A Detailed Photographic Presentation of our

Wall Panel Erection work at

DB Orchid Crown

Ghokale Road (East), Prabhadevi, Dadar,

Mumbai - 400025

Location…

Just Behind the

Motilal Oswal Towers

on the Ghokale Road

(East) at Prabhadevi,

Dadar, Mumbai – 400 025

Palletized Panels at Site…

Lifting the Panels…

The Pre-Engineered Panels sent from ICES Factory, Chennai - being

lifted to the required Floor using the Tower Crane at site…

House Keeping

Cleaning & Preparing

the Site for Panel

Erection…

Preparation…

Segregating the

Panels according to

the Shop Drawing

Internal Walls…

80 mm

Thick

Internal

Partition

walls after

Erection

Internal Walls…

Filling the gaps

with High

Strength Non

Shrink Grout

Mortar.

Internal Walls…

Internal Walls…

Internal Walls…

Filling the

Gaps with

High Strength

Non-Shrink

Grout

Internal Walls…

Internal Walls…

Conference

Hall in the

Making

Internal Walls…

Toilet Walls

after

Erection

Internal Walls…

80 mm Thick

Internal wall

after the

application of

Wall Putty

External Walls…

Just Two

Workmen

handling a 2.5m

high 150mm

thick External

Wall Panel

External Walls…

Using the right tool

makes it easier in

aligning the wall

panels

External Walls…

Checking

the Verticality

using

Plumb Bob

External Walls…

Nailing the

Clamp on the wall

for Temporary

Positioning

External Walls…

150 mm thick

External wall

Erected Flushing

the Beam

alignment

External Walls…

150 mm thick

External wall

Erected

Flushing the

Beam

alignment

External Walls…

150 mm thick

External wall

Erected

Flushing the

Beam

alignment

External Walls…

150 mm thick

External wall

Erected

Flushing the

Beam

alignment

Groove

Cutting and

Box Fixing

were done

back in the

factory

External Walls…

External Walls…

Applying Mortar at

the Joints and

Filling the Gaps

with Mortar

External Walls…

An

L - Joint

External Walls…

External Walls…

An 80 mm thick

Toilet Wall, ready

to receive the Door

Frame

Putty Finish…

Putty Finish…

Grooves were cut

and the Electrical

Box was fixed in

the Factory

before the panels

were sent to the

site for erection

Putty Finish…

Putty

Finish…

a Close

Look

Site Inspection…

On Completion of

the work, the Site

was inspected by the

Executive Director

Mr. Nitesh Kumar,

Architect Ms.

Chaitalee Patadia

(Hafeez Contractor),

Mr. Sathish Kumar

from L&T and their

Team…

Site Inspection…

Detailing the

System to the

Executive

Director, the

Architect and

their Team

Site Inspection…

Clearing the

doubts of the

Architect and

the team of

Engineers from

DB and L&T

Site Inspection…

Site Inspection…

Site Inspection…

76, 6th Street, Chowdary Nagar, Valasaravakkam, Chennai – 600087, India.Phone: +91-44-24865334 Telefax: +91-44-24869552 Mobile: +91-9884725775

Email: senthil@innovativecivilengineering.com Website: http://innovativecivilengineering.com

Recommended