MATTERS FOR LIVERPOOL LOCAL PLANNING PANEL
DETERMINATION
Monday 30th September 2019
To be held at the “Gold Room, Liverpool Library”
170 George Street Liverpool
Doors open at 1:45 PM to commence at 2:00 PM Note: Submissions by the applicant and concerned parties will be considered at the hearing. A
concerned party is deemed to be a person who has made a written submission in respect to the application. The Panel shall, upon request, hear submissions from persons who identify prior to a hearing that they wish to make a submission to be considered by the Panel. Presentations to the Panel by the applicant and concerned parties shall be restricted to 3 minutes each. The Panel Chairperson has the discretion to extend the period if considered appropriate.
Should you wish to address the Panel, please advise Danielle Hijazi, Panel Support Officer on 8711 7627 or 1300 36 2170, by 4pm, Friday, 27th September 2019.
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
1
The following development applications are referred to the Liverpool Local Planning Panel for its determination.
ITEM No.
SUBJECT PAGE No.
1
Development Application DA-188/2015 Torrens title subdivision to create 47 allotments and the construction of detached dwellings on nine (9) of the proposed Torrens title lots (As amended) (Note: proposal is identified as Nominated Integrated development pursuant to Water Management Act 2000) Lot 400 DP 1098281 Lot 400 Strathyre Drive, Prestons
2-79
ITEM No.
SUBJECT PAGE No.
2
Development Application DA-269/2019 Boundary Adjustment to Five (5) existing lots resulting in Four (4) re-configured allotments. The lot boundary re-alignment and lot consolidation is proposed to align with the adjoining R2 Low Density Residential and RE1 Public Recreation zones. The scope of works includes minor demolition works and erection of new boundary fencing. The subsequent re-subdivision of land results in:
- the consolidation of part of ‘Tepper Park’ and Lot 1 McLean Street into 41 Kennedy Street to create Proposed Torrens Title Lot 1;
- the consolidation of part of ‘Tepper Park’ into 39 Kennedy Street to create Proposed Torrens Title Lot 2;
- the consolidation of part of Lot 1 McLean Street into 81 Lehmann Avenue to create Proposed Torrens Title Lot 4;
the creation of Lot 3 from the remaining land in the RE1 zone (Tepper Park), due to the zone alignment. Lots 1 & 2 DP 31862 Lot 24 DP 230861 Lot 1 DP 1246664 Part Lot 17 DP 31863 39 & 41 Kennedy Street, 81 Lehmann Avenue Lot 1 Maclean Street, Part of ‘Tepper Park’ Liverpool
79-118
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
2
1. Executive Summary Council has received a Development Application (DA-188/2015) seeking consent for the Torrens title subdivision to create 47 allotments and the construction of detached dwellings on nine (9) of the proposed Torrens title lots (As amended) (Note: proposal is identified as Nominated Integrated development pursuant to Water Management Act 2000), Lot 400 Strathyre Drive, Prestons. The site is zoned R2 – Low Density Residential pursuant to Liverpool Local Environmental Plan 2008 and the proposed development is permissible with consent. The development application was notified and advertised for a period of 30 days from 20 May 2015 to 19 June 2015. As a consequence of amended plans the application was re-notified for 14 days from 24 August 2018 to 10 September 2018. During the notification periods a total of 10 unique submissions have been received. The concerns raised in the submissions and the response to these submissions are detailed further in this report. The application is referred to the Liverpool Local Planning Panel (LLPP) in accordance with its referral criteria and procedural requirements in that the development falls into the category of contentious development as the application received 10 or more unique submissions by way of objection to the proposal. The application has been assessed pursuant to the provisions of the Environmental Planning and Assessment (EP&A) Act 1979. Based on the assessment of the application, it is recommended that the application be approved by way of deferred commencement, subject to the imposition of conditions.
2. Site Description and Locality 2.1 The site
The site is identified as Lot 400 of DP 1098281 and is known as Lot 400 Strathyre Drive, Prestons. The site is an irregular shaped allotment with a total site area of 1.865 hectares. The site is relatively flat with a slight downslope from the north-eastern corner to the south-western corner of the site.
Item no: 1
Application Number: DA-188/2015
Proposed Development:
Torrens title subdivision to create 47 allotments and the construction of detached dwellings on nine (9) of the proposed Torrens title lots (As amended) (Note: proposal is identified as Nominated Integrated development pursuant to Water Management Act 2000)
Property Address Lot 400 Strathyre Drive, Prestons
Legal Description: Lot 400 DP 1098281
Applicant: JS Architects Pty Ltd
Land Owner: Maxma Developments Pty Ltd
Recommendation: Deferred Commencement
Assessing Officer: George Nehme
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
3
The site is located within an existing established low-density residential area and is currently vacant, however contains a large extent of vegetation which is identified as Endangered Ecological Community. The site adjoins residential dwelling houses to the east, south and west and has a stormwater drainage channel to the north of the site. The site is located approximately 5.9km to the south west of the Liverpool City Centre.
Figure 1: Aerial image of the site 2.2 The Locality
The area is currently characterised by low density residential development. West of the site is the Prestons Shopping Village which includes an IGA Supermarket, newsagent, butchery, medical centre, pharmacy, real estate office, beauty salon and take-a-way food stores (amongst others).
The local area also contains a number of schools, the closest being St Catherine of Siena Catholic Primary School to the west in Dalmeny Drive, Dalmeny Public Primary School to the north (also) in Dalmeny Drive, Amity College to the north in Kurrajong Road, William Carey Christian School to the west in Camden Valley Way and John Edmondson High School in the adjoining suburb to the west Horningsea Park.
Subject Site
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
4
3. Background
The application was lodged with Council on 13 March 2015;
Application was notified for 30 days from 20 May 2015 to 19 June 2015. During the exhibition period 4 submissions were received.
The applicant obtained a BioBanking statement from the Office of Environment and Heritage on 3 May 2017, granting approval for the offset of the EEC identified under the Threatened Species Conservation Act 1995.
The applicant was granted a controlled action by the Department of the Environment and Energy (reference: 2015/7627) on 21 November 2017.
Additional information was provided on 10 August 2018, in response to the additional information required.
The amended information incorporated amendments to the application including the proposal of 9 dwellings as part of the application.
Consequently the application was re-notified from 24 August 2018 to 10 September 2018. During the notification period an additional 6 submissions were received.
A final assessment of the amended plans was undertaken and it was considered the application is satisfactory and can proceed to determination.
4. Proposed Development The development application seeks approval for the Torrens title subdivision to create 47 allotments and the construction of detached dwellings on nine (9) of the proposed Torrens title lots. Dwellings will be constructed on Lots 3, 4, 22, 24, 27, 32, 33, 34 and 35. All dwellings will be detached and 2 storeys in height.
Figure 2: Proposed Site Plan
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
5
5. Planning Assessment The following planning instruments have been considered in the planning assessment of the subject Development Application:
Environment Protection and Biodiversity Conservation Act 1999 & Threatened Species
Conservation Act 1995
Greater Metropolitan Regional Environmental Plan No. 2 – Georges River Catchment;
State Environmental Planning Policy (SEPP) No.55 – Remediation of Land;
State Environmental Planning Policy (SEPP) BASIX 2004;
Liverpool Local Environmental Plan 2008 (LLEP 2008); and
Liverpool Development Control Plan 2008 (LDCP 2008). o Part 1 – General Controls for all Development o Part 2.2 – Carnes Hill, Hoxton Park & Prestons Residential Areas o Part 3.2 – Dwelling Houses on Land Greater than 400sqm in R2, R3 and R4 zones o Part 3.5 – Dwelling Houses on Land less than 400sqm in R2, R3 and R4 zones
The development has been assessed in accordance with the matters for consideration under Section 4.15 of the EP&A Act as follows: (a) Threatened Ecological Communities – Application of the Environment Protection and
Biodiversity Conservation Act 1999 & Threatened Species Conservation Act 1995 The subject allotment was created as part of a subdivision approved in 2004 (DA-2467/2004). As part of the subdivision approval the subject allotment being Lot 400 had an 88B restriction imposed which stated; “The registered proprietor for the time being of Lot 400 shall establish and retain the allotment as bushland and shall not permit the allotment to be cleared, altered or damaged except as required to remove noxious weeds or other exotic species and shall manage the allotment in accordance with the Vegetation Management Plan. A residence can be built within the building envelope as shown in Liverpool City Council approval No2467/2004”. The subject allotment is not mapped as containing endangered ecological communities, however the site is known to contain EEC. Consequently the application was accompanied by a Flora and Fauna Assessment prepared by Ecological Australia, dated 4 December 2014. The Flora and Fauna assessment identified that the subject site is recognised as containing two threatened ecological communities and one threatened fauna species. The Threatened Ecological Communities (EECs) identified within the subject site are:
Cumberland Plain Woodland (CPW) (listed under the NSW Threatened Species Conservation Act 1995 (TSC Act) and as Cumberland Plain Shale Woodlands and Shale-Gravel Transition Forest under the Environment Protection and Biodiversity Conservation Act 1999) and
River-flat Eucalypt Forest (RFEF) listed under the TSC Act.
The one threatened fauna species that is known to occur within the site is the Cumberland Plain
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
6
Land Snail (CPLS). This species is listed as endangered under the TSC Act. The assessment concluded the following; “The proposed subdivision lot layout will result in the permanent loss of up to 294 native trees, 1.41 ha of CPW and 0.22 ha of RFEF. Given that CPW is listed as a critically endangered ecological community the loss of up to 1.41 ha of vegetation listed under the TSC and EPBC Acts is considered a significant impact to this vegetation community. Subsequently an SIS is required and a referral to the Australian Government Department of the Environment (DotE) is recommended. The proposed subdivision development may also impact on threatened fauna species which may utilise the vegetation within the study area. The removal of CPW could result in the local extinction of a small isolated CPLS population that was identified within the study area”. Due to the identified impacts on significant vegetation the applicant applied for and was granted approval for the removal of the vegetation pursuant to the Environment Protection and Biodiversity Conservation Act 1999 for a controlled action and the Threatened Species Conservation Act 1995 through a Bio Banking arrangement. An outline of the relevant approvals obtained under the EPBC and the TSC Act is below. 1) Environment Protection & Biodiversity Act 1999.
Pursuant to Part 9 of the Environment Protection & Biodiversity Act 1999, a person must not take an action that has or is likely to have a significant impact on any of the matters of environmental significance or other protected matters, which include the removal of threatened species without approval from the Australian Government Minister for the Environment and Energy. As previously stated the subject site is identified as containing Cumberland Plain Shale Woodlands and Shale-Gravel Transition Forest which is identified as EEC under the Environment Protection and Biodiversity Conservation Act 1999). Consequently the applicant applied for and was granted approval for a controlled action by the Department of Environment and Energy (Reference: 2015/7627) on 21 November 2017. The link to the relevant approvals is provided below. http://epbcnotices.environment.gov.au/publicnoticesreferrals/ As a condition of the approved controlled action the approval holder must not clear more than 2.29 hectares of Cumberland Plain Shale Woodlands and Shale-Gravel Transition Forest (CPW) within the proposed action area. All requirements of the approved controlled will form part of the conditions of consent.
2) Threatened Species Conservation Act 1995 As indicated previously the subject site has been identified as containing the following EEC’s under the TSC Act 1995; The Threatened Ecological Communities (EECs) identified within the subject site are:
Cumberland Plain Woodland (CPW);
River-flat Eucalypt Forest (RFEF) and
One threatened fauna species that is known to occur within the site is the Cumberland Plain Land Snail - CPLS).
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
7
The flora and fauna assessment submitted with the application concluded that there will be a significant impact on the above-mentioned species and a species impact statement (SIS) is required for the project. However in lieu of a SIS, the applicant sought to enter a Biodiversity Banking and Offset Scheme, under Part 7AA of the TSC Act 1995. The applicant was granted approval for the Biokbanking Offsets on 3 May 2017 by the Office of Environment and Heritage (OEH). The requirements and conditional requirements of the OEH Bio banking approval will form part of the development consent. Conclusion Having regard to the above, notwithstanding the identified significance of the existing vegetation the proposed development has obtained the relevant approvals under the applicable legislation to enable the development to proceed. (b) Greater Metropolitan Regional Environmental Plan No.2 – Georges River Catchment
(Deemed SEPP) The subject land is located within the Georges River Catchments and as such The Greater Metropolitan Regional Environmental Plan No. 2 – Georges River applies to the application. The Greater Metropolitan Regional Environmental Plan No. 2 – Georges River Catchment generally aims to maintain and improve the water quality and river flows of the Georges River and its tributaries. The DA was referred to Council’s Land Development engineering section who reviewed stormwater management and drainage associated with the proposal. They were supportive of the proposed development, subject to conditions. Accordingly, the proposed development is considered to meet the objectives of the SEPP and is unlikely to have a negative impact on the environmental quality of the Georges River Catchment. (c) State Environmental Planning Policy No. 55 - Remediation of Land
Pursuant to Clause 7 of SEPP 55, a consent authority is unable to grant development consent unless it has considered whether the land is contaminated and, if so, whether the consent authority is satisfied that the land is suitable in its contaminated state, or can be remediated to be made suitable for the purposes for which the development is proposed to be carried out. Council must consider this and the likelihood of any contamination on-site and the possible impacts which may arise from any works associated with this proposal.
Clause 7 - Contamination and remediation to be considered in determining development application
Comment
(1) A consent authority must not consent to the carrying out of any development on land unless:
(a) it has considered whether the land is contaminated, and
The applicant submitted a Detailed Site Investigation prepared by Aargus Pty Ltd
(b) if the land is contaminated, it is satisfied that the land is suitable in its contaminated state (or will be suitable, after remediation) for the purpose for which the development is proposed to be carried out, and
The report concluded that the subject site is suitable for the proposed use.
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
8
(c) if the land requires remediation to be made suitable for the purpose for which the development is proposed to be carried out, it is satisfied that the land will be remediated before the land is used for that purpose.
The land does not require remediation.
Based on the above assessment, the proposal is considered to satisfy the relevant objectives and provisions of SEPP 55, therefore, it is considered that the subject site is suitable for the proposed development. (d) State Environmental Planning Policy – Building Sustainability Index: BASIX 2004 The proposal is accompanied by a BASIX Certificate which is consistent with the aims and intent of the Plan. It is recommended that appropriate conditions are imposed to ensure compliance with the BASIX commitments. (e) Liverpool Local Environmental Plan 2008 (LLEP 2008)
(i) Permissibility The subject site is zoned R2 – Low Density Residential in accordance with the Liverpool Local Environmental Plan (LLEP 2008). The proposed developments are best described as “dwellings” which is a permissible form of development with consent. The subject proposal also involves the subdivision of land. Subdivision is a permissible form of development pursuant to Clause 2.6 of the LLEP 2008.
Figure 3: Zoning map of the locality surrounding the subject site (ii) Objectives of the zone
To provide for the housing needs of the community within a low-density residential environment.
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
9
To enable other land uses that provide facilities or services to meet the day to day needs of residents.
To provide a suitable low scale residential character commensurate with a low dwelling density.
To ensure that a high level of residential amenity is achieved and maintained.
The proposed development is considered consistent with the objectives of the zone as it will provide for the housing needs of the community within a low-density residential environment. The proposal will provide a suitable low scale residential character within a low density environment. (iii) Principal Development Standards
Development Provision
Requirement Proposal Compliance
4.1 Minimum subdivision lot size
Min 300m2
All lots have a site area equal to or greater than 300m²
Complies
4.3 Height of Buildings
Maximum height permitted: 8.5m
Lots 3, 4, 22, 24, 27, 32, 33, 34 & 35 are all less than 8.5m in height
Complies
4.4 Floor Space Ratio (FSR)
Maximum FSR permitted: 0.6:1
Lots 3, 4, 22, 24, 27, 32, 33, 34 & 35 have an FSR of 0.6:1 or less.
Complies
5.10 Heritage Conservation
Development Consent is required for this development pursuant to Clause 5.10(2)
Refer to assessment below; Satisfactory
7.8 Flood Planning Provisions for protecting life and property in flood areas
The subject site is located within the Cabramatta Creek Catchment and is affected by Low Risk Flooding. The application was reviewed by Council’s Flooding Engineers and considered satisfactory subject to conditions.
Satisfactory
7.31 Earthworks Council to consider matters listed (a)-(g)
The earthworks proposed to facilitate the development is considered appropriate and can be addressed through conditions of consent.
Complies subject to conditions
5.10 Heritage Conservation Clause 5.10(2) of the LLEP 2008 states; (2) Requirement for consent Development consent is required for any of the following—
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
10
(a) demolishing or moving any of the following or altering the exterior of any of the following (including, in the case of a building, making changes to its detail, fabric, finish or appearance)—
(i) a heritage item, (ii) an Aboriginal object, (iii) a building, work, relic or tree within a heritage conservation area,
(b) altering a heritage item that is a building by making structural changes to its interior or by making changes to anything inside the item that is specified in Schedule 5 in relation to the item,
(c) disturbing or excavating an archaeological site while knowing, or having reasonable cause to suspect, that the disturbance or excavation will or is likely to result in a relic being discovered, exposed, moved, damaged or destroyed,
(d) disturbing or excavating an Aboriginal place of heritage significance,
(e) erecting a building on land—
(i) on which a heritage item is located or that is within a heritage conservation area, or (ii) on which an Aboriginal object is located or that is within an Aboriginal place of heritage
significance, (f) subdividing land—
(i) on which a heritage item is located or that is within a heritage conservation area, or (ii) on which an Aboriginal object is located or that is within an Aboriginal place of heritage
significance.
Comment: The subject site is not listed as a heritage item in the LLEP 2008, is not located within the immediate vicinity of a heritage item and is not located in a heritage conservation area. The subject site is a large parcel of undeveloped land covered with vegetation and in close proximity to ephemeral watercourses, thus increasing the likelihood of Aboriginal cultural deposits. A search of the Aboriginal Heritage information Management System found two Aboriginal sites on the allotment. The application was consequently accompanied by an Aboriginal Archaeological Assessment, dated December 2014, prepared by Comber Consultants. The assessment made the following recommendations;
1. An Aboriginal Heritage Impact Permit (AHIP) will be required as there are two registered
Aboriginal sites (AHIMS 45‐5‐4319, 45‐5‐4320) located on the property. Archaeological testing, salvage and Aboriginal community consultation must be undertaken prior to applying for an AHIP.
2. Aboriginal community consultation in accordance with OEH’s Aboriginal cultural heritage consultation requirements for proponents 2010 must be undertaken prior to applying for the permit.
3. Once the consultation has been completed archaeological testing must be undertaken in accordance with the Code of Practice for Archaeological Investigation of Aboriginal Objects in New South Wales in consultation with the registered Aboriginal stakeholders. This must be undertaken prior to applying for the AHIP and the results submitted with the AHIP application.
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
11
The proposal has been reviewed by Council’s Heritage Officer and it was concluded that the findings and recommendations of the assessment were supported subject to an additional condition requiring the report documenting the results of the archaeological testing and Aboriginal Consultation is to be provided to Liverpool City Council Heritage Officer. The application was also referred to the Office of Environment and Heritage due to the potential archaeological sites identified. The OEH have provided Council with General Terms of Approval, which will be incorporated into the development consent. Therefore having regard to the above it is considered the proposal has satisfactorily addressed Clause 5.10(2) of the LLEP 2008.
Section 4.15(1)(a)(ii) – Any Draft Environmental Planning Instruments
No draft Environmental Planning Instruments.
Section 4.15(1)(a)(iii) – Any Development Control Plan
Liverpool Development Control Plan 2008
LDCP 2008 Part 1 – General Controls for all Development
Control Required Proposal Compliance
Section 2 – Tree Preservation
Consider impact of development on existing vegetation
As indicated previously in report approval has been granted under the EPBC and TSC Acts for the removal of vegetation.
Satisfactory
Section 3 – Landscaping and Incorporation of Existing Trees
Incorporation of existing trees into development where appropriate
As indicated previously in report approval has been granted under the EPBC and TSC Acts for the removal of vegetation.
Satisfactory
Section 4 – Bushland and Habitat Preservation
Consider impact of development on bushland and habitats
As indicated previously in this report, notwithstanding the subject proposal has been set aside for the purpose of bushland appropriate approvals have been obtained to enable the offsets of the vegetation lost as a consequence of this development.
Satisfactory
Section 5 – Bushfire Risk
Land on or adjacent to bushfire prone land to comply with RFS requirements
Site is not identified as Bushfire prone land.
N/A
Section 6 – Water Cycle Management
Consideration of stormwater and drainage
Application reviewed by Council’s development engineer and considered acceptable.
Complies by condition
Section 7 – Development Near a Watercourse
Consideration of impact to riparian corridors
Development is located within 40m of watercourse. Application referred to NSW Office of Water. GTA’s issued for application.
Complies
Section 8 – Erosion and
Sediment Control Plan or Soil and
Sediment control details were submitted with the application.
Complies
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
12
Sediment Control
Water Management Plan required
Section 9 – Flooding Risk
Flood affection of property to considered
The subject site is located within the Cabramatta Creek Catchment and is affected by Low Risk Flooding. The application was reviewed by Council’s Flooding Engineers and considered satisfactory subject to conditions.
Complies
Section 10 – Contaminated Land Risk
Previous use to be considered in assessing risk
Site inspection and historic uses on the site suggest that there is no requirement for a land contamination assessment and the site is considered acceptable for this proposal.
Complies
Section 11 – Salinity Risk
Salinity Management response required for affected properties
Site is not known to be affected by salinity. Advisory condition to be applied.
Complies by condition
Section 12 – Acid Sulfate Soils Risk
Affected properties to consider impact of development on soils
Site is not affected by sulfate soils. N/A
Section 13 – Weeds
Noxious weeds to be removed as part of development where applicable
Any noxious weeds will be removed as part of the commencement of the development.
Satisfactory
Section 14 – Demolition of Existing Development
Must comply with AS 2601-2001
No demolition proposed N/A
Section 15 – Onsite Sewage Disposal
S68 Application required where connection to sewer not available
Site is connected to sewer. N/A
Section 16 – Aboriginal Archaeology
AHIA required where items of aboriginal archaeology exist
AHIP will be required as identified previously in this report. Proposal has adequately addressed LLEP 2008 in relation to Aboriginal Archaeology.
Satisfactory
Section 17 – Heritage and Archaeology
Consideration of the impact on the heritage significance on any heritage buildings, sites, streetscapes or areas.
AHIP will be required as identified previously in this report. Proposal has adequately addressed LLEP 2008 in relation to Aboriginal Archaeology.
Satisfactory
Section 18 – Notification of Application
Proposal was notified/advertised in accordance with the LDCP.
The development application was notified and advertised for a period of 30 days from 20 May 2015 to 19 June 2015. As a consequence of amended plans the application was re-notified for 14 days from 24
Complies
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
13
August 2018 to 10 September 2018. During the notification periods a total of 10 unique submissions have been received. The concerns raised in the submissions and the response to these submissions are detailed further in this report.
Section 20 – Car Parking and Access
2 spaces per dwelling
All lots proposing a dwelling being lots 3, 4, 22, 24, 27, 32, 33, 34 & 35 all provide a minimum 2 spaces.
Complies
Section 21 – Subdivision of Land and Buildings
Subdivision creating lots <300sqm or <10m width shall include the dwelling house as part of the DA
All lots are equal to or greater than 300m². However, as a consequence of the irregular lot several Lots being lots 3, 4, 22, 24, 27, 32, 33, 34 & 35 are less than 10m wide. Therefore, these lots have provided dwelling designs that will be incorporated into the proposal.
Complies
Section 22 & 23 – Water & Energy Conservation
New dwellings, are to demonstrate compliance with State Environmental Planning Policy – Building Sustainability Index (BASIX).
A compliant BASIX Certificate has been provided which outlines water and energy conservation commitments. Conditions of consent will apply to ensure compliance and implementation of the BASIX criteria within the dwellings.
Complies
DEVELOPMENT CONTROL
PROPOSAL COMMENT
PART 2.2 – CARNES HILL, HOXTON PARK & PRESTONS
1.1 INDICATIVE LAYOUT To be in accordance with Figure 2.
Development is designed in accordance with the Indicative Layout Plan.
Complies
2.1 STREET NETWORK AND ACCESS Subdivision plans must indicate street type.
The proposal has provided appropriately designed roads.
Complies
2.3 STREETSCAPE AND TREES Minimum of two trees per six metres of frontage
Landscaping plan provided and in accordance with DCP requirements.
Complies
2.6 Water Cycle Management
The proposed stormwater system for the site complies with the requirements of this section of the DCP.
Complies
2.7 CONTAMINATION Potential for contamination to be assessed.
A Contamination Assessment has been provided. Investigation concludes the site is suitable.. Conditions of consent shall be imposed as assessed by Council’s Environmental Health Officer.
Complies
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
14
PART 3.2 – Dwelling Houses on lots greater than 400sqm – Lots 3 and 4
Control Requirement Proposed Comment
Site Planning Development to be compatible with local amenity / streetscape
The designs of the proposed dwellings are compatible with nearby residential properties in the immediate vicinity, despite being on smaller lots
Complies
Dwelling layouts to be designed around slope, vegetation, and to provide solar access
Dwellings on these lots have been designed to accommodate site slope.
Complies
Direct link to be provided from a living area to the principal POS
Rear ground floor living areas open out to the principal POS
Complies
Building Siting, windows, balconies, fencing to consider privacy of residents and adjoining neighbours
All dwellings have been designed to account for privacy of adjoining neighbors.
Complies
Windows of habitable rooms to be situated to reduce overlooking of neighbouring POS
The dwelling windows do not look directly into adjoining premises windows nor do they overlook POS of other allotments.
Complies
Stormwater to be drained satisfactorily
The stormwater plans have been reviewed by Development Engineers and is satisfactory
Complies
Setbacks
Ground floor = 4.5m First floor = 5.5m
A minimum front setback of 4.5m is provided to all dwellings except and a minimum 5.5m is provided to the first floor for all dwellings.
Complies
Secondary setback (longest length boundary)
Ground & First Floor 2.5m
No dwellings have a secondary setback.
N/A
Side setback within a proposed subdivision
Ground = 900mm First = 1.2m
All dwellings provide the required side setbacks
Complies
Rear setback within a proposed subdivision
Ground Floor 4m First Floor 7m
All dwellings propose the required ground and first floor rear setbacks.
Complies
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
15
Landscaped Areas
25% of the site area to be Landscaped. Landscaped area for growing trees minimum 4m x 6m area in rear yard 50% front setback shall be landscaped Landscaped area for growing trees minimum 3m x 3m in front setback
All lots provide a minimum 25% landscaped area. A minimum 4x6, provided within rear setback. A minimum 50% of the front setback is landscaped. A minimum 3x3 area provided for growing trees.
Complies
Private Open Space
POS to be > 70sqm Not within primary street setback To have area to dry clothes Shall include a Principal POS directly accessible from dwelling living area (dimension 4m x 6m) Principal POS to receive 3 hours sunlight to 50% of the area (21 June – from 9am to 5pm)
All dwellings provide a POS equal to or greater than 70m². All include an area of 4x6 and all receive 3 hours of solar access to 50% of the PPOS on 21 June.
Complies
Cut and Fill Provisions to restrict changes to the natural ground levels Maximum cut 600mm
All dwellings comply with this requirement
Complies
Building Design & Appearance
Front Entrance to the visible to the street Front of Building to be articulated with porches/entries/ wall indents/balconies/verandas Eave overhang minimum of 400mm to be provided to 70% of the dwelling
All dwellings have been designed to comply with these requirements
Complies
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
16
Dwellings with 2 street frontages should address both Sidewalls to be articulated if continuous over 14m length Balconies should be constructed over garages Balconies should face the front only
Garage door/carports must not be > 50% of the building frontage Garages/carports must be The minor element of the building façade Garage shall be incorporated into the dwelling/roof design Garages/carports to be compatible with building design
Dwellings have been designed to accommodate this requirement.
Satisfactory.
Building Internal Design
Habitable rooms located to front for security and surveillance Living room should take advantage of northern aspect Access to POS from a living room Internal layout to allow cross ventilation WC/en-suites/laundries/Walk-in-robes to be located to sides and rear Each dwelling to provide 8m3 storage
Dwellings have been designed to accommodate this requirement
Satisfactory.
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
17
Locate habitable rooms overlooking communal public areas where possible
Landscaping and Fencing
Provisions for the planting of trees in landscaped areas and Fences adjoining public land on a Secondary Frontage Must be 1.2m high for 9m from the front boundary towards the rear, then can be stepped up to 1.8m, and must not be sheet metal in addressing the street
All dwellings have been designed to accommodate appropriate landscaping.
Satisfactory.
Car Parking & Access
2 Car Parking Spaces for each dwelling At least 1 car space behind the front setback Car space to be 2.5m x 5.5m
All dwellings provide the required number of parking spaces.
Complies
Amenity and Environment Overshadowing
Overshadowing – on 21 June adjoining allotment must receive 3 hours sunlight to; 50% of POS, and A living, rumpus room
All dwellings have been designed to maintain the amenity of the adjoining properties when developed.
Complies
Amenity and Environment Privacy
Minimise overlooking of neighbours by; Offsetting side windows by 1m Habitable room side windows are to have a sill height of 1.5m (road / open space excepted)
All dwellings have been designed to maintain the amenity of the adjoining properties when developed.
Complies
Acoustic Impact Measures to protect from impact of rail and/or traffic related noises as required
N/A N/A
Letterboxes Sympathetic to design of buildings
Not identified on plans. Complies by condition
Frontage works Where there are no existing street trees in front of the site and contributions have not
There are no trees in front of the site and no specific contributions provided. As
Complies by condition
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
18
been collected for street tree planting it may be a condition of consent that street trees be provided in the footpath area immediately in front of the site.
such a street tree will be required to be planted in front of the site.
PART 3.5 – Dwelling Houses on lots less than 400sqm – Lots 22, 24, 27, 32, 33, 34 & 35
Control Requirement Proposed Comment
Site Planning Development to be compatible with local amenity / streetscape
The designs of the proposed dwellings are compatible with nearby residential properties in the immediate vicinity, despite being on smaller lots
Complies
Dwelling layouts to be designed around slope, vegetation, and to provide solar access
Dwellings on these lots have been designed to accommodate site slope.
Complies
Direct link to be provided from a living area to the principal POS
Rear ground floor living areas open out to the principal POS
Complies
Building Siting, windows, balconies, fencing to consider privacy of residents and adjoining neighbours
All dwellings have been designed to account for privacy of adjoining neighbors.
Complies
Windows of habitable rooms to be situated to reduce overlooking of neighbouring POS
The dwelling windows do not look directly into adjoining premises windows nor do they overlook POS of other allotments.
Complies
Stormwater to be drained satisfactorily
The stormwater plans have been reviewed by Development Engineers and is satisfactory
Complies
Setbacks
Ground floor = 4.5m First floor = 5.5m
A minimum front setback of 4.5m is provided to all dwellings except and a minimum 5.5m is provided to the first floor for all dwellings.
Complies
Secondary setback (longest length boundary)
Ground & First Floor 2.5m
No dwellings have a secondary setback.
N/A
Side setback within a proposed subdivision
Ground & First Floor 900mm
All dwellings provide a minimum 900mm side setback
Complies
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
19
Rear setback within a proposed subdivision
Ground Floor 4m First Floor 7m
All dwellings propose the required ground and first floor rear setbacks.
Complies
Zero lot line N/A
No dwellings propose a zero lot line
N/A
Landscaped Areas
25% of the site area to be Landscaped. Landscaped area for growing trees minimum 4m x 5m area in rear yard.50% front setback shall be landscaped. Landscaped area for growing trees minimum 3m x 3m in front setback
All lots provide a minimum 25% landscaped area except for Lot 32. A minimum 4m x 5m provided in rear yard provided for planting trees. A 3mx3m in front yard is provided for all dwellings. Due to the irregular shape of the existing lot, some of the resultant Torrens title Lots have narrow frontages and would need to provide a large expanse of the frontage for the purpose of a driveway. As such Lot 32, is unable to provide the required 25% landscaping in this instance.
Satisfactory
Private Open Space
POS to be > 60sqm Not within primary street setback To have area to dry clothes Shall include a Principal POS directly accessible from dwelling living area (dimension 4m x 6m) Principal POS to receive 3 hours sunlight to 50% of the area (21 June – from 9am to 5pm)
All dwellings provide a POS equal to or greater than 60m². All include an area of 4x6 and all receive 3 hours of solar access to 50% of the PPOS on 21 June.
Complies
Cut and Fill Provisions to restrict changes to the natural ground levels Maximum cut 600mm
All dwellings comply with this requirement
Complies
Building Design & Appearance
Front Entrance to the visible to the street
All dwellings have been designed to comply with these requirements
Complies
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
20
Front of Building to be articulated with porches/entries/ wall indents/balconies/verandas Eave overhang minimum of 400mm to be provided to 70% of the dwelling Dwellings with 2 street frontages should address both Sidewalls to be articulated if continuous over 14m length Balconies should be constructed over garages Balconies should face the front only
Garage door/carports must not be > 50% of the building frontage Garages/carports must be The minor element of the building façade Garage shall be incorporated into the dwelling/roof design Garages/carports to be compatible with building design
Dwellings have been designed to accommodate this requirement.
Satisfactory.
Building Internal Design
Habitable rooms located to front for security and surveillance Living room should take advantage of northern aspect Access to POS from a living
Dwellings have been designed to accommodate this requirement
Satisfactory.
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
21
room Internal layout to allow cross ventilation WC/en-suites/laundries/Walk-in-robes to be located to sides and rear Each dwelling to provide 8m3 storage Locate habitable rooms overlooking communal public areas where possible
Landscaping and Fencing
Provisions for the planting of trees in landscaped areas and Fences adjoining public land on a Secondary Frontage Must be 1.2m high for 9m from the front boundary towards the rear, then can be stepped up to 1.8m, and must not be sheet metal in addressing the street
All dwellings have been designed to accommodate appropriate landscaping.
Satisfactory.
Car Parking & Access
2 Car Parking Spaces for each dwelling At least 1 car space behind the front setback Car space to be 2.5m x 5.5m
All dwellings provide the required number of parking spaces.
Complies
Amenity and Environment Overshadowing
Overshadowing – on 21 June adjoining allotment must receive 3 hours sunlight to; 50% of POS, and A living, rumpus room
All dwellings have been designed to maintain the amenity of the adjoining properties when developed.
Complies
Amenity and Environment Privacy
Minimise overlooking of neighbours by; Offsetting side windows by 1m Habitable room side windows
All dwellings have been designed to maintain the amenity of the adjoining properties when developed.
Complies
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
22
are to have a sill height of 1.5m (road / open space excepted)
Acoustic Impact Measures to protect from impact of rail and/or traffic related noises as required
N/A N/A
Letterboxes Sympathetic to design of buildings
Not identified on plans. Complies by condition
Frontage works
Where there are no existing street trees in front of the site and contributions have not been collected for street tree planting it may be a condition of consent that street trees be provided in the footpath area immediately in front of the site.
There are no trees in front of the site and no specific contributions provided. As such a street tree will be required to be planted in front of the site.
Complies by condition
Section 4.15(1)(a)(iiia) any planning agreement that has been entered into under section 93F, or any draft planning agreement that a developer has offered to enter into under section 93F, and
There are no draft planning agreements that apply to the site. Section 4.15(1)(a)(iv) – The Regulations The Environmental Planning and Assessment Regulation 2000 requires the consent authority to consider the provisions of the Building Code of Australia and the safety standards for demolition (AS 2601 – 2001). Accordingly, appropriate conditions of consent will be imposed. Section 4.15(1)(b) – The Likely Impacts of the Development
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
23
Heads of Consideration
Comment
Built Environment
The proposed development, as amended, is unlikely to create any adverse impacts on the surrounding built environment. The proposed development is considered to be of an appropriate scale and is unlikely to create any detrimental impacts on the adjoining properties or the locality as a whole. The proposal will facilitate residential development which is not considered an over-development and is consistent with the desired future built character of the locality.
Natural Environment
All assessments submitted with the application has identified a significant impact on the existing natural environment on the site, in particular the impact on the identified EEC’s on the site. However as identified in this report the applicant has obtained the relevant approvals under the EPBC and TSC Acts to offset the detrimental impact on the natural environment.
Social Impacts The application is unlikely to cause detrimental social impacts, being consistent with the current low density character of the area. The proposal will enable a development that will provide for the future housing needs of the community.
Economic Impacts
The proposal is likely to result in a positive economic impact in the locality through the capital investment of the development.
Section 4.15(1)(c) – The Suitability of the Site for the Development The subject proposal is a permissible development and the proposal satisfies the key planning controls for site as detailed above and is generally considered to be suitable for the site. Section 4.15(1)(d) – Any Submissions made in relation to the Development (a) Internal Referrals The following comments have been received from Council’s Internal Departments:
DEPARTMENT COMMENTS
Development Engineer Approval subject to conditions of consent
Traffic Engineer Approval subject to conditions of consent
Environmental Health Approval subject to conditions of consent
Flooding Approval subject to conditions of consent
(b) External Referrals The following comments have been received from External Agencies
DEPARTMENT COMMENTS
Office of Water GTA’s issued
Office of Environment and Heritage
GTA’s Issued and Bio banking Offset Credits approved
Department of Environment and Energy
Controlled Action Issued
(b) Community Consultation
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
24
The development application was notified and advertised for a period of 30 days from 20 May 2015 to 19 June 2015. As a consequence of amended plans the application was re-notified for 14 days from 24 August 2018 to 10 September 2018. During the notification periods a total of 10 unique submissions have been received. The concerns raised in the submissions and the response to these submissions are detailed further in this report. Issue 1: Parking, Traffic Comment: As part of the application a traffic impact assessment was provided, prepared by Transport and Traffic Planning Associates. The traffic report concluded that the proposed road system will be appropriate and compliant with the DCP, the provision of vehicle access and servicing will be satisfactory and that there will be no adverse traffic implications. The application was reviewed by Council’s traffic department and considered satisfactory. Given the additional dwellings likely to be serviced off Strathyre Drive, it was recommended that indent parking bays be provided along the street frontage. Accordingly the application has been amended to provide for the indent parking bays along Strathyre Drive. Issue 2: Removal of Trees Comment: It is acknowledged that the subject allotment contains EEC species. However as indicated previously in this report, the applicant has obtained the relevant approvals from the Department of Environment and Energy and the Office of Environment and Heritage to allow the proposed development to proceed and the removal of the vegetation to be undertaken. Issue 3: Stormwater Concerns as a consequence of the additional development Comment: The additional stormwater impact was reviewed by Council’s Land Development and considered satisfactory subject to conditions of consent. Given the proximity to the stormwater channel the application was also referred to the NSW Office of Water and General Terms of Approval have been issued. Section 4.15(1)(e) – The Public Interest The proposal is generally compliant with the relevant planning controls and is generally considered to be in the public interest.
6. Developer Contributions Contributions have been applied to the development in accordance with Liverpool Contributions Plan 2009 (Hoxton Park, Carnes Hill and Prestons Release Areas).
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
25
7. Conclusion
The application has been assessed having regard to the provisions of Section 4.15 of the EP&A Act 1979, and the Environmental Planning Instruments, including the applicable State Environmental Planning Policies, Liverpool LEP 2008, LDCP 2008, and the relevant codes and policies of Council. The proposed development is unlikely to result in any adverse impact upon neighbouring properties and the locality. Based on the assessment of the application, it is recommended that the application be approved subject to the imposition of conditions.
8. Recommendation
That Development Application DA-188/2015 be approved subject to conditions of consent.
9. Attachments
1. Plans of the Proposal
2. Draft Conditions of Consent
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
26
ATTACHMENT 1: PLANS OF THE PROPOSAL SUBDIVISION PLAN
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
27
SUBDIVISION PLAN WITH DWELLINGS
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
28
ATTACHMENT 2: DRAFT CONDITIONS OF CONSENT The following conditions have been imposed to achieve the objectives of the relevant planning instruments and policies.
PART 1:
DEFERRED COMMENCEMENT
Development consent shall be deferred pursuant to Section 4.16(3) of the Environmental Planning and Assessment Act 1979, until the submission to Council of:
1. An application for an amendment to the existing 88B instrument is to be submitted and
approved by Liverpool City Council for the removal of the of the existing
restriction/easement relating to the retention of the subject site for the purpose of bushland
specifically identified as follows;
TERMS OF EASEMENT, PROFIT A PRENDRE, RESTRICTION, OR POSITIVE
COVENANT NUMBERED 3 IN THE PLAN
“The registered proprietor for the time being of Lot 400 shall establish and retain the allotment as bushland and shall not permit the allotment to be cleared, altered or damaged except as required to remove noxious weeds or other exotic species and shall manage the allotment in accordance with the Vegetation Management Plan. A residence can be built within the building envelope as shown in Liverpool City Council approval No2467/2004”. The revised 88B Instrument is to be submitted to the Land and Property Information. Evidence is to be provided that the revised 88B instrument has been registered.
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
29
PART 2:
On the submission of the required evidence and on the applicant receiving written notification that Council is satisfied that the matters listed in “Part 1” have been satisfied, then the consent shall become operative subject to compliance with conditions outlined in “Part 2”.
A. THE DEVELOPMENT
Approved Plans
1. Development the subject of this determination notice must be carried out strictly in accordance with the following approved plans/reports marked as follows, except where modified by the undermentioned conditions.
Plan Name Plan Number Date Revision Prepared By
Architectural Plans – Lot 03 #B-001/#005 to #B-005/#005
22/06/2018
B JS Architects
Architectural Plans – Lot 04 #C-001/#005 to #C-005/#005
22/06/2018
B JS Architects
Architectural Plans – Lot 22 #D-001/#005 to #C-005/#005
22/06/2018
B JS Architects
Architectural Plans – Lot 24 #E-001/#005 to #E-005/#005
22/06/2018
B JS Architects
Architectural Plans – Lot 27 #F-001/#005 to #F-005/#005
22/06/2018
B JS Architects
Architectural Plans – Lot 32 #G-001/#005 to #G-005/#005
22/06/2018
B JS Architects
Architectural Plans – Lot 33 #H-001/#005 to #H-005/#005
22/06/2018
B JS Architects
Architectural Plans – Lot 34 #I-001/#005 to #I-005/#005
22/06/2018
B JS Architects
Architectural Plans – Lot 35 #J-001/#005 to #J-005/#005
22/06/2018
B JS Architects
Subdivision Plan 01/02 17-09-2018
C JS Architects
Street Landscaping Plan 02/02 17-09-2018
C JS Architects
Report Name Date Reference Prepared By
Traffic Impact Assessment December 2014 191/2014 Transport and Traffic Planning Associates
Aboriginal Archaeological Assessment
16/12/2014 B.2014 Comber Consultants
Geotechnical Investigation Report
22/12/2014 GS6083-1A Aargus
Detailed Site Investigation 16/12/2014 ES6083/2 Aargus
Council Waste-Water Requirements
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
30
2. The development must provide for a physical sewerage connection to each created
allotment to enable the method of sewage disposal by gravity reticulation mains to either, Sydney Water branch and trunk sewers or Sydney Water point of treatment. Council will not accept any temporary facilities to service the site, including pump-out wet-wells.
Construction Certificates for Dwellings
3. Individual Construction Certificates are required for each of the approved dwelling houses
in this development consent when the land subdivision has been completed before dwelling construction.
Works at no cost to Council
4. All roadworks, drainage works and dedications, required to effect the consented development shall be undertaken at no cost to Liverpool City Council.
Compliance with Controlled Action
5. All conditions of the controlled action issued by the Department of the Environment and Energy, reference 2015/7627, dated 21 November 2017 shall be complied with prior, during, and at the completion of construction. A copy of the controlled action are attached to this decision notice.
General Terms of Approval
6. All General Terms of Approval issued by the Office of Environment and Heritage shall be complied with prior, during, and at the completion of construction, as required in accordance with the General Terms of Approval dated 4 June 2015. A copy of the General Terms of Approval are attached to this decision notice.
7. All General Terms of Approval issued by the Department of primary Industries Office of
Water, shall be complied with prior, during, and at the completion of construction, as required in accordance with the General Terms of Approval dated 22 June 2015. A copy of the General Terms of Approval are attached to this decision notice.
Compliance with BioBanking Statement Conditions
8. All conditions of the Biobanking Statement issued by the Office of Environment and Heritage, dated 3 May 2017 shall be complied with prior, during, and at the completion of construction. A copy of the BioBanking Statement is attached to this decision notice.
B. PRIOR TO THE ISSUE OF A CONSTRUCTION CERTIFICATE
The following conditions are to be complied with or addressed prior to the issue of a Construction Certificate by the Principal Certifying Authority. SECTION 7.11 PAYMENT (Liverpool Contributions Plan 2009 – Hoxton Park, Carnes Hill and Prestons Release Areas
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
31
9. As a consequence of this development, Council has identified an increased demand for public amenities and public services. The following payment is imposed in accordance with Liverpool Contributions Plan 2009 – Hoxton Park, Carnes Hill and Prestons Release Areas
The total contribution is $1,968,999.00 and will be adjusted at the time of payment in accordance with the contributions plan.
A breakdown of the contributions payable is provided in the attached payment form.
Fee Payments
10. Unless otherwise prescribed by this consent, all relevant fees or charges must be paid. Where Council does not collect these payments, copies of receipts must be provided. For the calculation of payments such as Long Service Levy, the payment must be based on the value specified with the Development Application/Construction Certificate. The following fees are applicable and payable:
(a) Damage Inspection Fee – relevant where the cost of building work is $20,000 or
more, or a swimming pool is to be excavated by machinery. (b) Fee associated with Application for Permit to Carry Out Work Within a Road, Park
and Drainage Reserve. (c) Long Service Levy – based on 0.35% of the cost of building work where the costing
of the CC is $25,000 or more.
Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works. The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, is to be forwarded to the Long Service Levy Corporation or the Council, prior to the issuing of a Construction Certificate, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.
These fees are reviewed annually and will be calculated accordingly.
11. All fees associated with a road opening permit required for the connection, extension or amplification of any services within Council’s road reserve must be paid to Council and receipts provided to the PCA. A separate form must be submitted in conjunction with payment of the fees. The fees include the standard road opening permit fee and any restoration fees that may be required as a result of the works.
Building Compliance
12. The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times. Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of ‘on-the-spot’ penalty infringements or service of a notice and order by Council.
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
32
National Construction Code
13. All aspects of construction shall comply with the applicable Performance Requirements of the National Construction Code. Compliance with the Performance Requirements can only be achieved by:
(a) Complying with the Deemed to Satisfy Provisions; or (b) Formulating an Alternative Solution, which complies with the Performance
Requirements or is shown to be at least equivalent to the Deemed to Satisfy Provision, or a combination of (a) and (b).
Site Development Work
14. Site development work in the form of excavation, underpinning or shoring works must not
take place, until such time as a CC has been issued. Notification 15. The certifying authority must advise Council, in writing of:
(a) The name and contractor licence number of the licensee who has contracted to do
or intends to do the work, or (b) The name and permit of the owner-builder who intends to do the work.
If these arrangements are changed, or if a contact is entered into for the work to be done by a different licensee, Council must be immediately informed.
S138 Roads Act – Minor Works in the public road
16. Prior to the issue of a Construction Certificate a S138 Roads Act application/s, including payment of fees shall be lodged with Liverpool City Council, as the Roads Authority for any works required in a public road. These works may include but are not limited to the following:
Vehicular crossings (including kerb reinstatement of redundant vehicular crossings)
Road opening for utilities and stormwater (including stormwater connection to Council infrastructure)
Road occupancy or road closures
All works shall be carried out in accordance with the Roads Act approval, the development consent including the stamped approved plans, and Liverpool City Council’s specifications. Note: Approvals may also be required from the Roads and Maritime Service (RMS) for classified roads.
S138 Roads Act – roadworks requiring approval of civil drawings
17. Prior to the issue of a Construction Certificate for building or subdivision works the Certifying
Authority shall ensure that a S138 Roads Act application, including the payment of
application and inspection fees, has been lodged with Liverpool City Council (being the
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
33
Roads Authority under the Roads Act), for provision of (Road & Drainage Works),
(Connection to new Corrimal Street for both road pavement and stormwater connections)
Engineering plans are to be prepared in accordance with the development consent,
Liverpool City Council’s Design Guidelines and Construction Specification for Civil Works,
Austroad Guidelines and best engineering practice.
Note: Where Liverpool City Council is the Certifying Authority for the development the
Roads Act approval for the above works may be issued concurrently with the Construction
Certificate. Construction Certificate for Subdivision Works
18. Prior to the issue of a Construction Certificate for subdivision works the Certifying Authority shall ensure that engineering plans are consistent with the approved concept plan/s lodged for development approval, prepared by prepared by Neilly Davies Consulting Engineers, reference number 20878S8-VT, revision-C, dated 25-10-2018 and that all subdivision works have been designed in accordance with conditions of this consent, Liverpool City Council’s Design Guidelines and Construction Specification for Civil Works, any Roads Act approval issued, Austroad Guidelines and best engineering practice.
The subdivision works may include but are not limited to the following:
Stormwater drainage including water quantity and quality treatment measures
Interallotment drainage
Private access driveways
Sediment and erosion control measures
Overland flowpaths
Flood control measures
Traffic facilities including roundabouts, intersection treatments, car parks, bus stops, cycleways, pathways etc.
Earthworks
Bridges, culverts, retaining walls and other structures
Landscaping and embellishment works
All works required for conversion of the proposed sediment basin to a bio retention function All works required for the decommissioning temporary OSD systems including pipe removal, basin filling and works to existing pit structures if required
The Construction Certificate must be supported by engineering plans, calculations, specifications and any certification relied upon.
Road Design 19. Prior to the issue of a Construction Certificate the Certifying Authority shall ensure that the
proposed roads have been designed in accordance with Liverpool City Council’s Design Guidelines and Construction Specification for Civil Works and the following criteria;
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
34
Road No.
Road Reserve
Width
Carriageway Width
Verge Footpath
(1.5m wide) ESA
New Road No. 1
15.2 7.2 4.0 1.5 3 X 10^5
Stormwater Concept Plan
20. A stormwater drainage system shall be provided generally in accordance with the concept
plan/s lodged for development approval, prepared by Neilly Davies Consulting Engineers,
reference number 20878S8-VT, revision-C, dated 25-10-2018
(a) The proposed development and stormwater drainage system shall be designed to
ensure that stormwater runoff from upstream properties is conveyed through the site
without adverse impact on the development or adjoining properties.
(b) Engineering plans and supporting calculations for the stormwater drainage system
are to be prepared by a suitably qualified engineer and shall accompany the
application for a Construction Certificate. The plan shall indicate the method of
disposal of all stormwater and must include rainwater tanks, existing ground levels,
finish surface levels and sizes of all pipes.
(c) Prior to the issue of a Construction Certificate the Certifying Authority shall ensure
that the stormwater drainage system has been designed in accordance with Liverpool
City Council’s Design Guidelines and Construction Specification for Civil Works.
Retaining Walls on Boundary 21. All retaining walls shall be of masonry construction and must be wholly within the property
boundary, including footings and agricultural drainage lines. Construction of retaining walls or associated drainage works along common boundaries shall not compromise the structural integrity of any existing structures.
Where a retaining wall exceeds 600mm in height, the wall shall be designed by a practicing structural engineer and a construction certificate must be obtained prior to commencement of works on the retaining wall No Loading on Easements
22. Prior to the issue of a Construction Certificate the Certifying Authority shall ensure that the foundations of proposed structures adjoining the drainage and/ or services easement have been designed clear of the zone of influence.
Inter-allotment Drainage
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
35
23. Inter-allotment drainage shall be provided for all lots that are unable to be drained by gravity to the street system. Inter-allotment drainage is to be constructed with a pit located immediately within the lot boundary of each lot created by the subdivision at the lowest point in the line or a maximum pit spacing of 40m.
Floodplain Engineer Conditions of Consent
24. Prior to the issue of a Construction Certificate, detailed design plans, drawings and reports
are required to be submitted to Council for review and approval demonstrating the following:
(a) There shall be no adverse overland flooding impact on adjoining site from the development. Existing storm runoff on to the site from upstream/adjoining sites shall not be disturbed and be accommodated in to the proposed stormwater system.
(b) Post-developed flow discharges from the site shall be no greater than the pre-developed (100%impervious catchment) flows of the site. Am OSD shall be provided on the site to controls post development flow discharges from the site. Detailed design calculation and hydrologic/hydraulic modelling analysis of the OSD along with an assessment report shall be submitted for Council assessment and approval.
(c) There shall be no adverse overland flooding impact on existing creeks due the proposed work. Undertake detailed catchment analysis and overland flood assessment for rage of storm events with 2D flood modelling preferably using Council's tuflow model of Cabramatta Creek Flood Study 2011. Prepare flood maps for pre/post development and demonstrate that post developed flows will have no adverse flood impact on adjoining creeks for range of storm events including the 20%, 5% & 1%AEP flood event.
(d) Major/minor system shall comply Council design requirement. Major system (roads) shall comply flood depth criteria (d<0.2m) and velocity*depth (vd<0.4) safety criteria up to the 1%AEP flood. Demonstrate that existing adjoining roads will have no adverse impact from additional (if any) storm runoff from the development.
(e) Detailed concept design plans/drawings, hydrologic/hydraulic modeling of the OSD, overland flood assessment report with flood mapping, electronic copies of flood models with result files shall be submitted to Council for assessment.
(f) Future habitable floor levels shall be no lower than the 1% AEP flood plus half a metre freeboard.
(g) Future structures shall be constructed from flood compatible building components below the 1% AEP flood plus half a metre freeboard.
Traffic Management and Road Works
25. A traffic management plan is to be submitted to Liverpool City Council’s Traffic Committee for approval. Works within the road reserve shall not commence until the traffic management plan has been approved.
26. The traffic management plan is to be prepared by an accredited designer and submitted to
and stamp approved by Council via a standard Section 138 Roads Act Permit application available at Council’s customer service counter. The stamped approved Roads Act Permit
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
36
is to be obtained by the PCA. A copy of the stamped approved Roads Act Permit and traffic management plan is to be available on the works site for inspection at any time by an authorised Council officer.
Traffic, Access, Car Parking and Manoeuvring – General
27. Prior to the issue of a Construction Certificate the Certifying Authority shall ensure that vehicular access, circulation, manoeuvring, pedestrian and parking areas associated with the subject development, are in accordance with AS 2890.1, AS2890.2, AS2890.6 and Liverpool City Council’s Development Control Plan. Road Safety Audit
28. A Stage 3 (detailed design) Road Safety Audit (RSA) shall be undertaken on the proposed roadworks by an accredited auditor who is independent of the design consultant. A copy of the RSA shall accompany the design plans submitted with the Construction Certificate or Roads Act application. Prior to the issue of the Construction Certificate or Roads Act approval, the Certifying Authority shall ensure that the recommendations of the RSA have been addressed in the final design. Traffic and Parking Facilities Endorsement
29. Detailed designs and locations of all indent parking bays, pram ramps, linemarking, signposting and pedestrian crossing facilities if any is to be submitted to Liverpool City Council’s Traffic and Transport Department for review and endorsement. The final design of the indent bays is to be endorsed by the Liverpool Local Traffic Committee prior to the issue of the Construction Certificate.
Provision of Services
30. An application to obtain a Section 73 Compliance Certificate under the Sydney Water Act
1994, must be lodged with Sydney Water. To facilitate this, an application must be made through an authorised Water Servicing Coordinator. Please refer to the “building and developing” section of Sydney Water’s web site at www.sydneywater.com.au, or telephone 13 20 92. Following receipt of the application, a ‘Notice of Requirements’ will detail water and sewer extensions to be built and charges to be paid. Please make early contact with the Coordinator, since building of water/sewer extensions can be time consuming and may impact on other services and building, driveway or landscape design. A copy of the ‘Notice of Requirements’ must be submitted to the PCA.
31. Written clearance from Endeavour Energy, stating that electrical services have been made
available to the development or that arrangements have been entered into for the provision of services to the development must be submitted to the PCA.
32. Prior to the issue of a Construction Certificate, the PCA shall be satisfied that telecommunications infrastructure may be installed to service the premises which complies with the requirements of:
- The Telecommunications Act 1997:
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
37
- The NBN Co’s standard specifications current at the time of installation, for a fibre ready facility.
For a line that is to connect a lot to telecommunications infrastructure external to the premises, the line shall be located underground. Unless otherwise stipulated by telecommunications legislation at the time of construction, the development must be provided with all necessary pits and pipes, and conduits to accommodate the future connection of optic fibre technology telecommunications.
33. The applicant is to arrange with the appropriate service provider for any above ground service riser or access point to be constructed clear of any proposed or existing pedestrian footways, and if possible, located in recessed unobtrusive locations. Should any service provider require and/or insist the applicant/developer build a service riser that would create an obstruction and pose a potential safety hazard, then the applicant/developer should refer the request to Council for negotiation directly with the Service Network Authority.
34. The applicant is to obtain approval from relevant service authorities in relation to authority
assets that may require adjustment and or relocation in order to complete the works required by this consent.
Services
35. All services required to adequately service the development are to be shown on the engineering drawings submitted for the CC approval including duct configurations, road crossings, water and sewer services, electrical services and light columns positions.
Dilapidation Report
36. Prior to the Commencement of Works a dilapidation report of all infrastructure fronting the
development on all existing public roads adjoining the site is to be submitted to Liverpool City Council. The report is to include, but not limited to, the road pavement, kerb and gutter, footpath, services and street trees and is to extend 20m either side of the development. Street Names
37. All proposed street names must be confirmed with Council’s Strategic Planning Department prior to the issue of a Construction Certificate.
Heritage Conditions
38. An Aboriginal Heritage Impact Permit (AHIP) will be required as there are two registered Aboriginal sites (AHIMS 45‐5‐4319, 45‐5‐4320) located on the property. Archaeological testing, salvage and Aboriginal community consultation must be undertaken prior to applying for an AHIP.
39. Aboriginal community consultation in accordance with OEH’s Aboriginal cultural heritage consultation requirements for proponents 2010 must be undertaken prior to applying for the permit.
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
38
40. Once the consultation has been completed archaeological testing must be undertaken in
accordance with the Code of Practice for Archaeological Investigation of Aboriginal Objects in New South Wales in consultation with the registered Aboriginal stakeholders. This must be undertaken prior to applying for the AHIP and the results submitted with the AHIP application.
41. A copy of the report documenting the results of archaeological testing and Aboriginal
consultation should be provided to Liverpool City Council’s Heritage Officers. C. PRIOR TO WORKS COMMENCING
The following conditions are to be complied with or addressed prior to works commencing on the subject site. Construction Certificates
42. Detailed Civil engineering plans and specifications relating to the work shall be endorsed
with a Construction Certificate, in accordance with Section 4.19 of the Act, and a copy registered with Council.
43. Detailed engineering plans and specifications relating to the work shall be endorsed with a
Construction Certificate, in accordance with Section 4.19 of the EP&A Act, and a copy submitted to Council, with payment of any relevant fees.
44. Any Construction Certificate that may be issued in association with this development
consent must ensure that any certified plans and designs are generally consistent (in terms of site layout, site levels, building location, size, external configuration and appearance) with the approved Development Application plans.
45. Where this consent requires both engineering and building works to be undertaken, a
separate construction certificate shall be issued for each category of works i.e., a separate Civil Engineering Construction Certificate and a separate Building Construction Certificate. Building Compliance
46. Prior to the commencement of any building works, the following requirements must be
complied with: a) A Construction Certificate must be obtained from the Council or an accredited
certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.
b) A copy of the Construction Certificate, the approved development consent plans
and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.
c) A Principal Certifying Authority (PCA) must be appointed to carry out the necessary
building inspections and to issue an occupation certificate; and d) A principal contractor must be appointed for the building work, or in relation to
residential building work, an owner-builder permit may be obtained in accordance with the requirements of the Home Building Act 1989, and the PCA and Council
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
39
are to be notified accordingly; and d) The principal contractor or owner builder must be advised of the required critical
stage inspections and other inspections to be carried out, as specified by the Principal Certifying Authority; and
e) At least two days notice must be given to the Council, in writing, prior to
commencing any works
Matters to be addressed prior to commencement of Subdivision Works 47. Work on the subdivision shall not commence until:
(a) a Construction Certificate (if required) has been issued,
(b) a Principal Certifying Authority has been appointed for the project, and
(c) any other matters prescribed in the development consent for the subdivision and the
Environmental Planning and Assessment Act and Regulation have been complied with. A Notice of Commencement is to be submitted to Liverpool City Council two (2) days prior to commencement of engineering works or clearing associated with the subdivision.
Environmental Management
48. An Environmental Management Plan (EMP) shall be developed and submitted to the
Principal Certifying Authority for approval. The EMP shall provide a comprehensive and complete action and implementation plan to ensure that the anthropological and natural environment is not unacceptably impacted upon by the proposal. The EMP shall include but not be necessarily limited to the following measures: (a) Measures to control noise emissions from the site; (b) Measures to suppress odours and dust emissions; (c) Selection of traffic routes to minimise residential noise intrusions; (d) Soil and sediment control measures; (e) Measures to identify hazardous and industrial wastes and the procedures for
removal and disposal including asbestos; and (f) Community consultation. Waste Classification and Disposal of Contaminated Soil and Material
49. All soils and material(s), liquid and solid, to be removed from the site must be analysed and classified by an appropriately qualified and certified consultant, in accordance with the Protection of the Environment Operations (Waste) Regulation 2014 and related guidelines, in particular the NSW EPA Waste Classification Guidelines, prior to off-site disposal. All Waste material(s) must be disposed of at an appropriately licensed waste facility for the specific waste. Receipts for the disposal of the waste must be submitted to the Principal Certifying Authority within 30 days of the waste being disposed of.
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
40
All waste must be transported by a contractor licenced to transport the specific waste, and in vehicles capable of carting the waste without spillage, and meeting relevant requirements and standards. All loads must be covered prior to vehicles leaving the site.
Residential Building Work
50. Building work that involves residential building work (within the meaning of the Home Building Act 1989), must not be commenced until such time as a contract of insurance is in force in accordance with Part 6 of that Act.
51. Building work that involves residential building work (within the meaning of the Home Building Act 1989) must not be commenced unless the principal certifying authority for the development to which the work relates (not being the council) has given the council written notice of the following information:
(a) In the case of work for which a principal contractor is required to be appointed:
i. The name and licence number of the principal contractor; and ii. The name of the insurer by which the work is insured under Part 6 of that Act,
(b) in the case of work to be done by an owner-builder: i. the name of the owner-builder, and ii. if the owner-builder is required to hold an owner-builder permit under that Act,
the number of the owner-builder permit,
Note: A certificate supporting to be issued by an approved insurer under Part 6 of the Home Building Act 1989 that states that a person is the holder of an insurance policy issued for the purposes of that Part is, for the purposes of this condition, sufficient evidence that the person has complied with the requirements of that Part.
52. If arrangements for doing the residential building work are changed while the work is in
progress so that the information notified becomes out of date, further work must not be carried out unless the PCA for the development to which the work relates (not being the Council) has given the council written notice of the updated information.
Site Notice Board
53. A sign must be erected in a prominent position on the premises on which work is to be carried out. The sign is to be maintained during work, and removed at the completion of work. The sign must state: (a) The name, address and telephone number of the principal certifying authority for the
work; and (b) The name of the principal contractor (if any) for any building work and a telephone
number on which that person may be contacted outside working hours; and (c) Unauthorised entry to the premises is prohibited.
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
41
Site Facilities
54. Toilet facilities must be available or provided at the work site and must be maintained until the works are completed at a ratio of one toilet plus one additional toilet for every 20 persons employed at the site.
Each toilet must: (a) be a standard flushing toilet connected to a public sewer, or (b) have an on-site effluent disposal system approved under the Local Government Act
1993, or (c) be a temporary chemical closet approved under the Local Government Act 1993.
55. Adequate refuse disposal methods and builders storage facilities shall be installed on the
site. Builders’ wastes, materials or sheds are not to be placed on any property other than that which this approval relates to.
Exportation of Waste
56. Prior to the exportation of waste (including fill or soil) from the site, the material shall be
classified in accordance with the provisions of the POEO Act and NSW DECCW, (EPA) 'Environmental Guidelines: Assessment, Classification and Management of Non-Liquid Wastes'. The classification of the material is essential to determine where the waste may be legally taken. The POEO Act provides for the commission of an offence for both the waste owner and transporters if waste is taken to a place that cannot lawfully be used as a waste facility for the particular class of waste. For the transport and disposal of industrial, hazardous or Group A liquid and non-liquid waste advice should be sought from the DECCW (EPA).
Sydney Water
57. Prior to commencement of dwelling construction works, the approved plans must be
processed and approved by Sydney Water.
Sediment & Erosion Control
58. Prior to commencement of works sediment and erosion control measures shall be installed in accordance with the approved Construction Certificate and to ensure compliance with the Protection of the Environment Operations Act 1997 and Landcom’s publication “Managing Urban Stormwater – Soils and Construction (2004)” – also known as “The Blue Book”. The erosion and sediment control measures shall remain in place and be maintained until all disturbed areas have been rehabilitated and stabilised.
D. DURING CONSTRUCTION The following conditions are to be complied with or addressed during construction:
Building Compliance
59. The building works must be inspected by the Principal Certifying Authority, in accordance with sections 6.5 (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
42
with the relevant standards of construction, Council’s development consent and the construction certificate. The Principal Certifying Authority must specify the relevant stages of construction to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceedings to the subsequent stages of construction or finalisation of the works (as applicable).
60. A sign must be erected and maintained in a prominent position on the site, which contains
the following details: name, address, contractor licence number and telephone number of the principal
contractor, including a telephone number at which the person may be contacted outside working hours, or owner-builder permit details (as applicable)
name, address and telephone number of the Principal Certifying Authority a statement stating that ‘unauthorised entry to the work site is prohibited”.
Hours of Construction Work and Deliveries 61. Construction work/civil work/demolition work, including the delivery of materials, is only
permitted on the site between the hours of 7:00am to 6:00pm Monday to Friday and 8:00am to 1:00pm on Saturday. No work will be permitted on Sundays or Public Holidays, unless otherwise approved by Council.
Security Fence
62. A temporary security fence to WorkCover Authority requirements is to be provided to the
property during the course of construction. Note: Fencing is not to be located on Council’s reserve area.
Identification Survey Report 63. The building and external walls are not to proceed past ground floor/reinforcing steel level
until such time as the PCA has been supplied with an identification survey report prepared by a registered surveyor certifying that the floor levels and external wall locations to be constructed, comply with the approved plans, finished floor levels and setbacks to boundary/boundaries. The slab shall not be poured, nor works continue, until the PCA has advised the builder/developer that the floor level and external wall setback details shown on the submitted survey are satisfactory.
In the event that Council is not the PCA, a copy of the survey shall be provided to Council within three (3) working days. On placement of the concrete, works again shall not continue until the PCA has issued a certificate stating that the condition of the approval has been complied with and that the slab has been poured at the approved levels.
Traffic Management
64. All works within the road reserve are to be at the applicant cost and all signage is to be in
accordance with the RMS Traffic Control at Worksites Manual and the RMS Interim Guide to Signs and Markings.
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
43
65. If a works zone is required, an application must be made to Council’s Transport Planning
section. The application is to indicate the exact location required and the applicable fee is to be included. If parking restrictions are in place, an application to have the restrictions moved, will need to be made.
66. Notice must be given to Council’s Transport Planning section of any interruption to
pedestrian or vehicular traffic within the road reserve, caused by the construction of this development. A Traffic Control Plan, prepared by an accredited practitioner must be submitted for approval, 48 hours to prior to implementation. This includes temporary closures for delivery of materials, concrete pours etc.
67. Applications must be made to Council’s Transport Planning section for any road closures.
The applicant is to include a Traffic Control Plan, prepared by a suitably qualified person, which is to include the date and times of closures and any other relevant information.
Construction Requirements
68. The applicant/ builder shall be responsible to report to the Council any damage to Council’s footpath and road carriageway as a consequence of demolition or excavation or building activities or delivery/ departure of materials associated with this site. The damage shall be reported to Council as soon as the damage becomes apparent to the builder/ site manager. Arrangements to the satisfaction of Council are to be made for making safe by temporary repairs to the public way until permanent restoration and repair can be organised with Council.
General Site Works 69. Dust screens shall be erected and maintained in good repair around the perimeter of the
subject land during land clearing, demolition, and construction works. 70. Where operations involve excavation, filling or grading of land, or removal of vegetation,
including ground cover, dust is to be suppressed by regular watering until such time as the soil is stabilised to prevent airborne dust transport. Where wind velocity exceeds five knots the PCA may direct that such work is not to proceed.
71. All vehicles involved in the delivery, demolition or construction process departing from the
property shall have their loads fully covered before entering the public roadway. 72. Erosion and sediment control measures shall remain in place and be maintained until all
disturbed areas have been rehabilitated and stabilised. 73. Vehicular access to the site shall be controlled through the installation of wash down bays
or shaker ramps to prevent tracking of sediment or dirt onto adjoining roadways. Where any sediment is deposited on adjoining roadways is shall be removed by means other than washing. All material is to be removed as soon as possible and the collected material is to be disposed of in a manner which will prevent its mobilisation.
74. Any runoff entering the areas of vegetation to be retained shall be of an equivalent or better
quality, and of a similar rate of flow to present levels.
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
44
75. The development, including construction, shall not result in any increase in sediment deposition into any water body, wetland, bushland or environmentally significant land.
76. All dangerous and/or hazardous material shall be removed by a suitably qualified and
experienced contractor, licensed by WorkCover NSW. The removal of such material shall be carried out in accordance with the requirements of WorkCover NSW. The material shall be transported and disposed of in accordance with DECCW (EPA) requirements.
77. Building operations such as brick cutting, mixing mortar and the washing of tools, paint brushes, form-work, concrete trucks and the like shall not be performed on the public footway or any other locations which may lead to the discharge of materials into Council’s stormwater drainage system.
78. The developer is to maintain all adjoining public roads to the site in a clean and tidy state, free of excavated “spoil” material.
79. All topsoil, sand, aggregate, spoil or any other material shall be stored clear of any drainage
line, easement, water body, stormwater drain, footpath, kerb or road surface and there shall be measures in place in accordance with the approved erosion and sediment control plan.
Waste
80. All waste materials generated as a result of the development are to be disposed at a facility licensed to receive such waste.
81. Stockpiles of topsoil, sand, aggregate, spoil or other material capable of being moved by water, to be stored clear of any drainage line, easement, natural watercourse, footpath, kerb or roadside.
Earthworks
82. All earthworks shall be undertaken in accordance with AS 3798 and Liverpool City Council’s
Design Guidelines and Construction Specification for Civil Works. The level of testing shall be determined by the Geotechnical Testing Authority/ Superintendent in consultation with the Principal Certifying Authority.
83. Council will not permit contaminated material to be capped and contained beneath public
roads and footpath areas. Soil Testing
84. Soil Testing is to be carried out to enable each lot to be classified according to AS 2870
"Residential Slabs and Footings”. Car Parking Areas 85. The design of car-parking spaces must comply with Council’s DCP 2008, and Australian
Standard 2890.1 Parking Facilities – Off Street Car Parking.
86. ‘No Stopping’ parking restrictions in lane way and at intersections are to be provided in accordance with the DCP and AS 2890.
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
45
Unexpected Heritage Finds
87. All relevant on-site staff and contractors should be made aware of their statutory obligations for heritage under NSW National parks and Wildlife Act 1974 and the NSW Heritage Act 1977. They are to be informed of what the potential heritage on the site will be and the significant of the heritage. The site supervisor is to maintain a record of who has completed the heritage induction and this is to be provided to Council prior to Issue of Occupation Certificate.
88. If Aboriginal object/s are identified during works, then all works in the immediate area must
cease and the area secured. The Office of Environment and Heritage must be notified by ringing the Enviroline 131 555. No works are to commence until authorisation has been received from the Office of Environment and Heritage and the appropriate permits have been obtained.
89. In the event that skeletal remains are uncovered, work must cease immediately in that area and the area secured. NSW Police must be contacted and no further action taken until written advice has been provided by the NSW Police. If the remains are determined to be of Aboriginal origin, the Office of Environment and Heritage must be notified by ringing the Enviroline 131 555 and a management plan prior to works re-commencing must be developed in consultation with relevant Aboriginal stakeholders.
90. Copies of all Aboriginal Archaeological assessments and reports (including summary excavation and analysis reports) are to be provided to Liverpool City Council, Liverpool City Library and the relevant Local Aboriginal Land Councils.
Contamination 91. The development, including all civil works and demolition, must comply with the
requirements of the Contaminated Land Management Act, 1997, State Environmental Planning Policy No. 55 – Remediation of Land, and Managing Land Contamination – Planning Guidelines (Planning NSW/EPA 1998).
92. All fill introduced to the site must undergo a contaminated site assessment. This assessment may consist of either:
(a) a full site history of the source of the fill (if known) examining previous land uses or geotechnical reports associated with the source site to determine potential contamination as per the NSW DECCW ‘Waste Classification Guidelines’ April 2008; or
(b) clearly indicate the legal property description of the fill material source site; (c) provide a classification of the fill material to be imported to the site in accordance
with the ‘NSW DECCW ‘Waste Classification Guidelines’ April 2008. (d) a chemical analysis of the fill where the site history or a preliminary contamination
assessment indicates potential contamination or contamination of fill material; and (e) must provide Council with copies of validation certificate verifying the material to
be used is free of contaminants and fit for purpose re use in residential, commercial or industrial use.
External Treatment of Buildings
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
46
93. Any external lighting is to incorporate full cut-off shielding and is to be mounted so as to not cause any glare or spill over light nuisance within the development, neighbouring properties or road users.
94. The windows of all first floor bathrooms, W.C. and en-suites shall be fitted with translucent
obscure glazing to the satisfaction of the PCA.
Display of Street Numbers
95. Street/address numbers must be prominently displayed at the front of the development in a contrasting colour to the building materials and at the front of each individual unit. The number should be a minimum height of 120mm and be visible at night. Mail-boxes
96. The mailboxes for the studio dwellings are to be located along the front boundary of the lots
and must each have their own keys for private access. Mailboxes for the secondary dwellings are not to be located along the rear lanes.
97. The letter boxes for each allotment are to be consistent with the design and colours and
materials for the development. Waste Management Plan
98. A Waste Management Plan is to be submitted to and approved by the PCA and must be adhered to at all times throughout all stages of the development. Supporting documentation (receipts/dockets) of waste/recycling/disposal methods carried out, is to be kept and must be produced upon the request of Council or any other authorised officer. Note: Any non-compliance with this requirement will result in penalties being issued.
Vegetation
99. No known environmental or noxious weeds or known invasive plant species shall be included in the landscaping/revegetation.
100. Mulch generated from exotic trees or other weed species cleared shall not be used on site. It shall be removed from the site and disposed of appropriately and in accordance with legislative requirements.
101. Any imported soil and/or mulch shall be free of contaminants, seed and propagules of weeds and undesirable species. Mulch shall not be used on flood liable land.
Street Lighting
102. Street lighting is to be provided for all new and existing streets within the proposed subdivision to Liverpool City Council’s standards. The developer shall submit a Public Lighting Design Brief to Council for approval for the provision of street lighting on all new public roads dedicated to Council. A street lighting design plan must be prepared by an accredited service provider for approval prior to construction. All street lighting must comply with the electricity service provider Street
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
47
Lighting Policy and illumination requirements and Council’s Street Lighting policy. All cost associated with the installation of street lighting shall be borne by the developer.
E. PRIOR TO ISSUE OF A SUBDIVISION CERTIFICATE
The following conditions are to be complied with or addressed prior to issue of a Subdivision Certificate by Council:
Completion of subdivision works
103. Prior to the issue of a Subdivision Certificate, the Principal Certifying Authority shall ensure that all subdivision works required by this consent have been satisfactorily completed or that suitable arrangements have been made with Liverpool City Council for any outstanding works. Liverpool City Council clearance – Roads Act/ Local Government Act
104. Prior to the issue of a Subdivision Certificate, the Principal Certifying Authority shall ensure
that all works associated with a S138 Roads Act approval or S68 Local Government Act approval have been inspected and signed off by Liverpool City Council. Subdivision Compliance documentation
105. Prior to the issue of a Subdivision Certificate the following compliance documentation shall be submitted to the Principal Certifying Authority. A copy of the following documentation shall be provided to Council where Council is not the Principal Certifying Authority:
(a) Work as Executed (WAE) drawings of all civil works. The WAE drawings shall be
marked in red on copies of the stamped Construction Certificate drawings signed,
certified and dated by a registered surveyor or the design engineer. The Work as
Executed drawings shall be prepared in accordance with Council’s Design
Guidelines. Electronic copies of the WAE shall be provided in PDF format and a DXF
format to Council along with two hard copies of the WAE plans,
(b) The WAE drawings shall clearly indicate the 1% Annual Excedence Probability flood
lines (local and mainstream flooding),
(c) The WAE drawings shall be accompanied by plans indicating the depth of fill for the
entire development site. The plans must show, by various shadings or cross
hatchings, the depth of any fill within 0.3m depth ranges,
(d) CCTV footage in DVD format to Council’s requirements and a report in “SEWRAT”
format for all drainage within future public roads and public land. Inspections are to
be carried out in accordance with the Conduit Inspection Reporting Code of Australia
WSA 05-2006. Any damage that is identified is to be rectified in consultation with
Liverpool City Council,
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
48
(e) Surveyor’s Certificate certifying that all pipes and services are located wholly within
the property or within appropriate easements and that no services encroach
boundaries,
(f) Documentation for all road pavement materials used demonstrating compliance with
Council Design Guidelines and Construction Specification,
(g) Structural Engineer’s construction certification of all structures.
Stormwater Compliance 106. Prior to the issue of a Subdivision Certificate the Principal Certifying Authority shall ensure
that the On-site detention system/s and Stormwater pre-treatment system/s;
o Have been satisfactorily completed in accordance with the approved Construction Certificate and the requirements of this consent.
o Have met the design intent with regard to any construction variations to the approved design.
o Any remedial works required to been undertaken have been satisfactorily completed.
Details of the approved and constructed system/s shall be provided as part of the Works-As-Executed drawings.
Linen Plans & 88B
107. In order to enable a Subdivision Certificate to be issued for submission to the LPI Service,
the applicant is required to lodge a separate application along with one (1) original and four (4) copies of the proposed plan of subdivision and one (1) original and two (2) copies of the proposed 88b instrument if required.
108. The applicant shall pay the standard fee for purpose of subdivision certificate administration
of plan checking and release. 109. The final plan of subdivision must be supported by an 88B instrument to the approval of
Council. The 88B instrument shall properly reflect the requirements of the conditions of development consent, the plans forming part of the consent, and Council’s standards, codes and policy’s. Part 2 of the 88B instrument shall contain a provision that any easements, right of ways or covenants shall not be extinguished or altered without the written consent of Council.
110. The final plan of subdivision must be supported by an 88B Instrument. This instrument must
burden the Proposed Lots 3, 4, 22, 24, 27, 32, 33, 34 and 35 with a restriction as to user that the dwellings to be erected on these Lots are to be sited and constructed in accordance with the stamped approved building drawings and this Notice of Determination (DA-188/2015) issued by Council. Any costs associated with the preparation and checking of the instrument are to be borne by the applicant. The preparation of an 88B Instrument will not be required if construction of the dwellings has reached a stage where all brickwork is a minimum 500mm above finished floor level and the construction is in accordance with the Development Consent and the Construction Certificate.
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
49
111. Where common drainage lines or other drainage lines are required, a drainage easement shall be created in accordance with Council’s minimum widths as scheduled in Council's Design Specification for Subdivisions (as amended).
112. Correct notation concerning easements is required. The prepared 88B Instrument should be forwarded initially to Council. The land value of the easement and costs associated with checking the instrument are to be borne by the applicant. Part 2 of the 88B Instrument shall contain a provision that the easement may not be extinguished or altered without the written consent of Council.
113. Where registration of lots occurs prior to the construction of dwellings, a Restriction as to
User is to be created requiring the dwellings on each lot to be constructed in accordance with the approved plans listed in this consent.
Service Providers
114. The following documentation is to be provided prior to the release of the Occupation
Certificate.
a) Written evidence (Section 73 Certificate) is to be submitted to the PCA prior to the issue of the subdivision certificate.
b) Notification of arrangement for the development from Endeavour Energy shall be
submitted to Council. c) Written certification from the relevant service providers that the telecommunications
infrastructure is installed in accordance with:
The requirements of the Telecommunications Act 1997;
For a fibre ready facility, the NBN Co’s standard specifications current at the time of installation; and
For a line that is to connect a lot to telecommunications infrastructure external to the premises, the line shall be located underground.
Unless otherwise stipulated by telecommunications legislation at the time of construction, the development must be provided with all necessary pits and pipes, and conduits to accommodate the future connections of optic fibre technology telecommunications
Construction of Dwellings
115. Prior to the issue of the Subdivision Certificate, construction of the dwellings is required to have reached a stage where all brickwork is a minimum 500mm above finished floor level and the construction is in accordance with the development consent and the CC’s.
Rectification of Damage
116. Prior to the issue of a Subdivision Certificate, any damage to Council infrastructure not
identified in the dilapidation report, as a result of the development shall be rectified at no cost to Liverpool City Council. Any rectification works within existing public roads will require a Roads Act application. The
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
50
application is to be submitted and approved by Liverpool City Council prior to such works commencing.
117. Any rectification works required by Council regarding the condition of Council infrastructure shall be undertaken, at full cost to the developer.
Street Naming
118. Prior to the issue of a Subdivision Certificate, an application for proposed street names must be lodged with and approved by Liverpool City Council and the signs erected on-site. The proposed names must be in accordance with Council’s Street Naming Policy. Notes: Allow eight (8) weeks for notification, advertising and approval. Bond for Final Wearing Course
119. Prior to the issue of the Subdivision Certificate, a bond for the final layer of outstanding
asphalt works (AC Bond) is to be lodged with Liverpool City Council.
The final layer of asphalt on all roads shall not to be placed without the written consent of
Council (Consent will generally be provided when 80% of the housing within the subdivision
has been completed).
The value of the bond shall be determined in accordance with Liverpool City Council’s Bond
Policy. The bond will be administered in accordance with this policy.
The final AC layer may be requested by Council where it is deemed appropriate that the
final AC layer be undertaken.
Maintenance Bond 120. Prior to the issue of nominate a Subdivision Certificate a maintenance bond is to be lodged
with Liverpool City Council for All civil works The value of the bond shall be determined in accordance with Liverpool City Council’s Bond Policy. The bond will be administered in accordance with this policy.
121. A maintenance bond in the form of a bank guarantee or cash bond ($TBA), shall be lodged with Council prior to the issue of a subdivision certificate. The bond shall cover maintenance and any damage to roads, drainage lines, public reserves or other council property or works required as a result of work not in accordance with Council’s standards, and /or development consent conditions. The bond will be held by Council for a minimum period of 6 months from the date of Council’s acceptance of final works. Footpaths
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
51
122. Construction of 1.5m wide by 100mm thick (with one layer of SL72 reinforcing mesh)
concrete path paving on one side of all residential access roads and both sides of all collector and distributor roads. Path paving will not be required in minor cul-de-sac with less than fifteen lots.
F. PRIOR TO ISSUE OF AN OCCUPATION CERTIFICATE
The following conditions are to be complied with or addressed prior to issue of a Occupation Certificate by Council: Issue of Subdivision Certificate
123. Prior to the issue of an Occupation Certificate for the approved dwellings on proposed Lots 3, 4, 22, 24, 27, 32, 33, 34 and 35, evidence of registration of the Torrens title subdivision that creates these lots with the Land and Property Information service shall be submitted to the satisfaction of the Principal Certifying Authority.
Liverpool City Council clearance – Roads Act/ Local Government Act
124. Prior to the issue of an Occupation Certificate, the Principal Certifying Authority shall ensure
that all works associated with a S138 Roads Act approval or S68 Local Government Act approval have been inspected and signed off by Liverpool City Council.
Building Compliance
125. An Occupation Certificate must be obtained from the Principal Certifying Authority prior to any occupation of the building work encompassed in this development consent (including alterations and additions to existing buildings), in accordance with the relevant provisions of the Environmental Planning & Assessment Act 1979.
126. Details of critical stage inspections carried out by the principal certifying authority together with any other certification relied upon must be provided to Council with the occupation certificate.
127. In accordance with section 4.17 of the Environmental Planning & Assessment Act 1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, in relation to residential building work, the requirements of the Home Building Act 1989 must be complied with. Details of the Licensed Building Contractor and a copy of the relevant Certificate of Home Warranty Insurance or a copy of the Owner-Builder Permit (as applicable) must be provided to the Principal Certifying Authority and Council. Registration of Lots
128. Prior to the issue of an Occupation Certificate for any of the dwellings, evidence is to be submitted to the PCA indicating the registration of the approved lots with the LPI Service / NSW Registry, on which the dwellings were approved, as shown on approved plans. Landscaping
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
52
129. Upon completion of the approved landscape works associated with the development and prior to the issue of any Occupation Certificate, an Implementation Report is to be submitted to the PCA attesting to the satisfactory completion of the landscape works in accordance with the approved landscape plan. The report is to be prepared by a suitably qualified person.
BASIX
130. Supporting documentation issued by a suitable qualified person who has installed or carried out the works associated with the BASIX commitments shall be submitted to Council. Garbage Services
131. The owner/developer of the site is to contact Liverpool City Council – Sustainable
Environment section to determine the required number of waste/garbage bins for the dwellings as well as serving requirements. These waste/garbage bins are to be kept within the curtilage of each dwelling, except before and after collection days. Rectification of Damage
132. Prior to the issue of an Occupation Certificate, any damage to Council infrastructure not identified in the dilapidation report, as a result of the development shall be rectified at no cost to Liverpool City Council.
133. Any rectification works required by Council regarding the condition of Council infrastructure
shall be undertaken, at full cost to the developer.
G. GENERAL CONDITIONS
The following conditions relate to the ongoing use of the premises:
Landscaping
134. Landscaping shall be maintained in accordance with the approved plan, in a healthy state and in perpetuity by the existing or future owners and occupiers of the development. If any of the vegetation comprising the landscaping dies or is removed, it is to be replaced with vegetation of the same species, and similar maturity as the vegetation which has died or was removed.
Waste Storage Area
135. Waste bins must be kept within the curtilage of each dwelling. Bins must not be stored or
allowed to overflow into landscaped areas or the rear lanes, must not obstruct the entry/exit of the driveway, and must not leave the site onto neighbouring, public or private properties.
H. ADVISORY a) If you are dissatisfied with this notice of determination or the conditions contained within this
notice of determination, Sections 8.2, 8.3, 8.4 & 8.5 of the Environmental Planning and Assessment Act 1979 gives you the right to request a review of the determination within 6 months after the date on which the application is taken to have been determined.
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
53
b) If you are dissatisfied with this decision, Sections 8.7, 8.10 of the Environmental Planning and Assessment Act 1979 gives you the right to appeal to the Land and Environment Court within 6 months after the date on which the application is taken to have been determined.
c) In accordance with Section 4.53 of the Environmental Planning and Assessment Act 1979,
unless otherwise stated by a condition of this consent, this consent will lapse unless the development is commenced within five years of the date of this notice.
d) The approval of this application does not imply or infer compliance with the Disability
Discrimination Act and that the developer should investigate their liability under the Act. e) The requirements of all authorities including the Environmental Protection Authority and the
Work Cover Authority shall be met in regards to the operation of the building.
f) “DIAL BEFORE YOU DIG”
Underground assets may exist in the area that is subject to your application. In the interest of health and safety and in order to protect damage to third party assets please contact Dial before you dig at www.1100.com.au or telephone 1100 before excavating or erecting structures (This is the law in NSW). If alterations are required to the configuration, size, form or design of the development upon contact the Dial before You Dig service, an amendment to the development consent (or a new development application) may be necessary. Individuals owe asset owners a duty of care that must be observed when working in the vicinity of plant or assets. It is the individual’s responsibility to anticipate and request the nominal location of plant or assets on the relevant property via contacting the Dial before you dig service in advance of any construction or planning activities.
g) TELECOMMUNICATIONS ACT 1997 (COMMONWEALTH)
Telstra (and its authorised contractors) are the only companies that are permitted to conduct works on Telstra’s network and assets. Any person interfering with a facility or installation owned by Telstra is committing an offence under the Criminal Code Act 1995 (Cth) and is liable for prosecution. Furthermore, damage to Telstra’s infrastructure may result in interruption to the provision of essential services and significant costs. If you are aware of any works or proposed works which may affect or impact on Telstra’s assets in any way, you are required to contact: Telstra’s Network Integrity Team on Phone Number 1800 810 443.
h) The Liverpool City Council Local Government area soils and ground water may be subject to
varying levels of Salinity. Whilst Council may require applicants to obtain Salinity reports relating to some developments, no assessment may be made by Council in that regard. Soil and ground water salinity levels can change over time due to varying factors. It is recommended that all applicants make their own independent inquiries as to appropriate protection against the current and future potential affect of Salinity to ensure the ongoing structural integrity of any work undertaken. Liverpool City Council will not accept any liability for damage occurring to any construction of any type affected by soil and or ground water Salinity.
i) The cost of any necessary adjustments to utility mains and services shall be borne by the
applicant.
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
54
ATTACHMENT 2: Controlled Action – Department of the Environment and Energy
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
61
ATTACHMENT 3: GTA’s Office of Environment and Heritage
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
63
ATTACHMENT 4: GTA’s Office of Water
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
66
ATTACHMENT 4: BioBanking Statement Conditions
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
78
ATTACHMENT 5: Section 7.11 Payment Form
CONTRIBUTIONS PURSUANT TO SECTION 7.11 OF THE ENVIRONMENTAL
PLANNING & ASSESSMENT ACT, 1979
SECTION 7.11 PAYMENT (Liverpool Contributions Plan 2009 – Hoxton Park, Carnes Hill and Prestons Release Areas
Note to the applicant: When remitting payment as specified in the Conditions of
Consent to the approval, this Form must be submitted with your payment.
These figures have been calculated to the June 2019 CPI Quarter and will be adjusted at the time of payment in accordance with the conditions of consent.
APPLICATION NO.: DA-188/2015 APPLICANT: JS Architects Pty Ltd
PROPERTY: Lot 400 Strathyre Drive Prestons
PROPOSAL: Torrens title subdivision to create 47 allotments and the construction of detached dwellings on nine (9) of the proposed Torrens title lots (As amended) (Note: proposal is identified as Nominated Integrated development pursuant to Water Management Act 2000)
FACILITIES AMOUNT ($) JOB NO.
Central Library Extensions $7,920 GL.10000001870.10112
Powerhouse $6,794 GL.10000001870.10114
Whitlam Centre Extensions $11,669 GL.10000001869.10110
District Community Facilities - Land $8,517 GL.10000001870.10070
District Community Facilities - Works $54,710 GL.10000001870.10070
Local Community Facilities - Works $32,281 GL.10000001870.10065
District Recreation - Land $102,940 GL.10000001869.10064
District Recreation - Works $51,642 GL.10000001869.10064
Local Recreation - Land $647,189 GL.10000001869.10063
Local Recreation - Works $219,499 GL.10000001869.10063
District Transport Facilities - Land $66,171 GL.10000001865.10055
District Transport Facilities - Works $109,304 GL.10000001865.10055
Local Transport Facilities
East of Bernera Road - Land $149,639 GL.10000001865.10057
East of Bernera Road - Works $102,239 GL.10000001865.10057
District Drainage - Land $145,417 GL.10000001866.10042
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
79
District Drainage - Works $25,268 GL.10000001866.10042
Local Trunk Drainage
Prestons Central - Land $87,183 GL.10000001866.10045
Prestons Central - Works $88,334 GL.10000001866.10045
Streetscape - Land $20,145 GL.10000001871.10074
Streetscape - Works $5,824 GL.10000001871.10074
Administration $13,886 GL.10000001872.10073
Professional and Legal Fees $12,428 GL.10000001872.10072
TOTAL $1,968,999
---------------------------------------------- OFFICE USE ONLY ------------------------------------------- RECORD OF PAYMENT Total Amount paid: ______________________________ Date:________________________ Receipt No.:_____________________________Cashier:_____________________
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
80
Item no: 2
Application Number: DA-269/2019
Proposed Development:
Boundary Adjustment to Five (5) existing lots resulting in Four (4) re-configured allotments. The lot boundary re-alignment and lot consolidation is proposed to align with the adjoining R2 Low Density Residential and RE1 Public Recreation zones. The scope of works includes minor demolition works and erection of new boundary fencing. The subsequent re-subdivision of land results in:
- the consolidation of part of ‘Tepper Park’ and Lot 1 McLean Street into 41 Kennedy Street to create Proposed Torrens Title Lot 1;
- the consolidation of part of ‘Tepper Park’ into 39 Kennedy Street to create Proposed Torrens Title Lot 2;
- the consolidation of part of Lot 1 McLean Street into 81 Lehmann Avenue to create Proposed Torrens Title Lot 4;
- the creation of Lot 3 from the remaining land in the RE1 zone (Tepper Park), due to the zone alignment.
Property Address 39 & 41 Kennedy Street, Liverpool 81 Lehmann Avenue, Liverpool Lot 1 Maclean Street, Liverpool (closed road), and Part of ‘Tepper Park’
Legal Description: Lots 1 & 2 DP 31862 Lot 24 DP 230861 Lot 1 DP 1246664 Part Lot 17 DP 31863
Applicant: Burton and Field Pty Ltd (Steven Sampson)
Land Owners: Coptic Orthodox Church (NSW) Property Trust Liverpool City Council
Cost of Works: $15,000.00
Recommendation: Approval subject to conditions of consent
Assessing Officer: Ivan Kokotovic
1. EXECUTIVE SUMMARY This Development Application (DA) seeks consent for the;
Boundary Adjustment to Five (5) existing lots resulting in Four (4) re-configured allotments. The lot boundary re-alignment and lot consolidation is proposed to align with the adjoining R2 Low Density Residential and RE1 Public Recreation zones. The scope of works includes minor demolition works and erection of new boundary fencing.
The land subject to the boundary adjustments, lot consolidation and subsequent re-subdivision is zoned R2 Low Density Residential under Liverpool Local Environmental Plan 2008 (LLEP), for which the proposed development is permissible with consent. The RE1 zoned land is not
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
81
subdivided over. The key issues assessed within the proposed development relate to ensuring Council Park Maintenance Crew access and non-obstruction of structures on the over-land flow path of proposed Lot 1, which is a requirement of restrictions over the land to be transferred with the proposed re-subdivision. The proposal was not required to be placed on public exhibition in accordance with LDCP. Due to the application proposing the re-subdivision of land owned by Liverpool City Council, it is referred to the Liverpool Local Planning Panel (LLPP) in accordance with its referral criteria and procedural requirements. The application has been assessed pursuant to the provisions of the Environmental Planning and Assessment (EP&A) Act 1979, and the assessment has concluded that the proposal is generally satisfactory and achieves compliance with the relevant planning controls relevant to the proposal including LLEP 2008, and LDCP. 2. SITE DESCRIPTION AND LOCALITY 2.1 Site Description
The site comprises the entirety of 4 existing allotments entirely in R2 zoned land and the R2 zoned part of a lot known as ‘Tepper Park’. The land is identified as being;
- 39 & 41 Kennedy Street, Liverpool (Lots 1 & 2 DP 31862) - 81 Lehmann Avenue, Liverpool (Lot 24 DP 230861) - Lot 1 Maclean Street, Liverpool (closed road) (Lot 1 DP 1246664) - Part of ‘Tepper Park’ (Part Lot 17 DP 31863)
The land is highly irregular in shape, comprising an area of 3311.8sqm, with a consolidated front boundary along Kennedy Street, McLean Street and Lehmann Avenue to the east of 94.23m, and a rear boundary to the west with ‘Tepper Park’ of 74.74m. Adjoining the site to the north and south are lots with residential dwellings and to the west is ‘Tepper Park’ which is within the ‘Elouera Bushland Reserve’ which is associated with Cabramatta Creek. The site is east facing and is generally flat with a minor slope falling from east to west towards Cabramatta Creek. The site is identified as being low to medium risk flood prone as well as being within a Bushfire prone buffer zone with the nearest hazard within 10m to the west in the public reserve. Existing on-site currently:
- a single storey detached dwelling and associated outbuildings at 81 Lehmann Avenue, Liverpool;
- a single storey detached dwelling and associated outbuildings at 39 Kennedy Street, Liverpool;
- a Place of Public Worship (Saint George & Prince Theodorus Coptic Orthodox Church) at 39 Kennedy Street, Liverpool;
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
82
- a formalised paved closed road with kerb and gutter to one side, which has previously been subdivided and acquired by the adjoining owners of the Coptic Church.
- landscaped turf (no tree vegetation) in the area zoned R2 in part of ‘Tepper Park’.
Figure 1: Aerial view of site
A site inspection was carried out on 29 May 2019, and no works as proposed had commenced at the site. Site Inspection Photos
1. Front of the Coptic Church (41 Kennedy St) 2. Front of Lot 1 Maclean Street to ‘Tepper Park’.
Subject Lots
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
83
3. ‘Tepper Park’ pedestrian access 4. Proposed rear boundary of Lot 2.
2.2 Locality Description The subject development site is located along the western-most district of Liverpool along its boundary with the suburb of Ashcroft. Contextually, the site is approximately 450m south of Elizabeth Street (main east-west road corridor through the locality) and 1.2km west of Liverpool City Centre and 2km west of Liverpool Rail Station. The locality surrounding the site comprises of low density residential land to the east, north and south and the public reserve known as ‘Elouera Bushland Reserve’ associated with Cabramatta Creek immediately to the west. The site is also in proximity to the Liverpool Cemetery. The land is within the Georges River Catchment draining through the public reserve land directly to its tributary, Cabramatta Creek. An aerial photograph of the locality and photographs of the immediate development is provided below:
Figure 2: Locality surrounding the proposal.
Cabramatta Creek
Georges River
Liverpool City Centre
Development Location
Liverpool Rail Station
Liverpool Cemetery
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
84
2.3 Site Constraints
Are there any constraints or affectation on the site: - Bushfire - Flooding - Heritage Items - Aboriginal heritage - Environmentally
Significant Land - Threatened
Species/ Flora/ Habitat/ Critical Communities
- Acid Sulphate Soils
- Aircraft Noise - Flight Paths - Railway Noise - Road Noise/
Classified Road - Significant
Vegetation - Contamination
- The site is entirely Bushfire Risk Affected (buffer zone). - The site is Low to Medium Risk Flood Affected. - The site potentially contains moderate saline soils.
Are there any restrictions on title? Attach 88B instrument to the report
- Existing Lot 1 McLean Street (closed road) is affected by multiple easements and restrictions being;
View Attachment 2 of the Report.
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
85
Figure 3: Bushfire Prone Map extract
Figure 4: Flood Risk Map extract
3. Background
3.1 Background and DA History
Council’s Property Section created the McLean Street road reserve (Lot 1) as part of a road closure application under the Roads Act 1993, and subdivision application to have the land excised into a separate lot. The Subdivision Certificate was issued on 23 August 2018 creating Lot 1 DP 1246664. The road closure was endorsed by Council and received support as gazetted in NSW State Government gazette No.100 of 28 September 2018.
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
86
The current DA was lodged 3 May 2019 and the sale of the land was settled in late May 2019.
Council’s Development Assessment and Land Development Engineers sought additional information relating to the demolition of an awning and the formalising of drainage from proposed Lot 4, to the Public Reserve.
The applicant has submitted details of how drainage of Proposed Lot 4 can be formalised via a proposed easement (H) to drain water over proposed Lot 1, to discharge into Council’s reserve via existing easement (A).
4. Details of the Proposed Development
The proposed development seeks consent for the: Boundary Adjustment to Five (5) existing lots resulting in Four (4) re-configured allotments. The lot re-alignment and lot consolidation is proposed to align with the adjoining R2 Low Density Residential and RE1 Public Recreation zones. The scope of works includes minor demolition works and erection of new boundary fencing. Specifically, the proposal consists of the following; Demolition Demolition of an awning structure and associated concrete slab which is located encroaching over the boundary between proposed Lots 1 and 2.
Construction Construction of 1.8m high palisade / security fencing with supporting brick piers to a 2.1m height, in the following locations:
o Along the frontage of Lot 1 adjacent to Kennedy Street and McLean Street. o Along the rear boundary of Lot 1 with the Public Reserve.
Both fences are provided with pedestrian gates and double vehicle access gates. Note: the fencing is required to be open due to the flood / overland flow affectation of the site requiring waters to flow through during flood and stormwater events. Boundary Adjustment and re-subdivision
o Proposed Torrens Title Lot 1 is created by the consolidation of part of ‘Tepper Park’ and McLean Street into 41 Kennedy Street
o Proposed Torrens Title Lot 2 is created by the consolidation of part of ‘Tepper Park’ and part of 52 McLean Street into 41 Kennedy Street.
o Proposed Torrens Title Lot 2 is created by the consolidation of part of McLean Street into 81 Lehmann Avenue.
o Proposed Lot 3 is created from the remaining land in the RE1 zone (Tepper Park), due to the zone alignment.
Site Access Vehicular access to the lots is as follows:
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
87
- Proposed Lot 1 via Kennedy Street Frontage with rear access to the public reserve for
emergency access during bushfire or floor events if required; - Proposed Lot 2 via Kennedy Street as existing; - Proposed Lot 4 via Lehmann Avenue as existing; - Proposed Lot 3 (Tepper Park), can be accessed by pedestrians via RE1 zoned reserve
land located 120m to the north of the subject land. Site Servicing Standard conditions of consent will ensure the created lots are provided with the standard site service utilities required for residential land. Note: the land currently utilised as the extension to McLean Street (closed road) is not proposed to be developed by this DA. This land has significant restrictions over is as it is an overland flow path and has many easements for drainage and access which benefit Liverpool City Council and Sydney Water. These easements are to be transferred to the proposed Lot 1. Further, as the land is not being developed and use is not changing (existing hard surface pavement), it is considered any contamination of the not be required to be remediated to facilitate this proposed re-subdivision. Rather a restriction shall be placed on the title requiring any further development of the site require development consent in which likely site remediation is required. Extracts of the proposed plans are shown below.
Figure 5: Proposed Boundary adjustment and re-subdivision of land.
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
88
Figure 6: Proposed Demolition Plan (marked up in red)
Figure 7: Boundary Fencing Plan
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
89
5. STATUTORY CONSIDERATIONS Relevant matters for consideration The relevant planning instruments/policies for the proposed development are as follows:
State Environmental Planning Policy No. 55 – Remediation of Land;
Greater Metropolitan Regional Environmental Plan No. 2 – Georges River Catchment (now deemed SEPP);
Liverpool Local Environmental Plan (LLEP) 2008;
Liverpool Development Control Plan (LDCP) 2008;
- Part 1: General Controls for All Development; - Part 3.8: Non-residential development in residential zones
6. ASSESSMENT The development application has been assessed in accordance with the relevant matters of consideration prescribed by Section 4.15 of the EP&A 1979 and the Environmental Planning and Assessment Regulation 2000 as follows: 6.1 Section 4.15(1)(a)(1) – Any Environmental Planning Instrument
(a) State Environmental Planning Policy No. 55 – Remediation of Land Pursuant to Clause 7 of SEPP 55, a consent authority is unable to grant development consent unless it has considered whether the land is contaminated and, if so, whether the consent authority is satisfied that the land is suitable in its contaminated state, or can be remediated to be made suitable for the purposes for which the development is proposed to be carried out. Although the land over which is located the existing dwellings and church is unlikely to be contaminated due to previous long-term ongoing use, Council must consider the likelihood of any contamination on-site in particular with respect to the land previously used as a road in McLean Street (previously issued a Subdivision Certificate) and that used as part of ‘Tepper Park’. Consideration has been given to this issue. As the proposed boundary adjustments do not result in any specific works apart from demolition of an awning / slab and construction of light-weight fencing, it is considered the proposed scope of works would not ordinarily attract the need to remediate a contaminated site in entirety, given that the use of the site effectively remains consistent with its zoning. Further, it is considered conditions of consent requiring compliance with contamination standards for any ancillary work be applied for enforcement should any unlikely finds be uncovered during any works. Even so, it is considered prudent to require a restriction over Lots 1 and 2 from further wholesale development without evidence that the site can be developed / used in an uncontaminated environment. Council is satisfied that the land is suitable for ongoing residential and Place of Public Worship use, and that any ancillary works to enable the proposed subdivision are appropriate in this
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
90
instance. (b) Greater Metropolitan Regional Environmental Plan No. 2 – Georges River
Catchment (Deemed SEPP) The subject land is located within the Georges River Catchments and as such the Greater Metropolitan Regional Environmental Plan No. 2 – Georges River applies to the application. The Greater Metropolitan Regional Environmental Plan No. 2 – Georges River Catchment generally aims to maintain and improve the water quality and river flows of the Georges River and its tributaries. When a consent authority determines a development application, planning principles are to be applied (Clause 7(b)). Accordingly, a table summarising the matters for consideration in determining development applications (Clause 8 and Clause 9), and compliance with such is provided within Attachment 3 of this report.
It is considered that the proposal satisfies the provisions of the GMREP No.2 subject to appropriate sedimentation and erosion controls being implemented during demolition and fence construction works, as otherwise, the condition of storm-water discharge remains unchanged from the existing scenario, and as overland flow-paths are not interrupted.
(c) Liverpool Local Environmental Plan 2008 (i) Zoning The subject site is zoned R2 Low Density Residential pursuant to the LLEP 2008. An extract of the zoning map is provided in Figure 6 below.
Figure 8: Zoning Map extract.
(ii) Permissibility
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
91
Proposed development within the R2 zone is categorised as subdivision which is permitted with development consent pursuant to Clause 2.6 of the LEP. (iii) Objectives of zone
Objectives of the R2 Low Density Residential Zone are;
To provide for the housing needs of the community within a low density residential
environment.
To enable other land uses that provide facilities or services to meet the day to day
needs of residents.
To provide a suitable low scale residential character commensurate with a low
dwelling density.
To ensure that a high level of residential amenity is achieved and maintained.
The proposal generally satisfies the above objectives of the R2 zone as it does not cause any of the above objectives to be unachievable. (iv) Principal Development Standards and Provisions
The application has also been considered against the relevant provisions and principal development standards of the LLEP 2008, which are listed in the table below. The proposal demonstrates compliance with the LLEP 2008, where applicable.
Clause Provision Comment
Part 4 Principal Development Standards
2.6 Subdivision requirements
Provisions to meet consent All lots meet minimum lot sizes and no secondary dwellings are located on site
2.7 Demolition The demolition of a building or work may be carried out only with development consent.
Complies by condition Development consent is sought for the demolition of an awning and concrete slab.
4.1 Minimum Lot Size
Area D = 300sqm Complies 784.1sqm minimum (Lot 2)
4.3 Height of Buildings (as per HOB Map)
8.5m N/A (none proposed)
4.4 Floor Space Ratio (as per FSR Map)
0.5:1 N/A (none proposed)
5.1 Relevant Acquisition Authority
Allocates the relevant acquisition authority for certain land identified in this LEP
The site is not affected by any Land subject to compulsory acquisition
5.10 Heritage conservation
Provisions to conserve Heritage Items, significance, archaeological sites and aboriginal objects and places of heritage significance
The site does not contain and is not in the vicinity of any European heritage significance, and is unlikely to contain any aboriginal cultural
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
92
heritage.
5.11 Bushfire Hazard Reduction
Bushfire reduction work authorised by the Rural Fires Act 1997 may be carried out on any land without development consent
The site is identified as Bushfire Prone and was referred to the RFS for comment, as an integrated authority requiring to provide approval to the development subject to the Rural Fires Act 1997. The RFS has provided comments indicating that the development is supportable and that no conditions are required to apply to the land.
7.13 Minimum Lot width in Zones R1, R2, R3 and R4
(3) Minimum 10m width resulting from subdivision
Complies
7.31 Earthworks No earthworks proposed. N/A
It is considered that the proposal satisfies the provisions of the Liverpool LEP. 6.2 Section 4.15(1)(a)(ii) - Any Draft Environmental Planning Instrument
There are no draft Environmental Planning Instruments which apply to the development. 6.3 Section 4.15(1)(a)(iii) - Provisions of any Development Control Plan
(a) Liverpool Development Control Plan (LDCP) 2008 Liverpool Development Control Plan 2008 is applicable to the proposed development. The key controls are discussed in the following table:
Development Control
Provision Comment
Part 1 General Controls for all Development
Section 2. Tree Preservation
Controls relating to the preservation of trees
N/A (none proposed to be removed)
Section 3. Landscaping and Incorporation of Existing Trees
Controls relating to landscaping and the incorporation of existing trees.
N/A (none proposed)
Section 4 Bushland and Fauna Habitat Preservation
Controls relating to bushland and fauna habitat preservation
N/A
The site is not identified as containing an endangered ecological community of trees listed under the TSC Act 1995, nor of any endangered fauna.
Section 5. Bush Fire Risk
Controls relating to development on bushfire prone land
Complies
The land is bushfire affected and the proposed development has received support from RFS.
Section 6. Water Cycle Management
Stormwater runoff shall be connected to Council’s drainage system by gravity means. A stormwater drainage
Complies by condition
The proposal was reviewed by Council’s Land Development Engineers who have commented that existing stormwater connection to Council
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
93
concept plan is to be submitted. infrastructure is sufficient.
Section 7. Development Near a Watercourse
If any works are proposed near a water course, the Water Management Act 2000 may apply, and you may be required to seek controlled activity approval from the NSW Office of Water.
Not Applicable
The subject site is not within 40m of a watercourse.
Section 8. Erosion and Sediment Control
Erosion and sediment control plan to be submitted.
Complies by condition
Any consent for works attracts requirements for erosion and sediment control plans to be implemented during any works.
Section 9. Flooding Risk
Provisions relating to development on flood prone land.
Complies by condition
The proposal was reviewed by Council’s Floodplain Engineers who have provided a condition of consent ensuring that all fencing in the overland flow path allow waters to travel through.
Section 10. Contaminated Land Risk
Provisions relating to development on contaminated land.
Complies by condition
It has been assessed that the land does not require remediation at this time, and any subsequent development of the land is likely to require some remediation or demonstrate otherwise.
Section 11. Salinity Risk
Provisions relating to development on saline land.
N/A Scope of works does not warrant a Salinity Management Response,
Section 12. Acid Sulphate Soils
Provisions relating to development on acid sulphate soils
N/A The development site is not identified as containing Acid Sulfate Soil.
Section 13. Weeds
Provisions relating to sites containing noxious weeds.
N/A The site is not identified as containing noxious weeds.
Section 14. Demolition of Existing Development
Provisions relating to demolition works
Complies by condition
Standard conditions apply for the demolition of awning and concrete slab.
Section 15. On Site Sewage Disposal
Provisions relating to OSMS. N/A
Section 16. Aboriginal Archaeology
An initial investigation must be carried out to determine if the proposed development or activity occurs on land potentially containing an item of aboriginal archaeology.
N/A The site is unlikely to contain any Aboriginal Cultural Heritage.
Section 17. Heritage and Archaeological Sites
Provisions relating to heritage sites.
N/A Council’s mapping does not identify any heritage item on-site or in the vicinity of the site.
Section 18. Notification of Applications
Provisions relating to the notification of applications.
Complies The application was not required to be advertised nor notified.
Section 19. Used Provisions relating to used N/A
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
94
Clothing Bins clothing bins. The DA does not propose used clothing bins.
Section 20. Car Parking and Access
Rates for Car Parking N/A Proposed developed does not generate the need for additional parking.
Section 21. Subdivision of Land and Buildings
Provisions relating to the subdivision of land, buildings and roads and stormwater works Section 21.4 specifies development required for Residential zones (except R5)
Complies by condition The proposed boundary adjustment does not attract the required the delivery of development and infrastructure outcomes as required for subdivision development as no additional lots are created.
A restriction by condition of consent will be created over Lot 1 to ensure any re-development / re-subdivision of that land includes the likely construction of Council’s footpath in McLean Street in front of the site.
Section 22. and Section 23 Water Conservation and Energy Conservation
New dwellings, are to demonstrate compliance with State Environmental Planning Policy – Building Sustainability Index (BASIX).
Not Applicable Not applicable for subdivision only.
Section 24. Landfill
All fill applied should be Virgin Excavated Natural Material (VENM), as defined by the NSW Department of Environment and Climate Change. Any fill involving material other than VENM is subject to referral to the State Government as potential Integrated Development or contaminated land assessment
Not Applicable (none proposed)
Section 25. Waste Disposal and Re-use Facilities
Provisions relating to waste management during construction and on-going waste.
Complies by condition A waste management plan has been submitted.
Section 26 Outdoor Advertising and Signage
Provisions relating to signage. Not Applicable The DA does not propose any signage.
27. Social Impact Assessment
The DCP requires a comprehensive Social Impact Assessment (SIA) for Residential Apartment Buildings which contain affordable housing.
Not Applicable Council’s Community Planner was not required to review the application, and an SIA was not required.
28. Shopping Trolleys
This section applies to any development that will provide shopping trolleys for customers.
Not Applicable
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
95
Overall, the proposal is considered to be consistent with the key controls outlined in the Liverpool Development Control Plan 2008. 6.4 Section 4.15(1)(a)(iiia) - Planning Agreements
There are no Planning Agreements which apply to the development. 6.5 Section 4.15(1)(a)(iv) - The Regulations
The Environmental Planning and Assessment Regulation 2000 requires the consent authority to consider the provisions of the BCA and the Safety standards for demolition (AS 2601 – 2001). Accordingly, appropriate conditions of consent will be imposed. 6.6 Section 4.15(1)(b) - The Likely Impacts of the Development
Natural and Built Environment The proposed development is unlikely to create a detrimental impact on the natural environment surrounding the subject site due the minimal scope of works. The proposed development is unlikely to create any adverse impacts on the surrounding built environment due the minimal scope of works.
Development Control
Provision Comment
Part 3.8 Non-Residential Development in Residential Zones – Section 6 – Places of Public Worship
Section 6.5. Landscaping and Fencing
Controls relating Fencing: - Side and Rear fencing
shall be 1.8m in height and be of high grade material when adjoining a park
- Front fences can be a maximum of 1.2m in height and shall be 30% transparent.
Variation – complies on merit
- Proposed rear fencing complies
- Front fencing proposed with 1.8m high palisade / security design with 2.1m high support pylons.
In assessing the proposal against the controls and objectives of the controls it is considered the fencing is reasonable as follows:
i) a clear transition between public and private areas is provided
ii) the fence provides a visual element within the streetscape
iii) the fence is more than 30% transparent enabling safe sight lines and natural surveillance between he private and public land.
iv) the materials proposed are non-reflective and minimise opportunities for graffiti.
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
96
Social Impacts and Economic Impacts The proposal is unlikely to create any adverse impacts and instead results in the appropriate aligning of zone and allotment boundaries enabling a more efficient use of land consistent with the objectives and desired locality outcomes. 6.7 Section 4.15(1)(c) - The Suitability of the Site for the Development
The proposal generally complies with the relevant planning controls and the site is considered to be suitable for the proposed development. 6.8 Section 4.15(1)(d) - Any submissions made in relation to the Development (a) Internal Referrals The following comments have been received from Council’s Internal Departments:
DEPARTMENT COMMENTS
Development Engineer Approval subject to conditions of consent
Floodplain Engineer Approval subject to conditions of consent
Landscape Officer Approval with no objections
Parks Co-ordinator Approval with no objections
Property Services Approval with no objections
Strategic Planning Approval with no objections
Traffic Engineer Approval subject to conditions of consent
(b) External Referrals The following comments have been received from External Departments:
DEPARTMENT COMMENTS
RFS NSW Approval with no objections
(c) Community Consultation The proposal was not required to be placed on public exhibition and was not notified in accordance with LDCP 2008, and no objections were submitted to Council. 6.9 Section 4.15(1)(e) - The Public Interest
It is considered that the applicant has sufficiently demonstrated that the proposed development is in the public interest. 7. DEVELOPMENT CONTRIBUTIONS
Not Applicable as no additional residential allotments proposed. 8. CONCLUSION
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
97
The application has been assessed having regard to the provisions of Section 4.15 of the EP&A Act 1979, and the Environmental Planning Instruments. The proposed development is unlikely to result in any adverse impact upon the locality and is considered to be worthy of support specifically in providing a logical development which augments existing residences and Place of Public Worship, compatible with the desired future character of the locality, while being unlikely to negatively impact upon public reserve land.
9. RECOMMENDATION That pursuant to Section 4.16(1)(a) of the Environmental Planning and Assessment Act, 1979, Development Application DA-269/2019 be approved subject to conditions of consent. 10. ATTACHMENTS
1. PLANS OF THE PROPOSAL 2. 88B INSTRUMENT FOR LOT 1 DP1246664 3. CONDITIONS OF CONSENT
ATTACHMENT 1: PLANS OF THE PROPOSAL
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
102
ATTACHMENT 2: 88B INSTRUMENT FOR LOT 1 DP1246664
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
110
ATTACHMENT 3: CONDTIONS OF CONSENT
The following conditions have been imposed to achieve the objectives of the relevant planning instruments and policies.
A. THE DEVELOPMENT
Approved Plans
1. Development the subject of this determination notice must be carried out strictly in
accordance with the following approved plans/reports, except where modified by the undermentioned conditions.
Plan Name Plan Number Date Revision Prepared By
Demolition Plan (marked in red)
--- 24/05/2018
- Burton and Field
Plan of Subdivision S2695/70795RC2 16-01-2019 - Blake Trudgeon
Site Drainage Detail (marked in red)
--- 7/01/2019
- Burton and Field
Fencing Detail 1801 / DA-01 March 2019 B TIBA Architecture Group
Report Name Date Reference Prepared By
Bushfire Assessment Report 15th April 2016 160985 Building Code & Bushfire Hazard Solutions Pty Ltd
Waste Management Plan --- 70795_WMP ---
Works at no Cost to Council 2. All roadworks, drainage works and dedications, required to effect the consented
development shall be undertaken at no cost to Council. B. PRIOR TO ISSUE OF A CONSTRUCTION CERTIFICATE
The following conditions shall be complied with prior to issue of a CC by the PCA: Fee Payments 3. Unless otherwise prescribed by this consent, all relevant fees or charges must be paid.
Where Council does not collect these payments, copies of receipts must be provided. For the calculation of payments such as Long Service Levy, the payment must be based on the value specified with the DA/CC. The following fees are applicable:
(a) Damage Inspection Fee; (b) Fee associated with Application for Permit to Carry Out Work Within a Road,
Park and Drainage Reserve; and (c) Long Service Levy – based on 0.35% of the cost of building work.
These fees are reviewed annually and will be calculated accordingly
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
111
Long Service Levy payment is applicable on building work having a value of $25,000 or more, at the rate of 0.35% of the cost of the works. The required Long Service Levy payment, under the Building and Construction Industry Long Service Payments Act 1986, is to be forwarded to the Long Service Levy Corporation or the Council, prior to the issuing of a Construction Certificate, in accordance with Section 109F of the Environmental Planning & Assessment Act 1979.
Site Development Work
4. Site development work in the form of excavation, underpinning or shoring works must not
take place, until such time as a Construction Certificate has been issued. BCA Compliance
5. The requirements and provisions of the Environmental Planning & Assessment Act 1979 and Environmental Planning & Assessment Regulation 2000, must be fully complied with at all times. Failure to comply with these legislative requirements is an offence and may result in the commencement of legal proceedings, issuing of ‘on-the-spot’ penalty infringements or service of a notice and order by Council.
6. In accordance with Section 4.16(11) of the Environmental Planning & Assessment Act
1979 and clause 98 of the Environmental Planning & Assessment Regulation 2000, it is a prescribed condition that all building work must be carried out in accordance with the applicable Performance Requirements of the National Construction Code. Compliance with the Performance Requirements can only be achieved by: (a) Complying with the Deemed to Satisfy Provisions; or
(b) Formulating an Alternative Solution, which complies with the Performance
Requirements or is shown to be at least equivalent to the Deemed to Satisfy
Provision, or a combination of (a) and (b).
7. Building work shall not commence prior to the issue of a Construction Certificate. Building
work as defined under Section 1.4 of the EP&A Act means any physical activity involved in the erection of a building and includes but is not limited to, the placement of any site shed/s or builders facilities, site grading, retaining walls, excavation, cutting trenches, installing formwork and steel reinforcement or, placing of plumbing lines.
Notification 8. The certifying authority must advise Council, in writing of:
(a) The name and contractor licence number of the licensee who has contracted to do or intends to do the work, or
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
112
(b) The name and permit of the owner-builder who intends to do the work.
If these arrangements are changed, or if a contact is entered into for the work to be done by a different licensee, Council must be immediately informed.
S138 Roads Act – Minor Works in the public road
9. Prior to the issue of a Construction Certificate a S138 Roads Act application/s, including payment of fees shall be lodged with Liverpool City Council, as the Roads Authority for any works required in a public road. These works may include but are not limited to the following:
Vehicular crossings (including kerb reinstatement of redundant vehicular crossings)
Road opening for utilities and stormwater (including stormwater connection to Council infrastructure)
Road occupancy or road closures
All works shall be carried out in accordance with the Roads Act approval, the development consent including the stamped approved plans, and Liverpool City Council’s specifications. S68 Local Government Act – Stormwater Drainage Works
10. Prior to the issue of a Construction Certificate, the Principal Certifying Authority and / or Certifying Authority shall ensure that an application under Section 68 of the Local Government Act, including the payment of application and inspection fees, has been lodged with, and approved by Liverpool City Council for Construction of an interallotment stormwater drainage system to service the proposed Lot 4 and connection into the existing drainage system. Engineering plans are to be prepared in accordance with the development consent, Liverpool City Council’s Design Guidelines and Construction Specification for Civil Works and best engineering practice.
Traffic Design
11. Detailed design plans for the roads including swept path analysis, line markings and sign posting in accordance with the DCP and AS2890 is to be submitted to Council’s Traffic and Transport Section for review and approval.
Fence Design Control
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
113
12. Prior to the issue of a Construction Certificate the Certifying Authority shall ensure that
plans and details and plans have been provided demonstrating and confirming the following: a) The construction of the front and rear fence with a 0mm setback to the front and
rear boundaries with Council’s road reserve. b) That no elements of the front and rear fence open into Council’s road and park
reserves. c) That the fence structure is certified by a suitably qualified engineer. d) That all new fences within the high risk flood extent including western boundary
fences of 39 and 41 Kennedy Street and Lot 1 McLean Street and eastern side boundary fences of Lot 1 McLean Street and 81 Lehmann Avenue shall be permeable open type fences.
C. PRIOR TO WORKS COMMENCING The following conditions shall be complied with prior to works commencing on the subject site:
Building/Compliance
13. Prior to the commencement of any building works, the following requirements must be
complied with: (a) Construction Certificate must be obtained from the Council or an accredited
certifier, in accordance with the provisions of the Environmental Planning & Assessment Act 1979.
(b) Where a Construction Certificate is obtained from an Accredited Certifier, the applicant shall advise Council of the name, address and contact number of the Accredited Certifier, in accordance with Section 81A (4) of the Act.
(c) A copy of the Construction Certificate, the approved development consent plans and consent conditions must be kept on the site at all times and be made available to the Council officers and all building contractors for assessment.
(d) A Principal Certifying Authority (PCA) must be appointed to carry out the necessary building inspections and to issue an occupation certificate; and
(e) The PCA must advise Council of the intended date to commence work which is the subject of this consent by completing a notice of commencement of building works or subdivision works form, available from Council’s Customer Service Centre. A minimum period of two (2) working days’ notice must be given.
Notification/Principal Certifying Authority
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
114
14. Written notice of intention shall be given to the owners or the adjoining allotments of land, outlining the particulars of the work, which involves: a) Any excavation below the base of the footings of a building on an adjoining allotment
of land.
b) The notice shall be given seven (7) days prior to the commencement of work.
Site Notice Board 15. A sign must be erected in a prominent position on the premises on which work is to be
carried out. The sign is to be maintained during work, and removed at the completion of work. The sign must state: (a) The name, address and telephone number of the principal certifying authority for
the work; (b) The name of the principal contractor (if any) for any building work and a
telephone number on which that person may be contacted outside working hours; and
(c) Unauthorised entry to the premises is prohibited.
Sediment and Erosion Control Measures
16. Prior to commencement of works sediment and erosion control measures shall be installed in accordance with the approved Construction Certificate and to ensure compliance with the Protection of the Environment Operations Act 1997 and Landcom’s publication “Managing Urban Stormwater – Soils and Construction (2004)” – also known as “The Blue Book”. Measures must include, as a minimum:
(a) Siltation fencing; (b) Protection of the public stormwater system; and (c) Site entry construction to prevent vehicles that enter and leave the site from
tracking loose material onto the adjoining public place. Demolition Works
17. Any structures that straddle the new proposed boundary shall be removed.
Prior to the demolition of any structures on the site, the land must be investigated for the presence of asbestos. All asbestos must be removed and disposed of in accordance with all regulatory requirements, including those of WorkCover NSW and the Environment Protection Authority.
18. Demolition works shall be carried out in accordance with the following:
(a) Prior to the commencement of any works on the land, a detailed demolition work
plan designed in accordance with the Australian Standard AS 2601-2001 – The Demolition of Structures, prepared by a suitably qualified person with suitable
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
115
expertise or experience, shall be submitted to and approved by Council and shall include the identification of any hazardous materials, method of demolition, precautions to be employed to minimise any dust nuisance and the disposal methods for hazardous materials.
(b) Prior to commencement of any works on the land, the demolition Contractor(s) licence details must be provided to Council.
(c) The handling or removal of any asbestos product from the building/site must be carried out by a NSW Work Cover licensed contractor irrespective of the size or nature of the works. Under no circumstances shall any asbestos on site be handled or removed by a non-licensed person. The licensed contractor shall carry out all works in accordance with NSW Work Cover requirements.
Demolition Inspections
19. The following inspections are required to be undertaken by Council in relation to approved
demolition works:
(a) Immediately prior to the commencement of the demolition or handling of any building structure that contains asbestos. The applicant shall also notify the occupants of the adjoining premises and Workcover NSW prior to the commencement of any works. Please note that demolition works are not permitted to commence on site until such time as a satisfactory inspection result is obtained from Council.
(b) Immediately following completion of the demolition. Please note that proof of
appropriate disposal of demolition materials (including asbestos) may be required at this time in accordance with the approved Waste Management Plan.
To book an inspection with Council, please call 1300 362 170.
Waste Classification 20. Prior to the exportation of waste (including fill or soil) from the site, the material shall be
classified in accordance with the provisions of the POEO Act and NSW DECCW, (EPA) 'Environmental Guidelines: Assessment, Classification and Management of Non-Liquid Wastes'. The classification of the material is essential to determine where the waste may be legally taken. The POEO Act provides for the commission of an offence for both the waste owner and transporters if waste is taken to a place that cannot lawfully be used as a waste facility for the particular class of waste. For the transport and disposal of industrial, hazardous or Group A liquid and non-liquid waste advice should be sought from the DECCW (EPA).
Site Facilities 21. Toilet facilities must be available or provided at the work site and must be maintained
until the works are completed at a ratio of one toilet plus one additional toilet for every 20 persons employed at the site. Each toilet must:
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
116
(a) be a standard flushing toilet connected to a public sewer, or (b) have an on-site effluent disposal system approved under the Local Government Act
1993, or (c) be a temporary chemical closet approved under the Local Government Act 1993.
22. Adequate refuse disposal methods and builders storage facilities shall be installed on the
site. Builders’ wastes, materials or sheds are not to be placed on any property other than that which this approval relates to.
Notification of Service Providers 23. The approved development must be approved through the ‘Sydney Water Tap In’ service
to determine whether the development will affect any Sydney Water wastewater and water mains, stormwater drains and/or easement, and if any requirements need to be met. A receipt must be provided to Council.
Please refer to the website www.sydneywater.com.au for more information.
D. DURING CONSTRUCTION The following conditions shall be complied with during construction: Building Inspections 24. The building works must be inspected by the Principal Certifying Authority, in accordance
with sections 109E (3) of the Environmental Planning & Assessment Act 1979 and clause 162A of the Environmental Planning & Assessment Regulation 2000, to monitor compliance with the relevant standards of construction, Council’s development consent and the construction certificate.
25. The Principal Certifying Authority must specify the relevant stages of construction to be inspected and a satisfactory inspection must be carried out, to the satisfaction of the Principal Certifying Authority, prior to proceedings to the subsequent stages of construction or finalisation of the works (as applicable).
26. The applicant/ builder shall be responsible to report to the Council any damage to
Council’s footpath and road carriageway as a consequence of demolition or excavation or building activities or delivery/ departure of materials associated with this site. The damage shall be reported to Council as soon as the damage becomes apparent to the builder/ site manager. Arrangements to the satisfaction of Council are to be made for making safe by temporary repairs to the public way until permanent restoration and repair can be organised with Council.
Security Fence
27. A temporary security fence to WorkCover Authority requirements is to be provided to the
property during the course of construction.
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
117
Note: Fencing is not to be located on Council’s reserve area.
Hours of Construction Work
28. Construction work/civil work/demolition work, including the delivery of materials, is only
permitted on the site between the hours of 7:00am to 6:00pm Monday to Friday and 8:00am to 1:00pm on Saturday. No work will be permitted on Sundays or Public Holidays, unless otherwise approved by Council
Construction Noise
29. Construction noise shall not exceed the management levels defined within the Interim
Construction Noise Guideline published by the NSW Department of Environment and Climate Change dated July 2009.
General Site Works
30. Building operations shall not be performed on the public footway or any other locations which may lead to the discharge of materials into Council’s stormwater drainage system.
31. Erosion and sediment control measures shall remain in place and be maintained until all
disturbed areas have been rehabilitated and stabilised. 32. The developer is to maintain all adjoining public roads to the site in a clean and tidy state,
free of excavated “spoil” material.
33. All dangerous and/or hazardous material shall be removed by a suitably qualified and experienced contractor, licensed by WorkCover NSW. The removal of such material shall be carried out in accordance with the requirements of WorkCover NSW. The material shall be transported and disposed of in accordance with DECCW (EPA) requirements.
Waste Management Plan 34. The Waste Management Plan submitted to and approved by Council must be adhered to
at all times throughout all stages of the development. Supporting documentation (receipts/dockets) of waste/recycling/disposal methods carried out, is to be kept and must be produced upon the request of Council or any other authorised officer. Note: Any non-compliance with this requirement will result in penalties being issued.
Contamination 35. The development, including all civil works and demolition, must comply with the
requirements of the Contaminated Land Management Act, 1997, State Environmental
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
118
Planning Policy No. 55 – Remediation of Land, and Managing Land Contamination – Planning Guidelines (Planning NSW/EPA 1998).
36. Any new information which comes to light during demolition or construction works which
has the potential to alter previous conclusions about site contamination must be notified to Council and the accredited certifier immediately after discovery. A Section 4.55 Application under the EP&A Act shall be made for any proposed works outside the scope of the approved development consent.
Traffic Management
37. Any works within the road reserve are to be at the applicant cost and all signage is to be in accordance with the RMS’s Traffic Control at Worksites Manual and the RMS’s Interim Guide to Signs and Markings.
38. If a works zone is required, an application must be made to Council’s Transport Planning section. The application is to indicate the exact location required and the applicable fee is to be included. If parking restrictions are in place, an application to have the restrictions moved, will need to be made.
39. Notice must be given to Council’s Transport Planning section of any interruption to pedestrian or vehicular traffic within the road reserve, caused by the construction of this development. A Traffic Control Plan, prepared by an accredited practitioner must be submitted for approval, 48 hours to prior to implementation. This includes temporary closures for delivery of materials, concrete pours etc.
E. PRIOR TO ISSUE OF AN OCCUPATION CERTIFICATE
The following conditions shall be complied with prior to issue of either an Interim or Final Occupation Certificate by the Principal Certifying Authority: Building/Compliance
40. Prior to the issue of an Occupation Certificate, the Principal Certifying Authority shall ensure that any works associated with a S138 Roads Act approval or S68 Local Government Act approval have been inspected and signed off by Liverpool City Council.
41. Details of critical stage inspections carried out by the principal certifying authority together
with any other certification relied upon must be provided to Council with the Subdivision Certificate.
Roadworks
42. All signposting and road marking is to be completed to Liverpool Council requirements, at no expense to Liverpool Council or Roads and Maritime Services.
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
119
Rectification Works
43. Any rectification works required by Council regarding the condition of Council infrastructure shall be undertaken, at full cost to the developer.
F. PRIOR TO ISSUE OF A SUBDIVISION CERTIFICATE
The following conditions are to be complied with or addressed prior to issue of a Subdivision Certificate by Council. Demolition of Building
44. The existing building located across the proposed boundary of Lots 1 and 2 must be
demolished and removed from the site without nuisance prior to the release of the
Subdivision Certificate.
Liverpool City Council clearance – Roads Act/ Local Government Act 45. Prior to the issue of a Subdivision Certificate, the Principal Certifying Authority shall
ensure that all works associated with a S138 Roads Act approval or S68 Local Government Act approval have been inspected and signed off by Liverpool City Council.
Restriction as to User and Positive Covenant
46. Prior to the issue of an Subdivision Certificate, all restrictions as to user and positive
covenant relating to easements over existing Lot 1 DP 1246664, are to be transferred to Lot 1 approved by this consent, and shall be registered on the title of the property. The restriction as to user and positive covenant shall be in Liverpool City Council’s standard wording as detailed in Council’s Design and Construction Guidelines and Construction Specification for Civil Works.
47. A Restriction as to User over Proposed Lot 1 is to be created under Section 88B of the
Conveyancing Act 1919 in the following terms:
No further development of the lot burdened is to take place unless it is approved by a Development Consent. Such approval is likely to require, but not be restricted to, site remediation and construction of road (footpath, street lighting, kerb and gutter) and drainage works in Mclean Street.
48. A Restriction as to User over Proposed Lot 1 is to be created under Section 88B of the
Conveyancing Act 1919 in the following terms: Fences within the high risk flood extent including western boundary fences and eastern boundary fences shall be permeable open type fences.
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
120
49. A Restriction as to User over Proposed Lot 2 is to be created under Section 88B of the Conveyancing Act 1919 in the following terms:
No further development of the lot burdened is to take place unless it is approved by a Development Consent. Such approval is likely to require site remediation.
50. A Restriction as to User over Proposed Lot 2 is to be created under Section 88B of the
Conveyancing Act 1919 in the following terms:
Fences within the high risk flood extent including western boundary fences shall be permeable open type fences.
51. A Restriction as to User over Proposed Lot 4 are to be created under Section 88B of the
Conveyancing Act 1919 in the following terms: Fences within the high risk flood extent including western boundary fences and eastern boundary fences shall be permeable open type fences.
Linen Plans and 88B Instruments
52. In order to enable a Subdivision Certificate to be issued for submission to the LPI Service, the applicant is required to lodge a separate application along with one (1) original and ten (10) copies of the proposed plan of subdivision and one (1) original and two (2) copies of the proposed 88b instrument (where proposed).
53. The applicant shall pay the standard fee for purpose of subdivision certificate administration of plan checking and release.
54. The final plan of subdivision must be supported by an 88B Instrument, approved by Council. The 88B instrument shall properly reflect the requirements of the conditions of development consent, the plans forming part of the consent, and Council's standards, codes and policy’s. Part 2 of the 88B instrument shall contain a provision that any easements, right of ways or covenants shall not be extinguished or altered without the written consent of Council.
G. GENERAL CONDITIONS The following general conditions shall be complied with at all times: 55. The operator of the development (Place of Public Worship) on Lot 1, must not permit the
reversing of vehicles onto or away from the road reserve, including any garbage and recycling collection vehicles. All vehicles must be driven forward onto and away from the development and adequate space must be provided and maintained on the land to permit all vehicles to turn in accordance with AS 2890.1 Parking Facilities – Off Street Car Parking.
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
121
56. All sign posting is to be maintained in good condition at all times, to the satisfaction of Council.
57. No consent is expressed or implied for the attaching of signage, covering over or filling in of any part of the transparent fence as approved, such as to cause a visual obstruction from the road reserve into the subject premises.
H. ADVISORY j) Section 8.2, 8.3, 8.4 & 8.5 allows Council to reconsider your proposal. Should you wish to
have the matter reconsidered you should make an application under that section with the appropriate fee.
k) Under Section 8.7 & 8.10 of the Act applicants who are dissatisfied with the outcome of a consent authority have a right of appeal to the Land and Environment Court. This right must be exercised within six (6) months from the date of this notice. The Court's Office is situated at Level 1, 225 Macquarie Street, Sydney (Telephone 9228 8388), and the appropriate form of appeal is available from the Clerk of your Local Court.
l) In accordance with Section 4.53 of the Environmental Planning and Assessment Act 1979,
unless otherwise stated by a condition of this consent, this consent will lapse unless the development is commenced within five years of the date of this notice.
m) To confirm the date upon which this consent becomes effective, refer to Section 4.20 of the Environmental Planning and Assessment Act, 1979. Generally the consent becomes effective from the determination date shown on the front of this notice. However if unsure applicants should rely on their own enquiries.
n) To confirm the likelihood of consent lapsing, refer to Section 4.53 of the Act. Generally consent lapses if the development is not commenced within five years of the date of approval. However if a lesser period is stated in the conditions of consent, the lesser period applies. If unsure applicants should rely on their own enquiries.
o) In accordance with Section 8.8 and 8.10 of the Environmental Planning and Assessment
Act 1979, an objector who is dissatisfied with the determination of a consent authority to grant consent to a development application for designated development (including designated development that is integrated development), may, within 28 days after the date on which the application is taken to have been determined, appeal to the Land and Environment Court.
p) The approval of this application does not imply or infer compliance with the Disability
Discrimination Act and that the developer should investigate their liability under the Act. q) The requirements of all authorities including the Environmental Protection Authority and the
Work Cover Authority shall be met in regards to the operation of the building.
LIVERPOOL CITY COUNCIL
LOCAL PLANNING PANEL REPORT
30 September 2019
122
r) “DIAL BEFORE YOU DIG”
Underground assets may exist in the area that is subject to your application. In the interest of health and safety and in order to protect damage to third party assets please contact Dial before you dig at www.1100.com.au or telephone 1100 before excavating or erecting structures (This is the law in NSW). If alterations are required to the configuration, size, form or design of the development upon contact the Dial before You Dig service, an amendment to the development consent (or a new development application) may be necessary. Individuals owe asset owners a duty of care that must be observed when working in the vicinity of plant or assets. It is the individual’s responsibility to anticipate and request the nominal location of plant or assets on the relevant property via contacting the Dial before you dig service in advance of any construction or planning activities.
s) TELECOMMUNICATIONS ACT 1997 (COMMONWEALTH)
Telstra (and its authorised contractors) are the only companies that are permitted to conduct works on Telstra’s network and assets. Any person interfering with a facility or installation owned by Telstra is committing an offence under the Criminal Code Act 1995 (Cth) and is liable for prosecution. Furthermore, damage to Telstra’s infrastructure may result in interruption to the provision of essential services and significant costs. If you are aware of any works or proposed works which may affect or impact on Telstra’s assets in any way, you are required to contact: Telstra’s Network Integrity Team on Phone Number 1800 810 443.
t) The Liverpool City Council Local Government area soils and ground water may be subject
to varying levels of Salinity. Whilst Council may require applicants to obtain Salinity reports relating to some developments, no assessment may be made by Council in that regard. Soil and ground water salinity levels can change over time due to varying factors. It is recommended that all applicants make their own independent inquiries as to appropriate protection against the current and future potential affect of Salinity to ensure the ongoing structural integrity of any work undertaken. Liverpool City Council will not accept any liability for damage occurring to any construction of any type affected by soil and or ground water Salinity.
u) The cost of any necessary adjustments to utility mains and services shall be borne by the
applicant.
v) Care shall be taken by the applicant and the applicant’s agents to prevent any damage to adjoining properties. The applicant or applicant’s agents may be liable to pay compensation to any adjoining owner if, due to construction works, damage is caused to such an adjoining property.
Recommended