ery Safaria, MT - Primavera Softwareaining 1
HANDOUTSANDOUTS OFF
APPLICATION OF PRIMAVERAPPLICATION OF PRIMAVERA
SOFTWARE TRAININGOFTWARE TRAINING
Feryery Safariaafaria MT MT
PelatihanPelatihan ManajemenManajemen Proyek Proyek (Primavera)(Primavera)
PTPT WijayaWijaya KaryaKarya ( (PerseroPersero) ) Tbk Tbk – – April 2013 April 2013
INSTALLATION
2
8/17/2019 Handbook of Primavera Training (Indonesia)
2/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 2
Minimum Requirement in order to able forMinimum Requirement in order to able for
Primavera InstallationPrimavera Installation
Supported Platforms for Primavera Client modules (Project Management,
Methodology
, ,
■ Microsoft Windows 2000 Professional (SP4)
■ Microsoft Windows XP (SP2)
■ Citrix MetaFrame XP FR2 (for Windows 2000)
■ Citrix MetaFrame XP FR3 (for Windows 2003)
Minimum Client Configurations For clients running the Project Management,
Portfolio Analysis, and Methodology Management modules
■ 128 MB of RAM, 256 MB free recommended
■ 40 MB
of
hard
‐disk
space
(per
module)
■ Microsoft Internet Explorer 6.0 (SP1 or SP2)
■ TCP/IP network protocol
3
Primavera Installation ProcessPrimavera Installation Process
If you are installing from a CD, insert CD 1. An introductory screen should appear
that provides installation options. If the screen does not appear, or if you are
installing from a network location, double‐click SETUP.EXE in the root folder of CD 1
.
Click Install Client Applications.
4
8/17/2019 Handbook of Primavera Training (Indonesia)
3/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 3
Primavera Installation ProcessPrimavera Installation ProcessEnter the product key located on the CD 1 label.
If you are installing from a network location and are not sure what the product key is, ask
your system administrator.
ECEC –– C01C01
5
Primavera Installation ProcessPrimavera Installation Process
If you want to install the stand the stand ‐‐alone alone version, choose Primavera Stand Stand ‐‐alone.alone.
6
8/17/2019 Handbook of Primavera Training (Indonesia)
4/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 4
Browse to
the
location
of
the
LICENSE.TXT
file.
A
license
key
file
is
required
to
use
the
software and should have been provided via e‐mail or diskette.
Primavera Installation ProcessPrimavera Installation Process
7
Primavera Installation ProcessPrimavera Installation ProcessSelect the driver type for the Primavera database.
8
8/17/2019 Handbook of Primavera Training (Indonesia)
5/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 5
Primavera Installation ProcessPrimavera Installation ProcessEnter your public login information.
9
Primavera Installation ProcessPrimavera Installation Process
Click Next to test the database connection.
10
8/17/2019 Handbook of Primavera Training (Indonesia)
6/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 6
Primavera Installation ProcessPrimavera Installation Process
Click Finish to complete the installation.
11
PROJECT MANAGEMENT REVIEW
12
8/17/2019 Handbook of Primavera Training (Indonesia)
7/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 7
WHAT IS A PROJECT??
Suatu proyek adalah serangkaian aktivitas dan
rencana untuk membuat produk ataumemberikan pelayanan.
Proyek memiliki tanggal mulai dan selesai, workbreakdown structure (WBS), sejumlah aktivitas,u ungan, penge uaran, res o, an a nnya.
13
CHARACTERISTICS OF PROJECTS
New / innovative, relevant / important.New / innovative, relevant / important.
Complex, dynamic.Complex, dynamic.
Interdisciplinary.Interdisciplinary. Project “ culture” (rules and way ofProject “ culture” (rules and way of
management).management).
14
8/17/2019 Handbook of Primavera Training (Indonesia)
8/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 8
WHAT IS A PROJECT ?WHAT IS A PROJECT ?
Project is a process to reach a unique certain target,which limited by time and resources.
performanceperformance
TargetTarget
reqreq performanceperformance
CostCost
Time (schedule)Time (schedule)
due datedue date
15
TEN PROBLEMS WITH PROJECTSEN PROBLEMS WITH PROJECTS
BIENKOWSKIIENKOWSKI, 1989) 1989)
The project is a solution in search of a.
Only the project team is interested in the endresult.
No one is in charge.
.
The project plan lacks detail.
The project is under-budgeted.
16
8/17/2019 Handbook of Primavera Training (Indonesia)
9/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 9
TEN PROBLEMS WITH PROJECTSEN PROBLEMS WITH PROJECTS
BIENKOWSKIIENKOWSKI, 1989) 1989)
Insufficient resources are allocated.
The project is not tracked against its plan.
The project team is not communicating.
The project strays from its original goals.
Solution:employ Project Management techniques!
17
PROJECT MANAGEMENT PMBOK)ROJECT MANAGEMENT PMBOK)
Project management is the application ofProject management is the application of
knowledge, skills, tools, and techniquesknowledge, skills, tools, and techniques
o pro ec ac v es n or er o mee or exceeo pro ec ac v es n or er o mee or excee
stakeholder needs and expectationsstakeholder needs and expectations
from a project from a project . Meeting or exceeding stakeholder. Meeting or exceeding stakeholderneeds and expectations invariablyneeds and expectations invariably
involves balancing competing demands among:involves balancing competing demands among:
• Scope, time, cost, and quality.• Scope, time, cost, and quality.
• Stakeholders with differing needs and• Stakeholders with differing needs and
expectations.expectations.
• Identified requirements (needs) and unidentified• Identified requirements (needs) and unidentified
requirements (expectations).requirements (expectations).
18
8/17/2019 Handbook of Primavera Training (Indonesia)
10/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 10
WHAT IS MANAGEMENT?HAT IS MANAGEMENT?
Basic Principles of Management:Basic Principles of Management:
Think and act resultThink and act result--orientated.orientated.
Contribute to the big picture.Contribute to the big picture.
Focus on few things.Focus on few things.
Use your strengths.Use your strengths.
Create trust.Create trust. Think positive.Think positive.
19
(Fredmund Malik)
PROJECT MANAGEMENTROJECT MANAGEMENT
WHO doesWHO does
WHATWHAT
(until) WHEN(until) WHENHOW (in which form)HOW (in which form)
WHYWHY
WHERE.WHERE.
20
8/17/2019 Handbook of Primavera Training (Indonesia)
11/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 11
PRIME OBJECTIVES OF PROJECT MANAGEMENTRIME OBJECTIVES OF PROJECT MANAGEMENT
Done on time.
Completed within budget.
Quality work (meets specifications).
Safe work environment.
Free from litigation.Time
21
Quality $
WHY PROJECT MANAGEMENT?WHY PROJECT MANAGEMENT?
Actual workOptimal work
L e v e l o f E f f o r t Max work load
22
AssignedDate
Due Date
8/17/2019 Handbook of Primavera Training (Indonesia)
12/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 12
PROJECTS ARE BALANCING ACTSROJECTS ARE BALANCING ACTS
Cost/Resources Schedule/Duration Scope/Quality
23
Project
PROJECT MANAGEMENT SCOPEROJECT MANAGEMENT SCOPE
Planning Planning
ObjectivesObjectives Scheduling Scheduling
ResourcesResources
Work break Work break- -downdown
scheduleschedule
OrganizationOrganization
Start & end timesStart & end times
Network Network
24
Controlling Controlling
Monitor, compare, revise, actionMonitor, compare, revise, action
8/17/2019 Handbook of Primavera Training (Indonesia)
13/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 13
PROJECT MANAGEMENT SCOPEROJECT MANAGEMENT SCOPE- PLANNINGLANNING
25
BeforeBefore Start of project Start of project During During
project project TimelineTimeline project project
PROJECT MANAGEMENT SCOPEROJECT MANAGEMENT SCOPE- SCHEDULINGCHEDULING
26
BeforeBefore Start of project Start of project During During
project project TimelineTimeline project project
8/17/2019 Handbook of Primavera Training (Indonesia)
14/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 14
PROJECT MANAGEMENT SCOPEROJECT MANAGEMENT SCOPE- CONTROLLINGONTROLLING
27
BeforeBefore Start of project Start of project During During
project project TimelineTimeline project project
PROJECT MANAGEMENT SCOPEROJECT MANAGEMENT SCOPE
28
BeforeBefore Start of project Start of project During During
project project TimelineTimeline project project
8/17/2019 Handbook of Primavera Training (Indonesia)
15/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 15
“If you do not know where you are“If you do not know where you are
going, every road will get yougoing, every road will get you
nowhere.” nowhere.”
Henry Kissinger Henry Kissinger
29
PRIMAVERA SOFTWAREPRIMAVERA SOFTWARE
Primavera provides a set of integrated
components that meet the project management
needs of different areas of an organization. It uses
standard Windows
interfaces,
Web
‐enabled
technology, and stand ‐alone (Microsoft SQL Server
Desktop Engine (MSDE)) or network ‐based (Oracle
.
30
8/17/2019 Handbook of Primavera Training (Indonesia)
16/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 16
MSDE is a data engine built on SQL Server
MSDEMSDE
.
users and multiple databases, limited to 2
GB perdatabase. If your requirements extend
beyond these limitations, you can easily
move to SQL Server.
31
Module of PrimaveraModule of Primavera
1. Project Management module, which can stand alone for pro ject and resource management or be used with companion
roducts. Timesheets enables Web-based team communication
and time keeping;
2. Methodology Management a module for authoring andstoring methodologies, or project plan templates. Methodology
Management enables your organization to gather its “ best
practices” and store them in a central methodology
management database.
3. Portfolio Analysis Portfolio Analysis is an executivereporting tool, providing summaries and tracking layouts of
project data. Portfolio Analysis is the ideal tool for members of
the senior management team to review project data and analyze
performance.
32
8/17/2019 Handbook of Primavera Training (Indonesia)
17/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 17
GETTING STARTED
33
GETTING STARTEDETTING STARTED
•• Click Proj ect Management IconClick Proj ect Management Icon•• Login Name:Login Name:
adminadmin•• Password:Password:
adminadmin
34
8/17/2019 Handbook of Primavera Training (Indonesia)
18/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 18
Getting Started
35
CUSTOMIZING DISPLAY
36
8/17/2019 Handbook of Primavera Training (Indonesia)
19/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 19
CREATING A NEW PROJECT FILE
• File > New.
• oose w ere e pro ec w edeveloped.
• Determine ID and the New Project Name;
• Determine Starting Date of Project;
•
• Choose rate type;
• Choose No, do not run the Project Architect.
• Finish.37
CREATING A NEW PROJECT FILE
38
8/17/2019 Handbook of Primavera Training (Indonesia)
20/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 20
ENTERPRISE PROJECT STRUCTURE (EPS)
39
EPSPS ENTERPRISE PROJECT STRUCTURE ENTERPRISE PROJECT STRUCTURE
40
8/17/2019 Handbook of Primavera Training (Indonesia)
21/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 21
Primavera TermsPrimavera Terms
•• EPS EPS A A hierarchyhierarchy thatthat representsrepresents thethe breakdownbreakdown of of projectsprojects inin thetheorganizationorganization.. NodesNodes atat thethe highest,highest, or or root,root, levellevel mightmight representrepresent divisionsdivisions withinwithinyour your company,company, projectproject phases,phases, sitesite locations,locations, or or other other major major groupingsgroupings thatthat meetmeet
•• OBS OBS A A globalglobal hierarchyhierarchy thatthat representsrepresents thethe managersmanagers responsibleresponsible for for thetheprojectsprojects inin your your organizationorganization.. TheThe OBSOBS usuallyusually reflectsreflects thethe managementmanagement structurestructureof of your your organization,organization, fromfrom toptop--levellevel personnelpersonnel downdown throughthrough thethe variousvarious levelslevels
-- --
thethe needsneeds of of your your organization,organization, whilewhile projectsprojects alwaysalways representrepresent thethe lowestlowest levellevelof of thethe hierarchyhierarchy.. EveryEvery projectproject inin thethe organizationorganization mustmust bebe includedincluded inin anan EPSEPSnodenode..
.. ..
•• WBS WBS A A hierarchicalhierarchical arrangementarrangement of of thethe productsproducts andand servicesservices producedproducedduringduring andand byby aa projectproject.. InIn thethe ProjectProject ManagementManagement module,module, thethe projectproject isis thethehighesthighest levellevel of of thethe WBS,WBS, whilewhile anan individualindividual activityactivity requiredrequired toto createcreate aaproductproduct or or serviceservice isis thethe lowestlowest levellevel.. EachEach projectproject inin thethe EPSEPS hashas itsits ownownWBSWBS..
41
EPS
• Enterprise project structure (EPS) membentuk.
• Tiap EPS node (atau folder ) bisa diuraidiurai
keberbagai tingkatan untuk menunjukkanpekerjaan yang harus dilakukan.
• Jumlah tingkatan dan strukturnya masing-masing bergantung pada lingkup dari poyek dancara merangkum data.
42
8/17/2019 Handbook of Primavera Training (Indonesia)
22/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 22
EPS
Kita bisa gunakan EPS untuk
e a u an op- own u ge ng ser a ana s ssumber daya dan biaya.
Mengatur WBS dan OBS dalam satu strukturyang umum.
Men elola berba ai ro ek dari tin katan
tertinggi sampai pada individu yang melakukanaktivitas spesifik dari proyek.
43
Enterprise ProjectEnterprise Project StructStruct. (EPS). (EPS)
WIKA
DEPT. ENERGIDEPT. UTILITASDEPT. SIPIL
UMUMDEPT. WILAYAH& LUAR NEGRI
DEPT. SIPILUMUM i
DEPT. SIPILUMUM II
CIREBON STA.MODIFICATION
PROJECT
BANDENGANFLYOVERPROJECT
WBS1
WBS2 44
8/17/2019 Handbook of Primavera Training (Indonesia)
23/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 23
Setting up EPSToTo establishestablish thethe EPS EPS nodesnodes that that will will containcontain your your projects, projects, choosechoose Enterprise,Enterprise,
EnterpriseEnterprise Project Project StructureStructure..
45
Setting up EPSSetting up EPS
46
8/17/2019 Handbook of Primavera Training (Indonesia)
24/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 24
ORGANIZATIONAL BREAKDOWN (OBS)
47
OBS
• Organizational breakdown structure (OBS)
yang bertanggung jawab untuk berbagai proyek
di perusahaan.• OBS biasanya menguraikan struktur
manajemen dari perusahaan, mulai dari jajaranop- eve sampa pa a er aga ng a an
dibawahnya.
48
8/17/2019 Handbook of Primavera Training (Indonesia)
25/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 25
OBS
(MENAMPILKAN OBS)
• Kita bisa menampilkan OBS dalam dua cara.
1. engan mengguna an c ar un umenampilkan gambaran grafikal dari informasiOBS.
2. Dengan menggunakan OBS table untukmenampilkan informasi dalam format kolom.
49
OBS
(MENAMPILKAN OBS)
Enterprise > OBS.
pa a a og ox un u menen u ancara penampilan OBS yang diinginkan (dalam
bentuk Chart View atau Table View).
50
8/17/2019 Handbook of Primavera Training (Indonesia)
26/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 26
Organizational Breakdown (OBS)Organizational Breakdown (OBS)
51
Setting up OBS
ChooseChoose Enterprise,Enterprise, OBS OBS.. Select Select thethe OBS OBS element element immediately immediately aboveabove and and of of
thethe samesame hierarchy hierarchy level level asas thethe element element you you want want toto add,add, thenthen click click Add Add
52
8/17/2019 Handbook of Primavera Training (Indonesia)
27/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 27
Setting up OBS
53
WORK BREAKDOWN STRUCTURE (WBS)
54
8/17/2019 Handbook of Primavera Training (Indonesia)
28/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 28
WORK BREAKDOWN STRUCTURE
• Work breakdown structure (WBS) adalah hirarki
menyelesaikan suatu proyek.
• WBS disusun dalam tahapan detail pekerjaan,dimulai dari outputnyaoutputnya, dan kemudian diuraikanke berbagai elemen kerja yang bisa
en as an.
55
Dalam membuat proyek, manajer proyek secara tipikal mengembangkan
WBS terlebih dahulu, menyediakan dokumen untuk tiap elemen WBS, dan
menentukan berbagai aktivitas untuk melakukan elemen kerja yang ada.
SUCCESSFUL WBSUCCESSFUL WBS
Each activity in the WBS will be:Each activity in the WBS will be:
SingleSingle--purposed;purposed;
Of a specific t ime duration;Of a specific t ime duration;
Manageable;Manageable; Its time and cost easily derived;Its time and cost easily derived;
Deliverables clearly understood;Deliverables clearly understood;
assigned; andassigned; and
The final defined activit ies will be known asThe final defined activit ies will be known as
entities.entities.
56
8/17/2019 Handbook of Primavera Training (Indonesia)
29/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 29
VIEWING Work breakdown structureVIEWING Work breakdown structure
View the Work Breakdown Structure chartClick the Display Options bar, then choose Show on Top, Chart View. To changethe displayed information, click the Display Options bar and choose Chart BoxTemplate, then an information type.
57
VIEWING Work breakdown structureVIEWING Work breakdown structure(TABLE style)(TABLE style)
58
8/17/2019 Handbook of Primavera Training (Indonesia)
30/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 30
GROUPING BYROUPING BY WBSBS PATHATH
59
WBS OF CIREBON STATION MODIFICATION PROJECT
CommencementCommencement MobilizationMobilization
Topographical SurveyTopographical Survey
General ProvisionGeneral Provision
Relocation & Protection Relocation & Protection
of Public Utilitiesof Public Utilities
Temporary Access Temporary Access
Civil WorkCivil Work
Utilities InvestigationUtilities Investigation
Soil InvestigationSoil InvestigationTemporary BridgeTemporary Bridge
Cut & FillCut & Fill
Platform & ShelterPlatform & Shelter
DEPODEPO
POLSUSKAPOLSUSKA
Watchman Watchman
Rehabilitation Rehabilitation
Facility WorkFacility Work
Railway SwitchRailway Switch
New Track PanelNew Track Panel
Track WorkTrack Work
Bridge WorkBridge Work
Modification of InterlockingModification of Interlocking
Point MachinePoint Machine
Axle CounterAxle Counter
Signal & Telecom Signal & Telecom
WorkWork
KejaksanKejaksan Station Station
Building.Building.
JPJP -- JDIRJDIR
CTC CTC
CommissioningCommissioning
CompletionCompletion
60
8/17/2019 Handbook of Primavera Training (Indonesia)
31/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 31
FORMATTING CURRENCY, DATES & UNIT
61
Formatting CurrencyFormatting Currency
62
8/17/2019 Handbook of Primavera Training (Indonesia)
32/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 32
SETTING UP USER PREFERENCESETTING UP USER PREFERENCES
Choose Edit, User Preferences, then click the Currency tab to specify theChoose Edit, User Preferences, then click the Currency tab to specify the
currency used to view cost data, and whether to show or hide the currencycurrency used to view cost data, and whether to show or hide the currencysymbol and/or decimal values in cost values.symbol and/or decimal values in cost values.
63
Formatting CurrencyFormatting Currency
64
8/17/2019 Handbook of Primavera Training (Indonesia)
33/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 33
Formatting Time Unit
TimeTime unit unit settingssettings affect affect how how timetime unit unit valuesvalues areare displayed displayed inin tracking tracking layouts,layouts, activity activity durations,durations, resourceresource prices, prices, availability,availability, and and work work effortsefforts..
ChooseChoose Edit,Edit, User User Preferences,Preferences, thenthen click click thethe TimeTime UnitsUnits tabtab..
65
Formatting DatesChooseChoose Edit,Edit, User User Preferences,Preferences, thenthen click click thethe DatesDates tabtab toto specify specify how how toto
display display datesdates..
66
8/17/2019 Handbook of Primavera Training (Indonesia)
34/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 34
Formatting Units
ChooseChoose Admin, Admin, Admin Admin Categories,Categories, thenthen click click thethe Unit Unit MeasuresMeasures
67
CALENDARS
68
8/17/2019 Handbook of Primavera Training (Indonesia)
35/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 35
Creating CalendarsCreating Calendars
ThereThere areare threethree calendar calendar poolspools:: global,global, resourceresource,, andand
projectproject..
•• ee g o ag o a ca en ar ca en ar poopoo con a nscon a ns ca en arsca en ars aaapplyapply toto al lall projectsprojects inin thethe databasedatabase..
•• TheThe projectproject calendar calendar poolpool isis aa separateseparate poolpool of of calendarscalendars for for eacheach projectproject inin thethe organizationorganization..
•• TheThe resourceresource calendar calendar poolpool isis aa separateseparate poolpool of of calendarscalendars for for eacheach resourceresource..
69
Creating CalendarsCreating Calendars
Create a global calendarCreate a global calendar
Choose Enterprise, Calendars. Choose Global, then click Add. Select theChoose Enterprise, Calendars. Choose Global, then click Add. Select the
calendar you want to copy for the new global calendar, then click the Selectcalendar you want to copy for the new global calendar, then click the Select
button. Type the new calendar’s name. To make the new calendar the defaultbutton. Type the new calendar’s name. To make the new calendar the default
g o a ca en ar or ac v es an resources, mar e e au c ec ox. o eg o a ca en ar or ac v es an resources, mar e e au c ec ox. o e
the new calendar, click Modify. To view the calendar’s assignments beforethe new calendar, click Modify. To view the calendar’s assignments before
changing it, click Used By.changing it, click Used By.
70
8/17/2019 Handbook of Primavera Training (Indonesia)
36/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 36
Modifying CalendarsModifying Calendars
71
Modifying CalendarsModifying Calendars
72
8/17/2019 Handbook of Primavera Training (Indonesia)
37/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 37
Modifying CalendarsModifying Calendars
73
ACTIVITIES
74
8/17/2019 Handbook of Primavera Training (Indonesia)
38/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 38
ACTIVITY CODES
• Kita bisa mengelola berbagai proyek didalam
spesifik, misalnya lokasi dan manajer,menggunakan kodekode proyekproyek (project codes).
• Kita bisa mendefinisikan kode proyek hirarkisyang tak-terbatas untuk memenuhi persyaratanmenyaring, mengurutkan, dan melaporkan
proyek, dan mengatur secara hirarkis untukpengelolaan dan penempatan yang lebihmudah.
75
ACTIVITY CODES
Kode proyek bersifat global untuk seluruh.
Tetapkan nilai untuk tiap kode proyek yang
dibuat.
76
8/17/2019 Handbook of Primavera Training (Indonesia)
39/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 39
Establishing Activity Codes (Pay Item)Establishing Activity Codes (Pay Item)
77
Establishing Activity Codes (Pay Item)Establishing Activity Codes (Pay Item)
78
8/17/2019 Handbook of Primavera Training (Indonesia)
40/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 40
Establishing Activity Codes (Pay Item)Establishing Activity Codes (Pay Item)
79
Establishing Activity CodesEstablishing Activity Codes
Create global activity codes
Choose Enterprise, Activity Codes. Choose Global, then click Modify. Click Add, thentype the name of the global activity code.
80
8/17/2019 Handbook of Primavera Training (Indonesia)
41/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 41
Establishing Activity CodesEstablishing Activity Codes
81
Overview Activ itiesOverview Activ ities
Activi ties represent work that must take place in a Activi ties represent work that must take place in a
determined amount of time.determined amount of time.
Activ ity ID and name Activ ity ID and name – – to uniquely ident ify andto uniquely identify and
describe the activitydescribe the activity
Predecessor and successor relationshipsPredecessor and successor relationships – – to defineto define
relationships with other activities in the same projectrelationships with other activities in the same projector in di fferent projects in the enterprise projector in di fferent projects in the enterprise project
structure (EPS)structure (EPS)
Activi ty start and fin ish dates Activi ty start and fin ish dates
Activi ty calendar Activi ty calendar
Activi ty type, duration type, and percent complete Activi ty type, duration type, and percent complete
type; whether an activity is a start or finish milestone;type; whether an activity is a start or finish milestone;
how to keep an activity’s unit values, duration values,how to keep an activity’s unit values, duration values,
and resource units/time values synchronized; andand resource units/time values synchronized; and
how to calculate an activity’s percent completehow to calculate an activity’s percent complete 82
8/17/2019 Handbook of Primavera Training (Indonesia)
42/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 42
WBS elementWBS element
Activi ty codes and values Activi ty codes and values – – to categorize activ it iesto categorize activities
’’
Overview ActivitiesOverview Activities
ExpensesExpenses
Work products and documents, standards, and deliverablesWork products and documents, standards, and deliverables
ResourcesResources
RolesRoles – – to identi fy sk ill requi rements for staff ing the activi tyto identify ski ll requirements for staffing the activity
Notes and feedbackNotes and feedback – – to communicate with the resourceto communicate with the resource
working on an activityworking on an activity
Notes about performing the activityNotes about performing the activity
StepsSteps – – to divide the activi ty in to smaller uni tsto divide the activity into smaller units
Ac tivi ty Step Templates Ac tivi ty Step Templates – – to def ine sets of reusable stepsto define sets of reusable steps
common to many activities in a project or across projectscommon to many activities in a project or across projects
83
Adding Activities Adding Activities
Add activities in the Activity Table
Select an activity within the group to which you want to add a new activity, then
click Add. The new activity is placed according to the sorting options selected for the layout.
84
8/17/2019 Handbook of Primavera Training (Indonesia)
43/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 43
DEFINING GENERAL ACTIVITY INFORMATION
In the Activities window, select the activity whose general information you want todefine. Click the Layout Options bar, then choose Show on Bottom, Activity Details;click the General tab.
85
RELATIONSHIPS
86
8/17/2019 Handbook of Primavera Training (Indonesia)
44/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 44
• Hubungan mendefinisikan bagaimana suatu
ACTIVITY RELATIONSHIPSCTIVITY RELATIONSHIPS
selesainya aktivitas lainnya.
• Tetapkan hubungan antar aktivitas untukmembentuk suatu jalur jalur didalam jadwal mulaidari aktivitas pertama sampai pada aktivitas
era r .
• Hubungan ini, yang membentuk logika dari jaringan proyek, digunakan bersama dengandurasi aktivitas untuk menentukan jadwal.
87
ACTIVITY RELATIONSHIPSCTIVITY RELATIONSHIPS
ExamplesDefinitionType
You can't finish logging inventory off a truck until everythinghas been unloaded from the truck."I " ' " "
Task A must be completedbefore
Finish to FinishFF
You have to begin training new employees before you canevaluate their progress. The training, however, need not becomplete before evaluation begins."Level concrete" can't begin until "Pour foundation" begins.
Task A must be started(but does not need to be completed)
before Task B can begin.
Start to Start(SS)
You can't take a picture until you've loaded the camera withfilm.
"Paint fence" can't start until "Construct fence" finishes.
Task A has to be completed beforeTask B can begin.
Finish to Start(FS)
Task B
Task A
Task B
Task A
88
We need to begin painting the house before someone canevaluate the color for a proper match. But the painting neednot be finished before the evaluation is completed
Task A has to be started before Task B can befinished.
Start to Finish(SF)
I . .Task B
Task A
Task B
8/17/2019 Handbook of Primavera Training (Indonesia)
45/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 45
ACTIVITY RELATIONSHIPSCTIVITY RELATIONSHIPS
LAG represents a delay between the finish of
successor task.
Example: Use on day lag between the finish of“Paint Wall” and the start of “Hang Pictures” toallow the paint to dry.
89
Paint Wall Hang PicturesFinish to Startw/ 1 day LAG
ACTIVITY RELATIONSHIPSCTIVITY RELATIONSHIPS
LEAD is an overlap of two tasks, so the
finishes. Lead time is represented as
negative lag (i.e. -1 day).Example: Use lead time to begin “Plaster Walls”
when “Construct Walls” is half done.
90
Construct Wall
Plaster Walls
Finish to Start
w/ 50% LEAD
8/17/2019 Handbook of Primavera Training (Indonesia)
46/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 46
ASSIGN RELATIONSHIPS USING ACTIVITY DETAILS
In the Activi ties window, select the activity to which youIn the Activi ties window, select the activity to which you
want to add a predecessor or successor relationship.want to add a predecessor or successor relationship.
91
RESOURCES
92
8/17/2019 Handbook of Primavera Training (Indonesia)
47/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 47
RESOURCES
ResourcesResources includeinclude thethe personnelpersonnel andand
equipmentequipment thatthat performperform workwork onon activitiesactivities
acrossacross allall projectsprojects..
ResourcesResources areare different different thanthan expensesexpenses.. WhileWhile
somesome resourcesresources areare timetime- -based based and and generally generally
extend extend acrossacross multiplemultiple activitiesactivities and and projects, projects,
expensesexpenses areare oneone- - meme expen uresexpen ures or or
nonreusablenonreusable itemsitems required required by by activitiesactivities..
93
RESOURCES
94
8/17/2019 Handbook of Primavera Training (Indonesia)
48/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 48
RESOURCES
95
DEFINE RESOURCE SHIFTS
Define resource shiftsDefine resource shifts
Choose Enterprise, Resource Shifts. Click Add, then type the new shift’s name.Choose Enterprise, Resource Shifts. Click Add, then type the new shift’s name.
To edit the new shift, click Modify.To edit the new shift, click Modify.
96
8/17/2019 Handbook of Primavera Training (Indonesia)
49/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 49
VIEW RESOURCES
ChooseChoose Enterprise,Enterprise, Resources,Resources, or or c lickclick ResourcesResources onon thethe
HomeHome workspaceworkspace.. ClickClick thethe DisplayDisplay OptionsOptions bar,bar, thenthen
choosechoose oneone of of thethe followingfollowing::
ToTo viewview detaileddetailed informationinformation aboutabout aa specif icspecific resource,resource,
choosechoose Detai ls,Details, thenthen selectselect thethe resourceresource whosewhose
informationinformation youyou wantwant toto viewview..
ToTo viewview resourcesresources asas aa chart,chart, choosechoose ChartChart ViewView..
ToTo selectselect thethe columnscolumns toto includeinclude inin thethe display,display, choosechoose
Columns,Columns, Customize,Customize, or or oneone of of thethe predefinedpredefined columncolumn
97
displaysdisplays..
ToTo selectselect thethe resourcesresources toto display,display, choosechoose Filter Fi lter By,By,
thenthen choosechoose All Al l Active Active Resources,Resources, All Al l Resources,Resources, or or
CurrentCurrent Project’sProject’s ResourcesResources..
ADD RESOURCE CODE VALUES
InIn thethe ResourceResource CodesCodes dialog dialog box,box, select select thethe codecode for for whichwhich you you want want toto
establishestablish values,values, thenthen click click Add Add.. TypeType thethe resourceresource codecode valuevalue namename;; thethe
maximummaximum number number of of characterscharacters isis preset preset at at thethe resourceresource codecode level level.. TypeType aa
descri tiondescri tion for for thethe valuevalue.. ToTo createcreate aa hierarchhierarch of of codecode valuesvalues click click thethe ri ht ri ht
arrow arrow key key toto indent indent thethe selected selected valuevalue oneone level level..
98
8/17/2019 Handbook of Primavera Training (Indonesia)
50/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 50
ASSIGN RESOURCE CODE VALUES
ToTo useuse thethe CodesCodes tab,tab, click click thethe Display Display OptionsOptions bar bar and and choosechoose DetailsDetails (the(the
box box next next toto thethe DetailsDetails command command should should bebe marked)marked).. Click Click thethe CodesCodes tab,tab,
thenthen click click Assign Assign..
99
KODE SUMBER DAYAODE SUMBER DAYA
Equiv. Rp. ¥
LABOUR
Kode
SDY Sumber Daya Unit
UNIT RATEQuantity
AMOUNTResources
- , . , . , , -
C002 Trade Foreman man-day 76,885.00 2,720.71 209,181,907 -
C003 Foreman man-day 59,143.00 18,653.20 1,103,206,479 -
C004 Mechanic man-day 59,143.00 2,642.52 156,286,363 -
C007 Welder man-day 65,057.00 272.00 17,695,504 -
C008 Mason man-day 65,057.00 4,239.75 275,825,416 - C014 Skilled Labour man-day 59,143.00 33,972.10 2,009,212,059 -
C015 Labour man-day 53,228.00 84,579.37 4,501,990,832 -
C018 Surveyor man-day 70,971.00 3,547.56 251,773,565 -
C019 Technician man-day 76,885.00 252.26 19,394,981 -
C020 Install of Geotextile m2 591.00 73,305.00 43,323,255 -
C021 Placing Concrete without Concrete Pu m3 53,228.00 1,928.26 102,637,477 -
C024 Inst all & Fabric at ion of Reinforcement k g 1, 136.00 308,268.39 350,192,891 -
-
100
, . . , ,
C045 Install RCP dia 100 cm m 236,571.00 98.00 23,183,958 -
C046 Labour Ls 72,864.00 15.00 1,092,960 - P ASEP JFE REV
C048 Labour Ls 82,445,309.00 2.00 164,890,618 - P ASEP JFE REV
C049 Labour Ls 38,534,349.00 2.00 77,068,698 - P ASEP JFE REV
C050 Labour Ls 128,423,644.00 2.00 256,847,288 - P ASEP JFE REV
C051 Labour Ls 214,079,719.00 2.00 428,159,438 - P ASEP JFE REV
8/17/2019 Handbook of Primavera Training (Indonesia)
51/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 51
ADD A RESOURCE CURVE
Choose Enterprise, Resource Curves. Click Add. Select an existing curveChoose Enterprise, Resource Curves. Click Add. Select an existing curve
from which to copy the curve value percentages, then click Select. Type afrom which to copy the curve value percentages, then click Select. Type a
name for the new resource curvename for the new resource curve
101
ADD A RESOURCE CURVE
Click Modify to define the curve’s distribution. Edit the curve valueClick Modify to define the curve’s distribution. Edit the curve value
percentages to create a curve that indicates how your costs/units should percentages to create a curve that indicates how your costs/units should
distribute over time. Curves are defined by 21 points (at 5% intervals from 0distribute over time. Curves are defined by 21 points (at 5% intervals from 0
to 100 . Click Prorate to make the total of the distribution values e ual toto 100 . Click Prorate to make the total of the distribution values e ual to
100% while maintaining the shape you specified. Click OK, then Close100% while maintaining the shape you specified. Click OK, then Close
102
8/17/2019 Handbook of Primavera Training (Indonesia)
52/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 52
MANAGING RESOURCE ASSIGNMENTS
Display the Resource Usage Spreadsheet
Choose View, Resource Usage Spreadsheet, or click the Display Options bar, then
choose Resource Usage Spreadsheet.
103
ROLES
104
8/17/2019 Handbook of Primavera Training (Indonesia)
53/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 53
ROLESOLES
RolesRoles areare project project personnel personnel job job titlestitles or or skills,skills, for for
example,example, project project planner, planner, quality quality assuranceassurance tester,tester, and and
engineer engineer..
View View rolesroles
ChooseChoose Enterprise,Enterprise, Roles,Roles, thenthen click click thethe Display Display OptionsOptions
bar bar..
ToTo view view only only thosethose rolesroles that that havehave assignmentsassignments inin thethe
’ ’
105
,, ,, ..
ToTo view view all all roles,roles, choosechoose Filter Filter By,By, All All RolesRoles..
ROLESOLES
106
8/17/2019 Handbook of Primavera Training (Indonesia)
54/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 54
ROLES VS PROJECT ORGANIZATION CHARTOLES VS PROJECT ORGANIZATION CHART
107
ASSIGNING RESOURCES AND ROLES
InIn thethe Activities Activities window,window, select select thethe activity activity toto whichwhich you you want want toto assignassign aa
resourceresource or or rolerole.. Click Click thethe ResourcesResources tabtab inin Activity Activity DetailsDetails
Click Add Resource to assign a resource to the selected activity; clickClick Add Resource to assign a resource to the selected activity; click
Add Role to assign a role to the selected activity. Select the resource Add Role to assign a role to the selected activity. Select the resource
or role you want to assign. To assign multiple resources or roles, holdor role you want to assign. To assign multiple resources or roles, hold
down the Ctrl key, then click each resource/role you want to assign.down the Ctrl key, then click each resource/role you want to assign.
Click the Select button, then click the Close buttonClick the Select button, then click the Close button
108
8/17/2019 Handbook of Primavera Training (Indonesia)
55/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 55
BUDGETING
109
COST ACCOUNTS AND PROJECT EXPENSES
ExpensesExpenses areare nonnon--resourceresource costscostsassociatedassociated withwith aa projectproject andand assignedassigned toto
aa project’sproject’s activitiesactivities.. TheyThey areare typicallytypicallyoneone--timet ime expendituresexpenditures for for nonnon--reusablereusable
itemsitems.. ExamplesExamples of of expensesexpenses includeinclude
110
,, ,, ,, ..
8/17/2019 Handbook of Primavera Training (Indonesia)
56/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 56
COST ACCOUNT
• Kita bisa membuat akun biaya (cost accounts)
pengeluaran dari sumber daya aktivitas padaproyek.
• Akun biaya bersifatbersifat hirarkishirarkis dan memungkinkankita menelusuri biaya aktivitas dan nilai yang
apa .
111
CREATE A COST ACCOUNT HIERARCHY
ChooseChoose Enterprise,Enterprise, Cost Cost Accounts Accounts.. Click Click thethe Cost Cost Account Account IDID columncolumn label label toto
display display thethe cost cost accountsaccounts hierarchy hierarchy.. An An outlineoutline symbol symbol inin thethe Cost Cost Account Account IDID
columncolumn label label indicatesindicates aa hierarchy hierarchy display display..
112
8/17/2019 Handbook of Primavera Training (Indonesia)
57/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 57
SET THE PROJECT DEFAULT COST ACCOUNT
ChooseChoose Enterprise,Enterprise, Projects,Projects, toto openopen thethe ProjectsProjects window window.. Display Display Project Project
DetailsDetails by by clicking clicking thethe Display Display OptionsOptions bar bar and and choosing choosing Show Show onon Bottom,Bottom,
Project Project DetailsDetails.. Click Click thethe DefaultsDefaults tab,tab, select select aa project project inin thethe upper upper layout,layout,
thenthen click click thethe BrowseBrowse buttonbutton inin thethe Cost Cost Account Account field field.. Select Select thethe default default cost cost
accoun ,accoun , enen c c c c ee e ec e ec u onu on
113
ADDING EXPENSES AND ENTERING COST
INFORMATION
ToTo includeinclude Project Project ExpenseExpense DetailsDetails at at thethe bottombottom of of thethe Project Project ExpensesExpenses
window,window, click click thethe Display Display OptionsOptions bar bar and and choosechoose ExpenseExpense DetailsDetails
114
8/17/2019 Handbook of Primavera Training (Indonesia)
58/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 58
ENTER COST INFORMATION FOR EXPENSES
ChooseChoose Project,Project, ExpensesExpenses.. Select Select thethe expenseexpense whosewhose cost cost
informationinformation you you want want toto enter,enter, thenthen click click thethe CostsCosts tabtab
115
ENTER AN EXPENSE ACCRUAL TYPE
ChooseChoose Project,Project, ExpensesExpenses.. Select Select thethe expenseexpense whosewhose accrual accrual typetype you you want want
toto enter,enter, thenthen click click thethe Activity Activity tabtab..
Select one of the following accrual types:Select one of the following accrual types:
■■Start of Activity,Start of Activity, to accrue the entire expense on the date the activity beginsto accrue the entire expense on the date the activity begins
■■End of Activity,End of Activity, to accrue the entire expense on the date the activity endsto accrue the entire expense on the date the activity ends
■■Uniform Over Activity,Uniform Over Activity, to evenly distribute the expense over the course ofto evenly distribute the expense over the course of
the activity’s durationthe activity’s duration
116
8/17/2019 Handbook of Primavera Training (Indonesia)
59/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 59
CHANGE AN EXPENSE ASSIGNMENT
ChooseChoose Project,Project, ExpensesExpenses.. Select Select thethe expenseexpense you you want want toto reassign,reassign, thenthen
click click thethe Activity Activity tabtab..
117
ANALYZING COSTS
118
8/17/2019 Handbook of Primavera Training (Indonesia)
60/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 60
BASELINES
119
MANAGING BASELINES
A A baseline is a complete copy ofbaseline is a complete copy of
a project plan that you cana project plan that you can
compare to the current schedulecompare to the current scheduleto evaluate progress.to evaluate progress.
120
8/17/2019 Handbook of Primavera Training (Indonesia)
61/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 61
CREATE PROJECT BASELINES
ChooseChoose Project,Project, MaintainMaintain BaselinesBaselines.. TheThe MaintainMaintain BaselinesBaselines dialog dialog box box
groupsgroups thethe currently currently openopen projects projects intointo individual individual bands,bands, withwith any any existing existing
baselinebaseline projects projects beneathbeneath itsits current current project project
121
COMPARING CURRENT AND BASELINE SCHEDULES
After After aa project project isis updated,updated, you you cancan quickly quickly evaluateevaluate progress progress and and
performance performance onscreenonscreen.. UseUse aa layout layout that that showsshows current current and and baselinebaseline barsbars toto
identify identify taskstasks that that start start or or finishfinish later later thanthan planned planned
122
8/17/2019 Handbook of Primavera Training (Indonesia)
62/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 62
UPDATING SCHEDULE
123
HIGHLIGHTING ACTIVITIES FOR UPDATING
124
8/17/2019 Handbook of Primavera Training (Indonesia)
63/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 63
UPDATING ACTIVITIES MANUALLY
125
PERCENT COMPLETE
126
8/17/2019 Handbook of Primavera Training (Indonesia)
64/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 64
PERCENT COMPLETE TYPEPERCENT COMPLETE TYPE
toto calculatecalculate anan activity’sactivity’s percentpercent completecomplete accordingaccording toto activityactivityduration,duration, activityactivity units,units, or or aa physicalphysical percentpercent completecomplete thatthat youyouen er en er or or eaceac ac v yac v y.. ouou musmus e nee ne aa percenpercen comp e ecomp e e ypeypefor for eacheach activityactivity..ToTo indicateindicate thatthat thethe activity’sactivity’s percentpercent completecomplete willwill bebe enteredentered
byby thethe user user for for thisthis activity,activity, selectselect Physical Physical ..ToTo specifyspecify thatthat thethe activity’sactivity’s percentpercent completecomplete bebe calculatedcalculated
fromfrom thethe originaloriginal andand remainingremaining duration,duration, selectselect DurationDuration..’’
fromfrom thethe actualactual andand remainingremaining units,units, selectselect UnitsUnits..
127
UPDATE ACTIVITIES WITH DURATION PERCENT
COMPLETE TYPE
128
8/17/2019 Handbook of Primavera Training (Indonesia)
65/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 65
UPDATE ACTIVITIES WITH PHYSICAL PERCENT
COMPLETE TYPE
129
UPDATE ACTIVITIES WITH UNITS PERCENT
COMPLETE TYPE
130
8/17/2019 Handbook of Primavera Training (Indonesia)
66/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 66
ASSIGN A TRACKING LAYOUT TO AN ISSUE
131
REPORTS
132
8/17/2019 Handbook of Primavera Training (Indonesia)
67/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 67
REPORTING
• Dua alat pelaporan yang tersedia: Report.
• Report Editor adalah alat yang sangat baik yangmemungkinkan kita untuk membuat berbagailaporan dengan kastomasi yang sangat tinggi.
• Dibandingkan dengan Report Wizard, Report
Editor memiliki kapabilitas untuk memberikanlaporan yang sangatsangat dekatdekat dengan persyaratanspesifik pengguna.
133
REPORTING
(LAPORAN DENGAN REPORT WIZARD)
Tools > Report Wizard.
u ns ru s pa a ap a og ox pa a w zaruntuk membuat laporan yang diinginkan.
134
8/17/2019 Handbook of Primavera Training (Indonesia)
68/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 68
REPORTING
(LAPORAN DENGAN REPORT EDITOR)
Pilih suatu laporan yang sudah ada.
o y.
Klik Yes untuk konfirmasi bahwa kita inginmenggunakan Report Editor .
Pada Report Editor , klik ikon New Report.
.
135
PELAPORAN
(PRA-TINJAU LAPORAN)
Pada Reports window, pilih laporan dan klik Run.
Pilih Print Preview, lalu klik OK.
136
8/17/2019 Handbook of Primavera Training (Indonesia)
69/70
4/10/2013
ery Safaria, MT - Primavera Softwareaining 69
CREATING AND MODIFYING REPORTS
Create a report with the Report Wizard, Choose Tools, Report Wizard, and followCreate a report with the Report Wizard, Choose Tools, Report Wizard, and follow
the prompts. Using the Wizard, you can select multiple subject areas for the report.the prompts. Using the Wizard, you can select multiple subject areas for the report.
For each selected subject area you can customize columns and apply group, sort,For each selected subject area you can customize columns and apply group, sort,
and filter o tionsand filter o tions ..
137
USING THE REPORT EDITOR
138
8/17/2019 Handbook of Primavera Training (Indonesia)
70/70
4/10/2013
THANK YOUTHANK YOU
139
ABOUT TRAINERBOUT TRAINER
Full Name*) : FeryFerySafariaSafariaEmployee Number : ET042204Gender : MaleReligion : MoslemMarital Status : Married (1 son & 1 daughter);Permanent Address : Jl. Rancapetir 49A Ciamis West Java;Mobile Phone Number : +62-813-23687756Email : ferysafaria@hotmail.com
Education : Bachelor Program (ST), Sebelas MaretUniversity ( !994-1998)Post Graduate Program (MT), Bandung Institute of Technology (1999-2002)
Work Experience : Lecturer (1999 Lecturer (1999--2003) 2003)- Garut School of Tecnology;- Siliwangi University;- Galuh University;
Head o De artment o Civil En ineerin Head o De artment o Civil En ineerin Garut School of Tecnolo 2002-2003 Engineering Staff Engineering Staff , Double Tracking of Jogja-Kroya Project
h f f dh f f d bl k f