Fixed press-container,
where to the fixed installed press join interchangeable container with volume 30 cubic meters
Forcing compaction 1:5/7 (for dry waste)
Waste transportation using press-compactors
Waste transportation using bulk-refuse containers, volume 8-35 cubic meters
• For gathering and transportation oversized, building and industrial wastes large-sized containers in volume 8, 12, 15, 20, 25, 30, 35 m cubic which are established in territory of the client are used. It allows to use more rationally territory and to optimise transport costs at export of a waste.
Special motor transport and containers park for separate collection and waste
transportationFor introduction of separate gathering of a waste special containers in volume from 1, 1 to 3,5
m cubic, established on container platforms with a coloring by kinds of a waste are used
Mobile waste sorting and crushed complexesThe collected waste is sorted on mobile sorting complexes where are selected paper for recycling, polymers, metals, glass, and also combustible fractions which can be used as alternative fuel. The rests of the sorted waste (not utilised) dumps on landfill
.
The scheme of technological equipment producing electric and heat energy from
biomass and sorted waste (alternative fuel), developed by “Ukrspetstechnologii”
Corporation
Rest in ash Actually EPA
Barium 100 mg/l 0.37 mg/lCadmium 1 mg/l 0.10 mg/lPlumbum 5 mg/l 0.58 mg/lArsenic 5 mg/l 0.05 mg/lSelenium 1 mg/l 0.05 mg/lChrome 5 mg/l 0.01 mg/l4-methylpenthanol 7 mg/l 2.0 mg/lBenzol 0.5 mg/l 0.1 mg/lBenzol. N/A 170.0 mg/lOctanPhitalat N/A 4 mg/l
Ash contentAsh content, , formed in the process of burning of formed in the process of burning of alternative fuelalternative fuel
Ash contentAsh content, , formed in the process of burning of formed in the process of burning of alternative fuelalternative fuel
Emission Norm Actually
Macron 0.080 g 0.051gCO(carbon monoxide) 50 ‰ 1 ‰SO2 (sulfur dioxide) 150 ‰ 24 ‰HCI (hydrogen chloride) 50 ‰ 6 ‰NOX (nitrogen oxides) 200 ‰ 68 ‰
Levels of emissions in smoke gases at burning of Levels of emissions in smoke gases at burning of alternative fuelalternative fuel
Levels of emissions in smoke gases at burning of Levels of emissions in smoke gases at burning of alternative fuelalternative fuel
Necessary infrastructure for perfection of system of the waste management,
building and operation of the power generating enterprise
Necessary infrastructure for perfection of system of the waste management,
building and operation of the power generating enterprise
•The ground area (25 hectares) for placing of the transport-industrial complex of power generating enterprises and landfill for dumping of solid domestic waste.
•Transport and engineering communications: presence of roads with a firm covering, systems of water supply and a drainage system, electric mains
.
We are ready to any kind of mutually advantageous
cooperation – as in the field of technological decisions and questions of financing and operation of the given project