Leveren aan de Automobiel Industrie PPAP en APQP;
Een route naar succesvol toeleveren
Jan van de Venne HighTech meets Automotive,
21 juni 2012
Waarom vraagt de automobiel Industrie ppm kwaliteit
operations yield cumulative
1 99% 99%
2 99% 98%
3 99% 97%
4 99% 96%
5 99% 95%
6 99% 94%
7 99% 93%
8 99% 92%
9 99% 91%
10 99% 90%
15 99% 86%
20 99% 82%
30 99% 74%
40 99% 67%
45 99% 64%
rework= 36%
operations yield cumulative
1 97% 97%
2 97% 94%
3 97% 91%
4 97% 89%
5 97% 86%
6 97% 83%
7 97% 81%
8 97% 78%
9 97% 76%
10 97% 74%
15 97% 63%
20 97% 54%
30 97% 40%
40 97% 30%
45 97% 25%
rework= 75%
operations yield cumulative
1 99.9997% 99.9997%
2 99.9997% 99.9993%
3 99.9997% 99.9990%
4 99.9997% 99.9986%
5 99.9997% 99.9983%
6 99.9997% 99.9980%
7 99.9997% 99.9976%
8 99.9997% 99.9973%
9 99.9997% 99.9969%
10 99.9997% 99.9966%
15 99.9997% 99.9949%
20 99.9997% 99.9932%
30 99.9997% 99.9898%
40 99.9997% 99.9864%
45 99.9997% 99.9847%
rework= 0.02%
HighTech Meets Automotive; PPAP & APQP; 21-06-2012 2
Car Manufacturer Volvo Gent,
1999 EFQM and TPM Excellence Winner
Kwaliteit in de automobiel industrie
HighTech Meets Automotive; PPAP & APQP; 21-06-2012 3
Assembly Cell Glass wall,
in their meeting corner,
covering all relevant processes
& responsibilities.
Kwaliteit in de automobiel industrie
HighTech Meets Automotive; PPAP & APQP; 21-06-2012 4
Each group member has taken responsibility
to monitor performance of a specific
process and display the results
on their glass wall supporting excellence
Kwaliteit in de automobiel industrie
5 HighTech Meets Automotive; PPAP & APQP; 21-06-2012 5
Process control
Design Control
AQL
6s
Cp > 2.00
Ford Q1, QS9000
Cpk > 1.67
Ppk > 1.67
%
ppm
ppb
Reje
ct
lev
el
-->
Time -->
Product control
Where are you
Kwaliteit in volume productie
PPAP
APQP
ISO/TS 16949
HighTech Meets Automotive; PPAP & APQP; 21-06-2012 6
FORD, grondleggers van massaproductie en bijbehorende kwaliteitssystemen
Start massa productie: 30-
er jaren
Kwaliteit systemen:
70-er jaren: Ford Q101,
90-er jaren: Q-101 wordt
uitgebreid naar QS-9000
Een kwaliteits systeem
voor toeleveranciers aan
de automobiel industrie.
2002:
QS9000 is opgevolgd door
ISO/TS 16949.
Henry Ford with Model T in Buffalo, NY, 1921
HighTech Meets Automotive; PPAP & APQP; 21-06-2012 7
Interesse in Variatie
Walter Andrew Shewhart, de vader van Statistische Process Beheersing. Quote van Wikipedia: When Dr. Shewhart joined the Western Electric Company Inspection Engineering Department at the Hawthorne Works in 1918, industrial quality was limited to inspecting finished products and removing defective items. That all changed on May 16, 1924. Dr. Shewhart's boss, George D. Edwards, recalled: "Dr. Shewhart prepared a little memorandum only about a page in length. About a third of that page was given over to a simple diagram which we would all recognize today as a schematic control chart. That diagram, and the short text which preceded and followed it, set forth all of the essential principles and considerations which are involved in what we know today as process quality control."[1] Shewhart's work pointed out the importance of reducing variation in a manufacturing process and the understanding that continual process-adjustment in reaction to non-conformance actually increased variation and degraded quality.
HighTech Meets Automotive; PPAP & APQP; 21-06-2012 8
www.aiag.org
HighTech Meets Automotive; PPAP & APQP; 21-06-2012 9
“AIAG is the catalyst for peak performance to establish a seamless, efficient and
responsible supply chain.”
Non-profit organisatie Publiceert standaarden: o.a. :
APQP: Advanved Product Quality Planning PPAP: Production Part Approval Process
Organiseert training programma’s, conferenties etc.
Product & Process kwaliteit in uw rol van een producent - toeleverancier
Business Ontwikkeling & Program-
mering
Technologie Ontwikkeling
Voor- ontwikkeling
Product & Process
ontwikkeling
Pilot productie;
Toelevering aan de klant
Massa productie;
Supply Chain uitv.
• Hoe ver rijkt uw arm, • Hoe garandeert U kwaliteit in iedere situatie
PPAP
HighTech Meets Automotive; PPAP & APQP; 21-06-2012 10
PPAP: een Production Part Approval Process
Kern van PPAP:
• Specificaties worden begrepen
• 1e serie producten voldoen aan de specificaties
• Het maak-proces is aantoonbaar instaat deze specificaties blijvend te realiseren
• Een productie proces control plan en een management kwaliteit systeem verzekeren dat geen enkel product de klant kan bereiken dat niet voldoet aan overeengekomen specificaties of dat enig risico kan veroorzaken voor de veiligheid en reliability van de te maken auto’s.
HighTech Meets Automotive; PPAP & APQP; 21-06-2012 11
Elementen van het Production Part Approval Process
Enkele van de 18 elementen.
• Product Design tekeningen, spec’s, CTQ’s…
• Meetsysteem evaluatie;
• Pilot productie resultaten: productie capability, Cp aangetoond
• Design FMEA beoordeeld;
• Process FMEA uitgevoerd
• Control plan
• Resultaten
HighTech Meets Automotive; PPAP & APQP; 21-06-2012 12
Elementen van het Production Part Approval Process
Process Flow is de basis Definieer kritische en niet kritische product parameters op basis van overeengekomen specificaties van product design Definieer kritische Process parameters op basis van Process kennis , een Process Flow diagram incl. product – proces– machine relaties
Vervolgens: Verzeker dat voor alle kritische parameters gecalibreerde meetapparatuur beschikbaar is, en dat een meetsysteem analyse, MSA / GR&R, aantoont dat herhaalbaar & reproduceer gemeten kan worden.
Voer process capability studies voor product – process – materiaal Parameters. Hiermee kan aangetoond worden dat overeengekomen specificasties gerealiseerd kunnen worden conform overeengekomen kwaliteitsniveau. Maak process control plan, En detailleer plan op basis van parameter capabilities
Statistical Process Control: Bepaal voor alle process stappen, wat te meten,
• Product • Process • Materiaal
hoe te meten, frekwentie van meten, Bepaal type control kaart, maak OCAP’s, SOP’s
Definieer kritische Process parameters op basis van een risico analyse: Een Process FMEA
HighTech Meets Automotive; PPAP & APQP; 21-06-2012 13
POTENTIAL FMEA Number
FAILURE MODE AND EFFECTS ANALYSIS
(PROCESS FMEA) Page of
Item Process Responsibility Prepared By
Model Year(s)/Vehicle(s) Key Date FMEA Date (Orig.)
Core Team
S C O D R. Action Results
Process Function Potential Failure Potential Effect(s) E L Potential Cause(s)/ C E P. Recommended Responsibility Actions S O D R.
Requirements Mode of Failure V A Mechanism(s) of C Current Process Control T N. Action(s) & Target Taken E C O P.
S Failure U E Completion Date V C T N.
S R C
1
2 3
5 6
8
9 10 11 12
13
14
15
16
17
18 19
20
21
22
4
7
#
Develop Detailed Process Flow Charts
Collect Data
PFMEA
Capability studies Control Plans SPC
Werkinstructies
List Each Detailed Step and relevant parameters in the Process
Eerste Pilot Resultaten
List Potential Failure Modes, Effects, Causes, Controls and Actions
Develop Process Controls & Checking Devices
Instructions Reaction Plans
Elementen van het Production Part Approval Process (2)
#
Collect Data
HighTech Meets Automotive; PPAP & APQP; 21-06-2012 14
15
Wat zijn de kritische maten, Vanuit klanten functie, en!! Vanuit productie risico’s
Potential
Failure Mode and Effects Analysis(Process FMEA)
Process/Item : Block heating in oven and Press process
Model Year (s)/
Program(s) :
Wetering, pr Marc Valentijn
Core Team : William Peijnenburg, Marc Valentijn, Mireia Blanco Mantecon Doc Owner:Marc Valentijn
Controls
Preventiona method w hich
prevents the failure
mode from
happening
Controls
Detectiona method w hich
detects the failure
mode w hen it happens
before moving to next
process step
Dete
cti
on
1 Blok Heating in Oven
1.1 Place 2 ingots on top of
chain in oven entrance
automatically
horizontal position in chain
,,, mm from centre? ..
horizontal
position/separartion
bigger ….. Mm
inhomogenious heating, stopper wrong set 10
temparature at furnace end out
spec
stopper wrong set
in case specified: empty
row in chain to reduce load.
no empty space cycle time blockheating
disturbed, causing irregular
release of heated blocks at
furnace end, causing delay,
causing nor able to process
block due to temp decrease
due to waiting time
no sychronisation between
pushing block and chain
speed/ chain position
Too many blocks on chain,
causing insufficiend heating
per block, causing
temperature drop ingot at exit.
1.2 Heat up ingots
homogeniously during
automatic transport
inside oven by gas
heating
temperature block at
outside, at exit of furnace
to be ….. oC; ( specified);
at exit of furnace
so fer, no temperature
profile defined.
Temperature too low No pres cycle, block = reject
in process but can be reused.,
productivity loss
Pressedbut temp low, causing
high press pressures, causing
…
temperature too high
Temperature homogenuity ,
centre temp. -max X?? oC
from outersurface
temperature
Inhomogenious
temperature, centre too
low temp.
uncontrolled press process,
dimensions out of control
1.3 transport ingot from
overeit to pickup
position by dropping,
and guidance to ..
Max time from exit over to
pickup …….. Sec
time too long from
overexit too pickup
Ingot cools down causing
uncontrolled press process or
even ingot reject.
time too short unable too process ingots
sequencial, too many available
in certain time frame; causing
reject ingots due to waiting
time causing cooling down.
more than specified loaded
on chain, due to no empty
rows, due to lack of
synchronisation of pusher
and chainspeed
Potential (Root)
Cause(s) of Failure5 times w hy, dow nw ards along
requirements;
effect due to …. Due to … due to
...
Current Process
Oc
cu
rre
nc
e
Se
ve
rity
Cla
ss
ific
ati
on
Process
Responsibility :
Key Date :
Process Step/
Function
Requirement Potential Failure
Modei.e. not meeting process
specif ications
to much , to little w .r.t.
spec,
intermittent?
Different behaviour.
Potential Effect(s) of
FailureEffect on next upw ards level
requirement up to effect on desired
function up to effect to consumer of
product
Process FMEA, AIAG versie 4! Vanuit Process Flow Diagram Vanuit functioneel denken!!
GR&R
HighTech Meets Automotive; PPAP & APQP; 21-06-2012 15
MegaFuse Holder
PFD: Process Flow Diagram, noodzakelijke voorbereiding voor een P-FMEA
Y = De product spec’s die in de proces stap gerealiseerd worden
X, de proces condities die de output parameter Bepalen.
Y = f (X1, X2, X3, ..
HighTech Meets Automotive; PPAP & APQP; 21-06-2012 16
PFMEA: Process Function / Requirement Potential COMPLETE please
Failure Mode and Effects Analysis FILL-IN number
(Process FMEA)
Process/Item : FMEA Version :
Model Year (s)/
Program(s) :Page: of
Core Team : Prepared by:
FMEA Date (Orig.) :
Controls
Preventiona method w hich
prevents the failure
mode from
happening
Controls
Detectiona method w hich
detects the failure
mode w hen it happens
Dete
cti
on
Actions Taken Completion Date
Severi
ty
Occu
rren
ce
Dete
cti
on
RP
N
Action ResultsPotential (Root)
Cause(s) of Failure5 times w hy, dow nw ards along
requirements;
effect due to …. Due to … due to
...
Oc
cu
rre
nc
e
Current Process
RP
N
Recommended
Action
Responsibility &
Target Completion
Date
Process
Responsibility :
Key Date :
Process step and
intended function
Do this…. With this…. To
this….
Requirement
f inally f iles only on control
plan
Potential Failure
Modei.e. not meeting process
specif ications
to much , to little w .r.t.
spec,
intermittent?
Different behaviour.
Potential Effect(s) of
FailureEffect on next process, f inal
process result or consumer
requirement of product/service
Se
ve
rity
Cla
ss
ific
ati
on
• Identify the Process with its Functions and Requirements
– Process: description of the process operation
– Function: what the process must do
– Requirements: product / process specifications
• A process operation may have multiple functions
• Process Functions (from the Operation Description column in the PFD) are listed
separately and analyzed individually in the FMEA
Finally: Specifications belong in the PCP not the
PFD or PFMEA
HighTech Meets Automotive; PPAP & APQP; 21-06-2012 17
PFMEA: Identify Potential Failure Modes Potential COMPLETE please
Failure Mode and Effects Analysis FILL-IN number
(Process FMEA)
Process/Item : FMEA Version :
Model Year (s)/
Program(s) :Page: of
Core Team : Prepared by:
FMEA Date (Orig.) :
Controls
Preventiona method w hich
prevents the failure
mode from
happening
Controls
Detectiona method w hich
detects the failure
mode w hen it happens
Dete
cti
on
Actions Taken Completion Date
Severi
ty
Occu
rren
ce
Dete
cti
on
RP
N
Action ResultsPotential (Root)
Cause(s) of Failure5 times w hy, dow nw ards along
requirements;
effect due to …. Due to … due to
...
Oc
cu
rre
nc
e
Current Process
RP
N
Recommended
Action
Responsibility &
Target Completion
Date
Process
Responsibility :
Key Date :
Process step and
intended function
Do this…. With this…. To
this….
Requirement
f inally f iles only on control
plan
Potential Failure
Modei.e. not meeting process
specif ications
to much , to little w .r.t.
spec,
intermittent?
Different behaviour.
Potential Effect(s) of
FailureEffect on next process, f inal
process result or consumer
requirement of product/service
Se
ve
rity
Cla
ss
ific
ati
on
Determine the functional failures that could occur for each process and function.
The inability of an item to perform a specific function within the specified limits. Failure to perform a function. Over achieve or under achieve the function Poor performance (degraded or intermittent) of the function. Performing an unintended function.
HighTech Meets Automotive; PPAP & APQP; 21-06-2012 18
Pilot productie resultaten: Een meettabel voldoet niet!! productie capability, Cp aangetoond
Control: Implementatie van SPC Statistische & technische proces controle.
HighTech Meets Automotive; PPAP & APQP; 21-06-2012 19
Product & Process kwaliteit in uw rol van een co-designer - toeleverancier
Business Ontwikkeling & Program-
mering
Technologie Ontwikkeling
Voor- ontwikkeling
Product & Process
ontwikkeling
Pilot productie;
Toelevering aan de klant
Massa productie;
Supply Chain uitv.
• Hoe ver rijkt uw arm, • Hoe garandeert U kwaliteit in iedere situatie • PPAP wordt deel van een grotere scope!
PPAP APQP
HighTech Meets Automotive; PPAP & APQP; 21-06-2012 20
APQP: een ontwikkelproces met (wederzijdse) verantwoordelijkheden en resultaat verplichtingen
Kern van APQP: Advanced Product Quality Planning
HighTech Meets Automotive; PPAP & APQP; 21-06-2012 21
Kern van APQP: een ontwikkelproces met (wederzijdse) verantwoordelijkheden en resultaat verplichtingen
• ADVANCED: proactieve kwaliteitsplanning
– zowel met betrekking tot product ontwikkeling, het design
– alsook met betrekking tot proces ontwikkeling , industrialisatie
• Proactieve feedback naar de automotive klant voor elke ontwikkelfase, mijlpalen benadering met review structuur
• Ontwikkeling vindt plaats binnen gespecificeerde product & proces capabiliteit, aandacht voor “variatie”; nul uur kwaliteit, aandacht voor levensduur kwaliteit, reliability.
• Industrialisatie: Een productie proces control plan en een management kwaliteit systeem verzekeren dat geen enkel product de klant kan bereiken dat niet voldoet aan overeengekomen specificaties of dat enig risico kan veroorzaken voor de veiligheid en reliability van de te maken auto’s.
HighTech Meets Automotive; PPAP & APQP; 21-06-2012 22
Kern van APQP: analoog aan de proactieve QFD benadering: The houses of Quality,
HighTech Meets Automotive; PPAP & APQP; 21-06-2012 23
Elementen van Advanced Product Quality Planning
• Klanten wens, de functionele specificaties worden begrepen en omgezet naar technische, design, specificaties.
• Maakbaarheid wordt aangetoond door capabiliteit voorspellingen
• Risico analyse d.m.v. Design en Proces FMEA’s, gevolgd door aantoonbare risico voorkomende acties.
• Verificatie resultaten, Ppk’s, (tegen technische spec’s) en validatie (tegen functionele spec’s) Ppk’s.
• Verificatie van resultaten tegen reliability spec’s. (Call Rate?, MTTF?, B0.1 ? )
• Een productie proces control plan en een management kwaliteit systeem verzekeren dat geen enkel product de klant kan bereiken dat niet voldoet aan overeengekomen specificaties of dat enig risico kan veroorzaken voor de veiligheid en reliability van de te maken auto’s.
HighTech Meets Automotive; PPAP & APQP; 21-06-2012 24
De 5 Fasen van Advanced Product Quality
• Plan and Define Program
• Product Design and Development Verification
• Process Design and Development Verification
• Product and Process Validation
• Launch, Feedback, Assessment & Corrective Action
HighTech Meets Automotive; PPAP & APQP; 21-06-2012 25
APQP: een ontwikkelproces , analoog aan de proactieve “Design for “X” Sigma” benadering
HighTech Meets Automotive; PPAP & APQP; 21-06-2012 26
Define: Identify: Design:
Optimize: Verify:
De uitdaging, de CTQ, de gevraagde functionele specificatie. Identificeer de ”Voice of the customer” , maak dit meetbaar. Ontwikkel concepten en voorspel de potentiele performance. Op basis van inzicht verbetervoorstellen invoeren. Valideer en Verifieer de performance van de pilot.
De Overdrachtsfunctie
Design factoren
Y’s = System Specificatie
X
X
X
Constante Parameters
Y = f (X)
“Noise”, “Ruis” ; Niet controleerbare Parameters
Power vragen: • Welke factoren X beinvloeden Y, in welke mate? • Kan ik Y voorspellen, op basis van kennis van de X-en
HighTech Meets Automotive; PPAP & APQP; 21-06-2012 27
HighTech Meets Automotive; PPAP & APQP; 21-06-2012 28
HighTech Meets Automotive; PPAP & APQP; 21-06-2012 29
Kern van APQP: een ontwikkelproces met (wederzijdse) verantwoordelijkheden en resultaat verplichtingen
• ADVANCED: proactieve kwaliteitsplanning
– zowel met betrekking tot product ontwikkeling, het design
– alsook met betrekking tot proces ontwikkeling , industrialisatie
• Proactieve feedback naar de automotive klant voor elke ontwikkelfase, mijlpalen benadering met review structuur
• Ontwikkeling vindt plaats binnen gespecificeerde product & proces capabiliteit, aandacht voor “variatie”; nul uur kwaliteit, aandacht voor levensduur kwaliteit, reliability.
• Industrialisatie: Een productie proces control plan en een management kwaliteit systeem verzekeren dat geen enkel product de klant kan bereiken dat niet voldoet aan overeengekomen specificaties of dat enig risico kan veroorzaken voor de veiligheid en reliability van de te maken auto’s.
HighTech Meets Automotive; PPAP & APQP; 21-06-2012 30
APQP: Ontwikkel concepten en Voorspel de potentiele performance, Vervolgd door pilot met PPAP elementen.
PPAP: Maak en laat zien dat je het beheerst Maak en laat zien dat risico’s geëlimineerd zijn
HighTech Meets Automotive; PPAP & APQP; 21-06-2012 31
Contactgegevens
Jan van de Venne: jan.van.de.venne@holland-innovative.nl
Holland-Innovative:
Angelique van de Leur angelique.van.de.leur@holland-innovative.nl Sales Representative info@holland-innovative.nl 040 851 4611
Voor meer informatie: www.holland-innovative.nl
HighTech Meets Automotive; PPAP & APQP; 21-06-2012 32
Recommended