SUCF / UNIVERSITY AT ALBANY – ETEC PROJECT

Building and Remaining Site Work Project Data

245,000 gross square feet 5 levels, including MEP Penthouse and Basement Classrooms, Labs, Collaboratorium, Team Rooms, Offices Geothermal mechanical system Exterior Curtainwall, Glass Fiber Reinforced Concrete Panels,

and Metal Panel Systems Structural Steel Frame Casework, Acoustics, variety of Finishes Site Development, including parking, concrete and paver

walkways, pedestrian path from main campus, retention basins, utilities, and landscaping

Overall Landscape Plan

A

B

Exterior Rendering

Section Perspective

Floor Plan100 Seat Class

Lower Level Floor Plan

Stair75 Seat Class

Cafe36 Seat Classroom

Lower Level Rendering

First Level Floor Plan

Open Below

Main Lobby

Floor PlanTeam RoomShell

Stair

Shared Training

Science on a SphereIncubator

Shell

Main Entry Rendering

Main Lobby

Science Sphere Room

Main Stair

2. View From Level 01 Lobby1. View from Elevator Lobby on Level 02, 03, & 04

Atrium

Shared Training

Second Level Floor Plan

Team RoomConference Room

Floor Plan

Stair

Team Rooms

Team RoomsConference Room

Third Level Floor Plan

Decision TheaterExterior Porch

Floor Plan

Collaboratorium

Team RoomConference Room

Team RoomsConference Room

Stair

Team Rooms

Fourth Level Floor Plan

Floor Plan

Map Room

Team Room

Team RoomsConference Room

Stair

Balconies

Penthouse Level Roof Plan

Skylights

Floor Plan

Skylights

DAES Observation RoomStair

Roof Level Floor Plan

Floor PlanEquipment DeckStair

Project Schedule 10.16.17 Anticipated Advertise of Project 11.1.17 Pre Bid Walkthrough at University 12.6.17 Open Bids 3.1.18 Anticipated Notice to Proceed 6.29.21 Construction Complete

Project Budget Approximately $115,000,000 Single Prime Contract

Bidding Process

Advertisement in:Contract ReporterSUCF WebsiteDodge ServicesTime Union

Access Plan Holders List for GC’s / Major Subs Submit bid documents to SUCF per Information

for Bidders

Submissions 2 Days Major Trade Subs List 7 Days MWBE Utilization Plan & SDVOB Plan Plan Analysis and Approval Process

Plan is Approved ~ Notice of Award ~ Notice to Proceed ~ Work Begins Approximately 90 calendar day period from bid day to Notice to

Proceed

Post Bid Opening

What Makes this Project Attractive to Bidders? Early Site Work Project Complete by end of 2017

Location !!! Not really on the campus Easy access Parking on site Organized Site Logistics Plan

Limited Site Restrictions No down time with University operations and events

Prestigious project

Important Consultant & Fund Oversight

Quality Control will be paramount

Support Prompt Resolution of Project Issues

Close Coordination with External Projects (i.e.

Harriman Campus, CDTA Bus Rapid Transit, etc)

MWBE Project Opportunities

Outreach Program / Session occurred on 9/12/17 on campus (facilitated by Landon & Rian)

12% MBE, 18% WBE, and 3% SDV How to Access MWBE Entities Association of Minority Enterprises of New York New York State Contract System Contact Landon & Rian, MWBE Outreach and Compliance

27

z

Project Labor Agreement Overview

Final negotiations with Union representatives

Bid Documents will have final signed document

28

z

Joint Venture / GC PartnershipsInvites the approaches of strong teams with either J/V or Associated

GC Partnership

Allows additional small and medium sized Contractors the

opportunity to be involved

Takes pressure off of some GC’s (i.e. bonding capacity control/less

volume to manage/incur self performing contractors)

J/V agreements MUST be legally formed prior to Bid Date

- each J/V entity must meet the qualifications of having performed one project of 50% of the bid amount within the past five (5) years

Contact Information

Mike Stewart (Turner): 518-573-0343Email : mstewart@tcco.com

The Fund Web Site: www.sucf.suny.edu

Recommended