EGN 5620 Enterprise Systems Configuration Professional ...web.eng.fiu.edu/chen/Fall 2012/EGN 5623...

Preview:

Citation preview

EGN 5623 Enterprise Systems Optimization

PROFESSIONAL MSEM

SAP SCM Design & ImplementationGLOBAL BIKE COMPANY

(GBI-011)

Team Members:

Alexander Hurtado

Franibel Valette

Heidi Riesgo

Boni Canovas

Interactive SNP Planning: Create all the selection criteria’s with a new name for example

11A Finished Products and so on. NOTE: Enter all the three FG’s when creating for

Finished products (FG-0011-11, FG-0020-11, FG-0021-11). And also check the

lower/upper limit of the new RM depending on by what number you have designated it.

2 | P a g e

3 | P a g e

Note: No New Raw Material

4 | P a g e

5 | P a g e

Review forecast values for production.

6 | P a g e

Run SNP Heuristics - Location at plant level.

Finished Products (FG-0011-11):

7 | P a g e

8 | P a g e

Semi-Finished Products (SF-0030-11):

9 | P a g e

Raw Materials (FG-0011-11):

Resources:

10 | P a g e

11 | P a g e

Finished Products (FG-0020-11):

Resources:

12 | P a g e

Finished Products (FG-0021-11):

Resources:

13 | P a g e

Location Heuristics for multiple materials on multiple levels.

Finished Products:

14 | P a g e

Semi-Finished Products:

15 | P a g e

Resources:

16 | P a g e

Raw Materials:

17 | P a g e

Run SNP Heuristics – Network at the plant level.

Run SNP Heuristics – Multilevel at the plant level.

Finished Products:

18 | P a g e

Semi-Finished Products:

Raw Materials:

19 | P a g e

Resources:

Capacity Leveling:

20 | P a g e

Review production plan in product view.

21 | P a g e

Create sales order in DC in SAP ECC system: sold to party will be the new customer and

the product the new FG and order quantity as per your choice.

Network plan with multilevel heuristics.

22 | P a g e

The planning board.

FG-0011-11

23 | P a g e

FG-0020-11

Check the results in SAP ERP.

24 | P a g e

25 | P a g e

Define SNP deployment profile: Product enter the new FG (FG-0011-11) and follow

steps on page 127.

26 | P a g e

Assign the TLB profile to the transportation lane: In the section “means of transport”

double click on 11AUSA and follow the next steps. Do the same for 11A1 to 11A3.

27 | P a g e

Run deployment heuristics.

28 | P a g e

29 | P a g e

Delete transactional data: the upper limit for FG and RM should change according to

your products. In “multiple selection for location” all three values should be included.

30 | P a g e

Master data selection: In Check Profile enter ##AGBC. Create new selection criteria with

new names for example ##A EXTPROC GBC. NOTE: Make sure to enter all vendors

and customers while creating the criteria for location products.

31 | P a g e

Create CTM profile: In “settings” tab in section check profile enter ##AGBC.

32 | P a g e

Consistency check for CTM master data: Enter check profile as ##AGBC.

33 | P a g e

Planning with CTM.

34 | P a g e

35 | P a g e

Supply Chain Viewer

36 | P a g e

37 | P a g e

1. Conclusion

Global Bike International Company has successfully completed the design,

implementation and deployment activities for its multi-tier supply network operation. However,

some minor errors were found throughout the implementation. None of them were catastrophic

errors and we were able to continue to the end of the implementation. This process allowed the

creation, modification, transfer and integration of master data and transactional data in both SAP

ERP and SCM systems for GBI.

38 | P a g e