FORCE DRAFT HEAT EXCHANGER AIR COOLER INSTALLATION

Preview:

Citation preview

1

2

3

4

5

6

7

8

9

10

11

12

13

Plenum Chamber assembly prior to structure Erection completion.

14

15

16

17

18

19

20

21

22

23

24

25

Tube bundle Erection

All structure bolts torque inspection to be done.

Structure top surface fire proofing inspection to be done .

Structure bottom base plate grouting, curing and anchor bolt torque inspection to be completed.

Tube bundle internal connecting beam bolt torque inspection to be completed.

26

27

Structure bottom base plate grouting, curing and anchor bolt torque inspection to be completed.

28

Tube bundle internal connecting beam bolt torque inspection to be completed.

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

Prepared by; M.Balasubramanian Assist Superintendent Mechanical, Tank farm P-6 SATORP.

Recommended