View
34
Download
0
Category
Tags:
Preview:
DESCRIPTION
IRIOS-2 (Integrated Research Input & Output System 2). Overview Simon Kerridge Edinburgh , 11-12 th January 2012 http://irios2.wordpress.com. RMAS. Sunderland. ePrints. Glasgow. ePrints. St Andrews. PURE. Search. RC SSC. UNIS. Collaborative research app development. - PowerPoint PPT Presentation
Citation preview
IRIOS-2(Integrated Research Input & Output System 2)
OverviewSimon Kerridge
Edinburgh, 11-12th January 2012
http://irios2.wordpress.com
IRIOS System Overview
http://irios.unis4ne-system.net GUEST/guest
RC SSC UNIS
Sunderland ePrints
Glasgow ePrints
St Andrews PURE
FilterImport
Search
View
Collaborative research app development
Maintain output types &
relationships
Reconcile finance & grant status info
Query
RMAS
Query Query
IRIOS-2 = IRIOS++• IRIOS produced a proof of concept for:
– Gathering project data from the RCUK SSC– Importing it into the UNIS platform– CERIFying it– AND– Gathering data from the HEI partner IRs (ePrints, SURE)– Importing it into UNIS (and CERIFying it if need be)– THEN being able to– Link Publications to Projects
– It worked!– Others can use it… but is a bit ‘clunky’ and not fully featured!
IRIOS-2 = IRIOS++• IRIOS-2 will convert IRIOS PoC into a demonstrator
– Gathering more project data from the RCUK SSC– Importing it into the UNIS platform– CERIFying it [if needed]– AND– Gathering more data from the HEI partner IRs (ePrints, SURE)– Importing it into UNIS (and CERIFying it if need be)– THEN being able to– Link Publications to Projects [semi-automated?]– AND– Reconcile Project Finance Information– Connect to RMAS infrastructure– Run practical CERIF workshops
IRIOS-2: Project Staff• Sunderland
– Simon Kerridge, Martin Finlayson, Kevin Ginty, Paul Cranner, Paul Fairley, Ryan Henderson, Kathleen Callender, Katie Nurowski
• Glasgow– Valerie McCutcheon, William Nixon
• St Andrews– Anna Clements, Scott Brander
• NERC– Gerry Lawson
• EPSRC– Chris Moulsley, Colin Haylock
• euroCRIS– Keith Jeffery
IRIOS-2: OverviewThe aims of the IRIOS-2 project are :i) Extend the IRIOS proof of concept demonstrator to better handle non-standard research outputs and multiple authors and roles ii) Enable HEIs to better collaborate by developing a CERIF B2B platform iii) Enable RCs and HEIs to reconcile grant status and finance information iv) Produce an Enterprise Service Bus (ESB) connected cloud enabled version of IRIOS-2 such that it is RMAS compliantv) Run a series of practical CERIF technical and business process workshops
IRIOS-2 Plan
WP1: Requirements Analysis• Nov 2011 – Feb 2012• Establish the User Group, and analyse the existing IRIOS
platform and catalogue the extensions in functionality required to fully meet the needs of the group
• Produce the functional specification for the extension of the IRIOS platform
• D1.1 User requirements analysis – Nov 2011• D1.2 Functional specification – Jan 2011
WP2: IRIOS-2 System• Jan 2012 – Jun 2012• IRIOS platform Development of the IRIOS-2 extended
service
• D2.1 IRIOS-2 service – Jun 2012
WP3: RC CERIF interface• May 2012 – Aug 2012• Develop CERIF wrapper for RC integration
• D3.1 CERIF [v1.3] wrapper for RC interface – Aug 2012
WP4: Validation and Evaluation• May 2012 – Oct 2012• Use cases and testing plan – will be developed by the
User Group • Carry out the testing plan with defined use cases and
document the results
• D4.1 Use Cases and Testing Plan – Jun 2012• D4.2 Evaluation Report – Oct 2012
WP5: Dissemination• Nov 2011 – Oct 2012• Establish project website and blog (hosted at Sunderland) • Workshops • Attend Programme level meetings and events, and
community building activities supported by JISC InfoNet and UKOLN as necessary
• D5.1 Project website and Blog – Nov 2011• D5.2 Workshop report – Oct 2012
WP6: Project Management• Nov 2011 – Oct 2012• Establish steering group • Project tracking, reporting and production of financial
return and final report.
• D6.1 Project final report – Oct 2012
IRIOS-2 Progress Summary• Kick-Off Meeting 7th Nov 2011, Sunderland• Web & Blog: irios2.wordpress.com• Joint IRIOS-2+CIA CERIF meeting 5th Dec, Sunderland• ARMA CERIF in Practice workshop 7th Dec, Newcastle• euroCRIS2012 abstract submitted
• Planned• euroCRIS TG Meeting, UKOLN,9th-10th Feb• ?UCISA2012?, ARMA2012
IRIOS-2: Summary• Nov 2011 – Oct 2012• Extends the IRIOS Proof of Concept• The same partnership as IRIOS• B2B rather than manual• Additional Publication Types• Additional Author Types• Demonstrator targets
– Cloud based– Checking of SSC project payment profiles– RMAS compliant– ROS feed
• Technical Workshops