FUEL MANAGEMENT TECHNOLOGIES VR Refiner introduction VIDEO presentation

Preview:

DESCRIPTION

FUEL MANAGEMENT TECHNOLOGIES VR Refiner introduction VIDEO presentation. P.V. valve. Stage 1 Connector. Vent Manifold. Delivery Connection Point. Delivery Pipes. Vent Pipes. Pipes System from Other Tanks. Vents and Delivery Points ( no pump pipes are present in this graphic ). 95. - PowerPoint PPT Presentation

Citation preview

FUEL MANAGEMENT TECHNOLOGIESVR Refiner introduction

VIDEO presentation

95

Vents and Delivery Points

(no pump pipes are present in this graphic)

P.V. valve

Stage 1 ConnectorVent Manifold

Vent Pipes

Delivery Connection PointDelivery Pipes

Pipes Systemfrom Other Tanks

95

VR Refiner Installation

P.V. valve

Stage 1 ConnectorVent Manifold

Vent Pipes

Delivery Connection Point Pipes

Pipes Systemfrom Other Tanks

95

VR Refiner Installation

Connect the Unit between Vent Manifold and Vent Stack

95

VR Refiner Installation

Connect the Unit between Vent Manifold and Vent Stack

95

VR Refiner Installation

Connect the Unit between Vent Manifold and Vent Stack

95

VR Refiner Installation

Connect the Unit between Vent Manifold and Vent Stack

95

VR Refiner Installation

Connect Petrol Return Line and Power & Communication

380v 5Kw IP address

95

VR Refiner READY TO WORK

380v 5Kw IP address

95

VR Refiner Operation

Truck tanker connects fuel delivery hose & vapour return

hose as normal

380v 5Kw IP address

95

VR Refiner Operation

Truck tanker connects fuel delivery hose & vapour return

hose as normal

380v 5Kw IP address

VR Refiner Operation

The tanker begins delivery to the UST and displaced

vapours proceed to the VRR

380v 5Kw IP address

95

VR Refiner Operation

The tanker begins delivery to the UST and displaced

vapours proceed to the VRR

380v 5Kw IP address

95

VR Refiner Operation

VRR processes the Vapours recovering the Petrol

380v 5Kw IP address

95

VR Refiner Operation

The tanker completes the delivery process, the site UST

is full

380v 5Kw IP address

95

VR Refiner Operation

VRR completes the Vapours Processing and stores the fuel

380v 5Kw IP address

95

VR Refiner Operation

When VRR tank reaches a set volume the recovered Petrol

is returned to the UST

380v 5Kw IP address

95

VR Refiner Operation

The system reads VRR tank volume and communicates

data to management

380v 5Kw IP address

95

380v 5Kw IP address

95

VRR Data monitor, shows the accumulated volumes and results

VR Refiner

Converts Petrol Vapours to Petrol Liquid for Duty Free

resale

380v 5Kw IP address

95

Fuel Management Technologies Ltd3 Broughton Business CentreCauseway Road, BroughtonCambridgeshire PE28 3ARUnited Kingdom

Fuel Management Technologies S.L.Av. Diagonal 566, 408021 BarcelonaCatalonia Spain

info@vrrefiner.com www.vrrefiner.com

Recommended