1 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated © 2016 Bentley Systems, Incorporated© 2016 Bentley Systems, Incorporated

Engineering, The key to successful Implementation

Understanding the Engineering Design process

2 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated © 2016 Bentley Systems, Incorporated

Engineering Design Process

Cyclical series of steps that engineering teams use to guide them to solve problems.

3 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated

Determine the need and constraints

Redesign if Necessary

Develop a possible solution

Understand the problem

Look for possible solutions

Engineering / Design Process

4 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated

Engineering Design Responsibilities

Research

Design

Test

Modify & Re-test

Reporting

5 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated

Roles of Engineering Design Team

6 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated

Concerns of Engineering Design

Usability and Safety

Strength and Reliability

Look and Feel

Efficiency and Cost

Maintenance and Life Span

7 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated

How does AWP affect Engineering?

Construction

Work Area

Path of

Construction

Construction

Work Package Sequence

Construction EngineeringAWP

8 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated

Understanding CWA

Area

Multi Discipline

Functional

Geographic

System Turnover

9 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated

Path of Construction

1. Construction Activities

2. Engineering and Construction Agreement

3. Procurement Alignment

4. Constructability

10 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated

CWP Boundary Defines EWP Deliverable

11 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated

Sequence of Engineering

Design Criteria

Vendor Support

Stress Analysis

Requisition Process

Drawing Approval

Issue of Drawings

Fabricator Receipt

12 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated

EWP Deliverable Creates CWP

13 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated

Sequence North to South

14 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated

Does AWP change the way we perform Engineering Design?

15 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated

Process for Success

16 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated

Engineering Work Package

17 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated

Benefits of AWP in the Engineering Process

Clearly defined Construction Work Areas

Agreed upon Path of Construction by CWP boundary

Disciplined process for creation of EWP

Sequenced release of drawings to fabricators

18 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated