Field Period Assembly (FPA) Operations, Cost and schedule, staffing, and metrology utilization. Mike Viola Field Period Assembly Manager 10 AM October 12, 2006. FPA Concerns and Risks. Heavy emphasis on Prototyping each activity Crack Work Crew and Support - PowerPoint PPT Presentation
Citation preview
NCSX
Field Period Assembly (FPA) Operations, Cost and schedule,
staffing, and metrology utilization
Mike ViolaField Period Assembly Manager
10 AM October 12, 2006
October 12, 2006 NCSX Field Period AssyPeer Review
M. Viola 2
NCSXFPA Concerns and Risks
Heavy emphasis on Prototyping each activity• Crack Work Crew and Support
– Our best, highly effective and ingenious technicians assigned to perform first time tasks. More time allocated for first time.
John Edwards 30 years experience (Master Support Technician), Mike Duco from Lockheed (simulations, manufacturing, coatings
vibrations), Ed Bush 20+ Quality Assurance then NB Ion Sources.
– Augmented as needed by Cryogenic operators and NB Technicians• Learning Curve (Time included in schedule)
– Perform all tasks first with crack crew – Prove principles to mitigate risk!! And then Finalize Procedures
– Train secondary support crew to perform bulk of work• Tooling
– Crack Crew perform dry run of tooling• Metrology (Mike Duco with Steve Raftopoulos Support)
– Leica Laser: 0.0005” accuracy– Romer arm: 0.005-0.010” accuracy (2 other Romer Arms available)
October 12, 2006 NCSX Field Period AssyPeer Review
M. Viola 3
NCSXFPA Metrology Issues
• Equipment in house – Leica Laser: 0.0005” accuracy– Romer arm: 0.005” accuracy (2 other Romer Arms available)
• Reach/Accessibility– Coils are easy to reach but need high accuracy– VVSA is hard to reach but localized activities can use lower
accuracy equipment.• Repeatability
– Datums strategically located to provide individual activity support – Need recommendation for datum locations to be used through
final machine assembly• Expert support group being considered within Fabrication
Division
October 12, 2006 NCSX Field Period AssyPeer Review
M. Viola 4
NCSXSAFETY
• Documentation and ISM Work Plans– Manufacturing Facility Operation Plan (MFOP)
covers overall facility conduct using ISM as its basis.
– Activities Control Committee (ACC) independently reviews each station setup, operations, and plans before station is activated.
October 12, 2006 NCSX Field Period AssyPeer Review
M. Viola 5
NCSXFPA Process Definitions
• FPA Manufacturing, Inspection, Test, Quality Assurance Plan (MIT/QA) – Input:
• Dimensional Control Plan • FPA Assembly Sequence Plan • FPA Specification and Assembly Drawings
– Output:• Individual procedures to perform tasks
October 12, 2006 NCSX Field Period AssyPeer Review
M. Viola 6
NCSXFPA Cost and Schedule
• FPA Cost and Schedule– Station 1 $744K 6/30/06 – 1/17/08– Station 2 $336K 10/5/06 – 1/31/08– Station 3 $300K 7/31/07 – 4/7/08– Station 4 $214K 10/4/07 – 6/3/08– Station 5 $647K 9/14/07 – 7/11/08
• Total FPA Cost $2.241M
October 12, 2006 NCSX Field Period AssyPeer Review
M. Viola 7
NCSXField Period Assembly Operations
VVSA1_MTM_FINAL_NUMBERS VVSA1_PPPL_BEST_FIT
Very good agreement.
October 12, 2006 NCSX Field Period AssyPeer Review
M. Viola 8
NCSXField Period Assembly Operations
VVSA2_MTM_FINAL_NUMBERS VVSA2_PPPL_BEST_FIT
Metrology is serving appropriate needs.
October 12, 2006 NCSX Field Period AssyPeer Review
M. Viola 9
NCSXField Period Assembly Operations
Station 1 setup Port prefit
October 12, 2006 NCSX Field Period AssyPeer Review
M. Viola 10
NCSXField Period Assembly Operations
October 12, 2006 NCSX Field Period AssyPeer Review
M. Viola 11
NCSXField Period Assembly Operations
• Station 1 Schedule (VVSA)– All three VVSA’s received 9/30/06– All work performed on station 1 fixture
(2 “rotisserie” stations) with Leica & 2 men augmented with 3 technicians if needed
– Install VVSA external components (Diagnostic Coils, Cooling Tubes, Thermocouples) Laser or Romer
• Tooling Checks and Metrology Training 5/15/06 – • FP#1 6/30/06 – 5/3/07• FP#2 (VVSA #3) 9/30/06 – 8/31/07 • FP#3 (VVSA #2) 8/1/06 – 1/17/08
October 12, 2006 NCSX Field Period AssyPeer Review
M. Viola 12
NCSXField Period Assembly Operations
• Station 2 Schedule (3 Coil preassembly)– Perform crude prefit – any gross interferences
& Tooling checkout 10/30/06 – 6/19/07– Perform prefit – shim and alignment– Align and Assembly Laser Tracker
• Tooling checks 10/5/06 – 3/4/07• FP#1 3/5/07 – 9/6/07 • FP#2 9/7/07 – 11/15/07• FP#3 11/16/07 – 1/31/08
October 12, 2006 NCSX Field Period AssyPeer Review
M. Viola 13
NCSXField Period Assembly Operations
• Station 3 Schedule (Coils onto VVSA) (Laser Tracker or Internal GPS)– Align and Assembly 2 coil three packs
• Tooling checks 7/31/07 – 8/27/07• FP#1 9/7/07– 10/4/07• FP#2 11/16/07 – 12/10/07• FP#3 2/1/08 – 2/21/08
– Align and Assembly Coils onto VVSA• Tooling checks 7/31/07 – 8/27/07• FP#1 8/28/07– 11/7/07• FP#2 11/8/07 – 1/16/08• FP#3 1/17/08 – 4/7/08
October 12, 2006 NCSX Field Period AssyPeer Review
M. Viola 14
NCSXField Period Assembly Operations
• Station 4 Schedule (TF Coils) Laser• Align and Assembly TF Coils
• Tooling checks 10/4/07 – 11/14/07• FP#1 11/15/07 – 1/15/08 • FP#2 1/16/08 – 2/19/08 • FP#3 2/20/08 – 6/3/08
October 12, 2006 NCSX Field Period AssyPeer Review
M. Viola 15
NCSXField Period Assembly Operations
• Station 5 Final Assembly Schedule in NCSX Test Cell to enhance efficiency and reduce HP overhead (Weld ports, Install TF Coils, Leak Check, Final metrology)– Align and Assembly Laser Tracker and Laser
on Target for port welding• Tooling checks 9/14/07 – 10/4/07 • FP#1 11/8/07 – 4/4/08 • FP#2 1/17/08 – 5/20/08 • FP#3 4/11/08 – 7/11/08
October 12, 2006 NCSX Field Period AssyPeer Review
M. Viola 16
NCSXField Period Assembly Operations
• To Conclude– Assembly operations are considered
conceptual and will be tested out prior to actual work is performed.
– Our best technicians are assigned to these FPA tasks.
– Reasonable time is allocated to perform FPA
October 12, 2006 NCSX Field Period AssyPeer Review
M. Viola 17
NCSXAnd if all else fails
We found this guy