Long Harbour Processing Plant Overview

September 11, 2018

Vale Plating RoundsTM Global Kick-Off: Launch & Learn

2 Ag

en

da

1. Risk Management Share

2. Visitor Safety Orientation

3. Plant Site Overview

4. Performance Highlights

3

Risk Management

Share

4

Managing fatigue in the workplace

What is fatigue?

• Fatigue is a reversible physical or mental state of exhaustion which reduces a person’s ability to perform their work safely and efficiently.

What causes fatigue?

• Lack of opportunity to sleep

• Medical conditions and medications

• Failure to take advantage of sleep opportunities

• Failing to receive proper rest and sleep

• Working long hours, multiple jobs or home projects without adequate opportunity for rest and recuperation

• Intense, sustained mental exertion or physical effort.

5

Managing fatigue in the workplace

Spot the warning signs

Physical Signs

• Being unstable while standing

• Losing focus easily

• Struggling to keep eyes open

• Yawning frequently

• Rubbing of eyes

• Head jerking or gentle swaying

• Nodding off

• Compromised hand-eye coordination

Mental / Emotional Signs

• Increased risk-taking behaviour

• Reduced short term memory function

• Unable to concentrate

• Negative mood

• Unable to solve problems

• Lack of communication

6

Visitor Safety

Orientation

7

Personal Protective Equipment Requirements

Personal Protective Equipment (PPE) must be worn at all times onsite, unless in a PPE free area, or in a vehicle. Offices and trailers are common PPE free areas.

Where PPE is required, the following types are permitted for general visitor use:

• Class E CSA hardhat.

• CSA approved safety glasses.

• Single or double hearing protection in Production Area buildings, as dictated by

signage.

• A high visibility safety vest, jacket or coveralls. This clothing must have an orange,

lime, yellow or red bright coloured background with continuous striping that

crosses in the back.

• CSA Grade 1 footwear (green triangle) and electrical shock resistance (Y letter

“omega”) with minimum 6: in height.

• Clothing must provide full arm and leg coverage.

8

Personal Protective Equipment Requirements

In addition to PPE, there are site rules that all personnel, including visitors, must be aware of, and follow:

• Before entering a Production Area building long hair must be confined within hardhat.

• Visitors are exempt from being clean shaven, but are also restricted from accessing any areas where a respirator is required.

• All jewelry must be removed before entering a Production Area building. It can be carried in pocket.

• Smoking is only permitted in designated smoking area.

• Cell phones are not permitted to be used in the Production Area.

• Visitors must advise their host if they have been involved in an incident where they have been injured or potentially injured.

• Visitors must not cross coloured barrier chains in Production Area building without the knowledge of the host or designate for the area. Colored chains represent barriers to communicate hazards for a work area. Typically chains are yellow for caution and red for danger.

• Visitors are not permitted to be unsupervised in Production Area buildings and must remain in contact with host.

9

Emergency Response Protocols

If an emergency where building occupants must muster, visitors must do the following:

• Stay with your host and muster at nearest Emergency Assembly Area (EAA #21).

• If a visitor is involved in an incident or an emergency that requires emergency

response, your host will contact emergency response by phone at 752-3111 or

ERT on Radio Channel #1 to declare the emergency.

• When a building alarm sounds, visitors must follow their host to the nearest

Emergency Assembly Area (EAA) for the respective location/building and wait

further instructions. Your host is responsible to guide you safely in the event of an

emergency. Please follow their direction closely to ensure your safety.

10

Shelter in Place Alarm

• If a release of H2S occurs outside, or an uncontrollable release in the H2S

unloading area that is vented outside reaches an alarm condition, a Shelter in Place

alarm is initiated by a request to the control room. The Shelter-in-Place alarms will

differ from the evacuation alarms.

• Like an evacuation everyone reports to a common assemble area. To differentiate

between an evacuation the common assemble area will be called Shelter-in-Place

assembly area (SAA).

• Visitors will be escorted to the designated SAA by their host.

11

Designated Walkways

• Visitors are required to stay on

designated walkways where present.

12

Security Protocols

• Visitors are expected to uphold site

rules and security protocols on site.

• Vehicle inspections are common,

random and subject to all

personnel, including visitors.

• Visitors are required to check into

security and receive a visitor pass,

and return pass when exiting site.

• Visitors are not permitted to take

pictures – there will be an

opportunity to have your photo

taken during the tour.

• Security cameras are active.

13

Plant overview and

development history

14

Location and Personnel Statistics

• Long Harbour Processing Plant (LHPP) is located approximately 120 km from the

City of St. John’s. A bus service to/from St. John’s is available for employees.

• Workforce of 530 permanent Vale employees, of which 315 are Process Plant

Technicians (PPTs) working 24/7.

• Contractor numbers are approximately 250, comprised mostly of the outsourced

maintenance and site services personnel.

• Staff employees work 4 days x 10 hours a week.

• Non-unionized workforce utilize a High-Performance Work System (HPWS) model.

Technicians are trained to operate multiple areas of the plant and perform day-to-

day administrative tasks, reduce supervision workload.

15

Research and Development

A multi-phased US$200 million R&D program was conducted to extend the application of

hydrometallurgical technology to process Voisey’s Bay nickel concentrate.

Commercial PlantMini-pilot Plant Demonstration Plant

Laboratory Testing and Process

Modeling

1997 – 2002 2003-2004 2005-2008 2006-2016

Studies, Design, Engineering, and Construction

Bench Scale 1/10,000 1/100 1/1

Long Harbour, NewfoundlandMississauga, Ontario Argentia, NewfoundlandMississauga, Ontario

16

Long Harbour Site Pre 2009

17

Long Harbour Site –May 2010

18

Long Harbour Site 2018

Plant Site ~ 17 sq.km

• Distance between Lower Tier (Port) and the Upper Tier: 1 km

• Distance from Upper Tier to the Residue Storage Site: 4 km

• Treated Effluent pipeline discharge into ocean: 5 km on the ocean floor

19

Long Harbour Operations Port Site

• The MV Umiak 1 ships ~30,000 tonnes of concentrate, 8 – 10 times per year.

• Concentrate Storage Shed can hold up to 80,000 tonnes.

20

Long Harbour Operations Processing Plant

21

Site infrastructure and Water Management

22

LHPP Process Flowsheet

23

World Class Nickel Tankhouse

• 272 Nickel Plating Cells

• Two Automatic Harvesting Cranes plus two Cell Maintenance Cranes

24

Long Harbour Processing Plant Products

Vale Electrolytic Cobalt Rounds

>99.9 wt.% Cobalt

250 kg drums – 4/pallet

Long Harbour M-Rounds

ASTM B39 >99.80 wt.% Nickel

2000 kg bags

Long Harbour Plating Rounds

>99.9 wt.% Nickel

10 kg bags – 5/box

Vale Copper Cathode

99.999 wt.% Copper Grade A

Bundled Cathode ~1500 kg

25

Performance

Highlights

26

Overall Metal Recoveries meet Demo Plant

Targets after the first year of full plant operations

0%

20%

40%

60%

80%

100%

Jan-17 Mar-17 Jun-17 Sep-17 Dec-17 Mar-18 May-18

Ni Co Cu

• Design nickel,

cobalt and copper

recoveries were

95.0%, 93.3% and

73.6% respectively

• YTD-2018:

95.8% nickel,

94.4% cobalt

76.9% copper

27

Production Quality and Impurity Controls

continue to improve through 2017 & 2018

99.80

99.85

99.90

99.95

100.00

1-M

ar-1

7

1-J

un

-17

2-S

ep

-17

3-D

ec-1

7

6-M

ar-1

8

6-J

un

-18

Nickel Purity (%)

28

Product Quality meets LME Specifications

• Nickel round purity continues to meet London Metal Exchange (LME)

specifications and attracts a premium over the market price.

• Copper Cathodes are also meeting LME specifications and is sold as “Grade A”.

• Initial plating tests with USA customers in 2017 have been successful.

• Cadmium, copper and iron are the elements of focus for improving Cobalt Round

Purity.

29

Summary

• Long Harbour has been a benchmark ramp up in the world of nickel hydrometallurgy.

• Poised to become the world’s state-of-the-art electrolytic nickel and cobalt producer.