Hampton Roads Bridge-Tunnel Expansion Project
DBE/SWaM Opportunity EventSeptember 11, 2019
2
Introduction- Our Team: Hampton Roads Connector Partners (HRCP)
HRBT Expansion Project Overview- Scope- Benefits- Timeline and Milestones
Public Outreach
Small Business Opportunity
Q&A Session
2
Presentation Outline
3
3
Our Team
4
First Hampton Roads Bridge-Tunnel (current westbound tunnel) opened in November 1957
Eastbound tunnel opened in November 1976
December 2016 - Commonwealth Transportation Board approved expansion of the Hampton Roads Bridge-Tunnel
4
The Hampton Roads Bridge-Tunnel
5
55555555
Hampton Roads Transportation Fund to fund 95 percent of the project
Monies raised through regional gas and sales taxes
Other project funding includes $200 million from the Commonwealth’s SMART SCALE program
$108 million from VDOT to fund replacement of the Norfolk Side Trestle Bridges in Norfolk
5
HRBT Expansion ProjectProject Funding
6
6
Comprehensive Agreement between Commonwealth of Virginia and Hampton Roads Connector Partners (HRCP) signed in April 2019
HRCP CJV Partners: Dragados, VINCI Construction, Flatiron Constructors, Dodin Campenon Bernard
Expansion is a design-build project
Designers: HDR and Mott MacDonald
Project Cost: $3.8 Billion
HRBT Expansion Project The Current Design-Build Project
7
77
HRBT Expansion Project Project Benefits
Ease major congestion
Enhance travel time reliability
Support emergency evacuation
Improve safety
Increase capacity
Update transportation management systems
7
8
888
This is the fourth bored roadway tunnel project in the U.S.
Twin two-lane tunnels to be built west of existing eastbound tunnel (Navy side) to carry all eastbound traffic
Existing eastbound tunnel and current westbound tunnel will accommodate all westbound traffic upon project completion
Diameter of each new tunnel: approx. 45 feet (second largest tunnel opening for a Tunnel Boring Machine in North America)
8
HRBT Expansion ProjectAbout the Tunnels
9
9999
HRBT Expansion ProjectThe North Island
North Island Expansion Work (purple shaded area)
Legend:
General Purpose Lane
HOT Lane
Part Time Shoulder HOT Lane
10
1010101010Illustration of twin bored-tunnels between North and South Islands
HRBT Expansion ProjectThe Tunnels Section
Tunnel Boring Machine will launch first from the South Island and bore toward North Islandand then turnaround and bore toward the South Island
NORTH
ISLAND
SOUTH
ISLAND
11
111111111111
HRBT Expansion ProjectThe South Island
South Island Expansion (purple shaded area) and New South Trestle
Legend:
General Purpose Lane
HOT Lane
Part Time Shoulder HOT Lane
12
121212121212
Two lanes of traffic to be maintained in both eastbound and westbound directions
Pre-positioned wrecker service along the project 24 hours/day
Active public outreach campaigns throughout duration of project
12
HRBT Expansion ProjectMitigating Traffic Impacts
During Construction Phase
13
13131313131313
2019 2020 2025
Anticipated JPA Approval Date= NTP
540 days (18 months) after LNTP1= October 2020
2021 2022 2023 2024
Design and Investigation Works for Environmental Permitting
LNTP 3
LNTP2 + LNTP39 months after LNTP 1
= January 2020
Substantial Completion
06/30/25
LNTP3 : Launching Pit Construction to start
Permanent Works over 55 months
6 MONTHS OF SCOPE VALIDATION
LNTP 2 LNTP2 : Authorization for TBMProcurement
Contractual - Substantial Completion Deadline 09/01/25
Contractual - Final CompletionDeadline 11/01/25
Interior Works Tunnels
Commissioning and Testing North & South Marine Trestles
Land Works I-64 Widening
Launch & Receiving pit ready for TBM
TBM Assembly and Mining
13
HRBT Expansion ProjectThe Project Timeline
Contract Execution + LNTP1
04/15/19
LNTP 1
Current
Status
14
14141414141414141414
PUBLIC OUTREACH
VDOT has participated in more than 65 public outreach events about the HRBT Expansion Project since May 2017
HRCP has begun coordinating activities with City officials (Public Works, Emergency Services)
Will continue throughout life of project
Tunnel Boring Machine naming contest to include local school-age children 14
HRBT Expansion ProjectPublic Outreach
DBE/ SWaM Opportunities
DBE/SWaM Opportunity EventSeptember 11, 2019
16
161616161616161616o DBE (Disadvantaged Business Enterprise)· 12% Project Goal
16
HRBT Expansion ProjectSmall Business Opportunities: Project Goals
o SWaM (Small, Women and Minority-Owned Business)· 20% Project Goal
17
171717171717171717
HRCP-sponsored DBE/SWaM outreach events
Participation in VDOT and other community partner outreach events
Multi-tier DBE/SWaM opportunities DBE/SWaM-specific opportunities Break scope packages into
appropriate smaller packages to provide more opportunities and maximize participation.
HRCP Team adheres to all Federal, State and City regulations in order to provide a comprehensive DBE/SWaMcompliance program on the project.
Document all Good Faith Efforts taken to achieve the goal.
17
HRBT Expansion ProjectSmall Business Opportunities: Approach
18
181818181818181818
o Geotechnical Innovation PLLC (Gti)o Fishburne Drilling, Inc. o Air Water & Soil Laboratories, Inc.o 10 10 LLC DBA MinuteMan Presso iCivil, Inc.o Straughan Environmentalo Business Interiors & Moving Serviceso A-1 Environmental Services, Inc.
18
HRBT Expansion ProjectSmall Business Opportunities: Current Firms
o TreKnot Organization LLCo Uptime Solutions Professional Services
Group, Inc.
o NET100, Ltd.o Harris Miller Miller & Hanson Inco Coastal Resources, Inc.o Mid-Atlantic Drilling, Inc.o Precision Measurements, Inc.
36 DBE/SWaM Firms Already Participating
19
191919191919191919
o Bryant Ritter Electrical Corp.o Chesapeake Environmental
Communicationso A&A Consultants, Inc.o Froehling & Robertson, Inc.o REMSA, Inc.
19
HRBT Expansion ProjectSmall Business Opportunities: Current Firms
Current DBE/SWaM Firms Continued…
o Daniel Consultants, Inco Ron & Sons Janitorial Service, LLCo Grubb Printing & Stamp Co., Inc.o Wendt Productions, Inc.o Endesco, Inc.o Floura Teeter Landscape Architects, Inc.o Mattern & Craig, Inc.o Best Employment Solutions, LLCo EBA Engineering, Inc.o Engineering & Testing Serviceso Gall Zeidler Consultantso MAP Environmental, Inc.o GET Solutions, Inc.o Klein Engineering P.S.C. P.C.o Rinker Design Associates, P.C.o T3 Design Corporation
20
202020202020202020
From October 2018
20
HRBT Expansion ProjectSmall Business Opportunities: Original
Engineering & Design Specialty
Geotechnical Instrumentation, Monitoring and Investigations
Material Testing
QC/QA
Diving Services
Surveying
Interior Building Specialties
Waterproofing
SIP Deck Forms
Mechanical, Electrical, Plumbing, ITS, SCADA, Signage and Lighting
Reinforcing Steel
Site-work & Paving
Demolition & Sawcutting
Traffic Control & Devices
Guardrails and Fencing
Trucking
Seeding/Sodding/Landscaping
Marine Construction
Signage
Utilities
Concrete Flatwork & Structural
21
212121212121212121
NOW (New)
21
HRBT Expansion ProjectSmall Business Opportunities: Now
Engineering & Design Specialty
Roadway
Marine
Bridge
AutoCAD / Microstation
Commercial Printing
Furniture
Geotechnical Instrumentation, Monitoring and Investigations
IT
Supplies
Installation
Material Testing
Promotional Items
Safety Supplies
QC/QA
Drainage Cleaning / Video
Diving Services
Drone Services
Surveying
Interior Building Specialties
Janitorial
Waterproofing
Landscaping
SIP Deck Forms
Mechanical, Electrical, Plumbing, ITS, SCADA, Signage and Lighting
Rebar
Reinforcing Steel
Remediation Services
Site-work & Paving
Demolition & Sawcutting
Design
Construction
Traffic Control & Devices
Lead and Asbestos Inspections
Guardrails and Fencing
Traffic Engineering
Trucking
Fuel Supply
Seeding/Sodding/Landscaping
Moving Services
Marine Construction
MOT
Signage
Sweeper Truck
Utilities
Waste Management
Concrete Flatwork & Structural
Video Production
Web Development
22
22222222222222222222
HRBT Expansion ProjectSmall Business Opportunities: Construction
Project Opportunities
o Ground Improvementso Rebar Supply & Assemblyo Roadway Constructiono Marine Workso Asphalt Pavingo Sound Wallso MOT Deviceso Mechanicalo Electricalo Plumbingo Fire Protectiono ITS & Scadao Building Constructiono Bridge Repairso Utility Relocation
23
23232323232323232323
HRBT Expansion ProjectSmall Business Opportunities: Construction
Project Opportunities: Materials
o Ready Mix Concreteo Aggregateo Rebar Supplyo Precast Girderso Precast Concrete Pileso Quarry Materialso Sound Wallso MOT Deviceso Bridge Consumableso RCP Pipes & Manholeso Cemento Fuel
24
24242424242424242424
HRBT Expansion ProjectSmall Business Opportunities: Materials 1
Item Quantity Unit
Sand & Bund Fill 206,203 Cubic Yards Armor Stones & Underlayers 349,213 Tons
Marine Trestle 1,738,354 Square Feet
Armor Stones & Underlayers 304,051 Tons
Excavation 73,452 Cubic Yards
Embankment 52,619 Cubic Yards
Pavement 222,815 Square Feet
Noise Walls 727,245 Square Feet
Retaining Walls 124,327 Square Feet
ISLAND EXPANSIONS
BRIDGES
BRIDGES
MATERIALS
25
25252525252525252525
HRBT Expansion ProjectSmall Business Opportunities: Materials 2
Item Quantity Unit
TUNNEL 15,800 Linear Feet
Excavation 555,383 Cubic Yards
Concrete 117,529 Cubic Yards
GROUND IMPROVEMENT
Jet Grouting Plugs 107,366 Cubic Yards
Cutter Soil Mixing 54,872 Cubic Yards
TUNNEL APPROACH STRUCTURE
Excavation 201,149 Cubic Yards
Concrete Works 201,149 Cubic Yards
EXCAVATION
Tunnel & Tunnel Approach Structures 756,532 Cubic Yards
Roadway 73,452 Cubic Yards
MATERIALS
26
26262626262626262626
HRBT Expansion ProjectSmall Business Opportunities: Materials 3
Item Quantity Unit
CONCRETE
Cast In Place (Incl. Mass Concrete) 222,840 Cubic Yards
Precast Elements (Incl. Segments, Piles, Girders) 51,381 Cubic Yards
Ballast 67,995 Cubic Yards
REBAR
Rebar (not incl. Precast) 107,366 Tons
Black 3,037 Tons
CRR Class I 700 Tons CHROMX 9100 11,944 Tons
CRR Class II 47 Tons CRR Class III 18,531 Tons
EMBANKMENT & FILL
Roadway 52,619 Cubic Yards
Sand & Bund 206,203 Cubic Yards
Stones & Armor Stones 349,213 Tons
MATERIALS
27
27272727272727272727
HRBT Expansion ProjectSmall Business Opportunities: Smart Bid
28
28282828282828282828
HRBT Expansion ProjectSmall Business Opportunities: Design
Current Progress
• Scope Validation (Geotechnical, Survey, Traffic Counts, etc.)
• Environmental Permitting (Joint Permit Application, Nationwide
Permit 6, etc.)
Potential Upcoming Opportunities
• Bridge
• Roadway/Civil
• Environmental
• Tunnel Approach Structure/Bored Tunnel
• Electrical/SCADA/ITS
• Facility Structural
• Fire-Life Safety
• Island Septic Systems
• General CAD and Administrative Support
29
29292929292929292929
HRBT Expansion ProjectSmall Business Opportunities: Design
Discussion Points to Consider:
o Firm Capacity
o Identified Staff
o Experience
Relevant?
Local?
VDOT?
Design-Build?
o Ability to Co-Locate
o Commercial Terms
o Your Ideas
30
30303030303030303030
HRBT Expansion ProjectSmall Business Opportunities: Exhibitors
31
3131313131313131313131
PROJECT WEBSITE: www.hrbtexpansion.org
HRBT Expansion ProjectContact Information
HRCP Purchasing Contact
John Gray
HRCP Purchasing Manager
phone: (757) 328-6866
email: jgray@hrcpjv.com
HRCP DBE/SWaM Contact
Malcolm Kates
HRCP DBE/SWaM Compliance Manager
phone: (757) 439-7166
email: mkates@hrcpjv.com
Recommended