MILLBURN SCHOOL DISTRICT 24

SUMMER PROJECTS 2014

MILLBURN MIDDLE SCHOOL

Landscaping

New LED Lighting at Rear of Building

Damaged Tile

Tile after Repair

Fountain before Cleaning

Finished Product

Replaced Filters, Installed Motors in HVAC Units

Repaired Gate

Replaced Ballasts in Lights

Replaced Playground Mulch

New Chairs in Media Center

MILLBURN ELEMENTARY SCHOOL

Landscaping

Replaced Playground Mulch

Painting

Classroom Renovation Carpet & Paint

Painting before Installing Markerboards to Replace Chalkboards

Stripping Floors

Stripped and Ready for Wax

Replaced Counter

Welding at Both Buildings

New Chairs in Media Center

2014 SUMMER PROJECT UPDATE ‐ OCTOBER 2014 SCHOOL COMPLETEDReplace Parking Lot Signage & Posts Both YESDetermine which light fixtures/Ballasts need to be replaced  Both YESInstall classroom projectors in classrooms for new teachers Both YESInstallation of upgraded Technology Switches Both YESReplace bulbs with more energy efficient bulbs ‐ classrooms/hallways ‐ use light meter Both NORepaint Offices ‐ District Labor Both YESRepair/replace window screens Both YESConduct Garage Sale ‐ excess/outdated equipment (e.g. old overhead projectors, TV's, carts) Both NOClean & organize storage areas Both YESSidewalk Replacement/Repair ‐ Rear of Building by cafeteria MES NOPour pad for recycling dumpster & install fence enclosure MES NOPainting selected classrooms MES YESExplore pouring concrete spillways for detention/retention ponds MES NOReplace floor tiles on stage in cafeteria ‐ Completed, but need another solution MES NOReplace light covers in west stairwell MES NOInstall handrail/pipe under sidewalk ‐ Northwest Corner Entrance MES NOInstall Security Mirror in front entrance MES NOStrip wax build‐up ‐ Hallways not completed in 2013 MES YESFirst floor classrooms ‐ Strip many years of wax build‐up MES NOHave front parking lot storm sewer drains cleaned MES YESPaint walls on East Gym stage & storage doors MES NORepair ceiling at East Foyer Entrance by Cafeteria ‐ Water damage from sprinkler head MES YESRepair/Paint wood signs and fencing in rear of building MES YESPurchase and install Walk Pads near Chiller MES NOPaint, etc… in selected classrooms ‐ Original Building (1961) MES YESExplore addt'l intercom access for location other than the Office MMS YESPaint Hallways MMS YESRe‐weld lock connections on fire lane gates MMS YESRepair gates to disposal area MMS YESReplace Guardrail by playground MMS NORepair/Re‐build retaining wall by park next to parking lot MMS NORepair/Replace Millburn Middle School Sign / rotten wood MMS NOReplace lighting fixtures at rear of building ‐ look at having one switch MMS YES

2014 SUMMER PROJECT UPDATE ‐ OCTOBER 2014 SCHOOL COMPLETEDReplace light covers Parking lots  MMS NOInstallation of metal switch covers MMS ?Install AED Cabinet near Nurse's Office MMS NOInstallation of 4 electric outlets in LRC MMS YESPaint corridors , stairways, gymnasiums, classrooms as needed MMS YESWaterhog entrance matting 10 2/2 Ft X 27 1/2 Ft. EXIT 12  MMS YESInstall Power Saver light switch in the teacher workrooms/lounge MMS YES

2014 SUMMER ROUTINE MAINTENANCE SCHOOLInspect/Repair man lifts used to change lights, etc Both IN PROCESSMaintenance & Repair of bleachers Both IN PROCESSHVAC ‐ Clean univents/rooftops, power wash coils, lubricate, replace belts, check wiring, & change filters Both YESReplace/Repair restroom stalls Both YESClean roof drains Both YESMaintenance/repair of water faucets, toilets, etc… Both YESClean/sanitize lockers and windows Both YESLandscape clean‐up & re‐seeding of damaged lawn areas Both YESMove selected classrooms and offices Both YESPlayground Repairs (Equipment repairs, rust on stairs, fresh top coat of mulch) Both YESTouch‐up painting Both YESReplace ceiling tile as needed Both YESClean carpets Both YESClean all light covers Both YESLubricate cafeteria table hardware Both YESDishwasher Repair/Maintenance Both YESReplace light bulbs in parking lot Both IN PROCESSInspect/Lubricate/Repair Basketball Backboard Mechanisms & Hoops Both YESWax floors Both YESReplace light fixtures/ballasts as needed  Both YESPaint stair railings as needed MES YESLubricate Operable Walls in the Gymnasiums MMS ?