View
223
Download
3
Category
Preview:
Citation preview
Ministry of Land, Infrastructure, Transport and Tourism
Information for redesign of airspace composition
Yoshimichi HAMAHATAATC division, JCAB
THE EIGHTH MEETING OF THE INFORMAL EAST ASIA AIR TRAFFIC MANAGEMENT COORDINATION GROUP (EATMCG/8)
(Hong Kong, 21-22 May 2015)
Current facility and shape of sectors
S04 S34
S02
S03
S01
S31
T01T02
T03T04T05
T06
T07
T15
T10
T11
T13T12
T24 T09T14
T27
T22 T26
T17
T28
T23
T21
F01
F03
F11
F16F02
F08
F17
F05F06F07
F15
N06
N01
N02
●
●
●
●
Tokyo ACC22 sectors
Naha ACC3 sectors
Fukuoka ACC11 sectors
Sapporo ACC6 sectors
International flight and flying-over are increased. Domestic flight is dependent on the case of GDP. Even if GDP is estimated low, the number of aircrafts will exceed the limit of air traffic control capacity around 2025. The demand may go up rather than this forecast by further promotion of inbound tourism and the growth of LCC.
Demand forecast of air traffic in Japan
* Basic case of GDP is set up based on the economic growth rate which is a target of the Japanese future strategy. (economic growth rate is set up to 1.7% from 2010 to 2017 and 2.0% from 2017 to 2032)* In upper case, economic growth rate is set up 1% higher than basic case. • In lower case, economic growth rate is set up 1% lower than basic case.• The number of IFR flights is that to add military, non-scheduled and cargo flights to those above.
Flying- over
Domestic
International
1,713
2,092
1,666
1,973
1,605
1,834
1,029
1,393
1,671
1,346
1,553
1,285
1,414
838 882
811 826 774 755
1,303 1,208
714
0
200
400
600
800
1,000
1,200
1,400
1,600
1,800
2,000
2,200
1990 2000 2010 2020 2030 2040(FY)
実績値
上位ケース
中位ケース
下位ケース
Medium
Lower
Actual
Actualvalue
Predictedvalue
Reference
Traffic volume (thousand/ year )
Upper case
Actual
Upper case
Middle
Lower
Expectation of Air Traffic Flow Control
・ On the Ground due to flow control : 270 traffics
・ Average of delays : 25 min or over ⇒ flight cancellation will occur
2012年の制御状況
羽田空港
2025年頃の制御想定
・ On the Ground due to flow control : 60 traffics・ Average of delay : 8 min
In 2025, airspace capacity in the current airspace configuration becomes the limit.
TOKYOinternational Airport
2012 Air Traffic Flow Control
Expectation of 2025 Air Traffic Flow Control
西日本低高度
高高度
東日本低高度
We order to respond to an increase in the future traffic demand, conventional and different, to expand the ATC capacity by the airspace divided by altitude. ・ By difference of cruising, climbing, and descending, we raise the treatment capacity of aircraft.・ In the high altitude airspace of low workload, the handling number of aircraft makes to increase.
✓Handling ability of Air Traffic Control was raised by reducing number of aircraft per 1 sector by subdivision of a sector conventionally.✓However, enforcement of subdivision beyond this will increase the time and effort of taking over between sectors. Moreover, the airspace that detour for bad weather or turn order of an aircraft becomes less insufficient, and throughput declines conversely.
Current airspace composition and future airspace divided by altitude
(低高度空域)
(高高度空域)→「巡航」
(低高度空域)→「上昇降下」
(航空路空域)
(航空路空域)→「巡航」
「上昇降下」(航空路空域)
那覇管制部 福岡管制部東京管制部
札幌管制部
★TOKYO OLYMPICS
2022.Apr.2015 2018
2025.Apr.
2,000,000+α
1,900,000
西日本低高度
西日本高高度
東京管制部札幌管制部
【 image of airspace divided by altitude】
【 western JAPAN divided by altitude】
【 Restructure of en-route airspace completed】
Improvement of ATC capacity (measures to expand )
NAHA ACC
TOKYOACC
SAPPOROACC
FUKUOKA ACC
Traffic volume 1,800,000 / year
2020
The introduction of New en-route RADAR data processing system
FUKUOKA UAC
FUKUOKA UAC
KOBE ACCTOKYO ACC
SAPPORO ACC KOBE ACC
TOKYO ACC
Expand capacity and implementation stage
2020.Oct.(or Nov.)
○ Redesigning the current domestic airspace (En-route and ACA)○ Decreasing ATC workload totally and improving ATC operational efficiency.
【Before redesign- En-route and ACA】
(En-route)
(ACA)
(Airport)
【After redesign】
(En-route-Lower)
(consolidated ACA)
(Airport)
(En-route)(En-route) (En-route)
(En-route- Upper)
Restructure of Facilities
2024 - Sapporo ACC↓
Consolidated Terminal Radar Control
2018 - Naha ACC↓
Consolidated Terminal Radar
Control
2018- Kobe ACC (New) Western Lower En-route
2020 - Fukuoka UACUpper En-route
2024- Tokyo ACCEastern Lower En-route
Redesign of Airspace
Change of Domestic Airspace and Facilities
6
Draft of airspace composition in 2025
w53 w52
w51
s55
w43
w48
w44w47
w49
n30
n31
n32
n33
s54
s50 e46
e45
e42e41
n34
n35n36
e39e38
T25s e40
h17
h16
h13
h15
h14
h12
h04
h01
h03
h11
h08
h07
h05
h10
h09
h02
h06
1 FUKUOKA UAC ( Upper Area Sector + Oceanic sector ) ・ EAST area ・・・ 11 sectors (within 4 Oceanic sector) ・ WEST area ・・・ 11 sectors (within 1 Oceanic sector)2 TOKYO ACC ( EAST of JAPAN below FL335 ) ・ North area ・・・ 7 sectors ・ East area ・・・ 8 sectors3 KOBE ACC ( WEST of JAPAN below FL335) ・ WEST area ・・・ 8 sectors ・ SOUTH area ・・・ 3 sectors
~ Number of sectors ~
SAPPORO 6TOKYO 22FUKUOKA 11NAHA 3ATMC ( Oceanic )5 total 47
FUKUOKA 22( within Oceanic 5)TOKYO 15KOBE 1 1
total 4 8
current restructured
Tokyo ACC
Kobe ACC
Fukuoka UAC
【 Shape of Upper Area sectors】
【 Shape of ACC sectors below FL335】
w53 w52
w51
h17
h16
s55
h13
h15
h14
h12
w43w48
w44w47w49
n30
n31
n32
n33
h04
h01
s54
s50
h03
h11
h08h07
h05
h10
h09
h02
h06
e46
e45e42e41
n34
n35n36
e39e38
e40T25s
Draft of airspace composition in 2025
2018 ① Metropolitan airspace around TOKYO and NARITA international airport
will be change. (Preparation for the Tokyo Olympics)
②NAHA ACC will move to KOBE building
(KOBE aeronautical satellite center building)
2018 ~ 2019
Introduce new en-route RADAR data processing system to 4ACC.
2020 TOKYO Olympics & Paralympics
2020 ~ 2022
Redesign of western en-route airspace.
2023 ~ 2025
Redesign of eastern en-route airspace.
2025.April
Redesign of en-route airspace will be completed.