DT 1320 BIM

Preview:

DESCRIPTION

DT 1320 BIM. Unit 1 Intro To Architectural Design and BIM. The Professional practice of architectural working drawings 4 th edition. Professional Foundations Chapter 1 The Office. The physical office: I. Local firms II. Global firms. Three Major Components: I. Administration - PowerPoint PPT Presentation

Citation preview

DT 1320 BIMUNIT 1 INTRO TO ARCHITECTURAL DESIGN AND

BIM

THE PROFESSIONAL PRACTICE OF ARCHITECTURAL WORKING DRAWINGS

4TH EDITION

PROFESSIONAL

FOUNDATIONS

CHAPTER

1

THE OFFICE

THE PHYSICAL OFFICE:

I. LOCAL FIRMS

II. GLOBAL FIRMS

THREE MAJOR COMPONENTS:

I. ADMINISTRATION

II. DESIGN

III. PRODUCTION

Administration

Design Production

• Job Captain• Senior Technician• Intermediate

Technician• Junior Technician

• Project Architect• Job Captain• Senior Technician• Intermediate

Technician• Junior Technician

Architect(s)/Principal(s)Oversee

Page 5, 4th ed.

• Human Resources• Accounting• Marketing

ARCHITECTURAL SUPPORT:

I. BOARDS/ORGANIZATIONS

II. RESEARCH SOURCES

III. AFFILIATIONS

NATIONAL ARCHITECTURAL ACCREDITING BOARD

(NAAB)

ARCHITECTURE

REGISTRATION EXAMINATION (ARE)

Page 5, 4th ed.

INTERN DEVELOPMENT PROGRAM (IDP)

NATIONAL COUNCIL OF ARCHITECTURAL

REGISTRATION BOARDS (NCARB)

Page 5, 4th ed.

MASTERFORMAT GROUPS, SUBGROUPS, AND DIVISIONS PROCUREMENT AND

CONTRACTING

REQUIREMENTS GROUP

DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS

INTRODUCTORY INFORMATION

PROCUREMENT REQUIREMENTS

CONTRACTING REQUIREMENTS

 

SPECIFICATIONS GROUP

 

GENERAL REQUIREMENTS SUBGROUP

DIVISION 01 – GENERAL REQUIREMENTS

Page 6, 4th ed.

FACILITY CONSTRUCTION SUBGROUP

DIVISION 02 – EXISTING CONDITIONS

DIVISION 03 – CONCRETE

DIVISION 04 – MASONRY

DIVISION 05 – METALS

DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

DIVISION 08 – OPENINGS

DIVISION 09 – FINISHES

DIVISION 10 – SPECIALTIES

DIVISION 11 – EQUIPMENT

DIVISION 12 – FURNISHINGS

DIVISION 13 – SPECIAL CONSTRUCTION

DIVISION 14 – CONVEYING EQUIPMENT

DIVISION 15-19 – RESERVED FOR

FUTURE EXPANSION

FACILITY SERVICES SUBGROUP

DIVISION 20 – RESERVED FOR FUTURE EXPANSION

DIVISION 21 – FIRE SUPPRESSION

DIVISION 22 – PLUMBING

DIVISION 23 – HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)

DIVISION 24 – RESERVED FOR FUTURE EXPANSION

DIVISION 25 – INTEGRATED AUTOMATION

DIVISION 26 – ELECTRICAL

DIVISION 27 – COMMUNICATIONS

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

DIVISION 29 – RESERVED FOR FUTURE EXPANSION

Page 6, 4th ed.

 

SITE AND INFRASTRUCTURE SUBGROUP

DIVISION 30 – RESERVED FOR FUTURE EXPANSION

DIVISION 31 – EARTHWORK

DIVISION 32 – EXTERIOR IMPROVEMENTS

DIVISION 33 – UTILITIES

DIVISION 34 – TRANSPORTATION

DIVISION 35 – WATERWAY AND MARINE CONSTRUCTION

DIVISION 36-39 – RESERVED FOR FUTURE EXPANSION

PROCESS EQUIPMENT SUBGROUP

DIVISION 40 – PROCESS INTEGRATION

DIVISION 41 – MATERIAL PROCESSING AND HANDLING EQUIPMENT

DIVISION 42 – PROCESS HEATING, COOLING, AND DRYING EQUIPMENT

DIVISION 43 – PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND STORAGE EQUIPMENT

DIVISION 44 – POLLUTION AND WASTE CONTROL EQUIPMENT

DIVISION 45 – INDUSTRY-SPECIFIC MANUFACTURING EQUIPMENT

DIVISION 46 – WATER AND WASTEWATER EQUIPMENT

DIVISION 47 – RESERVED FOR FUTURE EXPANSION

DIVISION 48 – ELECTRICAL POWER GENERATION

DIVISION 49 – RESERVED FOR FUTURE EXPANSION

Page 6, 4th ed.

 PROCESS EQUIPMENT SUBGROUP

DIVISION 40 – PROCESS INTEGRATION

DIVISION 41 – MATERIAL PROCESSING AND HANDLING EQUIPMENT

DIVISION 42 – PROCESS HEATING, COOLING, AND DRYING

EQUIPMENT

DIVISION 43 – PROCESS GAS AND LIQUID HANDLING,

PURIFICATION, AND STORAGE EQUIPMENT

DIVISION 44 – POLLUTION AND WASTE CONTROL EQUIPMENT

DIVISION 45 – INDUSTRY-SPECIFIC MANUFACTURING EQUIPMENT

DIVISION 46 – WATER AND WASTEWATER EQUIPMENT

DIVISION 47 – RESERVED FOR FUTURE EXPANSION

DIVISION 48 – ELECTRICAL POWER GENERATION

DIVISION 49 – RESERVED FOR FUTURE EXPANSION

Page 6, 4th ed.

AMERICAN INSTITUTE OF ARCHITECTS

(AIA)

LEADERSHIP

IN ENERGY AND ENVIRONMENTAL DESIGN (LEED )

Page 7, 4th ed.

ARCHITECT/CLIENT RELATIONSHIP: I. WORKING RELATIONSHIP

A. CONTRACT

B. RETAINER

C. PROJECT PROGRAM

D. CLIENT REVIEW

E. CLIENT APPROVAL

SCHEMATIC DESIGN (SD) I. DESIGN AND REVIEWS

A. ARCHITECTURE PROGRAM

1. ESTIMATED SQ. FT.

2. TYPE OF USE

3. OTHER ELEMENTS

Page 7-9, 4th ed.

SCHEMATIC DESIGN (SD)

B. STUDY DRAWINGS, DOCUMENTS, AND

OTHER MEDIA

1. CONCEPTS

2. SPATIAL RELATIONS

3. SCALE

4. FORM

5. CLIENT REVIEW

Page 7-9, 4th ed.

SCHEMATIC DESIGN (SD)

C. RESEARCH PHASE

1. ZONING

2. PLANNING

3. BUILDING

4. ENVIRONMENTAL

5. ENGINEERING

6. SITE ANALYSIS

Page 7-9, 4th ed.

SCHEMATIC DESIGN (SD)

D. PRODUCE SCHEMATIC

1. CLIENT REVIEW

2. ESTIMATE COST

3. SITE & FLOOR PLAN

4. SECTION &

ELEVATION

5. MODEL/RENDERING

6. OVERALL DIMENSION

7. CLIENT APPROVAL

Page 7-9, 4th ed.

DESIGN DEVELOPMENT (DD) II. DESIGN AND REVIEWS

A. LAYOUT & DETERMINE

1. MECHANICAL

2. ELECTRICAL

3. PLUMBING

4. STRUCTURAL DETAILS

5. ARCHITECTURAL

DETAILS

6. MATERIAL TYPES

7. DOOR/WINDOW LOCATIONS

8. OTHER ELEMENTS

Page 9, 4th ed.

DESIGN DEVELOPMENT (DD)

B. PRODUCE DESIGN

1. CLIENT REVIEW

2. ESTIMATE COST

3. SITE & FLOOR PLANS

4. SECTIONS &

ELEVATIONS

5. OUTLINE

SPECIFICATIONS

6. CLIENT APPROVAL

Page 10, 4th ed.

CONSTRUCTION DOCUMENTS (CD) III. DESIGN AND REVIEWS

A. LAYOUT & DETERMINE

1. DRAWINGS WITH GREATER

DETAIL

2. SPECIFICATIONS

3. DETAILS

4. MATERIALS

Page 12, 4th ed.

CONSTRUCTION DOCUMENTS(CD)

B. PRODUCE DOCUMENTS

1. CLIENT REVIEW

2. CLIENT APPROVAL

3. AGENCY REVIEW

4. AGENCY APPROVAL

5. OUT TO BID

Page 12, 4th ed.

BIDDING & NEGOTIATING I. PUBLICALLY OWNED PROJECTS

A. QUALIFIED BIDDERS

1. UNLIMITED NUMBER

2. LOWEST BID

3. BID DELIVERED ON TIME

Page 12, 4th ed.

BIDDING & NEGOTIATING II. PRIVATELY OWNED PROJECTS

A. OWNER/ARCHITECT

DETERMINED

1. BID/NEGOTIATED

2. 4 TO 5 BIDDERS

3. BUDGET OR TIME

Page 12, 4th ed.

CONSTRUCTION ADMINISTRATION (CA) I. OBSERVE PHASES OF

CONSTRUCTION

A. ARCHITECTS ROLE

1. FIELD ACTIVE

2. FIELD VISIT

3. WRITTEN REPORTS

4. RFI

5. PUNCH LIST

Page 13, 4th ed.

BUILDING CODES I. PURPOSE

A. LIFE SAFETY

1. REVISED OFTEN

2. CATASTROPHIC CONDITIONS

A. HURRICANES

B. SEISMIC

C. FIRES

3. DETAILS

4. STRUCTURE

Page 13, 4th ed.

BUILDING CODES II. PROCEDURE

B. BUILDING USE &

OCCUPANCY

1. CLASSIFY USE

2. FIRE RATED

ASSEMBLIES

3. LOCATE BUILDING ON SITE

4. DETERMINE FLOOR AREAS

5. DETERMINE HEIGHT OF BUILDING 6. BUILDING EXITING

Page 13, 4th ed.