu
re o
f outd
oo
r furn
iture
and
am
enitie
s;
•Lo
catio
n a
nd
deta
ils o
f exte
rnal lig
htin
g;
•E
xte
nt a
nd
type o
f bo
und
ary w
alls
, fencin
g a
nd
gate
s; a
nd
•E
xte
nt a
nd
type o
f pavin
g tre
atm
ent.
Flo
or P
lans o
f all b
uild
ing
s
Shad
ow
Dia
gra
m
Ele
vatio
ns a
nd
Sectio
ns th
oug
h a
ll build
ing
s
Bre
eze
Path
Dia
gra
m
Lig
htin
g P
lan S
pecific
atio
n a
nd
Lo
catio
ns
Ele
ctric
al S
pecific
atio
n a
nd
Lo
catio
ns
Co
nstru
ctio
n W
aste
Manag
em
ent P
lan
De
sig
n R
eq
uire
me
nts
Urb
an
an
d A
rch
itec
tura
l Fo
rm M
1
Co
nso
lidate
d c
usto
mer s
ervic
e a
nd
em
plo
yee a
menitie
s w
ithin
front
build
ing
zone
Op
era
tional a
rea w
ithin
rear b
uild
ing
zone
6m
front s
et b
ack fo
r build
ing
3m
sid
e s
et b
ack fo
r min
imum
21
m fro
m fro
nt b
ound
ary
Active
build
ing
ed
ges to
stre
et a
nd
ad
jacent o
pen p
ark
ing
are
as a
nd
seco
nd
ary s
treet fa
cad
es o
f sim
ilar q
uantity to
prim
ary fa
cad
e
06
15
Merid
ian P
ark
Desig
n G
uid
elin
es C
hecklis
t - 5 O
ct 2
01
0 R
ev 2
/Vo
lum
es/P
roje
cts
-2/0
61
5 M
erid
ian P
K D
esig
n G
uid
elin
es/0
61
5 P
roje
ct F
iling
/2 C
lient/2
.3 R
ep
ort/D
esig
n G
uid
elin
es/F
eb
- Aug
20
10
DG
Revis
ed
Layo
ut/R
evis
ed
DG
Checklis
t Feb
& O
ct 2
01
0/1
01
00
5 D
G S
tag
e 2
Checklis
t Rev 2
xxviiDesign Requirements and Guidelines – December 2010
A11 APPENDICES
Design Guidelines Checklist - Stage 2
MER
IDIA
N PA
RK
Design G
uideline Stage 2 Checklist - Pre-developm
entS
elf
Assessm
ent
LandCorp A
ssessment
LandCorp A
ssessment
MER
IDIA
N PA
RK
Design G
uideline Stage 2 Checklist - Pre-developm
entS
elf
Assessm
entC
om
pliant
No
n Co
mp
liant
Parking
and A
ccess M3
Required car parking bays provided
Public parking w
ithin parking zone
Landscap
ing M
4
Micro-clim
ate zone provided
Shade trees provided to east and w
est building walls and 1 per 10m
on front
boundary. One shade tree per four car bays.
Planting density in all areas m
inimum
two plants per m
2
General landscaping in accordance w
ith figures in section M3
Irrigated soft landscape does not exceed 60% (80%
for corner Lots) of
landscape and limited turf
Soil conditioner specified in all planted areas
All plant species from
Appendix 7 including deciduous trees
No invasive plant species w
ithin 500m of B
ush Forever sites or
conversation area
Watering of soft landscape area provided by autom
atic electronic controlled
drip irrigation system using harvested rain w
ater
Irrigation system has integrated m
oisture sensors
All soft landscape areas are m
ulched
All storm
water harvested on site (into sw
ales, soak wells and/or landscape
areas)
Service, S
torag
e and D
isplay A
reas M5
Service areas screened behind front building line
Display areas in line or behind building line
Fencing and
Sig
nage M
6
Fencing to front and secondary streets kept to minim
um
Front fence behind building line (building line does not include blade walls)
Conditional fencing in front of m
icro-climate zone
Fence complies w
ith minim
um standard
Pylon sign sym
metrical or aligned w
ith facade
Sign is less than 12m
height and 20m2 surface area
100224 DG
Stage 2 checklist
/Volumes/P
rojects-2/0615 Meridian P
K D
esign Guidelines/0615 P
roject Filing/2 Client/2.3 R
eport/Design G
uidelines/Feb - Aug 2010 D
G
Revised Layout/R
evised DG
Checklist Feb &
Oct 2010/101005 D
G S
tage 2 Checklist R
ev 2
xxviii Design Requirements and Guidelines – December 2010
A11APPENDICES
Design Guidelines Checklist - Stage 2
MER
IDIA
N PA
RK
Design G
uideline Stage 2 Checklist - Pre-developm
entS
elf
Assessm
ent
LandCorp A
ssessment
LandCorp A
ssessment
MER
IDIA
N PA
RK
Design G
uideline Stage 2 Checklist - Pre-developm
entS
elf
Assessm
entC
om
pliant
No
n Co
mp
liant
Passive D
esign M
2
Developm
ent optimises use of passive solar design
External shading to all north, east and w
est facade openings
Minim
ize east and west glazing not facing street
High level openable w
indows and vents provided for heat purging
All roofing has solar absorbance of 0.5 or less
Ceiling voids ventilated
Energ
y Manag
ement M
7
Solar hot w
ater (4-star), gas (5-star) or heat pump system
Minim
um 80%
internal lamps have efficacy of <
90 lumens/W
att and 20,000
hour lamp life
Minim
um 80%
external lamps have efficacy of <
65 lumens/W
att and
20,000 hour lamp life
Water M
anagem
ent M8
Minim
um 4-star dual flush toilets specified
Minim
um 6-star w
aterless urinals specified (if applicable)
Minim
um 3-star fittings and appliances (i.e. dishw
ashers, washing
machines etc.)
Show
er and personal storage facilities provided if development exceeds
2,000sqm G
LA
Maintenance program
for verge areas in place
Appropriate licences and w
orks approvals in compliance w
ith
Developm
ent complies w
ith AS
1668 minim
um fresh air rates
Construction W
aste Managem
ent Plan subm
itted
0615 Meridian P
ark Design G
uidelines Checklist - 5 O
ct 2010 Rev 2
/Volumes/P
rojects-2/0615 Meridian P
K D
esign Guidelines/0615 P
roject Filing/2 Client/2.3 R
eport/Design G
uidelines/Feb - Aug 2010 D
G
Revised Layout/R
evised DG
Checklist Feb &
Oct 2010/101005 D
G S
tage 2 Checklist R
ev 2
Manag
ement M
9
environmental regulations
xxixDesign Requirements and Guidelines – December 2010
A12 APPENDICES
Credits
CONTACTS, CONTRIBUTORS AND CONSULTANT TEAM:
LandCorp
David Lewis and Greg Ryan
Westfarmers Building Level 6, 40 The Esplanade Perth WA 6000
08 9482 7499 landcorp@landcorp.com.au
landcorp.com.au/meridianpark
Benchmark Projects
Brett Chivers
Level 4, 10 Eastbrook Terrace, East Perth WA 6004
Taylor Burrell Barnett
Karen Wright
187 Roberts Road, Subiaco WA 6008
DnA Architects
Wayne Dufty
20 Jersey Street, Jolimont WA 6014
Blackwell & Associates
Tony Blackwell
550 Stirling Highway Peppermint Grove, WA 6011
Cossill Webley
John Barham
431 Roberts Road, Subiaco WA 6008
Worley Parsons
Paul Hardisty, Andre Garnaut
Level 7, QV1 250 St George’s Terrace Perth WA 6000
CBRE
Warick Irving
4/ 225 St George’s Terrace, Perth WA 6000
Turner & Townsend
Ian Dunlop - Level 5 London House Perth WA 6000
IMAGES CREDITS
M21. Huanacu Warehouse & Office by tFPS Chile
M41. Image courtesy Landcom.
M51. Eko Park Expo Pavillion. Warsaw, Poland. Autorska Pracownia
Architektury Kurylowicz & Associates2. Parish Centre. Podersdorf Amsee, Austria. Lichtblau architects.3. Ercol Factory. UK. Hordern Cherry Lee Architects4. ARCA. Osbourne Park, WA. Harry Seidler Architects.
M61. Business Communication Centre, IT Park Saarland, Germany.2. GKD Headquarters Building, Maryland, USA. Dominique Perrault.
S11. Fogtech Building, Koln by Georg Giebeler / 4000 architekten
S21. Ruffi Sports Complex. Marseille, France. Remy Marciano
S31. Danpalon facade, Hobart Airport by Hassell Architects
S61. Sports Facilities Area, Educare School, Mexico. TEN Arquitectos.2. National Library diet Japan3. Cartier Watch Factory, Bern by Jean Nouvel
S71. Hakuou High School. Wakayanagi, Japan. Kajima & Sampei
S91. MetalART Industries2. Hakuou High School. Wakayanagi, Miyagi Prefecture, Japan. Kazuhiro
Kajima and Mitsumasa Sampei.
S111. Recall Information Centre. Lacoste + Stevenson Architects
2. Gate 1 pylon sign by DnA Architects photo by Acorn
S151. Carpark Northbridge wall detail2. Steven Holl, Nelson-Atkins Museum of Art Kansas City3. St Andrews House by Sean Godsell Architect
S171. Air Cargo Center Vienna, Austria: Treusch architecture
A8 (left to right)Row 1:1. ANZAC Hall. Canberra, ACT, Australia. Denton Corker Marshall2. O Museum. Canberra, ACT, Australia. Kazuyo Sejima + Ryue Nishima/
SANAA3. Karmoy Fishing Museum. Karmoy, Rogeland, Norway. Snohetta
Row 2:1. New Helexpo Gates. Thessaloniki, Greece. Katerina Tsigarida Architects2. Vina Las Ninas. Santa Cruz, Chile. Mathias Klotz
Row 3:1. Dyson Headquarters. Malmesbury, UK. WilkinsonEyre2. Recall Information Centre, Greystanes NSW. Lacoste + Stevenson
Architects3. Herzog & de Meuron Architects5. Perth Convention Centre. Cox Howlett & Bailey Woodland6. Ruffi Sports Complex. Marseille, France. Remy Marciano
Row 4:1. Lume Mediacenter. Helsinki, Finland. Heikkinen-Komonen Architects2. An Turas. Tiree, Inner Hebrides, Scotland, UK. Sutherland Hussey
Architects3. Eko Park Expo Pavillion. Warsaw, Poland. Autorska Pracownia
Architektury Kurylowicz & Associates
Row 5:
1. Art Centre College of Design, Pasadena, California by Daly Genik Architects
2. Curtin University, Bentley WA.3. Imola Business Park, Kewdale WA. Feldhusen Choy Design.5. Caltrans District 7 Headquarters, Los Angeles, Calafornia by Morhosis
xxx xxixDesign Requirements and Guidelines – December 2010
APPENDICES
Credits
Row 6:1. Het Valkhof Museum. Nijmegen, Netherlands. UN Studio.2. Sheep Farm House, Kyneton, Victoria, Australia. Denton Corker Marshall.3. Combined Heat Power plant and Office Building. Luxembourg. Paul
Bretz.4. Town Hall and Theatre. Ijsselstein, Netherlands. UN Studio & Bretz5. 50 Argo Street. South Yarra, VIC. O’Conner + Houle Architecture
Row 7: 3. Fogtech Building, Koln, Germany by Georg Giebeler / 4000 architekten5. Concordia Textiles Head Office. Waregem, Belgium. Vincent van Duysen.
Row 8:1. Air Cargo Center Vienna, Austria: Treusch architecture2. Sainsbury Supermarket, Deal, Kent, UK. Lifschultz Davidson.3. Agricultural Park. Hayami-gun, Oita, Japan. Toyo Ito & Associates4. GKD Headquarters Building, Maryland, USA. Dominique Perrault
Row 9:1. Gallery of Horiyuji Treasures, Tokyo Museum: Taniguchi & Assoc.2. MPreis Supermarket. Wattens, Austria. Dominique Perrault.3. Imola Business Park, Kewdale WA. Feldhusen Choy Design.4. House at Maple Avenue. Singapore. WOHA
Row 10:1. Sports Facilities Area, Educare School, Mexico. TEN Arquitectos.2. Sheep Farm House, Australia: Denton Corker Marshall.3. Three Houses. Beinwil, Switzerland. Gmur-Vacchini Architekten
Row 11:1. Tempo Office Building, Subiaco, WA. Giorgi Group.2. Airport Building3. Hakuou High School. Wakayanagi, Miyagi Prefecture, Japan. Kazuhiro
Kajima and Mitsumasa Sampei / C+A Associate Architects.4. V42 House. Bangkok, Thailand. Duangrit Bunnag Architect5. An Turas. Tiree, Inner Hebrides, UK. Sutherland Hussey Architects
Row 12:1. An Turas. Tiree, Inner Hebrides, Scotland, UK. Hussey Architects2. Tulach a‘tSolais Monument. Oulart Hill, Wexford, Ireland. Scott Tallon
Architects3. House of Silence. Konigsmunster, Germany. Peter Kulka.
A9Row 1: (left to right)3. Faller PharmaServiceCenter, Binzen, Germany. pfeifer roser Kuhn
Architecten.4. Business Communication Centre, IT Park Saarland. Saarbruken,
Germany. ARUS.5. Image from BlueScope Lysaght
Row 4:1. GKD Headquarters Building 2. The British School in The Netherlands. Holland. Kraaij van ger Urbis.3. Cinema. Rotterdam, Holland. Koen van Velsen.4. Olympia Fields. Illinois, USA. Weiss / Manfredi Architects
Row 5:1. GKD Headquarters Building. CAmbridge, MAryland, USA. Dominique
Perrault2. Telecom Authority Building. Oporto, Portugal. Joao Alvaro Rocha & Jose
Manuel Gigante.3. Coreten Façade Building4. Caltrans District 7 Headquarters. Los Angeles, California, USA.
Morphosis.5. Recall Information Centre, Greystanes NSW. Lacoste + Stevenson
Architects
Row 6:6. Palacio de Congresos. Santiago de Compostela, Spain. Alberto Noguerol
y Pilar Diez Architects.7. Casa Ponce. Buenos Aires, Argentina. Mathias Klotz
A12
Recommended