Intellivex data center projects

Preview:

DESCRIPTION

Data Center Projects: For over 28 years, Intellivex has dominated the Intermountain West market by providing state-of-the-art management solutions for mission-critical data centers.

Citation preview

Intellivex - Project Profiles

Zions Bank Data Services

Building Owner: Zions First National Bank

Size of Installation:

12,000 sq. ft. Data Center

32,000 sq. ft. eBuilding

Products: Full Turnkey, Design Build, Raised Access Flooring,

Critical Power Equipment, Cable Tray, Sub Floor Cabling, Computer

Room HVAC, Fire Suppression Systems and Technical Furniture.

Goldman Sachs

Building Owner: California Avenue L.L.C.

Size of Installation: 60,000 square feet

Products: Raised Access Flooring, Critical Power Equipment

and Sub Floor Cabling.

Pacific Landing

Building Owner: California Avenue Inc.

Size of Installation: (2) 50,000 square foot buildings

Product: Raised Access Flooring

Social Hall Avenue

Building Owner: Internal Revenue Service

Size of Installation: 68,000 square feet

Product: Raised Access Flooring and Plug & Play Electrical

Ninigret Buildings

Building Owner: Ninigret Park

Development

Size of Installation: 97,000 square

feet

Two buildings equaling 194,000

square feet

Products: Raised Access Flooring, Sub Floor Plug & Play Power,

Voice and Data Distribution, Cable Tray, and Critical Power

Equipment.

Talk2 Technology

Scope of Work: Turnkey Computer Room

Size of Installation: 1,600 square feet

Products: Full Turnkey, Raised Access

Flooring, Critical Power Equipment, Cable

Tray, Sub Floor Cabling, Computer Room

HVAC and Fire Suppression Systems.

Switch & Data

Building Owner: Switch & Data

Size of Installation: 20,000 square feet

Product: Raised Access Flooring, Critical Power Equipment, Cable Tray, Sub Floor Cabling and Computer Room

HVAC.

Ovid Technologies

Building Owner: Larry H. Miller

Size of Installation: 5,700 square feet

Products: Full Turnkey, Raised Access Flooring, Critical Power

Equipment, Cable Tray, Sub Floor Cabling, Computer Room HVAC and

Fire Suppression Systems.

Church of Jesus Christ of Latter Day Saints

Assembly Hall

Building Owner: LDS Church

Size of Installation: 14,000 square feet Products: Raised Access Flooring, Critical Power

Equipment, Computer Room HVAC, Under Floor Cabling,

Cable Tray and Carpet Finishes.

Consonus

Building Owner: Questar MetroNet Services, Inc.

Size of Installation: 20,000 square feet

Product: Raised Access Flooring and Electrical

Consulting

Wells Fargo Loan Operation Center

Building Owner: Wells Fargo Bank

Northwest

Size of Installation: 145,000 square feet

Products: Raised Access Flooring, Critical

Power Equipment, Cable Tray, Sub Floor

Cabling, Computer Room HVAC and Fire

Suppression Systems.

Inovex Data Services

Building Owner: C3 Investments L.L.C.

Size of Installation: 12,000 square feet

Product: Full Turnkey, Design Build, Raised Access Flooring,

Critical Power Equipment, Cable Tray, Sub Floor Cabling,

Computer Room HVAC and Fire Suppression Systems.

C3 Investments

Building Owner: C3 Investments, LLC

Size of Installation: 36,000 square feet

Product: Full Turnkey, Design Build, Raised Access Flooring,

Critical Power Equipment, Cable Tray, Sub Floor Cabling,

Computer Room HVAC and Fire Suppression Systems.

222 South Main

Building Owner: Goldman Sachs

Size of Installation: 150,000 square feet

Product: Raised Access Flooring, Critical Power Equipment,

Cable Tray, Sub Floor Cabling and Internal Air Quality

Management.

Adobe Corporate Campus

Building Owner: Adobe Systems, Inc.

Size of Installation: 16,000 square feet

Product: Raised Access Floor System and Seismic Evaluation

eBay Customer Service Center

Building Owner: eBay

Size of Installation: 160,000 square feet

Product: Raised Access Floor System, Cable Tray, Sub Floor

Cabling and Subfloor Air Quality Management

Missionary Training Center

Building Owner: Brigham Young University

Size of Installation: 3,000 square feet

Product: Full Turnkey, Design Build, Raised Access Flooring,

Critical Power Equipment, Cable Tray, Sub Floor Cabling,

Computer Room HVAC, Fire Suppression Systems and

Seismic Isolation.

University of Utah Data Center

Building Owner: University of Utah

Size of Installation: 76,000 square feet

Product: Design Build, Critical Power Equipment, PDU’s, Isle

Containment, Data Cabinets, Data Cabling Management

Systems and Seismic Isolation.

Stampin’ Up Office and Distribution Building

Building Owner: Stampin’ Up

Size of Installation: 160,000 square feet

Product: Design, Raised Access Floor System, Sub floor

Mechanical Distribution, Subfloor Plug Play Electrical, Subfloor

Plug Play Voice Data, Critical Power Equipment and Data

Cabling Management Systems.