Fieldbus RoadmapFieldbus Roadmap

NeSSI WorkshopMay 5, 2005

NeSSI WorkshopMay 5, 2005

Enterprise Data LayersEnterprise Data Layers

Company Management Data Presentation

Company Management Information

Company Production Assignment Scheduling

Supervision

Company Production Scheduling Assignment

Operational & Production Supervision

Production Scheduling & Operational Management

Supervisor’s Console Inter-Area Coordination

Supervisor’s Console Supervisory Control

Operator’s Console Direct Digital Control

Level 5

Level 4

Level 3

Level 2

Level 1

Controllers

Process

IT S

ecur

ity P

olic

ies

and

Pra

ctic

es(I

SO

177

99)

Mfg

Se

cu

rity

Po

lic

ies

an

d P

rac

tic

es

(IS

A 9

9)

Common technologies, policies and

practices

Pro

cess

Saf

ety

(IS

A 8

4,

IEC

615

08,

IEC

615

11)

Purd

ue re

fere

nce

Mod

el L

evel

s

Safety Critical

H1

HS

E

Eth

ern

et

Fieldbus TodayFieldbus Today

H1 Devices available> 500,000 devices installed > 4,000 systems

Layers 0 and 1 of enterpriseHigh Speed Ethernet (HSE) products within last year+Flexible Function Block

H1 Devices available> 500,000 devices installed > 4,000 systems

Layers 0 and 1 of enterpriseHigh Speed Ethernet (HSE) products within last year+Flexible Function Block

Physical LayerPhysical Layer

FF-831 in 2004 to certify Power Supplies/Conditioners

Additional Standards in development

Variety of connection types availableTerminalPlugNew smaller form factors in development

Ohm’s Law will impact distances

FF-831 in 2004 to certify Power Supplies/Conditioners

Additional Standards in development

Variety of connection types availableTerminalPlugNew smaller form factors in development

Ohm’s Law will impact distances

Under DevelopmentUnder Development

Safety BusApply Fieldbus in Safety Systems

EDDLGraphical and archival support

Safety BusApply Fieldbus in Safety Systems

EDDLGraphical and archival support

Fieldbus for Safety Instrumented Systems (FF-SIS)Fieldbus for Safety Instrumented Systems (FF-SIS)

End User Initiated Project – Approved October 2002Based on the IEC 61508 International StandardProtocol Supports SIL 2 and 3 ApplicationsCentralized and Distributed Logic Solver Options

Reduces Total Cost of Ownership for SIS CAPEX - Hardware, Footprint, Commissioning, PowerOPEX - Advanced Diagnostics, Reduced Test Interval

Improves Asset Management Information for FF-SIS and Non-SIS Devices Available

End User Initiated Project – Approved October 2002Based on the IEC 61508 International StandardProtocol Supports SIL 2 and 3 ApplicationsCentralized and Distributed Logic Solver Options

Reduces Total Cost of Ownership for SIS CAPEX - Hardware, Footprint, Commissioning, PowerOPEX - Advanced Diagnostics, Reduced Test Interval

Improves Asset Management Information for FF-SIS and Non-SIS Devices Available

IEC 61158 - PHY

IEC 61158 - FMSIEC 61158 - FASIEC 61158 - DLL

IEC 61804

Black ChannelNo Change to H1

Same DD as H1

FF-SISExtensions

Developed usingIEC 61508

FF-SIS StandardizationFF-SIS Standardization

• New Function Blocks for SIS Applications – FBAP Part 6• New FBAP diagnostics detect application faults and appropriate action can be taken without human intervention.

• New Function Blocks for SIS Applications – FBAP Part 6• New FBAP diagnostics detect application faults and appropriate action can be taken without human intervention.

IEC 61508

IEC 61508

Black Channel

SIS User Layer ExtensionsSIS User Layer Extensions

New SIS Function Blocks &

Function Block Diagnostics

Operation Engineering

Proprietary Network

SIS Logic

Hardwired

H1

Operation EngineeringTotal Asset Management

HSE

SIS FF Devices

SIS – Open Fieldbus SolutionSIS – Open Fieldbus Solution

Linking Device

H1

Non-SIS FF Devices

Linking Device

EthernetSwitch

. . . .

SIS_DI

SIS_AVTR

SIS_DO

Write Lock (WL)

S

SIS_WL

SIS_AI

SIS_RB

SIS_WL

SIS_AI

SIS_RB

SIS_WL

SIS_AI

SIS_RB

SIS_WL

SIS_RB

Example SIS Application Analog 2 out of 3 Voter Example SIS Application Analog 2 out of 3 Voter

SIS Development Schedule

2002 4Q FF Board of Director Approval for SIS Project

2003 1Q Project Kickoff Meeting 2Q Architecture Completed 3Q Draft Preliminary Specifications (DPS) Version 0.4 4Q TÜV Concept Approval for SIS

2004 1Q DPS Version 0.5 External Review 2Q DPS Version 0.9 3Q DPS Version 1.0, Develop Lab Test Tools and Lab Prototypes 4Q Begin Specification Validation Lab Testing @ Infraserv in Frankfurt

2005 – Release Final SIS Specifications and Final TÜV Type Approval 2006 – First Safety-Certified, FF-Registered Devices

Electronic Device Description Language (EDDL)Electronic Device Description Language (EDDL)

IEC 61804 Function Blocks (FB) for Process Control

Part 1: Overview of system aspectsPart 2: Specification of FB concept and Electronic Device Description Language (EDDL)

Covers DDL used in the FOUNDATION™ fieldbus, HART® and Profibus communication protocolInternational Standard in March 2004

IEC 61804 Function Blocks (FB) for Process Control

Part 1: Overview of system aspectsPart 2: Specification of FB concept and Electronic Device Description Language (EDDL)

Covers DDL used in the FOUNDATION™ fieldbus, HART® and Profibus communication protocolInternational Standard in March 2004

EDDL BenefitsEDDL Benefits

Established – millions of devices worldwideSystem Independent (including OS)A single EDD for all hostsRobust Revision ControlTesting and RegistrationInternational StandardUniformitySupported by major suppliersBackward compatiblePreserves investments

Established – millions of devices worldwideSystem Independent (including OS)A single EDD for all hostsRobust Revision ControlTesting and RegistrationInternational StandardUniformitySupported by major suppliersBackward compatiblePreserves investments

EDDL Cooperation Project EDDL Cooperation Project

Extension to the IEC 61804-2 International Standard

Operating System & Communication Protocol Independent

No Changes to Existing Device Descriptions

Protects Investment in DD-based Devices, Tools & Training

Single Technology for Suppliers and End Users

Reduces Device Development Time & Development Cost

Improves Asset Management Capability

Extension to the IEC 61804-2 International Standard

Operating System & Communication Protocol Independent

No Changes to Existing Device Descriptions

Protects Investment in DD-based Devices, Tools & Training

Single Technology for Suppliers and End Users

Reduces Device Development Time & Development Cost

Improves Asset Management Capability

MOTORSYMMETRY

MOTOR PARAMETERS

New EDDL ExtensionsNew EDDL Extensions

WindowsDialog BoxesGroupingPagingImagesMultiple Languages

Enhanced Enhanced VisualizationVisualization

Blue line is a reference retrievedvia FILE and ARRAY

Travel (From device)

Setpoint (Stored)

New EDDL ExtensionsNew EDDL Extensions

Plot real time device data.

Valve Step Response Diagnostics

Charts!Charts!

Radar Level Gauge Calibration

Echo Curve

Filter

New EDDL ExtensionsNew EDDL Extensions

Plot static device data, persisted data, calculated data, etc.

GraphsGraphs

Blue line is a reference retrievedvia FILE and ARRAY

Open Stroke

Close Stroke

New EDDL ExtensionsNew EDDL Extensions

Valve Signature

Plot current and archived (persisted) data

GraphsGraphswith with persistent persistent datadata

FF EDDL ProductsFF EDDL Products

DD Services v5 for Host ApplicationsDD Tokenizer v5 for Device DevelopersDD “Super” Viewer with full extension support (Development Support)Testing and Registration supported with Interoperability Test Kit (ITK) 5 (4Q2005)

DD Services v5 for Host ApplicationsDD Tokenizer v5 for Device DevelopersDD “Super” Viewer with full extension support (Development Support)Testing and Registration supported with Interoperability Test Kit (ITK) 5 (4Q2005)

EDDL Phase 2EDDL Phase 2

Work is UnderwayCooperation with OPC

Support for UA (Universal Architecture)Platform independent

Additional capabilitiesBetter history supportImproved flexibility

Input to Fieldbus Foundation via End User Advisory Council

EUAC@fieldbus.org

Work is UnderwayCooperation with OPC

Support for UA (Universal Architecture)Platform independent

Additional capabilitiesBetter history supportImproved flexibility

Input to Fieldbus Foundation via End User Advisory Council