A current or future standard price exists for material 033591-50

Message no. CKPRCH025

Diagnosis

A current or future cost estimate exists.

Procedure

You can set the price of a marked cost estimate through the radio button 'Default Planned Prices' and release it by saving.

Price change document 3000006607 posted

Message no. CKPRCH019

Procedure

You can display the document in the information system for the component Actual Costing/Material Ledger.

Execute function

Other work around is make the error message M8/155 (I suppose) a warning message (this is applicable to a particular user) in OMRM and then run MR21 with that user authorization.CK44 : delete costing run

Recommended