View
9
Download
2
Category
Preview:
Citation preview
Magna SteyrMagna Steyr –
ein Pionier der Energieeffizienz
Roman Pöltner, Director Facility Management
Energieeffizienz Konferenz; 28.11.2017
Managementstruktur
Mai 2017
Don Walker Chief Executive Officer
Tom Skudutis COO Magna Exteriors, Seating, Mirrors, Closures and Cosma
Jim Tobin Chief Marketing Officer, President Magna Asia
Swamy Kotagiri Chief Technology Officer
Günther Apfalter President Magna Europe
Mike Sinnaeve VP Operational Improvement & Quality
Chief Financial OfficerVince Galifi
Mark Dong EVP Magna China
Frank Sequin EVP Corporate Projects & Strategy Development
Mike BissonPresident
SEATING EXTERIORS
Grahame BurrowPresident
CLOSURES
VISION SYSTEMS
ROOF SYSTEMS
John O’HaraPresident
BODY & CHASSIS
John FarrellPresident
POWERTRAIN
Jake HirschPresident
ELECTRONICS
Swamy KotagiriPresident
VEHICLE ENG
CONTRACT MFG
FUEL SYSTEMS
Günther ApfalterPresident
28.11.2017 Autor: Roman Pöltner Disclosure or duplication without consent is prohibited 2
Globale Präsenz
~163.000 Mitarbeiter
29 Länder
58 OEM Kunden
328 Produktion
99 Eng. / Produktentw. / Vertrieb
$36,4 Milliarden
(Umsatz 2016)
Q3 2017
NORDAMERIKA
139 Produktion / Montage
25Engineering / Produkt-
entwicklung / Vertrieb
75.600 Mitarbeiter
SÜDAMERIKA
13 Produktion / Montage
2Engineering / Produkt-
entwicklung / Vertrieb
3.650 Mitarbeiter
ASIEN
58 Produktion / Montage
22Engineering / Produkt-
entwicklung / Vertrieb
23.300 Mitarbeiter
EUROPA
118 Produktion / Montage
50Engineering / Produkt-
entwicklung / Vertrieb
60.775 Mitarbeiter
28.11.2017 Autor: Roman Pöltner Disclosure or duplication without consent is prohibited 3
Managementstruktur
Don Walker Chief Executive Officer
Tom Skudutis COO Magna Exteriors, Seating, Mirrors, Closures and Cosma
Jim Tobin Chief Marketing Officer, President Magna Asia
Swamy Kotagiri Chief Technology Officer
Günther Apfalter President Magna Europe
Mike Sinnaeve VP Operational Improvement & Quality
Chief Financial OfficerVince Galifi
Mark Dong EVP Magna China
Frank Sequin EVP Corporate Projects & Strategy Development
Mike BissonPresident
SEATING EXTERIORS
Grahame BurrowPresident
CLOSURES
VISION SYSTEMS
ROOF SYSTEMS
John O’HaraPresident
BODY & CHASSIS
John FarrellPresident
POWERTRAIN
Jake HirschPresident
ELECTRONICS
Swamy KotagiriPresident
VEHICLE ENG
CONTRACT MFG
FUEL SYSTEMS
Günther ApfalterPresident
28.11.2017 Autor: Roman Pöltner Disclosure or duplication without consent is prohibited 4
Mai 2017
Magna Steyr
28.11.2017 Autor: Roman Pöltner Disclosure or duplication without consent is prohibited 5
Weltklasse-Produktion Weltklasse-Engineering Innovation Glaubwürdigkeit Begeisterung
VISION
Die Vision ist, der weltweit führende, markenunabhängige Engineering- und
Fertigungspartner und Anbieter von innovativen Lösungen für die Mobilität
der Zukunft zu sein.
MISSION
Die Mission ist, die Erwartungen unserer Kunden und Aktionäre durch höchste
Qualität unserer Produkte und Dienstleistungen zu erfüllen, nachhaltige
Wirtschaftlichkeit sicherzustellen und motivierte Mitarbeiter zu haben.
Innovation
Leadership / Der Mensch im Mittelpunkt
PRIORITÄTEN
SELBSTVERSTÄNDNIS
Kompetenz & Wirtschaftlichkeit
Kooperierende Produkt- & Produktionsgestaltung
Vorausschauendes Innovations- und Kompetenzmanagement
Fabrikskostenorientierte Produktionsstrukturen
MarktgerechteProduktion
Marktorientiertes Produktionsnetzwerk
Bedarfsgerechte und synchrone Prozesse
ZIELE
Qualitäts- & Imageführerschaft
Qualität als Selbstverständnis
Effektive Anlaufprozesse
Weltweit bestes Produktionsimage
World Class Manufacturing
Magna Steyr-Standorte
Weltweit präsent – weltweit vernetzt
28.11.2017 Autor: Roman Pöltner Disclosure or duplication without consent is prohibited 6
NORDAMERIKA
1Engineering / Produkt-
entwicklung / Vertrieb
Standort Auburn Hills
EUROPA
8 Produktion / Montage
12Engineering / Produkt-
entwicklung / Vertrieb
Standorte
Böblingen
Coventry
Etupes
Graz
Grevenbroich
Hambach
Heilbronn
Ingolstadt
Mühlhausen
München
Neumarkt
Paris
Roye
Sailauf
Schwäbisch
Gmünd
Sinabelkirchen
Sindelfingen
Turin
Weiz
Wolfsburg
ASIEN
2 Produktion / Montage
8Engineering / Produkt-
entwicklung / Vertrieb
Standorte
Changchun
New Delhi
Pune
Seoul
Shanghai
Shenyang
Shin-Yokohama
Wuhan
Firmensitz: Graz~12.500 Mitarbeiter 31 Standorte
Q3 2017
Historie
28.11.2017 Autor: Roman Pöltner Disclosure or duplication without consent is prohibited 7
1914PUCHWERKE AG
1934 20011998STEYR-DAIMLER-PUCH
FAHRZEUGTECHNIK
A COMPANY OF MAGNA
1864J. & F.
Werndl & Comp.
STEYR
1899Österr. DAIMLER
Motorenges.
Wr. Neustadt
1899J. PUCH
Erste Steiermärkische
Fahrrad-Fabriks AG Graz
1928AUSTRO
DAIMLER-
PUCHWERKE AG
1926STEYR-WERKE AG
1957TORONTO CANADA
STEYR-DAIMLER-PUCH AG
ERHARD & SÖHNE
1844
2005
19951990
1998
2014
2007 2010 2011 2016
Magna Steyr-Leistungsspektrum
28.11.2017 Autor: Roman Pöltner Disclosure or duplication without consent is prohibited 8
Flexible und globale Lösungen, maßgeschneidert für den OEM
EngineeringFahrzeug-
AuftragsfertigungTanksysteme
Von Systemen und Modulen
bis zum Gesamtfahrzeug Flexible Lösungen von Nischen- bis
Volumenfertigung auf Weltklasse-Niveau
Energiespeicher aus Stahl,
Kunststoff und Aluminium
Engineering-Dienstleistungen
bis hin zur Gesamtfahrzeugentwicklung
28.11.2017 Autor: Roman Pöltner Disclosure or duplication without consent is prohibited 9
Engineering
Design- und Fahrzeugkonzepte
Gesamtfahrzeugentwicklung
Entwicklung von Modulen und Teilprojekten
Safety Engineering
Versuchsträger, Prototypen, Kleinserienbau
Hybrid- und Elektrofahrzeuge
Von Systemen und Modulen
bis zum Gesamtfahrzeug
Fahrzeugelektronik & Digitalisierung
Engineering-Dienstleistungen
bis hin zur Gesamtfahrzeugentwicklung
28.11.2017 Autor: Roman Pöltner Disclosure or duplication without consent is prohibited 10
EngineeringVon Systemen und Modulen
bis zum Gesamtfahrzeug
EUROPA
Deutschland
Böblingen, Ingolstadt,
Mühlhausen, München,
Sailauf, Sindelfingen,
Wolfsburg
Österreich
Graz
Frankreich
Etupes, Paris, Roye
Italien
Turin
ASIEN
Japan
Shin-Yokohama
China
Changchun, Shanghai,
Shengyang, Wuhan
Indien
Pune, New Delhi
19 Engineering-Standorte in 7 Ländern3.500 Mitarbeiter
Kompetenzaufbau im Bereich Fahrzeugelektronik
• Im Mai 2016 hat Magna Steyr die Telemotive AG, einen
führenden Entwicklungsdienstleister im Bereich der
Automobilelektronik, übernommen.
• Die fünf Telemotive-Standorte mit ihren etwa 550 Mitarbeitern
wurden in die Magna Steyr-Organisation integriert.
• Diese Akquisition stärkt die Engineering-Position von Magna
Steyr nachhaltig.
Kernkompetenzen von
• Bussysteme
• Infotainment
• Konnektivität
• Fahrerassistenz
• Fahrzeugdiagnose
• Elektromobilität
• Elektromagnetische Verträglichkeit
28.11.2017 Autor: Roman Pöltner Disclosure or duplication without consent is prohibited 11
Auftragsfertigung auf Weltklasse-Niveau
28.11.2017 Autor: Roman Pöltner Disclosure or duplication without consent is prohibited 12
Fahrzeug-
AuftragsfertigungFlexible Lösungen von Nischen- bis
Volumenfertigung auf Weltklasse-Niveau
EUROPA
Deutschland
Heilbronn
Österreich
Graz
Frankreich
Hambach
Gesamtfahrzeugproduktion in Graz,
Türmodulfertigung in Hambach und Fertigung
von Strukturbauteilen in Heilbronn
7.000 Mitarbeiter
Produktion von bis zu
200.000 Fahrzeugen pro Jahr
Volumenfertigung und flexible
Einzelprogramme bis hin zur
individuellen Fahrzeugmanufaktur
Komponenten und
Module
Tür- und Heckklappenmodule,
Lightweight Body Solutions mit
Multi-Material-Lösungen,
Strukturbauteile
Industrial
Services
Lokale und
internationale
Industriedienstleistungen
Auftragsfertigung auf Weltklasse-Niveau
28.11.2017 Autor: Roman Pöltner Disclosure or duplication without consent is prohibited 13
Fahrzeug-Auftragsfertigung in Graz
Verschiedene Kundenprogramme an einem Standort
28.11.2017 Autor: Roman Pöltner Disclosure or duplication without consent is prohibited 14
Mercedes-Benz G-KlasseRohbau (Halle 2), Montage (Halle 12)
BMW 5er(Halle 3, 81, 82)
Jaguar E-PACE, SOP 2017
Jaguar I-PACE, SOP 2018(Halle 1, 2, 3, 39, 71)
Lackiererei
(Halle 8, 14)
Engineering
Halle 1
Halle 12
Halle 2
Halle 3
Halle 8
Haupteinfahrt
Eingang
Liebenauer Hauptstraße
Prototypenbau
Berufsausbildungs-
zentrum
Engineering
Versuch
Verwaltung
Sonderfertigung
Halle 81
Schulungszentrum/
Magna Kids World
Teststrecke
Engineering
Center
Halle 71
Halle 14
Halle 39
Engineering
Halle 82
3,3 Millionen Automobile made in Graz
28.11.2017 Autor: Roman Pöltner Disclosure or duplication without consent is prohibited 15
in Produktion
Mercedes-Benz
G-Klasse
seit 1979
Audi
V8L
1990 – 1994
VW Transporter
T3 4x4
1984 – 1992
VW
Golf Country
1990 – 1991
Voiturette
1906
Alpenwagen
1919
Puch
500 / 650 / 700c / 126
1957 – 1975
Haflinger
1959 – 1974
Pinzgauer
1971 – 2000
BMW X3
2003 – 2010
Jeep
Grand Cherokee
ZG/WG/WJ
1994 – 2004
Mercedes-Benz
E-Klasse
1996 – 2002
Mercedes-Benz
M-Klasse
1999 – 2002
Chrysler
Voyager
2002 – 2007
Mercedes-Benz
E-Klasse
2003 – 2006
Saab
93 Cabrio
2003 – 2009
Jeep Grand Cherokee
WH
2005 – 2010
Chrysler
300 C
2005 – 2010
Peugeot
RCZ
2010 – 2015
Jeep
Commander
2006 – 2010
Aston Martin
Rapide
2010 – 2012
Mercedes-Benz
SLS
Aluminiumkarosserie
2009 – 2014
MINI
Countryman
2010 – 2016
MINI
Paceman
2012 – 2016
BMW
5er
seit 2017
Jaguar
E-PACE
ab Q4 2017
in Produktion
Jaguar
I-PACE
ab 2018
Operational
Excellence
Exo-Skelett
Eco Ergo
Big Data
Wissens-
management
New Work Order
HMI
Digitaler C-Teile-
Prozess
Fahrerloses
Transportsystem
Intelligente
GebindeKollaborierende
Robotik
SmartFactory by Magna Steyr
Unser ganzheitlicher, strategischer Ansatz, um sich für
die Herausforderungen der Zukunft zu rüsten.
Use Case-Beispiele
28.11.2017 Autor: Roman Pöltner Disclosure or duplication without consent is prohibited 16
Magna Steyr-Leistungsspektrum
28.11.2017 Autor: Roman Pöltner Disclosure or duplication without consent is prohibited 17
Flexible und globale Lösungen, maßgeschneidert für den OEM
Engineering TanksystemeVon Systemen und Modulen
bis zum Gesamtfahrzeug
Energiespeicher aus Stahl,
Kunststoff und Aluminium
Fahrzeug-
AuftragsfertigungFlexible Lösungen von Nischen- bis
Volumenfertigung auf Weltklasse-Niveau
Tanksysteme – Breites Produktportfolio
bei Energiespeichersystemen
28.11.2017 Autor: Roman Pöltner Disclosure or duplication without consent is prohibited 18
Kraftstofftanks
Tankeinfüllrohre
Komponenten
Alternative Speichersysteme
TanksystemeEnergiespeicher aus Stahl,
Kunststoff und Aluminium
Tanksysteme – Breites Produktportfolio
bei Energiespeichersystemen
28.11.2017 Autor: Roman Pöltner Disclosure or duplication without consent is prohibited 19
TanksystemeEnergiespeicher aus Stahl,
Kunststoff und Aluminium
EUROPA
Deutschland
Grevenbroich, Neumarkt,
Schwäbisch Gmünd
Österreich
Graz, Sinabelkirchen, Weiz ASIEN
China
Changchun, Shanghai
8 Standorte in 3 Ländern1.450 Mitarbeiter
Auszeichnungen
28.11.2017 Autor: Roman Pöltner Disclosure or duplication without consent is prohibited 20
• J. D. Power
Viertbestes Werk in Europa/Südafrika (2016)
• Fabrik2013 Award
Bestes Produktionswerk Österreichs (2013)
• Fiat Chrysler Automobiles
Supplier of the Year Award (2014)
• Staatspreis für Unternehmensqualität
Kategoriesieger Großunternehmen (2014)
• EMAS-Preis
Auszeichnung für vorbildliches Umweltmanagement (2015)
• Project CULT
Österreichischer Staatspreis und Autorevue-Innovationsaward (2013)
• Qoros
5 Sterne im Euro-NCAP erstmals für ein chinesisches Fahrzeug (2013)
Best Supplier Award (2013)
• MINI Countryman
J. D. Power APEAL* Award 2011, 2012, 2014 und 2015
• Mercedes-Benz G-Klasse
über 50 Auszeichnungen als bester Geländewagen
• Great Place to Work®
Magna Steyr Graz zählt zu den besten Arbeitgebern Österreichs (2016, 2017)
* APEAL: Automotive Performance, Execution and Layout
Zertifikate
28.11.2017
• ISO/TS 16949
• ISO 9001
• EN 9100
• ISO 14001
• OHSAS 18001
• ISO/IEC 27001
• ISO 17025
• EN 3834-2
• DIN 2303
Autor: Roman Pöltner Disclosure or duplication without consent is prohibited 21
Referenzen (Auswahl)
28.11.2017 Autor: Roman Pöltner Disclosure or duplication without consent is prohibited 22
Engineering
Tanksysteme
Fahrzeug-
Auftragsfertigung
Alles aus einer Hand
28.11.2017 Autor: Roman Pöltner Disclosure or duplication without consent is prohibited 23
Produktportfolio von Einzelmodulen bis zum Gesamtfahrzeug
Weltweit präsent – weltweit vernetzt
Höchste Qualität zu wettbewerbsfähigen Preisen
Bestens ausgebildete und motivierte Mitarbeiter
Erfahrener und stabiler Partner mit Tradition
Innovativer und verlässlicher Partner mit Handschlagqualität
Energiestrategie und Handlungsfelder
28.11.2017 Autor: Roman Pöltner Disclosure or duplication without consent is prohibited 24
EnergiebezugEnergieverteilung/
UmwandlungEnergieverbrauch
Stellhebel bei:
FM und Einkauf
Stellhebel bei:
FM
Stellhebel bei:
FM und Technologie
Fremdbezug 100%
Eigenherstellung 0%
Effizienz
Wärmeverteilung Menge: Dauer in h
Verschwendung?
Effizienz
Anlagentechnik?
Druckluftverteilung
Stromverteilung
Gasverteilung
WasserverteilungVertragsbedingungen
Das Versorgungsnetz
28.11.2017
Druckluft: ca. 30 km
Heizung: ca. 42 km
Gas: ca. 13 km
Strom (20 kV) : ca. 10 km
Wasser: ca. 35 km
Vergleich
Strom: ~ 19.500 Haushalte
Wärme: ~4.300 Haushalte
Erdgas: ~4.200 Haushalte
Kanal
Wasser
Gas
Heizung
Elektro
Druckluft
H 71
Autor: Roman Pöltner Disclosure or duplication without consent is prohibited 25
Transparenz des Energieverbrauchs
28.11.2017 Autor: Roman Pöltner Disclosure or duplication without consent is prohibited 26
Selektive/detaillierte Betrachtung
28.11.2017 Autor: Roman Pöltner Disclosure or duplication without consent is prohibited 27
Strom
2016
Druckluft
2016
Wärme
2016
Erdgas
2016
Jahresverlauf des Energiebedarfs
28.11.2017 Autor: Roman Pöltner Disclosure or duplication without consent is prohibited 28
Unser Regelkreis im Energiemanagement
Analyse
Identifikation
der Potenziale
und Bewertung
Planung
und
Umsetzung
Wirksamkeit
und
Nachweis
Stufe 1 im Regelkreis
Energieberichte
Schichtanalysen
Bereinigung Heizgradtrage
Energiemonitoring
Analyse
Stufe 2 im Regelkreis
Identifikation
der Potenziale
und Bewertung
Stufe 2 im Regelkreis
Analyse Rücklauftemperaturen Raumheizung Wärmenetz
Bewertung:
Ist-Situation: Zu hohe Rücklauftemperaturen
Ursache: - Fehlender hydraulischer Abgleich
- Überströmventile im Heiznetz
Dadurch unnötige Wärmeverluste
Ziel: Reduzierung der Rücklauftemperaturen
Maßnahmen: - Einbau von thermischen
Ventilen
- Optimierung der
Beimischventile im Kesselhaus
Berechnete Einsparung pro Jahr:
1.480 MWh
Identifikation
der Potenziale
und Bewertung
28.11.2017 Autor: Roman Pöltner Disclosure or duplication without consent is prohibited 32
Stufe 3 im Regelkreis
ProjektierungAmortisation
BerechnungBudgetplanung Budgetantrag
Planung
Ausschreibung
Vergabe
Umsetzung
bis zur
Abnahme und
Übergabe an
den Betreiber
Planung
und
Umsetzung
Stufe 4 im Regelkreis
Wirksamkeit
und
Nachweis
Stufe 4 im Regelkreis
Wirksamkeit NachweisWirksamkeit
und
Nachweis
Basis
Wirtschaftlichkeit
Berechnung
Umgesetzte Top Energieprojekte
28.11.2017 Autor: Roman Pöltner Disclosure or duplication without consent is prohibited 36
Änderung Netzebene von 4 auf 3 Kosteneinsparung durch geringere
Netzkosten
Wasser-Wasser-Wärmepumpe Einsparung Energie Strom und Wärme
1.100 MWh/a
Wärmerückgewinnung im LackEinsparung Energie Wärme 5.500 MWh/a
und Erdgas 6.500 MWh/a
Wärmerückgewinnung DruckluftEinsparung Energie Wärme 1.100 MWh/a
Wärmeräder Lüftungsanlagen H2 Einsparung Wärme 6.179 MWh/a
Beleuchtung auf LED umstellenEinsparung Strom 3.344 MWh/a
Trennung Industrie- und
RaumheizungEinsparung Wärme und Strom 3.540 MWh/a
Isolation VentileEinsparung Wärme 1.500 MWh/a
Aktuelle Energieprojekte
28.11.2017 Autor: Roman Pöltner Disclosure or duplication without consent is prohibited 37
Absenkung VorlauftemperaturenEinsparung Wärme 1.367 MWh/a
Wärmedämmung Halle 2 Einsparung Wärme 178 MWh/a
Regelung Lüftungsanlage H20Einsparung Energie Wärme 159 MWh/a
Dachventilatoren H82 RegelungEinsparung Energie Wärme 1.620 MWh/a
und Strom 88 MWh/a
BypassventileEinsparung Wärme 140 MWh/a
Bedarfsorientierte
Wärmeversorgung H3Einsparung Wärme 500 MWh/
Hydraulischer Abgleich H20 Einsparung Strom 63 MWh/a
Free Cooling H22 Einsparung Strom 64 MWh/a
Zusammenfassung
28.11.2017 Autor: Roman Pöltner Disclosure or duplication without consent is prohibited 38
Nachweisbarer Erfolg
Qualifizierte MA
Transparenz
Nachweisbare
Einsparungen
seit 2012:
30 GWh
Recommended