Hall C Users Meeting SHMS Structure Installation A pictorial review

Preview:

DESCRIPTION

M. Fowler Hall C Users Group, 2014. Hall C Users Meeting SHMS Structure Installation A pictorial review. Mike Fowler Hall C Engineering 21 Feb 2014. M. Fowler Hall C Users Group, 2014. August 2013. - PowerPoint PPT Presentation

Citation preview

Hall C Users MeetingSHMS Structure Installation

A pictorial review

Mike FowlerHall C Engineering

21 Feb 2014

M. Fowler Hall C Users Group, 2014

August 2013

M. Fowler Hall C Users Group, 2014

Structure assembly well underway

8 August 2013

M. Fowler Hall C Users Group, 2014

Back almost complete

14 August 2013

M. Fowler Hall C Users Group, 2014

Magnet wings go on

19 August 2013

M. Fowler Hall C Users Group, 2014

Beamline wall goes up

21 August 2013

M. Fowler Hall C Users Group, 2014

Structure assembly well underway

30 August 2013

M. Fowler Hall C Users Group, 2014

Platform pads are in

9 September 2013

M. Fowler Hall C Users Group, 2014

Sitting on wheels

12 September 2013

M. Fowler Hall C Users Group, 2014

Structure complete, concrete forming started

19 September 2013

M. Fowler Hall C Users Group, 2014

Forms taking shape

23 September 2013

M. Fowler Hall C Users Group, 2014

Rebar arrives

27 September 2013

M. Fowler Hall C Users Group, 2014

Ready to pour floor

27 September 2013

M. Fowler Hall C Users Group, 2014

New floor

30 September 2013

M. Fowler Hall C Users Group, 2014

Wall forms begin to go up

15 October 2013

M. Fowler Hall C Users Group, 2014

First wall pour

28 October 2013

M. Fowler Hall C Users Group, 2014

Second wall pour

29 October 2013

M. Fowler Hall C Users Group, 2014

Beamline wall form goes up

1 November 2013

M. Fowler Hall C Users Group, 2014

Beamline wall pour

6 November 2013

M. Fowler Hall C Users Group, 2014

Forms begin to come down

7 November 2013

M. Fowler Hall C Users Group, 2014

Pretty new walls

25 November 2013

M. Fowler Hall C Users Group, 2014

Boron concrete pour

2 January 2014

M. Fowler Hall C Users Group, 2014

Boron concrete forms come down, roof started

21 January 2014

M. Fowler Hall C Users Group, 2014

Swing door poured, roof forming progressing

27 January 2014

M. Fowler Hall C Users Group, 2014

Utility platform begins

6 February 2014 Transfer line goes up

M. Fowler Hall C Users Group, 2014

Today

M. Fowler Hall C Users Group, 2014

Platform up, roof blocks poured

Additional reading at:

CONCRETEPRODUCTS.COM

M. Fowler Hall C Users Group, 2014

Video

M. Fowler Hall C Users Group, 2014

http://www.youtube.com/watch?v=w4Q7izUnXU0

YouTube

By: Walt Akers

M. Fowler Hall C Users Group, 2014

To Be Done Door hingeTarget platformLead in the hutComputer floorPower suppliesUtilitiesCryoHVACDetectors &MAGNETS