High Speed Rail Station Design

Preview:

Citation preview

Paul Visee – Project ManagerPaul Visee – Project ManagerKristofer Kieca – Civil Engineer / EstimatorKristofer Kieca – Civil Engineer / Estimator

Erik Jalowy – Designer / Assistant PMErik Jalowy – Designer / Assistant PMNeil A. Cellini – LEED APNeil A. Cellini – LEED AP

Design and Drafting Capstone ProjectCD 331March 8, 2011Instructor: Mr. Falco

Scope

30 years from now there will be an expected 70 million more U.S. Citizens. 30 years, is tomorrow morning in transportation terms. We need to make sure we are accommodating to the needs of the future generation in the cleanest way possible.

2Silver Bullet Rail Deisgn

Group

The Future of High Speed Rail

3Silver Bullet Rail Deisgn

Group

http://www.midwesthsr.org/splash.html

Click on link below to view short video clip on the future of high speed rail

The Future of High Speed Rail

Silver Bullet Rail Deisgn Group

4

Midwest High Speed Rail

5Silver Bullet Rail Deisgn

Group

300 Miles of upgraded track

Supports high speed trains going 220-mph

Michigan secured over $40 million in stimulus money

Jobs And High Speed Rail

Creates construction and permanent jobs.

The high-speed train system in California will generate 600,000 construction-related jobs over the life of the project.

6Silver Bullet Rail Deisgn

Group

Safety of High Speed Rail

Offers SAFE, and GREEN transportation.

In 2009 36,000 Americans died in car accidents.

Train fatalities in 2009---700

Silver Bullet Rail Deisgn Group

7

2030 Challenge

The overall result is equivalent 1 gallon of gas for 720 miles per person – reduced energy consumption and reduced CO2 emissions that also benefit our environment.

8Silver Bullet Rail Deisgn

Group

Design Goal Our groups design goal is to build a station hub that

will accommodate the future Midwest high speed rail.

We have taken ideas for our design from various existing hubs around the world.

Customer: City of Kalamazoo, MI

9Silver Bullet Rail Deisgn

Group

Railway Hub Design Ideas

Anaheim, California Naples, Italy

10Silver Bullet Rail Deisgn

Group

• Below grade train lines• Green technology• Open floor plan

• Modern design• Site orientation• Highly reflective building materials

Location-Kalamazoo MI

• Hub between Chicago & Detroit

• Located near major highways & local airport

• Utilizing existing railway

11Silver Bullet Rail Design

Group

Kalamazoo Hub

Detroit

Chicago

Site Location

Silver Bullet Rail Deisgn Group

12

•Existing out of date station•Undersized property

Site Location

Silver Bullet Rail Deisgn Group

13

New site location

Site Plan Layout

Silver Bullet Rail Deisgn Group

14

Site Plan Layout

Silver Bullet Rail Deisgn Group

15

Southwest View

Silver Bullet Rail Deisgn Group

16

Northwest View

Silver Bullet Rail Deisgn Group

17

Building Plan

18Silver Bullet Rail Deisgn

Group

Building Sections

19Silver Bullet Rail Deisgn

Group

Building Sections

20Silver Bullet Rail Deisgn

Group

Interior Views

21Silver Bullet Rail Deisgn

Group

Interior Views

22Silver Bullet Rail Deisgn

Group

Interior Views

23Silver Bullet Rail Deisgn

Group

Building Materials

Silver Bullet Rail Deisgn Group

24

Lumeta PowerPly Solar Panels•Minimized Roof Load•No Roof Penetrations•Reduces installation labor by 60%•400 watts per panel

Building Materials

Silver Bullet Rail Deisgn Group

25

Englert Metal Roof System•Lightweight•Reflects 75%-80% of the Suns energy•Roof wont rot, crack, crumble, or burn•Made from 100% recycled material•Great for water harvesting

Building Materials

Silver Bullet Rail Deisgn Group

26

Porous Asphalt•Provides flood control•Reduces stormwater infrastructure•Suitable for cold climates (reduced freeze-thaw)•Maintains traction when wet

Building Materials

Silver Bullet Rail Deisgn Group

27

Low – E Glass•Provides passive solar heating•Cuts cooling and heating costs•Reduces harmful UV rays•Enhanced insulation performance

Summer Solar Study

Silver Bullet Rail Deisgn Group

28

Click on link below to view short video clip of the summer solar

study

http://www.youtube.com/watch?v=_nyAesZcTpE

Winter Solar Study

Silver Bullet Rail Deisgn Group

29

Click on link below to view short video clip of the Winter solar study

http://www.youtube.com/watch?v=DJAVY1sQpg8

Silver Bullet Rail Deisgn Group

30

LEED Energy Efficiency

47% Reduction over Baseline

Silver Bullet Rail Deisgn Group

31

LEED Water Efficiency

20% Water Reduction

33% Water Reduction

87% Water Reduction

47% Reduction over Baseline

LEED Checklist for Kalamazoo HSR Station

Silver Bullet Rail Deisgn Group

32

LEED Goal: 40 pts Estimated LEED Points: 62 pts,

Gold Rating

Construction Budget Site Construction $6,114,386

Road Construction $6,548,850

Building Construction $7,336,764

Total Cost: $20,000,000

Silver Bullet Rail Deisgn Group

33

Animation

Silver Bullet Rail Deisgn Group

34

Click on link below to view an animation of the rail station

http://www.youtube.com/watch?v=oEPACQTf9hs

Q & A Session