0 | P a g e
Bahagian Pengurusan Sumber Air dan Hidrologi
Unit Ramalan dan Operasi
Seksyen Ramalan Banjir dan Kemarau
Bahagian Pengurusan Sumber Air dan
Hidrologi
Laporan Pemantauan Kemarau Semenanjung Malaysia April 2016 (Berdasarkan Analisa Hidrologi)
1 | P a g e
ISI KANDUNGAN
1. RINGKASAN ............................................................................................................................................... 2
1.1 RUMUSAN DATA..................................................................................................................................... 4
2. ANALISIS HUJAN ...................................................................................................................................... 6
2.1 Taburan Hujan Semasa ................................................................................................................... 6
2.2 Taburan Hujan Kumulatif 3 Bulan ................................................................................................ 6
2.3 Peratusan Perbandingan Purata Hujan April 2016 dengan LTM .......................................... 7
2.4 Peratusan Perbandingan Hujan Kumulatif 3 Bulan dengan LTM ........................................ 9
2.5 Analisis Berdasarkan Jumlah Hujan 3 Bulan (Moving Three Months Analysis) ........... 10
3. ANALISIS LUAHAN SUNGAI ................................................................................................................ 28
3.1 Bacaan Purata Luahan Sungai yang Dipantau bagi Bulan April 2016. ............................ 28
3.2 Sungai yang berada dibawah Drought Flow 5 Year : 1 Sungai .......................................... 32
3.3 Sungai yang berada dibawah Drought Flow 10 Year : 4 Sungai ........................................ 33
3.4 Sungai yang berada dibawah Drought Flow 20 Year : 3 Sungai ....................................... 37
4. ANALISIS STORAN EMPANGAN ......................................................................................................... 40
4.1 Aras Air bagi Empangan-empangan yang Dipantau pada April 2016 .............................. 40
4.2 Empangan di Bawah Baki Storan 50% : 8 Empangan .......................................................... 42
5. PENGESAHAN.............................................................................................................................................. 50
2 | P a g e
1. RINGKASAN
Sejumlah 41 stesen kemarau telah dipantau dalam analisis hujan bagi menyediakan
Laporan Kemarau. Senarai 41 stesen kemarau di Semenanjung Malaysia yang terlibat
adalah seperti Jadual 1.
Bil. Stn Indeks
No. Stesen
Nama Stesen Daerah Negeri
1 R1 6501005 Abi Kg. Bahru Kangar Perlis
2 K1 6206035 Kuala Nerang Padang Terap Kedah
3 K3 6103047 Rumah Pam Sungai Raja Kota Setar Kedah
4 K4 6207032 Ampang Pedu Padang Terap Kedah
5 K5 6108062 Ampang Muda Padang Terap Kedah
6 P1 5505033 Rumah Pam Pinang Tunggal Seb. Perai Utara Pulau Pinang
7 P2 5304045 Pusat Kesihatan Bkt. Berapit Seb. Perai Tengah Pulau Pinang
8 P3 5302003 Kolam Takongan Air Itam Daerah Timur Laut Pulau Pinang
9 A4 4109095 Kg. Pulau Besar Perak Tengah Perak
10 A6 4011139 Rumah JPS., Sg. Mengkuang Hilir Perak Perak
11 A8 4011144 Rumah Kerajaan JPS., Chui Chak Hilir Perak Perak
12 A12 4511111 Politeknik Ungku Omar di Ipoh Kinta Perak
13 A14 5006021 Kolam Air Bkt. Merah Kerian Perak
14 A15 5003028 Stn. Petak Ujian Tg. Piandang Kerian Perak
15 A16 5210069 Stn. Pemeriksaan Hutan Lawin Hulu Perak Perak
16 B3 3411017 Stor JPS Tg.Karang Kuala Selangor Selangor
17 B4 2917001 RTM Kajang Hulu Langat Selangor
18 B5 2818110 SMK Tasik Kesuma Hulu Langat Selangor
19 B6 3516022 Loji Air Kuala Kubu Bahru Hulu Selangor Selangor
20 B7 3117070 Pusat Penyelidikan di JPS Ampang WP Selangor
21 B8 3010001 Tmn Ehsan Kg. Melayu Subang Sg.Buloh
Petaling Selangor
22 N1 2719001 Setor JPS Sikamat Seremban Seremban N. Sembilan
23 N3 3023098 Sg. Lui Halt Kuala Pilah N. Sembilan
24 M1 2321006 Ldg. Lendu Alor Gajah Melaka
25 J1 2526001 Ldg. Sungai Gemas Segamat Johor
26 J2 2033002 Stn. Telemetri Bandar Kluang Kluang Johor
27 J5 1437116 Stor JPS Johor Bahru Johor Bahru Johor
28 J7 1829001 Sek. Men. Munshi Sulaiman Batu Pahat Johor
29 J8 2528002 Stn. Telemetri di Bandar Segamat Segamat Johor
30 J9 2536168 Empangan Labong, Endau Mersing Johor
31 J10 2527004 Ldg. Paya Lang, Segamat Segamat Johor
32 C3 3424081 JPS Temerloh Termeloh Pahang
33 C4 3533102 Rumah Pam Pahang Tua di Pekan Pekan Pahang
34 C8 4414036 Ldg. Boh (Kawasan Kilang) Cameron Higlands Pahang
35 C9 3930012 Sg. Lembing P.C.C.L Mill Kuantan Pahang
36 D1 4726001 Gunung Gagau Gua Musang Kelantan
37 D2 4819027 Gua Musang Gua Musang Kelantan
38 D6 5921009 Ibu Bekalan To' Uban Pasir Mas Kelantan
39 T1 4234109 JPS Kemaman Kemaman Terengganu
40 T2 4734079 Sek. Men. Sultan Omar di Dungun Dungun Terengganu
41 T5 5331048 Setor JPS Kuala Terengganu Kuala Terengganu Terengganu Jadual 1: Senarai 41 Stesen Kemarau di Semenanjung Malaysia
3 | P a g e
Rajah 1 merupakan lokasi 41 stesen kemarau di Semenanjung Malaysia yang digunakan
bagi penyediaan laporan.
Rajah 1 : Lokasi 41 Stesen Kemarau di Semenanjung Malaysia
4 | P a g e
1.1 RUMUSAN DATA
Purata keseluruhan jumlah hujan bulan APRIL 2016 adalah 81mm sebagaimana
Jadual2.
INDEKS
STESEN
JUMLAH HUJAN (MM) Minggu 1 Minggu 2 Minggu 3 Minggu 4
(mm) 1hb-7hb 8hb-14hb 15hb-21hb 22hb- 31hb
R1
25.0 0.0 6.0 56.0 87.0 K1 13.5 21.5 8.5 10.0 53.5 K3 1.5 0.0 1.0 32.0 34.5 K4 34.0 11.0 9.0 70.0 124.0 K5 36.0 16.0 53.0 37.0 142.0 P1 53.5 0.0 26.5 55.5 135.5 P2 22.0 14.0 25.5 8.5 70.0 P3 8.5 13.5 20.5 38.0 80.5 A4 1.5 2.5 0.5 1.5 6.0 A6 12.0 0.5 3.5 22.5 38.5 A8 22.5 10.0 22.5 15.0 70.0
A12 1.5 1.5 0.0 2.0 5.0 A14 2.5 25.0 12.0 22.5 62.0 A15 12.0 22.5 2.5 0.5 37.5 A16 16.5 20.5 12.0 12.0 61.0 B3 0.0 0.0 22.5 13.0 35.5 B4 73.0 2.0 36.0 76.5 187.5 B5 36.5 1.0 7.0 96.0 140.5 B6 14.5 17.0 4.0 31.5 67.0 B7 26.5 14.5 63.5 98.0 202.5 B8 19.0 17.0 12.0 82.5 130.5 N1 2.0 3.0 32.0 69.0 106.0 N3 0.0 10.0 95.5 1.0 106.5 M1 15.5 0.5 2.5 65.5 84.0 J1 0.0 13.0 5.0 43.0 61.0 J2 16.0 111.5 106.0 60.0 293.5 J5 21.0 58.0 63.0 41.0 183.0 J7 18.0 19.5 7.0 9.0 53.5 J8 0.0 25.5 32.5 37.5 95.5 J9 0.0 1.0 0.0 37.5 38.5 J10 0.0 82.0 6.0 30.0 118.0 C3 0.5 10.5 35.0 29.5 75.5 C4 0.0 0.5 0.0 2.0 2.5 C8 0.5 22.5 14.5 28.5 66.0 C9 0.0 12.5 0.5 42.0 55.0 D1 3.0 9.0 35.0 4.0 51.0 D2 0.0 7.0 41.0 105.0 153.0 D6 0.0 0.0 0.0 0.0 0.0 T1 0.0 1.0 1.0 0.0 2.0 T2 0.0 1.0 0.0 0.0 1.0 T5 1.0 0.0 0.0 0.0 1.0
JUMLAH PURATA HUJAN (MM) 81
Jadual 2 : Purata Hujan Bulan April 2016
5 | P a g e
Jumlah purata hujan bulan April 2016 didapati telah bertambah sebanyak 34mm
bersamaan % berbanding dengan jumlah purata hujan bulan Mac 2016 seperti Jadual
3.
PURATA HUJAN (mm)
MAC APRIL PERBEZAAN % PERBEZAAN
47 81 34 72%
Jadual 3 : Peratus Perbezaan Purata hujan bulanan semasa dengan Purata hujan Bulanan Sebelum
Manakala bagi data kumulatif 3 bulan (bulan semasa dan 2 bulan ke belakang) hujan
sebenar dengan kumulatif 3 bulan (bulan semasa dan 2 bulan ke belakang) hujan
jangka panjang (Long Term Mean rainfall, LTM), didapati berlaku pengurangan hujan
sebanyak -258 mm bersamaan -52 % seperti Jadual 4.
PURATA HUJAN (mm)
KUMULATIF 3
BULAN LTM
KUMULATIF 3
BULAN SEBENAR PERBEZAAN % PERBEZAAN
501 243 -258 -52%
Jadual 4 : Peratus Perbezaan Kumulatif 3 bulan (bulan semasa dan 2 bulan ke belakang) hujan sebenar dengan Kumulatif 3 bulan (bulan semasa dan 2 bulan ke belakang) hujan jangka panjang
(LTM)
6 | P a g e
2. ANALISIS HUJAN
2.1 Taburan Hujan Semasa
Peta isohyet pada Rajah 2 menggambarkan taburan keadaan hujan semasa bagi bulan
April 2016. Purata taburan hujan bagi Semenanjung Malaysia ialah 81mm.
Pertambahan hujan sebanyak 34mm bersamaan 72% berbanding dengan jumlah
purata hujan bulan Mac 2016 iaitu 47mm (rujuk Jadual 3).
2.2 Taburan Hujan Kumulatif 3 Bulan
Peta isohyet pada Rajah 3 menggambarkan taburan hujan kumulatif untuk 3 bulan
sebenar (Februari, Mac dan April 2016). Purata taburan hujan kumulatif untuk 3 bulan
sebenar bagi Semenanjung Malaysia ialah 243mm. Pengurangan hujan sebanyak -
258mm bersamaan -52% berbanding dengan taburan hujan kumulatif 3 bulan LTM
iaitu 501mm (rujuk Jadual 4).
Rajah 2 : Hujan Bulan April 2016 Rajah 3: Hujan Kumulatif 3 Bulan
7 | P a g e
2.3 Peratusan Perbandingan Purata Hujan April 2016 dengan LTM
Analisis berdasarkan jumlah hujan satu bulan, iaitu purata hujan bulan April 2016
(81mm) berbanding dengan purata hujan jangka panjang (202mm) menunjukkan
terdapat pengurangan sebanyak -122mm, iaitu -60.04%.
NO. INDEKS
STESEN
HUJAN
SEMASA
HUJAN LTM PERBEZAAN (MM) % PERBEZAAN
1 R1 87 155 -68 -44.0 2 K1 54 188 -134 -71.5
3 K3 35 174 -140 -80.2
4 K4 124 232 -108 -46.5
5 K5 142 224 -82 -36.5
6 P1 136 200 -65 -32.3
7 P2 70 217 -147 -67.7
8 P3 81 197 -116 -59.1
9 A4 6 226 -220 -97.3
10 A6 39 314 -275 -87.7
11 A8 70 354 -284 -80.2
12 A12 5 246 -241 -98.0
13 A14 62 299 -237 -79.2
14 A15 38 189 -152 -80.2
15 A16 61 188 -127 -67.6
16 B3 36 133 -98 -73.4
17 B4 188 272 -84 -31.0
18 B5 141 223 -83 -37.1
19 B6 67 267 -200 -74.9
20 B7 203 295 -92 -31.3
21 B8 131 261 -130 -49.9
22 N1 106 232 -126 -54.4
23 N3 107 186 -79 -42.7
24 M1 84 174 -90 -51.6
25 J1 61 156 -95 -60.8
26 J2 294 236 57 24.3
27 J5 183 251 -68 -27.2
28 J7 54 205 -152 -73.9
29 J8 96 148 -53 -35.5
30 J9 39 151 -113 -74.5
31 J10 118 154 -36 -23.2
32 C3 76 139 -64 -45.8
33 C4 3 131 -128 -98.1
34 C8 66 242 -176 -72.7
35 C9 55 210 -155 -73.8
36 D1 51 237 -186 -78.4
37 D2 153 154 -1 -0.8
38 D6 0 77 -77 -100.0
39 T1 2 126 -124 -98.4
40 T2 1 131 -130 -99.2
41 T5 1 109 -108 -99.1 PURATA
81 202 -122 -60.04
Jadual 5 : Peratusan Perbandingan Hujan Bulan April 2016 dengan Hujan Jangka Panjang (LTM)
8 | P a g e
Jadual 5 menunjukkan peratusan perbandingan hujan bulan April 2016 dengan hujan
jangka panjang. Berdasarkan 41 stesen kemarau yang dipantau, tiga puluh empat (34)
stesen merekodkan defisit hujan melebihi 35% (kawasan kering); iaitu di:-
i. Abi Kg. Bahru, Perlis ii. Kuala Nerang, Kedah iii. Stor JPS Alor Star, Kedah iv. Ampang Pedu, Kedah v. Ampang Muda, Kedah vi. Pusat Kesihatan Bkt. Berapit, Pulau Pinang vii. Kolam Takongan Air Itam, Pulau Pinang viii. Kg. Pulau Besar, Perak ix. Rumah JPS., Sg. Mengkuang, Perak x. Rumah Kerajaan JPS Chui Chak, Perak xi. Politeknik Ungku Omar di Ipoh, Perak xii. Kolam Air Bukit Merah, Perak xiii. Stn. Petak Ujian Tg. Piandang, Perak xiv. Stn. Pemeriksaan Hutan Lawin, Perak xv. Stor JPS Tg.Karang, Selangor xvi. SMK Tasik Kesuma, Selangor xvii. Loji Air Kuala Kubu Bahru, Selangor xviii. Pusat Penyelidikan Getah Sg. Buloh, Selangor xix. Stor JPS Sikamat Seremban, Negeri Sembilan xx. Sg. Lui Halt, Negeri Sembilan xxi. Ldg. Lendu, Melaka xxii. Ldg. Sungai Gemas, Johor xxiii. Sek Men Munshi Sulaiman, Johor xxiv. Stn. Telemetri di Bandar Segamat, Johor xxv. Empangan Labong, Endau, Johor xxvi. JPS Temerloh, Pahang xxvii. Rumah Pam Pahang Tua di Pekan, Pahang xxviii. Ldg. Boh (Kawasan Kilang), Pahang xxix. Sg. Lembing P.C.C.L Mill, Pahang xxx. Gunung Gagau, Kelantan xxxi. Ibu Bekalan To' Uban, Kelantan xxxii. JPS Kemaman, Terengganu xxxiii. Sek. Men. Sultan Omar di Dungun, Terengganu xxxiv. Setor JPS Kuala Terengganu, Terengganu
Peta isohyet pada Rajah 4 menunjukkan peratusan perbandingan hujan April 2016
dengan hujan jangka panjang (LTM)
9 | P a g e
Rajah 4 : Peratusan Perbandingan Hujan April 2016 dengan hujan LTM
2.4 Peratusan Perbandingan Hujan Kumulatif 3 Bulan dengan LTM
Analisis berdasarkan purata kumulatif 3 bulan hujan sebenar, iaitu jumlah purata
hujan bulan Februari, Mac dan April 2016 (243mm) berbanding dengan purata
kumulatif 3 bulan hujan jangka panjang (501mm) menunjukkan terdapat
pengurangan sebanyak -258mm, iaitu -52 %.
Berdasarkan 41 stesen kemarau yang dipantau, terdapat tiga puluh empat (34) stesen
merekodkan defisit hujan melebihi 35% (kawasan kering); iaitu di:-
i. Abi Kg. Bahru, Perlis ii. Kuala Nerang, Kedah iii. Stor Jps. Alor Star, Kedah iv. Ampang Pedu, Kedah v. Ampang Muda, Kedah vi. Rumah Pam Pinang Tunggal, Pulau Pinang vii. Pusat Kesihatan Bkt. Berapit, Pulau Pinang viii. Kolam Takongan Air Itam, Pulau Pinang ix. Kg. Pulau Besar, Perak x. Rumah JPS., Sg. Mengkuang, Perak xi. Rumah Kerajaan JPS., Chui Chak, Perak xii. Politeknik Ungku Omar di Ipoh, Perak xiii. Kolam Air Bkt. Merah, Perak xiv. Stn. Petak Ujian Tg. Piandang, Perak xv. Stn. Pemeriksaan Hutan Lawin, Perak xvi. Stor JPS Tg.Karang, Selangor xvii. RTM Kajang, Selangor xviii. SMK Tasik Kesuma, Selangor
10 | P a g e
xix. Loji Air Kuala Kubu Bahru, Selangor xx. Pusat Penyelidikan di JPS Ampang, WP KL xxi. Pusat Penyelidikan Getah Sg.Buloh, Selangor xxii. Setor JPS Sikamat Seremban, Negeri Sembilan xxiii. Sg. Lui Halt, Negeri Sembilan xxiv. Ldg. Lendu, Melaka xxv. Sek. Men. Munshi Sulaiman, Johor xxvi. Stn. Telemetri di Bandar Segamat, Johor xxvii. Empangan Labong, Endau, Johor xxviii. Ldg. Paya Lang, Segamat, Johor xxix. JPS Temerloh, Pahang xxx. Rumah Pam Pahang Tua di Pekan, Pahang xxxi. Ldg. Boh (Kawasan Kilang), Pahang
xxxii. Ibu Bekalan To' Uban, Kelantan xxxiii. Sek. Men. Sultan Omar di Dungun, Terengganu xxxiv. Setor JPS Kuala Terengganu, Terengganu
Peta isohyet pada Rajah 5 menunjukkan peratusan perbandingan hujan kumulatif 3
bulan dengan hujan kumulatif 3 bulan LTM.
Rajah 5 : Peratusan Perbandingan Hujan Kumulatif 3 Bulan dengan Hujan Kumulatif 3 Bulan LTM
2.5 Analisis Berdasarkan Jumlah Hujan 3 Bulan (Moving Three Months Analysis)
Analisis hujan 3 bulan dijalankan bertujuan untuk meramalkan kebarangkalian berlaku
kemarau di Semenanjung Malaysia dengan membandingkan keadaan hujan semasa
dengan purata hujan jangka panjang bagi 3 bulan bergerak.
Bagi bulan April 2016, analisis hujan 3 bulan dijalankan dengan mengambilkira data
hujan bagi bagi bulan-bulan berikut:-
11 | P a g e
i. Analisis 1 : Februari, Mac dan April 2016
ii. Analisis 2 : Mac, April dan Mei LT 2016
iii. Analisis 3 : April, Mei LT dan Jun LT 2016
Bagi Analisis 1, data hujan semasa bagi ketiga-tiga bulan terlibat digunapakai. Bagi
Analisis 2 dan 3, oleh kerana pada bulan April 2016, data hujan semasa bagi bulan
Mei 2016 dan Jun 2016 masih belum diperolehi, maka data hujan jangka panjang (LT)
digunakan di dalam analisis-analisis ini.
Setiap analisis seperti di atas dibahagikan kepada tiga (3) senario seperti berikut:-
i. Senario 1 : Andaian hujan normal untuk tiga bulan
ii. Senario 2 : Andaian penambahan 35% kepada purata hujan jangka panjang
iii. Senario 3 : Andaian pengurangan 35% kepada purata hujan jangka panjang
Keputusan analisis hujan 3 bulan untuk bulan April 2016 bagi ketiga-tiga senario
adalah diperincikan di dalam Rajah 6 hingga Rajah 8 dan Jadual 6 hingga Jadual 12.
12 | P a g e
Rajah 6 : Peta Isohyet Analisis Hujan 3 Bulan – Senario 1 (Andaian Hujan Normal untuk 3 Bulan)
Berdasarkan peta isohyet bagi Senario 1, dapat dirumuskan:-
i. Analisis 1 (Februari, Mac dan April 2016) menunjukkan pada bulan April 2016, pengurangan hujan melebihi 35% (kering) berlaku
di stesen berindeks R1, K1, K3, K4, K5, P1, P2, P3, A4, A6, A8, A12, A14, A15, A16, B3, B4, B5, B6, B7, B8, N1, N3, M1, J7, J8,
J9, J10, C3, C4, C8, D6, T2 dan T5
ii. Analisis 2 (Mac, April dan Mei LT 2016) meramalkan keadaan kering akan berlaku pada bulan Mei 2016 di stesen berindeks R1,
K1, K3, K4, K5, P1, P2, P3, A4, A6, A8, A12, A14, A15, A16, B3, B5, B6, N3, M1, J1, J5, J7, J8, J9, J10, C3, C4, C8, C9, D1,
D6, T1, T2 dan T5
iii. Analisis 3 (April, Mei LT dan Jun LT 2016) meramalkan keadaan kering akan berlaku pada bulan Jun 2016 di stesen berindeks A4,
A6, A8, A14, C4, dan T2
13 | P a g e
Rajah 7 : Peta Isohyet Analisis Hujan 3 Bulan – Senario 2 (Andaian Penambahan Hujan 35% kepada Purata Hujan Jangka Panjang)
Berdasarkan peta isohyet bagi Senario 2, dapat dirumuskan:-
i. Analisis 1 (Februari, Mac dan April 2016) menunjukkan pada bulan April 2016, pengurangan hujan melebihi 35% (kering) berlaku
di stesen berindeks R1, K1, K3, K4, K5, P1, P2, P3, A4, A6, A8, A12, A14, A15, A16, B3, B4, B5, B6, B7, B8, N1, N3, M1, J7,
J8, J9, J10, C3, C4, C8, D6, T2 dan T5
ii. Analisis 2 (Mac, April dan Mei LT 2016) meramalkan keadaan kering akan berlaku pada bulan Mei 2016 di stesen berindeks K1,
K3, P2, A4, A6, A8, A12, A14, A15, B3, M1, J1, J8, J9, C3, C4, C8, C9, T1, T2 dan T5
iii. Analisis 3 (April, Mei LT dan Jun LT 2016) meramalkan TIADA keadaan kering akan berlaku pada bulan Jun 2016
14 | P a g e
Rajah 8: Peta Isohyet Analisis Hujan 3 Bulan – Senario 3 (Andaian Pengurangan Hujan 35% kepada Purata Hujan Jangka Panjang)
Berdasarkan peta isohyet bagi Senario 3, dapat dirumuskan:-
i. Analisis 1 (Februari, Mac dan April 2016) menunjukkan pada bulan April 2016, pengurangan hujan melebihi 35% (kering) berlaku di
stesen berindeks R1, K1, K3, K4, K5, P1, P2, P3, A4, A6, A8, A12, A14, A15, A16, B3, B4, B5, B6, B7, B8, N1, N3, M1, J7, J8, J9,
J10, C3, C4, C8, D6, T2 dan T5
ii. Analisis 2 (Mac, April dan Mei LT 2016) meramalkan keadaan kering akan berlaku pada bulan Mei 2016 di stesen berindeks R1, K1,
K3, K4, K5, P1, P2, P3, A4, A6, A8, A12, A14, A15, A16, B3, B5, B6, B8, N1, N3, M1, J1, J7, J8, J9, J10, C3, C4, C8, C9, D1, D2,
D6, T1, T2 dan T5
iii. Analisis 3 (April, Mei LT dan Jun LT 2016) meramalkan keadaan kering akan berlaku pada bulan Jun 2016 di stesen berindeks R1, K1,
K3, K4, K5, P2, P3, A4, A6, A8, A12, A14, A15, A16, B3, B5, B6, B8, N1, N3, M1, J1, J7, J8, J9, C3, C4, C8, C9, D1, D6, T1, T2 dan
T5
15 | P a g e
NO Station Index FEB MAC APRIL Cumm of 3 Months Actual Rainfall Cumm of 3 Months LT Rainfall Diff in Rainfall (mm) % Dev 1 R1 11 5 87 103 328 -225 -69
2 K1 10 7 54 70 381 -311 -82
3 K3 0 0 35 35 337 -303 -90
4 K4 6 0 124 130 434 -304 -70
5 K5 8 0 142 150 492 -342 -70
6 P1 23 1 136 159 419 -260 -62
7 P2 30 30 70 130 462 -332 -72
8 P3 15 45 81 141 397 -256 -65
9 A4 156 18 6 180 600 -420 -70
10 A6 187 65 39 290 841 -551 -66
11 A8 120 85 70 275 932 -657 -70
12 A12 57 40 5 102 555 -454 -82
13 A14 109 37 62 208 731 -524 -72
14 A15 34 43 38 114 435 -321 -74
15 A16 31 67 61 159 378 -219 -58
16 B3 127 15 36 178 353 -176 -50
17 B4 54 163 188 404 675 -271 -40
18 B5 71 33 141 245 544 -299 -55
19 B6 87 144 67 298 598 -301 -50
20 B7 61 174 203 437 688 -251 -36
21 B8 109 130 131 370 675 -306 -45
22 N1 89 151 106 346 553 -207 -37
23 N3 85 75 107 266 488 -222 -45
24 M1 95 13 84 192 408 -216 -53
25 J1 253 0 61 314 413 -99 -24
26 J2 107 31 294 432 524 -93 -18
27 J5 239 249 183 671 630 41 7
28 J7 129 133 54 316 570 -254 -45
29 J8 140 5 96 240 420 -180 -43
30 J9 274 15 39 328 583 -255 -44
31 J10 146 0 118 264 438 -174 -40
32 C3 34 5 76 115 384 -269 -70
33 C4 154 31 3 188 424 -237 -56
34 C8 173 14 66 253 553 -300 -54
35 C9 315 31 55 401 524 -123 -24
36 D1 374 35 51 460 655 -195 -30
37 D2 149 2 153 304 351 -47 -13
38 D6 108 22 0 130 247 -117 -47
39 T1 261 7 2 270 400 -130 -33
40 T2 191 7 1 199 362 -163 -45
41 T5 92 4 1 97 354 -257 -73
115 47 81 243 501 -258 -51.5
Jadual 6 : Hujan 3 Bulan (Februari, Mac dan April 2016) bagi Analisis 1 -Senario 1,2 dan 3
16 | P a g e
NO Station Index MAC APRIL MEI LT Cumm of 3 Months Actual Rainfall Cumm of 3 Months LT Rainfall Diff in Rainfall (mm) % Dev 1 R1 5 87 190 282 469 -187.2 -40
2 K1 7 54 171 232 503 -271.6 -54
3 K3 0 35 207 241 497 -255.8 -51
4 K4 0 124 227 351 599 -247.6 -41
5 K5 0 142 233 375 631 -255.9 -41
6 P1 1 136 195 331 528 -197.2 -37
7 P2 30 70 180 280 544 -264.2 -49
8 P3 45 81 215 340 534 -194.1 -36
9 A4 18 6 158 182 584 -402.4 -69
10 A6 65 39 211 314 818 -503.6 -62
11 A8 85 70 248 403 930 -526.4 -57
12 A12 40 5 237 282 670 -388.5 -58
13 A14 37 62 226 325 778 -452.6 -58
14 A15 43 38 159 240 496 -256.1 -52
15 A16 67 61 177 305 483 -177.4 -37
16 B3 15 36 121 171 376 -204.7 -54
17 B4 163 188 168 518 678 -159.1 -23
18 B5 33 141 160 334 581 -247.3 -43
19 B6 144 67 251 462 712 -250.1 -35
20 B7 174 203 245 621 762 -140.6 -18
21 B8 130 131 193 453 689 -236.0 -34
22 N1 151 106 178 435 611 -175.8 -29
23 N3 75 107 179 360 559 -198.7 -36
24 M1 13 84 141 238 465 -226.6 -49
25 J1 0 61 138 199 453 -254.0 -56
26 J2 31 294 170 494 589 -94.6 -16
27 J5 249 183 224 656 715 -59.3 -8
28 J7 133 54 168 355 576 -221.1 -38
29 J8 5 96 123 223 450 -226.5 -50
30 J9 15 39 197 251 557 -306.0 -55
31 J10 0 118 161 279 482 -202.1 -42
32 C3 5 76 134 214 420 -206.0 -49
33 C4 31 3 122 156 433 -277.5 -64
34 C8 14 66 210 290 649 -358.8 -55
35 C9 31 55 205 291 610 -318.7 -52
36 D1 35 51 313 399 776 -377.1 -49
37 D2 2 153 211 366 481 -115.7 -24
38 D6 22 0 185 207 346 -139.3 -40
39 T1 7 2 151 160 447 -287.0 -64
40 T2 7 1 119 127 406 -279.4 -69
41 T5 4 1 108 113 371 -258.1 -70
47 81 186 314 567 -253.7 -44.7
Jadual 7 : Hujan 3 Bulan (Mac, April dan Mei LT 2016) bagi Analisis 2- Senario 1
17 | P a g e
NO Station Index APRIL MEI LT JUN LT Cumm of 3 Months Actual Rainfall Cumm of 3 Months LT Rainfall Diff in Rainfall (mm) % Dev 1 R1 87 190 164 441 509 -68.4 -13
2 K1 54 171 117 341 475 -134.2 -28
3 K3 35 206 186 427 566 -139.5 -25
4 K4 124 227 166 517 625 -107.7 -17
5 K5 142 233 209 584 665 -81.5 -12
6 P1 136 195 152 482 546 -64.6 -12
7 P2 70 180 127 377 523 -146.8 -28
8 P3 81 214 162 457 573 -116.3 -20
9 A4 6 158 101 265 485 -219.8 -45
10 A6 39 211 133 383 658 -275.4 -42
11 A8 70 248 137 455 739 -283.9 -38
12 A12 5 237 257 498 739 -240.9 -33
13 A14 62 226 146 434 670 -236.5 -35
14 A15 38 159 125 322 473 -151.9 -32
15 A16 61 177 117 355 483 -127.4 -26
16 B3 36 121 82 238 336 -97.8 -29
17 B4 188 168 119 474 559 -84.2 -15
18 B5 141 160 96 397 480 -82.9 -17
19 B6 67 251 175 494 694 -200.2 -29
20 B7 203 244 164 611 703 -92.3 -13
21 B8 131 193 118 441 571 -130.0 -23
22 N1 106 178 115 399 526 -126.4 -24
23 N3 107 179 110 396 475 -79.3 -17
24 M1 84 141 106 331 421 -89.5 -21
25 J1 61 138 99 298 393 -94.7 -24
26 J2 294 170 146 610 553 57.3 10
27 J5 183 224 145 552 620 -68.3 -11
28 J7 54 168 159 381 532 -151.5 -28
29 J8 96 123 84 303 355 -52.5 -15
30 J9 39 197 166 401 514 -112.7 -22
31 J10 118 161 117 396 432 -35.7 -8
32 C3 76 134 95 304 368 -63.7 -17
33 C4 3 122 108 233 361 -128.4 -36
34 C8 66 210 103 380 555 -175.6 -32
35 C9 55 205 177 437 592 -155.0 -26
36 D1 51 313 219 583 769 -185.6 -24
37 D2 153 211 196 559 560 -1.3 0
38 D6 0 184 176 360 437 -76.7 -18
39 T1 2 151 146 299 423 -124.4 -29
40 T2 1 119 108 228 358 -130.3 -36
41 T5 1 108 98 206 314 -107.9 -34
81 186 140 406 528 -121.6 -23.0
Jadual 8 : Hujan 3 Bulan (April, Mei LT dan Jun LT 2016) bagi Analisis 3 -Senario 1
18 | P a g e
NO Station Index MAC APR MEI LT (+35%)
Cumm of 3 Months Actual Rainfall Cumm of 3 Months LT Rainfall Diff in Rainfall (mm) % Dev
1 R1 5 87 256 348 469 -120.8 -26
2 K1 7 54 231 292 503 -211.7 -42
3 K3 0 35 279 313 497 -183.5 -37
4 K4 0 124 307 431 599 -168.0 -28
5 K5 0 142 315 457 631 -174.4 -28
6 P1 1 136 263 399 528 -129.1 -24
7 P2 30 70 243 343 544 -201.1 -37
8 P3 45 81 290 415 534 -119.0 -22
9 A4 18 6 213 237 584 -347.2 -59
10 A6 65 39 284 388 818 -430.0 -53
11 A8 85 70 335 490 930 -439.5 -47
12 A12 40 5 320 365 670 -305.6 -46
13 A14 37 62 306 405 778 -373.4 -48
14 A15 43 38 215 295 496 -200.5 -40
15 A16 67 61 239 367 483 -115.3 -24
16 B3 15 36 163 213 376 -162.4 -43
17 B4 163 188 227 577 678 -100.3 -15
18 B5 33 141 217 390 581 -191.1 -33
19 B6 144 67 339 550 712 -162.1 -23
20 B7 174 203 330 707 762 -55.0 -7
21 B8 130 131 260 521 689 -168.6 -24
22 N1 151 106 240 497 611 -113.4 -19
23 N3 75 107 242 423 559 -136.0 -24
24 M1 13 84 190 287 465 -177.2 -38
25 J1 0 61 187 248 453 -205.6 -45
26 J2 31 294 229 554 589 -35.2 -6
27 J5 249 183 302 734 715 19.0 3
28 J7 133 54 227 413 576 -162.3 -28
29 J8 5 96 166 266 450 -183.6 -41
30 J9 15 39 266 320 557 -237.0 -43
31 J10 0 118 218 336 482 -145.7 -30
32 C3 5 76 180 261 420 -159.2 -38
33 C4 31 3 165 199 433 -234.7 -54
34 C8 14 66 284 364 649 -285.2 -44
35 C9 31 55 277 363 610 -246.9 -40
36 D1 35 51 423 509 776 -267.5 -34
37 D2 2 153 284 439 481 -41.9 -9
38 D6 22 0 249 271 346 -74.7 -22
39 T1 7 2 204 213 447 -234.1 -52
40 T2 7 1 160 168 406 -237.9 -59
41 T5 4 1 145 150 371 -220.5 -59
47 81 250 379 567 -189 -33
Jadual 9 : Hujan 3 Bulan (Mac, April dan Mei LT 2016) bagi Analisis 2 -Senario 2
19 | P a g e
NO Station Index APR MEI LT (+35%)
JUN LT (+35%)
Cumm of 3 Months Actual Rainfall Cumm of 3 Months LT Rainfall Diff in Rainfall (mm) % Dev
1 R1 87.0 256.4 220.9 564.31 509.0 55.3 11
2 K1 53.5 231.0 157.5 442.01 475.5 -33.5 -7
3 K3 34.5 278.7 250.9 564.17 566.4 -2.2 0
4 K4 124.0 306.8 224.0 654.83 624.9 29.9 5
5 K5 142.0 314.5 281.8 738.30 665.2 73.1 11
6 P1 135.5 262.8 204.7 603.00 546.4 56.6 10
7 P2 70.0 243.1 171.0 484.05 523.5 -39.5 -8
8 P3 80.5 289.6 218.7 588.81 573.3 15.5 3
9 A4 6.0 212.9 136.9 355.77 484.9 -129.1 -27
10 A6 38.5 284.3 180.2 503.01 658.0 -155.0 -24
11 A8 70.0 335.3 184.3 589.65 738.8 -149.2 -20
12 A12 5.0 319.6 346.4 670.95 739.2 -68.2 -9
13 A14 62.0 305.6 196.5 564.10 670.4 -106.3 -16
14 A15 37.5 214.6 168.9 420.99 473.5 -52.5 -11
15 A16 61.0 239.4 157.9 458.30 482.7 -24.4 -5
16 B3 35.5 163.0 110.7 309.20 336.0 -26.8 -8
17 B4 187.5 226.7 160.5 574.72 558.5 16.2 3
18 B5 140.5 216.6 129.5 486.51 479.7 6.8 1
19 B6 67.0 339.1 236.7 642.80 693.7 -50.9 -7
20 B7 202.5 330.0 220.9 753.41 702.9 50.5 7
21 B8 130.5 260.3 159.2 550.07 571.3 -21.2 -4
22 N1 106.0 240.3 155.5 501.81 525.6 -23.8 -5
23 N3 106.5 241.5 149.0 497.07 475.1 22.0 5
24 M1 84.0 190.5 143.3 417.73 420.7 -3.0 -1
25 J1 61.0 186.8 133.1 380.93 392.7 -11.8 -3
26 J2 293.5 229.3 197.7 720.49 552.5 168.0 30
27 J5 183.0 301.9 196.0 680.89 620.1 60.8 10
28 J7 53.5 226.9 214.9 495.35 532.3 -36.9 -7
29 J8 95.5 165.6 114.0 375.09 355.1 20.0 6
30 J9 38.5 266.2 223.5 528.18 513.9 14.3 3
31 J10 118.0 217.9 157.3 493.22 431.6 61.6 14
32 C3 75.5 180.5 127.8 383.82 367.6 16.2 4
33 C4 2.5 165.1 145.7 313.31 361.1 -47.8 -13
34 C8 66.0 283.7 139.5 489.23 555.1 -65.9 -12
35 C9 55.0 277.2 239.1 571.28 592.4 -21.1 -4
36 D1 51.0 422.6 296.3 769.84 769.1 0.8 0
37 D2 153.0 284.3 264.0 701.30 560.5 140.9 25
38 D6 0.0 249.0 237.0 486.07 436.8 49.3 11
39 T1 2.0 204.2 196.7 402.89 423.4 -20.5 -5
40 T2 1.0 160.3 145.9 307.24 358.1 -50.9 -14
41 T5 1.0 145.2 132.2 278.39 314.4 -36.0 -11
80.9 250.5 188.5 519.8 527.6 -7.8 -1
Jadual 10 : Hujan 3 Bulan (April, Mei LT & Jun LT 2016) bagi Analisis 3- Senario 2
20 | P a g e
NO Station Index MAC APRIL MEI LT (-35%)
Cumm of 3 Months Actual Rainfall Cumm of 3 Months LT Rainfall Diff in Rainfall (mm) % Dev
1 R1 5 87 123 215 469 -253.7 -54 2 K1 7 54 111 172 503 -331.5 -66 3 K3 0 35 134 169 497 -328.0 -66 4 K4 0 124 148 272 599 -327.1 -55 5 K5 0 142 151 293 631 -337.5 -53 6 P1 1 136 127 263 528 -265.3 -50 7 P2 30 70 117 217 544 -327.2 -60 8 P3 45 81 139 265 534 -269.1 -50 9 A4 18 6 102 126 584 -457.6 -78 10 A6 65 39 137 240 818 -577.3 -71 11 A8 85 70 161 316 930 -613.4 -66 12 A12 40 5 154 199 670 -471.3 -70 13 A14 37 62 147 246 778 -531.9 -68 14 A15 43 38 103 184 496 -311.8 -63 15 A16 67 61 115 243 483 -239.5 -50 16 B3 15 36 78 129 376 -247.0 -66 17 B4 163 188 109 460 678 -217.9 -32 18 B5 33 141 104 278 581 -303.4 -52 19 B6 144 67 163 374 712 -338.0 -47 20 B7 174 203 159 535 762 -226.1 -30 21 B8 130 131 125 386 689 -303.5 -44 22 N1 151 106 116 373 611 -238.1 -39 23 N3 75 107 116 298 559 -261.3 -47 24 M1 13 84 92 189 465 -276.0 -59 25 J1 0 61 90 151 453 -302.5 -67 26 J2 31 294 110 435 589 -154.1 -26 27 J5 249 183 145 577 715 -137.6 -19 28 J7 133 54 109 296 576 -280.0 -49 29 J8 5 96 80 180 450 -269.4 -60 30 J9 15 39 128 182 557 -375.0 -67 31 J10 0 118 105 223 482 -258.6 -54 32 C3 5 76 87 167 420 -252.8 -60 33 C4 31 3 80 113 433 -320.3 -74 34 C8 14 66 137 217 649 -432.3 -67 35 C9 31 55 133 219 610 -390.6 -64 36 D1 35 51 203 289 776 -486.6 -63 37 D2 2 153 137 292 481 -189.4 -39 38 D6 22 0 120 142 346 -203.8 -59 39 T1 7 2 98 107 447 -339.9 -76 40 T2 7 1 77 85 406 -321.0 -79 41 T5 4 1 70 75 371 -295.8 -80
47 81 121 249 567 -318.6 -56
Jadual 11 : Hujan 3 Bulan (Februari, Mac dan April LT 2016) bagi Analisis 2 -Senario 3
21 | P a g e
NO Station Index APRIL MEI LT (-35%)
JUN LT (-35%)
Cumm of 3 Months Actual Rainfall Cumm of 3 Months LT Rainfall Diff in Rainfall (mm) % Dev
1 R1 87.0 123.5 106.4 316.82 509.0 -192.1 -38
2 K1 53.5 111.2 75.8 240.56 475.5 -234.9 -49
3 K3 34.5 134.2 120.8 289.53 566.4 -276.8 -49
4 K4 124.0 147.7 107.8 379.58 624.9 -245.3 -39
5 K5 142.0 151.4 135.7 429.11 665.2 -236.1 -35
6 P1 135.5 126.6 98.5 360.59 546.4 -185.8 -34
7 P2 70.0 117.0 82.3 269.36 523.5 -254.1 -49
8 P3 80.5 139.4 105.3 325.24 573.3 -248.1 -43
9 A4 6.0 102.5 65.9 174.41 484.9 -310.5 -64
10 A6 38.5 136.9 86.7 262.15 658.0 -395.8 -60
11 A8 70.0 161.5 88.7 320.20 738.8 -418.6 -57
12 A12 5.0 153.9 166.8 325.64 739.2 -413.6 -56
13 A14 62.0 147.1 94.6 303.75 670.4 -366.7 -55
14 A15 37.5 103.3 81.3 222.14 473.5 -251.3 -53
15 A16 61.0 115.2 76.0 252.29 482.7 -230.4 -48
16 B3 35.5 78.5 53.3 167.28 336.0 -168.8 -50
17 B4 187.5 109.2 77.3 373.94 558.5 -184.6 -33
18 B5 140.5 104.3 62.3 307.10 479.7 -172.6 -36
19 B6 67.0 163.3 113.9 344.24 693.7 -349.5 -50
20 B7 202.5 158.9 106.3 467.75 702.9 -235.1 -33
21 B8 130.5 125.3 76.7 332.51 571.3 -238.8 -42
22 N1 106.0 115.7 74.9 296.57 525.6 -229.0 -44
23 N3 106.5 116.3 71.8 294.55 475.1 -180.6 -38
24 M1 84.0 91.7 69.0 244.69 420.7 -176.0 -42
25 J1 61.0 89.9 64.1 215.04 392.7 -177.6 -45
26 J2 293.5 110.4 95.2 499.09 552.5 -53.4 -10
27 J5 183.0 145.4 94.4 422.72 620.1 -197.4 -32
28 J7 53.5 109.3 103.5 266.24 532.3 -266.1 -50
29 J8 95.5 79.7 54.9 230.12 355.1 -125.0 -35
30 J9 38.5 128.2 107.6 274.27 513.9 -239.7 -47
31 J10 118.0 104.9 75.7 298.66 431.6 -133.0 -31
32 C3 75.5 86.9 61.6 223.95 367.6 -143.6 -39
33 C4 2.5 79.5 70.1 152.15 361.1 -209.0 -58
34 C8 66.0 136.6 67.2 269.78 555.1 -285.3 -51
35 C9 55.0 133.5 115.1 303.58 592.4 -288.9 -49
36 D1 51.0 203.5 142.6 397.11 769.1 -372.0 -48
37 D2 153.0 136.9 127.1 417.00 560.5 -143.5 -26
38 D6 0.0 119.9 114.1 234.03 436.8 -202.7 -46
39 T1 2.0 98.3 94.7 195.02 423.4 -228.3 -54
40 T2 1.0 77.2 70.3 148.45 358.1 -209.7 -59
41 T5 1.0 69.9 63.6 134.56 314.4 -179.8 -57
80.9 120.6 90.7 292.2 527.6 -235.4 -45
Jadual 12 : Hujan 3 Bulan (April, Mei LT dan Jun LT 2016) bagi Analisis 3- Senario 3
22 | P a g e
Berdasarkan keputusan Analisis Hujan 1 bulan dan Analisis Hujan 3 Bulan bagi bulan April
2016 untuk keseluruhan senario, kebarangkalian kawasan kering bagi bulan Mei 2016 dan
Jun 2016 adalah seperti Jadual 13, Jadual 14 dan Jadual 15.
Bulan Indeks Stesen
Nama Stesen Daerah Negeri Kawasan Kebarangkalian
Kering
Mei
2016
R1 Abi Kg. Bahru Kangar Perlis Kangar
K1 Kuala Nerang Padang Terap
Kedah Padang Terap
K3 Stor Jps. Alor Star Kota Setar Kedah Kota Setar
K4 Ampang Pedu Padang Terap
Kedah Padang Terap
K5 Ampang Muda Padang Terap
Kedah Padang Terap
P1 Rumah Pam Pinang Tunggal
SPU P.Pinang SPU
P2 Pusat Kesihatan Bkt. Berapit
SPT P.Pinang SPT
P3 Kolam Takongan Air Itam
Daerah Timur Laut
P.Pinang Daerah Timur Laut
A4 Kg. Pulau Besar Perak Tengah
Perak Perak Tengah
A6 Rumah JPS., Sg.
Mengkuang
Hilir Perak Perak Hilir Perak
A8 Rumah Kerajaan JPS., Chui Chak
Hilir Perak Perak Hilir Perak
A12 Politeknik Ungku Omar di Ipoh
Kinta Perak Kinta
A14 Kolam Air Bkt. Merah Kerian Perak Kerian
A15 Stn. Petak Ujian Tg. Piandang
Kerian Perak Kerian
A16 Stn. Pemeriksaan Hutan Lawin
Hulu Perak Perak Hulu Perak
B3 Stor JPS Tg.Karang Kuala Selangor
Selangor Kuala Selangor
B5 SMK Tasik Kesuma Hulu Langat Selangor Hulu Langat
B6 Loji Air Kuala Kubu Bahru
Hulu Selangor
Selangor Hulu Selangor
N3 Sg Lui Halt Kuala Pilah Negeri Sembilan
Kuala Pilah
M1 Ldg. Lendu Alor Gajah Melaka Alor Gajah
J1 Ldg. Sungai Gemas Segamat Johor Segamat
J5 Stor JPS Johor Bahru
Johor Bahru Johor Johor Bahru
J7 Sek. Men. Munshi Sulaiman
Batu Pahat Johor Batu Pahat
J8 Stn. Telemetri di Bandar Segamat
Segamat Johor Segamat
J9 Empangan Labong, Endau
Mersing Johor Mersing
J10 Ldg. Paya Lang, Segamat
Segamat Johor Segamat
23 | P a g e
Bulan Indeks Stesen
Nama Stesen Daerah Negeri Kawasan Kebarangkalian
Kering
C3 JPS Temerloh Temerloh Pahang Temerloh
C4 Rumah Pam Pahang Tua di Pekan
Pekan Pahang Pekan
C8 Ldg. Boh (Kawasan Kilang)
Cameron Highlands
Pahang Cameron Highlands
C9 Sg. Lembing P.C.C.L Mill
Kuantan Pahang Kuantan
D1 Gunung Gagau Gua Musang Kelantan Gua Musang
D6 Ibu Bekalan To' Uban Pasir Mas Kelantan Pasir Mas
T1 JPS Kemaman Kemaman Terengganu Kemaman
T2 Sek. Men. Sultan Omar di Dungun
Dungun Terengganu Dungun
T5 Setor JPS Kuala Terengganu
Kuala Terengganu
Terengganu Kuala Terengganu
Jun
2016
A4 Kg. Pulau Besar Perak Tengah
Perak Perak Tengah
A6 Rumah JPS., Sg.
Mengkuang
Hilir Perak Perak Hilir Perak
A8 Rumah Kerajaan JPS., Chui Chak
Hilir Perak Perak Hilir Perak
A14 Kolam Air Bkt. Merah Kerian Perak Kerian
C4 Rumah Pam Pahang Tua di Pekan
Pekan Pahang Pekan
T2 Sek. Men. Sultan Omar di Dungun
Dungun Terengganu Dungun
Jadual 13 : Senarai Stesen Kebarangkalian Kering Berpandukan Analisis Hujan bagi Bulan April2016 (Senario 1 : Sekiranya Berlaku Hujan Normal bagi bulan Mei 2016 dan Jun 2016)
Bulan Indeks Stesen
Nama Stesen Daerah Negeri Kawasan Kebarangkalian
Kering
Mei
2016 K1 Kuala Nerang Padang
Terap Kedah Padang Terap
K3 Stor Jps. Alor Star Kota Setar Kedah Kota Setar
P2 Pusat Kesihatan Bkt. Berapit
SPT P.Pinang SPT
A4 Kg. Pulau Besar Perak Tengah
Perak Perak Tengah
A6 Rumah JPS., Sg.
Mengkuang
Hilir Perak Perak Hilir Perak
A8 Rumah Kerajaan JPS., Chui Chak
Hilir Perak Perak Hilir Perak
A12 Politeknik Ungku Omar di Ipoh
Kinta Perak Kinta
A14 Kolam Air Bkt. Merah Kerian Perak Kerian
A15 Stn. Petak Ujian Tg. Piandang
Kerian Perak Kerian
B3 Stor JPS Tg.Karang Kuala Selangor
Selangor Kuala Selangor
24 | P a g e
Bulan Indeks Stesen
Nama Stesen Daerah Negeri Kawasan Kebarangkalian
Kering
M1 Ldg. Lendu Alor Gajah Melaka Alor Gajah J1 Ldg. Sungai Gemas Segamat Johor Segamat
J8 Stn. Telemetri di Bandar Segamat
Segamat Johor Segamat
J9 Empangan Labong, Endau
Mersing Johor Mersing
C3 JPS Temerloh Temerloh Pahang Temerloh
C4 Rumah Pam Pahang Tua di Pekan
Pekan Pahang Pekan
C8 Ldg. Boh (Kawasan Kilang)
Cameron Highlands
Pahang Cameron Highlands
C9 Sg. Lembing P.C.C.L Mill
Kuantan Pahang Kuantan
T1 JPS Kemaman Kemaman Terengganu Kemaman
T2 Sek. Men. Sultan Omar di Dungun
Dungun Terengganu Dungun
T5 Setor JPS Kuala Terengganu
Kuala Terengganu
Terengganu Kuala Terengganu
Jun 2016
TIADA
Jadual 14 : Senarai Stesen Kebarangkalian Kering Berpandukan Analisis hujan bagi Bulan April 2016 (Senario 2 : Sekiranya Berlaku Pertambahan 35% Kepada Purata Hujan Jangka Panjang bagi Bulan
Mei 2016 dan Jun 2016)
Bulan Indeks Stesen
Nama Stesen Daerah Negeri Kawasan Kebarangkalian
Kering
Mei 2016
R1 Abi Kg Bahru Kangar Perlis Kangar
K1 Kuala Nerang Padang Terap
Kedah Padang Terap
K3 Stor Jps. Alor Star Kota Setar Kedah Kota Setar
K4 Ampang Pedu Padang Terap
Kedah Padang Terap
K5 Ampang Muda Padang Terap
Kedah Padang Terap
P1 Rumah Pam Pinang Tunggal
SPU P.Pinang SPU
P2 Pusat Kesihatan Bkt. Berapit
SPT P.Pinang SPT
P3 Kolam Takongan Air Itam
Daerah Timur Laut
P.Pinang Daerah Timur Laut
A4 Kg. Pulau Besar Perak Tengah
Perak Perak Tengah
A6 Rumah JPS., Sg.
Mengkuang
Hilir Perak Perak Hilir Perak
A8 Rumah Kerajaan JPS., Chui Chak
Hilir Perak Perak Hilir Perak
A12 Politeknik Ungku Omar di Ipoh
Kinta Perak Kinta
25 | P a g e
Bulan Indeks Stesen
Nama Stesen Daerah Negeri Kawasan Kebarangkalian
Kering
A14 Kolam Air Bkt. Merah Kerian Perak Kerian A15 Stn. Petak Ujian Tg.
Piandang Kerian Perak Kerian
A16 Stn. Pemeriksaan Hutan Lawin
Hulu Perak Perak Hulu Perak
B3 Stor JPS Tg.Karang Kuala Selangor
Selangor Kuala Selangor
B5 SMK Tasik Kesuma Hulu Langat Selangor Hulu Langat
B6 Loji Air Kuala Kubu Bahru
Hulu Selangor
Selangor Hulu Selangor
B8 Pusat Penyelidikan
Getah Sg.Buloh
Petaling Selangor Petaling
N1 Setor JPS Sikamat
Seremban
Seremban Negeri
Sembilan
Seremban
N3 Sg Lui Halt Kuala Pilah Negeri Sembilan
Kuala Pilah
M1 Ldg. Lendu Alor Gajah Melaka Alor Gajah
J1 Ldg. Sungai Gemas Segamat Johor Segamat
J7 Sek. Men. Munshi Sulaiman
Batu Pahat Johor Batu Pahat
J8 Stn. Telemetri di Bandar Segamat
Segamat Johor Segamat
J9 Empangan Labong, Endau
Mersing Johor Mersing
J10 Ldg. Paya Lang, Segamat
Segamat Johor Segamat
C3 JPS Temerloh Temerloh Pahang Temerloh
C4 Rumah Pam Pahang Tua di Pekan
Pekan Pahang Pekan
C8 Ldg. Boh (Kawasan Kilang)
Cameron Highlands
Pahang Cameron Highlands
C9 Sg. Lembing P.C.C.L Mill
Kuantan Pahang Kuantan
D1 Gunung Gagau Gua Musang Kelantan Gua Musang
D2 Gua Musang Gua Musang Kelantan Gua Musang
D6 Ibu Bekalan To' Uban Pasir Mas Kelantan Pasir Mas
T1 JPS Kemaman Kemaman Terengganu Kemaman
T2 Sek. Men. Sultan Omar di Dungun
Dungun Terengganu Dungun
T5 Setor JPS Kuala Terengganu
Kuala Terengganu
Terengganu Kuala Terengganu
Jun 2016
R1 Abi Kg. Bahru Kangar Perlis Kangar
K1 Kuala Nerang Padang Terap
Kedah Padang Terap
K3 Stor Jps. Alor Star Kota Setar Kedah Kota Setar
K4 Ampang Pedu Padang Terap
Kedah Padang Terap
26 | P a g e
Bulan Indeks Stesen
Nama Stesen Daerah Negeri Kawasan Kebarangkalian
Kering
K5 Ampang Muda Padang Terap
Kedah Padang Terap
P2 Pusat Kesihatan Bkt. Berapit
SPT P.Pinang SPT
P3 Kolam Takongan Air Itam
Daerah Timur Laut
P.Pinang Daerah Timur Laut
A4 Kg. Pulau Besar Perak Tengah
Perak Perak Tengah
A6 Rumah JPS., Sg.
Mengkuang
Hilir Perak Perak Hilir Perak
A8 Rumah Kerajaan JPS., Chui Chak
Hilir Perak Perak Hilir Perak
A12 Politeknik Ungku Omar di Ipoh
Kinta Perak Kinta
A14 Kolam Air Bkt. Merah Kerian Perak Kerian
A15 Stn. Petak Ujian Tg. Piandang
Kerian Perak Kerian
A16 Stn. Pemeriksaan Hutan Lawin
Hulu Perak Perak Hulu Perak
B3 Stor JPS Tg.Karang Kuala Selangor
Selangor Kuala Selangor
B5 SMK Tasik Kesuma Hulu Langat Selangor Hulu Langat
B6 Loji Air Kuala Kubu Bahru
Hulu Selangor
Selangor Hulu Selangor
B8 Pusat Penyelidikan
Getah Sg.Buloh
Petaling Selangor Petaling
N1 Setor JPS Sikamat
Seremban
Seremban Negeri
Sembilan
Seremban
N3 Sg Lui Halt Kuala Pilah Negeri Sembilan
Kuala Pilah
M1 Ldg. Lendu Alor Gajah Melaka Alor Gajah
J1 Ldg. Sungai Gemas Segamat Johor Segamat
J7
J8 Stn. Telemetri di Bandar Segamat
Segamat Johor Segamat
J9 Empangan Labong Mersing Johor Mersing
C3 JPS Temerloh Temerloh Pahang Temerloh
C4 Rumah Pam Pahang Tua di Pekan
Pekan Pahang Pekan
C8 Ldg. Boh (Kawasan Kilang)
Cameron Highlands
Pahang Cameron Highlands
C9 Sg. Lembing P.C.C.L Mill
Kuantan Pahang Kuantan
D1 Gunung Gagau Gua Musang Kelantan Gua Musang
D6 Ibu Bekalan To' Uban Pasir Mas Kelantan Pasir Mas
T1 JPS Kemaman Kemaman Terengganu Kemaman
27 | P a g e
Bulan Indeks Stesen
Nama Stesen Daerah Negeri Kawasan Kebarangkalian
Kering
T2 Sek. Men. Sultan Omar di Dungun
Dungun Terengganu Dungun
T5 Setor JPS Kuala Terengganu
Kuala Terengganu
Terengganu Kuala Terengganu
Jadual 15 : Senarai Stesen Kebarangkalian Kering Berpandukan Analisis hujan bagi Bulan April 2016 (Senario 3 : Sekiranya Berlaku Pengurangan 35% Kepada Purata Hujan Jangka Panjang bagi Bulan
Mei 2016 dan Jun 2016)
28 | P a g e
3. ANALISIS LUAHAN SUNGAI
3.1 Bacaan Purata Luahan Sungai yang Dipantau bagi Bulan April 2016.
B. NAMA
STESEN NEGERI
PARAS
NORMAL
SUNGAI
(m)
PURATA
PARAS
SUNGAI
BULAN MAC
(m)
PURATA
KADARALIR
SUNGAI
BULAN MAC
(m3/s)
PURATA
PARAS
SUNGAI
BULAN
APRIL (m)
PURATA
KADARALIR
SUNGAI
BULAN
APRIL (m3/s)
KADARALIR KEMARAU TEMPOH ULANGAN UNTUK
7 HARI KADARALIR RENDAH
(m3/s)
2-Tahun 5-Tahun 10-
Tahun 20-Tahun
01
SG.MUAR DI
BULOH
KASAP
JHR 15.50 - - - - 8.05 5.05 4.2 3.2
02
SG .BEKOK
DI BT.77 JLN
Y.P
JHR 5.94 2.88 0.32 2.86 0.30 1.88 0.73 0.35 0.14
03
SG. JOHOR
AT RANTAU
PANJANG
JHR 4.00 3.02 24.85 3.02 24.85 8.14 4.79 3.15 1.9
04
SG. MUDA
AT
JAMBATAN
SYED OMAR
KDH 8.00 6.20 20.42 6.36 25.41 17.6 10.96 9.33 8.6
05 SG.GALAS
DI DABONG KEL 28.00 24.75 59.94 23.79 29.22 195.13 101.74 61.48 33.74
06
SG.KELANT
AN DI
KUSIAL
KEL 10.00 9.19 303.87 8.86 230.91 155.4 98.9 70.5 48.5
07
SG. LINGGI
AT SUA
BETONG
N. S 5.00 - - - - 3.47 1.73 1.07 0.65
29 | P a g e
B. NAMA
STESEN NEGERI
PARAS
NORMAL
SUNGAI
(m)
PURATA
PARAS
SUNGAI
BULAN MAC
(m)
PURATA
KADARALIR
SUNGAI
BULAN MAC
(m3/s)
PURATA
PARAS
SUNGAI
BULAN
APRIL (m)
PURATA
KADARALIR
SUNGAI
BULAN
APRIL (m3/s)
KADARALIR KEMARAU TEMPOH ULANGAN UNTUK
7 HARI KADARALIR RENDAH
(m3/s)
2-Tahun 5-Tahun 10-
Tahun 20-Tahun
08
SG.BENTON
G DI KUALA
MARONG
PHG 86.00 85.26 4.72 85.25 4.61 2.77 1.64 1.16 0.83
09
SG.KUANTA
N DI BUKIT
KENAU
PHG 17.00 16.29 1.10 16.27 1.01 8.28 1.5 0.91 0.64
10
SG.PAHANG
DI SUNGAI
YAP
PHG 44.00 43.81 365.01 - - 104.52 51.78 32.16 20.05
11
SG.TRIANG
DI
JAM.KERET
API
PHG 31.00 29.70 1.08 30.09 2.63 18.11 7.31 3.33 0.9
12
SG.PAHANG
DI
TEMERLOH
(LUBUK
PASU)
PHG 26.00 24.13 193.62 22.96 67.94 165.43 110.86 90.75 78.44
13
SG. KULIM
DI ARA
KUDA
P.P 7.00 5.89 36.62 5.84 34.46 1.74 1.22 1.07 0.99
14
SG.MUDA DI
LADANG
VICTORIA
P. P 3.50 2.44 17.83 2.53 19.96 15.75 9.83 8.2 7.39
15 SG.PLUS DI
KG.LINTANG PRK 52.00 52.52 22.37 52.48 20.82 13.3 9.29 7.41 6.03
http://infokemarau.water.gov.my/river_chart_scatter.cfm?ids=99http://infokemarau.water.gov.my/river_chart_scatter.cfm?ids=99http://infokemarau.water.gov.my/river_chart_scatter.cfm?ids=99
30 | P a g e
B. NAMA
STESEN NEGERI
PARAS
NORMAL
SUNGAI
(m)
PURATA
PARAS
SUNGAI
BULAN MAC
(m)
PURATA
KADARALIR
SUNGAI
BULAN MAC
(m3/s)
PURATA
PARAS
SUNGAI
BULAN
APRIL (m)
PURATA
KADARALIR
SUNGAI
BULAN
APRIL (m3/s)
KADARALIR KEMARAU TEMPOH ULANGAN UNTUK
7 HARI KADARALIR RENDAH
(m3/s)
2-Tahun 5-Tahun 10-
Tahun 20-Tahun
16
SG.PERAK
DI
ISKANDAR
BRIDGE
PRK 32.00 31.52 115.27 31.58 120.33 122.65 68.94 45.49 29.16
17 SG. KERIAN
DI SELAMA PRK 10.00 7.60 4.74 7.50 3.76 10.13 6.09 4.21 2.84
18 SG.LANGAT
DI DENGKIL SEL 4.00 3.24 13.56 3.24 13.56 7.29 4.31 3.15 2.41
19
SG.BERNAM
DI
JAMBATAN
SKC
SEL 16.60 15.92 19.01 15.85 17.44 15.79 12.17 10.88 10.12
20
SG.BERNAM
DI TANJUNG
MALIM
SEL 38.30 36.26 1.83 36.23 1.81 3.27 2.28 1.97 1.81
21 SG.LANGAT
DI KAJANG SEL 22.89 22.29 6.79 22.33 7.19 2.29 1.13 0.79 0.61
22
SG.SELANG
OR DI
RANTAU
PANJANG
SEL 4.50 4.24 20.83 4.23 20.60 18.87 13.07 9.95 7.4
23 SG.LUI DI
KG. SG. LUI SEL 76.80 74.57 1.40 74.61 1.79 0.65 0.37 0.24 0.16
31 | P a g e
Jadual 16 : Rekod Luahan Sungai pada April 2016
B. NAMA
STESEN NEGERI
PARAS
NORMAL
SUNGAI
(m)
PURATA
PARAS
SUNGAI
BULAN MAC
(m)
PURATA
KADARALIR
SUNGAI
BULAN MAC
(m3/s)
PURATA
PARAS
SUNGAI
BULAN
APRIL (m)
PURATA
KADARALIR
SUNGAI
BULAN
APRIL (m3/s)
KADARALIR KEMARAU TEMPOH ULANGAN UNTUK
7 HARI KADARALIR RENDAH
(m3/s)
2-Tahun 5-Tahun 10-
Tahun 20-Tahun
24
SG.SEMENY
IH DI
RINCHING
SEL 22.00 20.51 4.22 20.53 4.73 1.93 1.14 0.96 0.88
25
SG.DUNGUN
DI
JAM.JERAN
GAU
TER 7.00 4.57 1.70 4.38 1.12 26.84 12.81 6.12 1.14
32 | P a g e
3.2 Sungai yang berada dibawah Drought Flow 5 Year : 1 Sungai
33 | P a g e
3.3 Sungai yang berada dibawah Drought Flow 10 Year : 4 Sungai
34 | P a g e
35 | P a g e
36 | P a g e
37 | P a g e
3.4 Sungai yang berada dibawah Drought Flow 20 Year : 3 Sungai
38 | P a g e
39 | P a g e
40 | P a g e
4. ANALISIS STORAN EMPANGAN
4.1 Aras Air bagi Empangan-empangan yang Dipantau pada April 2016
BIL. ID
STESEN NEGERI NAMA EMPANGAN
NORMA
L LEVEL
(M)
MIN
LEVEL
(M)
MAX
LEVEL
(M)
ARAS
AIR MIN
BULAN
APRIL(M)
ARAS
AIR MAX
BULAN
APRIL
(M)
ARAS AIR
PURATA
BULAN
MAC (M)
ARAS
AIR
PURATA
BULAN
APRIL
(M)
STORAN
EMPANGA
N (MCM)
STORAN
EMPANGA
N (%)
1 1832401 JHR EMPANGAN MACHAP 15.85 13.10 19.4 15.20 15.50 15.53 15.32 9.61 77.08
2 1931425 JHR EMPANGAN SEMBRONG 10.00 6.00 13.8 9.28 9.52 9.41 9.39 25.20 82.54
3 2030401 JHR EMPANGAN BEKOK 15.50 8.70 22.00 13.28 13.68 13.67 13.43 33.10 54.17
4 2536468 JHR EMPANGAN LABONG 8.03 7.01 10.06 6.11 6.31 6.39 6.21 0.62 13.65
5 6397405 KDH EMPANGAN PADANG
SAGA 21.18 18.50 22.60 17.78 18.44 18.28 18.01 0.05 35.58
6 5907401 KDH EMPANGAN BERIS 84.00 68.00 86.40 75.63 79.21 81.01 77.35 43.32 37.99
7 5919403 KEL EMPANGAN BUKIT
KWONG 16.76 12.20 17.72 12.32 12.88 14.00 12.58 1.35 9.78
8 6207480 KDH EMPANGAN PEDU 97.56 67.07 97.56 87.91 94.20 94.80 91.73 755.51 69.95
9 6307480 KDH EMPANGAN AHNING 105.70 101.90 114.00 106.07 107.88 108.83 106.98 207.74 75.87
10 6108480 KDH EMPANGAN MUDA 94.50 82.20 103.30 91.58 94.98 95.67 93.59 65.02 42.08
11 2634402 PHG EMPANGAN ANAK
ENDAU 19.00 12.00 21.60 18.93 19.08 19.13 19.00 37.48 64.89
12 6502436 PLS EMPANGAN TIMAH
TASOH 29.10 25.30 30.10 26.10 26.47 26.89 26.26 11.56 29.01
13 4613401 PRK EMPANGAN ULU KINTA 245.00 189.80 245.00 241.56 243.70 244.67 242.36 61.87 91.82
41 | P a g e
BIL. ID
STESEN NEGERI NAMA EMPANGAN
NORMA
L LEVEL
(M)
MIN
LEVEL
(M)
MAX
LEVEL
(M)
ARAS
AIR MIN
BULAN
APRIL
(M)
ARAS
AIR MAX
BULAN
APRIL
(M)
ARAS AIR
PURATA
BULAN
MAC (M)
ARAS
AIR
PURATA
BULAN
APRIL
(M)
STORAN
EMPANGA
N (MCM)
STORAN
EMPANGA
N (%)
14 5006401 PRK EMPANGAN BUKIT
MERAH 8.70 6.40 9.80 6.03 7.48 8.31 6.50 19.57 24.76
15 3218402 SEL EMPANGAN LANGAT 220.96 204.21 220.96 215.55 216.67 215.75 216.05 24.36 71.46
16 3517401 SEL EMPANGAN SUNGAI
SELANGOR 220.00 184.63 220.00 204.80 212.20 215.39 208.18 160.64 69.84
17 3114401 SEL EMPANGAN TASIK
SUBANG 37.87 34.75 37.87 37.55 38.01 38.26 37.77 3.73 88.68
18 3515401 SEL EMPANGAN SUNGAI
TINGGI 59.50 45.03 59.50 55.46 56.83 57.59 55.99 97.32 79.45
19 3018402 SEL EMPANGAN SEMENYIH 111.00 84.30 113.90 105.24 107.53 108.57 106.16 42.58 60.27
20 3216403 WLY EMPANGAN BATU 102.70 79 107.3 97.82 99.21 99.96 98.47 23.46 73.38
21 3217435 WLY EMPANGAN KLANG
GATE 94 84 98 90.67 92.31 93.12 91.47 20.32 73.09
22 - N.SMN EMPANGAN
GEMENCHEH 110 86 120 94.57 94.69 95.13 94.63 6220.00 20.87
Jadual 17 : Rekod Aras Empangan pada Bulan April 2016
42 | P a g e
4.2 Empangan di Bawah Baki Storan 50% : 8 Empangan
43 | P a g e
44 | P a g e
45 | P a g e
46 | P a g e
47 | P a g e
48 | P a g e
49 | P a g e
50 | P a g e
5. PENGESAHAN
Disediakan Oleh:-
Mohammad Hasmiruddin bin Mohd Nasaruddin Penolong Jurutera
Unit Ramalan dan Operasi Seksyen Ramalan Banjir dan Kemarau
Siti Azura binti Mat Daud Penolong Pengarah Kanan (Fleksi)
Unit Ramalan dan Operasi Seksyen Ramalan Banjir dan Kemarau
Disemak Oleh;
______________________________________________ Muhammad Al-Muzammil bin Chu Ahmad
Ketua Penolong Pengarah Unit Ramalan dan Operasi
Seksyen Ramalan Banjir dan Kemarau
Tarikh : 08 Jun 2016
Recommended