GOES-R Proving Ground OCONUS Meeting
Network Upgrades and Data Flow Questions
Eric Lau
NWS Pacific Region
May 2015
NWS Pacific Region
2
3
Oahu, Hawaii – NWS and Partners
PTWC
Ford Island JTWC
HCC
NWS PRH
UH, WFO Honolulu/CPHC
Waikiki
Satellite Farm
4
Ford Island Inouye Regional Center(IRC)
5
IRC Rooftop Antenna Farm
Rooftop shelter 2.4 meter L/X Band
antenna5/30/2015
3.7 meter Himawari antenna
8/26/2015
3.7 meter GRB Antenna
11/4/2015
3.7 meter Himawari antenna 10/30/2015 WFO Guam
2.4 meter L/X Band antenna TBD. WFO Guam
Pacific Region’s Network Getting Better
Himawari Dissemination
Integrated Dissemination Project (IDP) Ground Readiness Project (GRP)
• The IDP was kicked off to ensure optimizations at NWS field offices by providing sufficient network bandwidth. • WFO Guam upgraded to 100 Mbps (from 2 T-1s) • WFO Honolulu will be upgraded to 250 Mbps (from 4 T-1s)• American Samoa will utilize satellite upgraded to 10 Mbps (from 384K) • Pacific Region HQ will be upgraded to 250 Mbps
• The GRP was kicked off to ensure NWS has the ability to ingest/utilize next generation satellite data. • Himawari direct read out station at IRC (September)• Himawari direct read out station at WFO Guam (October)• GOES-R direct read out station at IRC (November)• L/X Band polar direct read out station at WFO Guam (TBD)
8
How are we going to get this data into AWIPS?
• Propose to install at satellite processing server on the LDAD DMZ to bypass the legacy LDAD /data/Incoming process. •Need to find a baseline method to standardize ingest of direct readout data into AWIPS. • Pacific Region in process of procuring this server.
9
Mahalo and Aloha!