GALILEO - navnin.nl · EGNOS first mission: provide GPS integrity in Europe. Evolutions of EGNOS:...

Preview:

Citation preview

1Slide 1

GA

LILE

O

GALILEO

Directorate General of Energy and Transport

European Commission

2Slide 2

GA

LILE

OGALILEO DEFINITION

PHASE RESULTS

3Slide 3

GA

LILE

O

International negotiations

Security requirements

Users requirements

PPP

GalileoOverall Architecture

GalileoSat

Pre

limin

ary

inpu

ts fr

om G

NS

S-2

For

um,

Gal

ileo

Com

mun

icat

ion,

ES

A s

tudi

es, e

tc.

Rep

ort t

o E

U a

nd E

SA

Cou

ncils

Definition Phase

EGNOS integration

DEFINITION PHASE ACTIVITIESDec 99 Dec 2000

Search & Rescue

4Slide 4

GA

LILE

O GALILEO SERVICES

5Slide 5

GA

LILE

OPosition accuracy and integrity

1.E-09

1.E-08

1.E-07

1.E-06

1.E-05

1.E-04

1.E-03

1.E-020.001 0.01 0.1 1 10 100 1000

Inte

grity

Ris

k /h

r

specialist professionaltransport

high volume

TrainControlTrack survey Harbour

DockingSpace Docking

6Slide 6

GA

LILE

OKey performance needs

– Accuracy:• 50% of applications are satisfied by~4 m,

• 80% of applications satisfied by~1 m.

– Availability:• 30% of applications are satisfied by99%,

• 80% of applications are satisfied by99.9%.

– Integrity:• 35% of applications are satisfied byan integrity

risk/hour of 1x10-4,

• 90% of applications are satisfied byan integrity risk/hour of 1x10-6.

7Slide 7

GA

LILE

O MissionRequirements

•User needs•Cost/Benefits analysis•Security requirements•Safety requirements

•Standard Issues

•Interfaces issues•International issues

•Legal & Institutional issues•Frequency Issues

•PPP objectives

Overviewof MissionRequirements

GALILEO Requirements

GALILEO Global, Regional & Local Components

User Terminal

SIS ICD & MOPS

Othersystems

8Slide 8

GA

LILE

O

GALILEO ARCHITECTURE

9Slide 9

GA

LILE

OGALILEO ARCHITECTURE (1/2)

� Constellation: 30 MEOs (“Walker 27/3/1 + 3 in-orbit spares”)� Best solution in terms of robustness, performance

homogeneity including northern lattitudes� Global Navigation Service including integrity.

� Ground Integrity Channel concept.� World-wide coverage disseminated through

MEO broadcast� Galileo and GPS/(GLONASS) satellites

integrity� Channels available for non-European

States/Regions wishing to generate their own integrity information (up to 8)

10Slide 10

GA

LILE

OGALILEO ARCHITECTURE (2/2)

� Local Componentsinvestigated for various types of applications� Mandatory for some applications performances� Multimodal use enhancement

� User Segment� User Segment concept covering hybridisation, use of

other systems and use of GPS/GLONASS.� Design to cost approach to be implemented during the

development phase to ensure the competitiveness on the user market

� SAR serviceImplementation� RAMS and Security analyses to comfort the design

choices in the early steps of the design phase

11Slide 11

GA

LILE

OGALILEO OVERALL

ARCHITECTURE

User Terminal

Global Component

IntermediaryService Provider

Local Component

Regional Components

outsideEurope

externalsystems

othersensors

Signal In Space

Service Customer

ExternalEntities

• Time-Ref.UTC

• Geo-Ref.ITRF

ExternalSystems

• mod. GPS• Glonass• LORAN-C• ...

Galileo SAR

System Administration and Operation

SAR

12Slide 12

GA

LILE

OLOCAL COMPONENTS

• Implementation of Local Components

– Galileo System design• Local Components as integral part of the Galileo

System• LC service will be provided by Galileo Service Centres

– External Service Provider• use Galileo global SIS (e.g. Open service)• can be part of a package to provide value added

services

• Local Component Techniques• Differential Satellite Positioning Techniques• Ground Based Integrity Monitoring • Ground Based Ranging Sources (Pseudolites)

13Slide 13

GA

LILE

OEGNOS first mission: provide GPS integrity in Europe.

Evolutions of EGNOS:

EGNOS mission and future evolution.

1 Integration into GALILEO. 2 Adaptation to the GPS modernisation.

3 Extensions outside Europe.

Preliminary assessment

in the definition phase.

Will have to be harmonised with the provision of a global service by GALILEO.

Applying the European 2 steps approach outside Europe.

14Slide 14

GA

LILE

OA vision for services evolution: 3 phases.

Phase 1

2003 2008

EGNOS service (GEO)

GALILEO+ EGNOS services

(MEO and GEO)

GALILEOservices (MEO)

Long term

Phase 2 Phase 3

2015

GALILEO & GPS integrity by MEO

This transition plan will be flexible to accommodate long term market demands and user needs.

~

15Slide 15

GA

LILE

O

GALILEO MARKET

&

COST BENEFIT ANALYSES

16Slide 16

GA

LILE

OMarketsMarketsMarketsMarkets User User User User ForaForaForaFora

ServicesServicesServicesServices

ArchitectureArchitectureArchitectureArchitecture

CostsCostsCostsCosts

•Strategic goalsStrategic goalsStrategic goalsStrategic goals

•SocioeconomicSocioeconomicSocioeconomicSocioeconomic

•RevenuesRevenuesRevenuesRevenues

EC CBA

17Slide 17

GA

LILE

OEuropean GNSS Market

2005

Car Navigation23%

Mobile Phones73%

Aviation1%

Fleet Mgt1%

Augmentation1%Leisure

1%Surveying1%

Market Size €6Bn

18Slide 18

GA

LILE

OGlobal GNSS Market Size

0

500

1,000

1,500

2,000

2,500

3,000

2000 2005 2010 2015 2020

Galileo Share

19Slide 19

GA

LILE

O

GPS alone: 55% urban coverage

GPS+GALILEO: 95% urban coverage

GALILEO: liability and

guarantee on quality of service

GALILEO: certification for Safety of Life

GALILEO: local elements

etc.

GALILEOGALILEOGALILEOGALILEO discriminatorsdiscriminatorsdiscriminatorsdiscriminators

20Slide 20

GA

LILE

OOVERALL PROGRAM COSTS

� B€ 3,25B overall programme cost over 2000-2007

� Development and validation phase : B€ 1,1

� Deployment phase : B€ 2.15

� B€ 3,25B overall programme cost over 2000-2007

� Development and validation phase : B€ 1,1

� Deployment phase : B€ 2.15

DEVELOPMENT AND

DEPLOYMENT

COSTS

DEVELOPMENT AND

DEPLOYMENT

COSTS

� assessed M€ 220

yearly beginning in 2008

� assessed M€ 220

yearly beginning in 2008

RECURRING

COSTRECURRING

COST

� € 80 M

(EC and ESA)� € 80 M

(EC and ESA)

DEFINITION PHASE

COSTDEFINITION PHASE

COST

21Slide 21

GA

LILE

O2001-2005 2006-2007 2010 2015 2020

Annual averages

Net user benefits 0 0 1,990 4,740 7,630

GALILEOGALILEOGALILEOGALILEO BenefitsBenefitsBenefitsBenefits totototo UsersUsersUsersUsers

New Services:

- Aviation, - Rail, - S&R, - Inland waterways, - Robotics, etc.

Complementary GPS + GALILEO:

- Route guidance for all road vehicles, - Advanced road driver assistance, - Land survey,- GIS mapping, etc.

22Slide 22

GA

LILE

O

Validation and Development

Phase

23Slide 23

GA

LILE

OGeneral Roadmap Logic

2001 2002 2003 2004 2005

Mission Doc.

System Doc.

GALILEO Consolidation Development and validation

5th Framework Prgm

6th Framework Prgm

+ Important milestones :

System Test bed availability,

• World RadioConference (WRC-2003)

• Flight model(s) availability

• EGNOS availability

• Agency

• International discussions, Enlargement

24Slide 24

GA

LILE

ODevelopment and Validation:

• Consolidation of Mission and System requirements

• Components, Equipment, subsystem and

system developments for

• Space Segment

• Ground Segment

• Local Elements prototyping and

wide scale demonstration

• Generic Receivers development

• Early positioning, navigation and timing marketing

• Mapping and Synergy with other systems (GMES)

• European Radionavigation Plan

• Enlargement

25Slide 25

GA

LILE

ODevelopment and Validation:

• Maximum use of Ground simulations

• Early experiments on a test satellite (till 2003)

- Atomic clocks

- Signal Characteristics

• First flight model launch: 2005

• Constellation deployment: 2006

• Progressive services provision

• General service

• Commercial service

• Public service

26Slide 26

GA

LILE

O

GALILEO

Studies Activities

27Slide 27

GA

LILE

O1. Local Elements Definition

AM, 18 months, mid-2001

2. Impact of Interoperability on system

definition

AM, 18 months, end-2001

3. Frequencies allocation and protection,

Certification and Standardisation

AM, 36 months, end-2001

4. Development and optimal use of satellite

navigation for all modes of transport

SC, 36 months, end-2001

5. Detailed Service Analysis

Sub-Task 1: AM, 36 months, mid-2001

Sub-Task 2: SC, 36 months, mid-2001

6. Legal, Institutional and Regulatory

framework

AM, 24 months, end-2001

1 Local

2 Interoperability

3 Freq. Std. Certif.

4 Pilot projects

5 Services

6 Framework

AM: Accompanying Measure

SC: Shared Costs

28Slide 28

GA

LILE

O2001 2002 2003 2004 2005

Mission

System

GALILEO Consolidation Development and validation

1- Local elements

2- Interoperability

3- Freq., Std, Certif.

4- Pilot projects

5- Services

6- Framework

Fifth Framework Program: Roadmap Logic

29Slide 29

GA

LILE

O

EuropeanEuropeanCommiss ionCommiss ion

ESTBReference station

ESTBProcessing Facil ity

NLES

Hartebeeshoek(South Africa)

Kourou(French Guyana)

AOR-EIOR

EEGNOS System Test Bed (ESTB)GNOS System Test Bed (ESTB)

Ready for Application DemonstrationsReady for Application Demonstrations

to be complemented with Mediterranean Test Bed - MTB

Recommended