Loading and Unloading of Lyophilizers

Arnold Stoker

Project Manager

Sanquin’s approach to EudraLex Annex 1 Compliance

• Introduction of Sanquin Blood Supply

• EudraLex Annex 1

• Articles 116 and 120

• Current Situation

• Design of Transport System

• Design Limitations

• Operation

• System Implementation

• Installation & Qualification planning

AGENDA

Introduction of Sanquin Blood Supply

• Sanquin Division Plasma Products

• Manufacturer of parenteral plasma products

• Sanquin products and CMO

• Partnership with CAF (Belgium) and LFB (France)

• Registrations in EU, US and ROW

Introduction of Sanquin Blood Supply

• Article 116:

• Partially stoppered freeze drying vials should be maintained under Grade A

conditions at all times until the stopper is fully inserted.

• Article 120:

• Vial capping can be undertaken as an aseptic process using sterilized caps

or as a clean process outside the aseptic core. Where the latter is adopted,

vials should be protected by Grade A conditions up to the point of leaving

the aseptic processing area and thereafter vials should be protected with a

Grade A air supply until the cap has been crimped.

EudraLex Annex 1

Articles 116 and 120

EudraLex Annex 1

Current Situation

Design of Transport System

• Two mayor design limitations:

• Space available

• …..

Design of the Transport System

Design limitations

• Two mayor design limitations:

• Space available

• Lyophilizers of different age, size, manufacturers

Design of the Transport System

Design limitations

Christ, 1997

Klee, 2003

Klee, 2010Solution:

transport of product vials in frames

-Stable

-Frames needed

Design of the Transport System

Operation

Chris, 1997

Klee, 2003

Klee, 010

OPTIMA 2013

Design of the Transport System

Operation

Formatting

station

Design of the Transport System

Operation Formatting

station

Design of the Transport System

Operation

Transport to

lyophilizers

Design of the Transport System

Operation Loading/Unloading

robots

Design of the Transport System

Operation

Transport to

deformatting

station

Design of the Transport System

Operation Transport to

deformatting

station

Deformatting

station

Design of the Transport System

Operation

Deformatting

station

Design of the Transport System

Operation

• Total shutdown period: 14 weeks

• Impact on other systems:

• Changes in 44 of 46 rooms of fill finish department

• Installation of additional washer

• Replacement of autoclave

• Replacement of lyophilizer

• For the transport system:

• 4 weeks installation

• 4 weeks commissioning & qualification (SAT, IQ, OQ) by vendor

• 4 weeks IQ, OQ, PQ including smoke studies and media fills

• Registration CBE-30

System implementation

Installation and Qualification Planning

Recommended