International Case Study A pilot project in Lebanon

Preview:

Citation preview

International Case Study

A pilot project in Lebanon

SELE

CTION

INTEROPER

ABILITY

DEPLOYMENTPLANNING

START-UP

MAINTENANCE

Three different places:• Urban areas• Semi-Urban areas• Rural areas

We need to know the network topology

ASPECTS TO CONSIDER

• Distances• Number of clients• Power topology (number of

transformers)• Type of lines (air, underground)• …………

SELE

CTION

INTEROPER

ABILITY

DEPLOYMENTPLANNING

START-UP

MAINTENANCE

THE IMPORTANCE OF TESTING

CERTIFICATION

DEPLOYMENT

APPROVAL IN LABORATORY

APPROVAL IN FIELD

CERTIFICATION• BASIC (Metrological,.......etc.)• DLMS APPROVAL: METER PROTOCOL• PRIME APPROVAL: MODEM plc (SERVICE NODE)

NECESSARY…. BUT NOT ENOUGH

PENDING: Integration, functional test...…

APPROVAL IN LABORATORY

• Interoperability Test• Functionality• Performance• Stability• …

NEW DEVELOPMENTS NEW TEST

MAINTENANCE

APPROVAL IN FIELD

• SELECT 1-2 secondary substations for test• Represent the different scenarios• With the same version of PRIME SW• Detailed analysis• Monitoring the test

DEPLOYMENT

• As a last step• After the test

WITH GUARANTEES

SpecsProof of concept

Prototyping

Lab testingField deployment

SELE

CTION

INTEROPER

ABILITY

DEPLOYMENTPLANNING

START-UP

MAINTENANCE

GPRSGPRS

SELECT THE TECHNOLOGY SOLUTIONS

Remote reading(scheduled)

PLC MT, GPRS, ADSL,

etc.

LAN

DLMS overPLC PRIME

MDM

FRONT-END

Concentrators DC

Smart meters

Interface DC-METERS

Interface FE-DC

Interface MDM-FRONT-END

4

3

2

1

time

end

time

Operations

6

3

1

5

4

2

end

SMART METERING ARCHITECTURE

Start

DC Communi.

Test

Meter Comm.

Test

DC Config.

Test

Meter Config.

Test

DC Functio. & Operation

Test

Meter Functio. & Operation

Test

END

TESTING PROCESS

SELE

CTION

INTEROPER

ABILITY

DEPLOYMENTPLANNING

START-UP

MAINTENANCE

INSTALL + VALIDATEThe importance of validation

CONSIDER

• We need to be clear the deployment plan, and steps to certify an installation I coordinate the installation of data

concentrators and meters? or are they two completely independent activities?

How can I validate an installation? What tools do I need?

• Thinking on how to adapt our IT systems to the new way of working

INSTALL IN THE SECONDARY SUBSTATION

• Cabinet installation• Installation of current transformers• Power Supply• Checking operation equipment

DC Communications

INSTALL IN THE CENTRALIZATION

• Installing Meters• Power supply• Check functioning and registration

LED PRIME!!!!

• LED PRIME– PLM: Activity PRIME– PLM: Try to register– PLM: Registered

• 1000 Imp /KWh – Imp/KVArh flashing: load

• PHONE: 432 connection

INSTALL IN THE CENTRALIZATION (II)

INSTALL IN THE CENTRALIZATION (III)

Sequence LED PRIME

1. FLASHING FAST

2. TURNS OFF

3. FLASHING 30 seconds

4. GOES TO Try to register

5. GOES TO Registered

VALIDATION OF THE INSTALLATION

* Use the DC to validate

Monitoring the network PRIME1. Availability2. Availability launching measurement cycles

<cycles><cycle name="TEST_ciclos" period="1" immediate="true"

stop="2010/10/28 01:00">

<get obis="1-0:1.8.10.255" class="3" element="2"/><get obis="0-0:21.0.6.255" class="7" element="2"/>

</cycle></cycles>

VALIDATION OF THE INSTALLATION (II)

SELE

CTION

INTEROPER

ABILITY

DEPLOYMENTPLANNING

START-UP

ROLL-OUT

Poor conditions of some metering rooms

DIAGNOSIS OF THE NETWORK

meter as a switch40:40:22:10:1e:88

meter as a switchc0:ac:54:f4:73:89

meter as terminal00:80:e1:13:08:94

DIAGNOSIS

A network diagnostic for:

Topology MAC traffic Noise spectrum …………

TopologyMAC Traffic

Noise Spectrum

SOME EXAMPLES

SELECTIVE NOISE IN FREQUENCY IMPULSE NOISE

THANK YOU VERY MUCH